SlideShare a Scribd company logo
1 of 18
Download to read offline
2
3
•
•
4
•
•
•
5
6
7
•
•
8
•
•
•
•
•
•
•
•
9
Implications of census approach Implications of sample approach
• Data collection becomes part of regular business. Staff
may need to take on extra responsibilities
• Initial costs (training and any IT changes) may be high,
but these will generally reduce over time
• All staff to be trained initially
• Staff ownership – should be seen as business as usual
• Continuity – High chance of continuity
• Robustness – more robust for trend analysis
• Data management can be overwhelming at the
beginning, but should become easier over time as
process is embedded into operations
• Project management should be smoother and become
easier over time as this process becomes business as
usual. Only small changes may be needed over time
• The effectiveness of a census approach is high as data
collection and processes are business as usual
• Separate time allocation for data collection which can be
inefficient.
• Generally each sample data collection approach will
cost the same over time.
• Only a few staff to be trained – loss of these staff may
require further training in the future
• Staff ownership – may be seen as separate activity and
therefore less ownership taken
• Continuity – easier to stop
• Robustness – Less robust for trend analysis
• Data management may be easier with smaller amounts
of data
• Project management can be difficult it requires effective
resource allocation and constant attention.
• The effectiveness of a sample approach may be low to
moderate as the data collection is a separate activity
10
•
•
11
•
•
•
•
12
13
•
•
•
•
•
•
14
15
•
•
16
17
•
•
•
•
18

More Related Content

What's hot

Cheapest User Stories - The Achilles Heel of Agile
Cheapest User Stories - The Achilles Heel of Agile Cheapest User Stories - The Achilles Heel of Agile
Cheapest User Stories - The Achilles Heel of Agile Anton Oosthuizen
 
Infrastructure services business issues and possible solutions
Infrastructure services business issues and possible solutionsInfrastructure services business issues and possible solutions
Infrastructure services business issues and possible solutionsBrijesh Ghodasara
 
Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)Sónia
 
Visual stream mapping
Visual stream mappingVisual stream mapping
Visual stream mappingsaurabhshri
 
Kanban - Establish a Delivery Rhythm
Kanban - Establish a Delivery RhythmKanban - Establish a Delivery Rhythm
Kanban - Establish a Delivery RhythmAvarteq
 
Reliability Maintenance Engineering 2 - 1 Concepts and Software
Reliability Maintenance Engineering 2 - 1 Concepts and SoftwareReliability Maintenance Engineering 2 - 1 Concepts and Software
Reliability Maintenance Engineering 2 - 1 Concepts and SoftwareAccendo Reliability
 
Comp10 unit10 lecture_slides
Comp10 unit10 lecture_slidesComp10 unit10 lecture_slides
Comp10 unit10 lecture_slidesCMDLMS
 
Workforce Management & BPM Integration
Workforce Management & BPM IntegrationWorkforce Management & BPM Integration
Workforce Management & BPM IntegrationNathaniel Palmer
 
Kanban: The Dilemma of an Agile Manager
Kanban: The Dilemma of an Agile ManagerKanban: The Dilemma of an Agile Manager
Kanban: The Dilemma of an Agile ManagerAvarteq
 
Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...
Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...
Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...SchoolDude
 
Erp Implementation Project Planning
Erp Implementation Project PlanningErp Implementation Project Planning
Erp Implementation Project PlanningDarshan Ambhaikar
 
Best Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationBest Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationSynerion North America Inc.
 
managed_print_services_the_next_leap_forward
managed_print_services_the_next_leap_forwardmanaged_print_services_the_next_leap_forward
managed_print_services_the_next_leap_forwardSimon Walshaw
 
SAFe Variability
SAFe VariabilitySAFe Variability
SAFe VariabilityPranab Das
 
Supply Chain in Maintenance
Supply Chain in MaintenanceSupply Chain in Maintenance
Supply Chain in MaintenanceMohamed A Hakim
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...robgirvan
 

What's hot (20)

Cheapest User Stories - The Achilles Heel of Agile
Cheapest User Stories - The Achilles Heel of Agile Cheapest User Stories - The Achilles Heel of Agile
Cheapest User Stories - The Achilles Heel of Agile
 
Infrastructure services business issues and possible solutions
Infrastructure services business issues and possible solutionsInfrastructure services business issues and possible solutions
Infrastructure services business issues and possible solutions
 
ERP Implementation
ERP ImplementationERP Implementation
ERP Implementation
 
Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)
 
Test terry upload
Test terry uploadTest terry upload
Test terry upload
 
BCI & Plan B DR best practice presentation 110914
BCI &  Plan B DR best practice presentation 110914BCI &  Plan B DR best practice presentation 110914
BCI & Plan B DR best practice presentation 110914
 
Visual stream mapping
Visual stream mappingVisual stream mapping
Visual stream mapping
 
Kanban - Establish a Delivery Rhythm
Kanban - Establish a Delivery RhythmKanban - Establish a Delivery Rhythm
Kanban - Establish a Delivery Rhythm
 
