This presentation was given by SPA Vijayawada for "Samavesh" - XVl Annual NOSPlan Convention. The Theme of Presentation - "Accessibility in Peri-urban area" case study of Vijayawada Zonal Development Plan".
Development Plan- Planning Intervention by School of Planning and Architecture (SPA Vijayawada)
1. • DEVELOPMENT PLAN: ACCESSIBILITY TO PERI-URBAN AREAS
(Zonal Development Plan Vijayawada)
Presentation By
School of Planning and Architecture, Vijayawada
2. Master Plan Provision
Zonal Development Plan
Vijayawada
Contents
1) Zonal Development Plan
2) Vijayawada and Peri-urban Area
3) Case study
4) Public transportation
5) Problems and Proposal
Submitted By:- School of Planning and Architecture, Vijayawada
3. Zonal Development Plan
1 KM
Gollapudi Zone
Vijayawada Zone
Kanuru Zone
Andhra Pradesh Urban Areas
(Development) Act,1975
Vijayawada Guntur Tenali
Mangalgiri Urban Development
Authority (VGTM UDA)
Zonal Development Plan
(2004-2024)
Land-use plans for peri-urban
area and development area. Source:- Google earth image and ZDP Vijayawada, Kanuru and Gollapudi
Year 2001 2010 2021 2025
Population (In Thousand) 845 1438 1640 2545
Source:- VGTM UDA ZDP, Global Cities of Future (Mckinsey 2010)
4. Vijayawada Settlement growth and Peri-urban area
Map Not to Scale
Source:- Google earth image and ZDP Vijayawada, Kanuru and Gollapudi
• The inmigration to the
city (VMC) has
suddenly declined to 2%
of cities population in
1991-2001
• 1971-81 (12%)
• 1981-1991 (17%)
Late 1850’s
1890’s
1920’s
1960’s
1980’s
2001-
Railway line
Canal
N
Kanuru
Gollapudi
5. Case Study: Kanuru
• Improper monitoring of Land-use
0
0.5
1
1.5
2
2.5
3
3.5
4
Primary
Healthcare
center
Recrational
area
Public utilities
offices
Educational
Institute
Market
Kanuru
(Distance traveled)
• No PHC Planned for population of 60000
• 73 % Population is literate (as per 2001 Census),Highest
education level is High-school (45%).
• 76 % HH has income of Rs. 2000-5000.
• 28 % people use cycle as mode of transport.
49%
24%
27%
30%
2%
68%
KANURU OCCUPATION PATTERN
Primary Secondary Tertiary
Source:- Primary Survey 2012
Source:- Google map ( Timeline 2007 and 2014)
1991
2001
Year 2007Year 2014
6. Case Study: Gollapudi
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
Primary
Healthcare
center
Recrational
area
Public utilities
offices
Educational
Institute
Market
Gollapudi
(Distance traveled)
• 52 % Population is literate (as per 2001 Census), Highest
education level is Highschool (45%).
• 69 % HH has income of Rs. 2000-5000.
• 34 % people use cycle as mode of transport. • Improper monitoring of Land-use.
• No public utilities office in area.
69%
8%
23%
57%
4%
39%
GOLLAPUDI OCCUPATION PATTERN
Primary Secondary Tertiary
Source:- Primary Survey 2012
Source:- Google map ( Timeline 2007 and 2014)
1991
2001
Year 2007Year 2014
7. Connectivity with Public Transport
Peri-urban areas are well
connected with public
transportation but frequency of
buses varies.
Bus Route
APSRTC Buses has good connectivity with Vijayawada and its Peri- Urban area.
Bus stop Coverage
Major Activity
Centre Kamayathopu Bustop, Kanuru
Kanuru Bustop, Kanuru
Bustop, near Kanuru Lake
8. Problems and Proposal
• Both case study area has change in occupation pattern. More people working in tertiary sector.
• More than 50% mode of transport in both case study area is NMT.
• No preference was given to cyclist or walking person. Infrastructure related to public
transportation is in poor condition in peri-urban areas.
• Because of zonal development plan, focus was given to
peri-urban area too.
• Public transportation has good connectivity for city and
peri-urban area but has problem related to frequency in
some areas.
• Desire pattern of motorized goods vehicle consist 51%
share of External to External (2001 primary survey), need of
outer ring road connecting other peri-urban areas and
avoiding major urban areas like Vijayawada, Guntur in
Region.
• Goods traffic cause delays in peak hours on arterial and
sub arterial roads.
Source:- Andhra nation, wordpress.