This document outlines the transportation of several large ODC tanks from a factory approximately 400 km away to the port of Mundra, India for loading onto the vessel MV Frida Scan. It describes obtaining necessary permissions and completing a route survey. Details are provided on the dimensions and weights of 6 ODC tanks to be moved from the factory to the port and loaded onto the ship.
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
Odc tank project bdq to za
1. ODC TANK Project
Scope Of Work
Transportation from Factory to Mundra Approx. 400 Km .
Rout Survey , GEB and Forest Department Permissions etc.
Loading on to Vessel MV Frida Scan .