Reliability Maintenance Engineering 2 - 1 Concepts and Software
Reliability Maintenance Engineering 2 - 1 Concepts and SoftwareReliability Maintenance Engineering 2 - 1 Concepts and Software
Reliability Maintenance Engineering 2 - 1 Concepts and Software
 
Comp10 unit10 lecture_slides
Comp10 unit10 lecture_slidesComp10 unit10 lecture_slides
Comp10 unit10 lecture_slides
 
Workforce Management & BPM Integration
Workforce Management & BPM IntegrationWorkforce Management & BPM Integration
Workforce Management & BPM Integration
 
Kanban: The Dilemma of an Agile Manager
Kanban: The Dilemma of an Agile ManagerKanban: The Dilemma of an Agile Manager
Kanban: The Dilemma of an Agile Manager
 
Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...
Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...
Key Performance Indicators for Facility Operations (from ASBO MD & DC Savings...
 
Erp Implementation Project Planning
Erp Implementation Project PlanningErp Implementation Project Planning
Erp Implementation Project Planning
 
Process mapping overview
Process mapping overviewProcess mapping overview
Process mapping overview
 
Best Practices - Project Management & Implementation
Best Practices - Project Management & ImplementationBest Practices - Project Management & Implementation
Best Practices - Project Management & Implementation
 
managed_print_services_the_next_leap_forward
managed_print_services_the_next_leap_forwardmanaged_print_services_the_next_leap_forward
managed_print_services_the_next_leap_forward
 
SAFe Variability
SAFe VariabilitySAFe Variability
SAFe Variability
 
Supply Chain in Maintenance
Supply Chain in MaintenanceSupply Chain in Maintenance
Supply Chain in Maintenance
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...
 

Similar to Planning stage 1 v3

Business presentation jit
Business presentation jitBusiness presentation jit
Business presentation jitosegura2475
 
Kanban like another approach for gaming projects, Катерина Гаськова
Kanban like another approach for gaming projects, Катерина ГаськоваKanban like another approach for gaming projects, Катерина Гаськова
Kanban like another approach for gaming projects, Катерина ГаськоваSigma Software
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurementAndrew Lengkong
 
Virtusa_Presentation.pptx
Virtusa_Presentation.pptxVirtusa_Presentation.pptx
Virtusa_Presentation.pptxManujaVidunuwan
 
Performance Assurance for Packaged Applications
Performance Assurance for Packaged ApplicationsPerformance Assurance for Packaged Applications
Performance Assurance for Packaged ApplicationsAlexander Podelko
 
Azuma Trading Ordering System
Azuma Trading Ordering SystemAzuma Trading Ordering System
Azuma Trading Ordering SystemNadzarul Afizan
 
Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...
Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...
Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...Datavail
 
Service operation management 4
Service operation management 4Service operation management 4
Service operation management 4Judianto Nugroho
 
Top Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practicesTop Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practicesMike Kavis
 
Group 2 six myths of product development final
Group 2 six myths of product development finalGroup 2 six myths of product development final
Group 2 six myths of product development finalCRISIL Limited
 
Project Fusion Engagement Kick-Off
Project Fusion Engagement Kick-OffProject Fusion Engagement Kick-Off
Project Fusion Engagement Kick-OffRalph Hatem
 
Project fusion engagement kick off
Project fusion engagement kick offProject fusion engagement kick off
Project fusion engagement kick offmaxalus
 
Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?Integrify
 
Telecom Services Provider Assessment
Telecom Services Provider AssessmentTelecom Services Provider Assessment
Telecom Services Provider AssessmentSourcing Sage
 
Observability – the good, the bad, and the ugly
Observability – the good, the bad, and the uglyObservability – the good, the bad, and the ugly
Observability – the good, the bad, and the uglyTimetrix
 
Geek Sync I Agile Data Management vs. Agile Data Modeling
Geek Sync I Agile Data Management vs. Agile Data ModelingGeek Sync I Agile Data Management vs. Agile Data Modeling
Geek Sync I Agile Data Management vs. Agile Data ModelingIDERA Software
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxFaith Youngsville, NC
 
DSS Case on Planpower
DSS Case on PlanpowerDSS Case on Planpower
DSS Case on PlanpowerSubhasis Maji
 

Similar to Planning stage 1 v3 (20)

Lean operations presentation
Lean operations   presentationLean operations   presentation
Lean operations presentation
 
Business presentation jit
Business presentation jitBusiness presentation jit
Business presentation jit
 
Kanban like another approach for gaming projects, Катерина Гаськова
Kanban like another approach for gaming projects, Катерина ГаськоваKanban like another approach for gaming projects, Катерина Гаськова
Kanban like another approach for gaming projects, Катерина Гаськова
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurement
 
Virtusa_Presentation.pptx
Virtusa_Presentation.pptxVirtusa_Presentation.pptx
Virtusa_Presentation.pptx
 
Performance Assurance for Packaged Applications
Performance Assurance for Packaged ApplicationsPerformance Assurance for Packaged Applications
Performance Assurance for Packaged Applications
 
Azuma Trading Ordering System
Azuma Trading Ordering SystemAzuma Trading Ordering System
Azuma Trading Ordering System
 
Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...
Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...
Collaborate 2018: Optimizing Your Robust Oracle EBS Footprint for Radical Eff...
 
Service operation management 4
Service operation management 4Service operation management 4
Service operation management 4
 
Top Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practicesTop Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practices
 
Group 2 six myths of product development final
Group 2 six myths of product development finalGroup 2 six myths of product development final
Group 2 six myths of product development final
 
Project Fusion Engagement Kick-Off
Project Fusion Engagement Kick-OffProject Fusion Engagement Kick-Off
Project Fusion Engagement Kick-Off
 
Project fusion engagement kick off
Project fusion engagement kick offProject fusion engagement kick off
Project fusion engagement kick off
 
Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?Why Workflow Automation and Why Now?
Why Workflow Automation and Why Now?
 
Telecom Services Provider Assessment
Telecom Services Provider AssessmentTelecom Services Provider Assessment
Telecom Services Provider Assessment
 
Observability – the good, the bad, and the ugly
Observability – the good, the bad, and the uglyObservability – the good, the bad, and the ugly
Observability – the good, the bad, and the ugly
 
Geek Sync I Agile Data Management vs. Agile Data Modeling
Geek Sync I Agile Data Management vs. Agile Data ModelingGeek Sync I Agile Data Management vs. Agile Data Modeling
Geek Sync I Agile Data Management vs. Agile Data Modeling
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptx
 
DSS Case on Planpower
DSS Case on PlanpowerDSS Case on Planpower
DSS Case on Planpower
 
Method Study
Method Study Method Study
Method Study
 

More from opportunityspm

Training material data validation and internal audit
Training material   data validation and internal auditTraining material   data validation and internal audit
Training material data validation and internal auditopportunityspm
 
Training material data collection
Training material   data collectionTraining material   data collection
Training material data collectionopportunityspm
 
Planning phase 2 designing data collection tools and processes
Planning phase 2   designing data collection tools and processesPlanning phase 2   designing data collection tools and processes
Planning phase 2 designing data collection tools and processesopportunityspm
 
Planning phase 2 designing data collection tools and processes
Planning phase 2   designing data collection tools and processesPlanning phase 2   designing data collection tools and processes
Planning phase 2 designing data collection tools and processesopportunityspm
 
1 a3 how to guide-ad mar 11
1 a3 how to guide-ad mar 111 a3 how to guide-ad mar 11
1 a3 how to guide-ad mar 11opportunityspm
 
1 a2 how to guide apr 1
1 a2 how to guide apr 11 a2 how to guide apr 1
1 a2 how to guide apr 1opportunityspm
 

More from opportunityspm (9)

Training material data validation and internal audit
Training material   data validation and internal auditTraining material   data validation and internal audit
Training material data validation and internal audit
 
Training material data collection
Training material   data collectionTraining material   data collection
Training material data collection
 
Planning phase 2 designing data collection tools and processes
Planning phase 2   designing data collection tools and processesPlanning phase 2   designing data collection tools and processes
Planning phase 2 designing data collection tools and processes
 
Planning phase 2 designing data collection tools and processes
Planning phase 2   designing data collection tools and processesPlanning phase 2   designing data collection tools and processes
Planning phase 2 designing data collection tools and processes
 
1 a3 how to guide-ad mar 11
1 a3 how to guide-ad mar 111 a3 how to guide-ad mar 11
1 a3 how to guide-ad mar 11
 
1 a2 how to guide apr 1
1 a2 how to guide apr 11 a2 how to guide apr 1
1 a2 how to guide apr 1
 
1 a1 how to guide v2
1 a1 how to guide v21 a1 how to guide v2
1 a1 how to guide v2
 
Planning stage 1 v3
Planning stage 1   v3Planning stage 1   v3
Planning stage 1 v3
 
Planning stage 1 v3
Planning stage 1   v3Planning stage 1   v3
Planning stage 1 v3
 

Planning stage 1 v3

  • 1.
  • 2. 2
  • 5. 5
  • 6. 6
  • 9. 9 Implications of census approach Implications of sample approach • Data collection becomes part of regular business. Staff may need to take on extra responsibilities • Initial costs (training and any IT changes) may be high, but these will generally reduce over time • All staff to be trained initially • Staff ownership – should be seen as business as usual • Continuity – High chance of continuity • Robustness – more robust for trend analysis • Data management can be overwhelming at the beginning, but should become easier over time as process is embedded into operations • Project management should be smoother and become easier over time as this process becomes business as usual. Only small changes may be needed over time • The effectiveness of a census approach is high as data collection and processes are business as usual • Separate time allocation for data collection which can be inefficient. • Generally each sample data collection approach will cost the same over time. • Only a few staff to be trained – loss of these staff may require further training in the future • Staff ownership – may be seen as separate activity and therefore less ownership taken • Continuity – easier to stop • Robustness – Less robust for trend analysis • Data management may be easier with smaller amounts of data • Project management can be difficult it requires effective resource allocation and constant attention. • The effectiveness of a sample approach may be low to moderate as the data collection is a separate activity
  • 12. 12
  • 14. 14
  • 16. 16
  • 17. 17