  1. 1. SOME PICTURES OF PROJECTS YASHAR POURANG INVOLVED
  2. 2. Tenandra Irrigation Scheme Macquarie Valley, NSW June 2012-Present
  3. 3. Tenandra Irrigation Scheme - Macquarie Valley, NSW Bulk earthworks, Cut and overcut
  4. 4. Tenandra Irrigation Scheme - Macquarie Valley, NSW Bulk earthworks, Cut and overcut, adding water to get the optimum moisture
  5. 5. Tenandra Irrigation Scheme - Macquarie Valley, NSW Trimming Batters, Nuclear Density meter and compaction test
  6. 6. Tenandra Irrigation Scheme - Macquarie Valley, NSW Nuclear Density meter and compaction test Permeability tests
  7. 7. Tenandra Irrigation Scheme - Macquarie Valley, NSW Concrete pipes laying & installing headwalls
  8. 8. Tenandra Irrigation Scheme - Macquarie Valley, NSW Installing double barrel headwalls
  9. 9. Tenandra Irrigation Scheme - Macquarie Valley, NSW Traffic control and Detour road to install 1800mm road crossing pipes
  10. 10. Tanavob General Contractor (TGC) Earthworks, drainage, concreting and foundation 2008-2011
  11. 11. Tanavob General Contractor (TGC) Bulk earthworks and excavation; totally: 170,000 m³
  12. 12. Tanavob General Contractor (TGC) Drainage System to control and conduct underground water, before commencing construction of Foundation
  13. 13. Tanavob General Contractor (TGC) Completed Drainage System; 2000 m²
  14. 14. Tanavob General Contractor (TGC) Cleaning concrete and construction of Foundation (Reinforcement and Frame works)
  15. 15. Tanavob General Contractor (TGC) Construction of Foundation (Reinforcement and Frame works) and commencing of concreting
  16. 16. Tanavob General Contractor (TGC) Construction of Foundation , concreting
  17. 17. Tanavob General Contractor (TGC) Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system, Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month
  18. 18. Tanavob General Contractor (TGC) Roads and Pavement 2008-2011 Primary excavation and earthworks
  19. 19. Tanavob General Contractor (TGC) Embankment, road bases and sub-bases, Side walk, pavements and drainage
  20. 20. Tanavob General Contractor (TGC) Embankment, road bases and sub-bases, Side walk, pavements
  21. 21. Tanavob General Contractor (TGC) Completion of project involves: Dual layer Asphalt & Spraying (17,000 m³) Earthworks, excavation and embankment (120,000 m³) Pavement and Sidewalks ( 4,000 m²)
  22. 22. Tanavob General Contractor (TGC) Roads and Pavement Satellite pictures of the project (by Google Earth); before commencing the project and 6 month after
  23. 23. Tanavob General Contractor (TGC) Roads and Pavement Satellite pictures of the project (by Google Earth); 6 month after commencing the project
  24. 24. Tanavob General Contractor (TGC) Construction of a 2800 m² Car park
  25. 25. Tanavob General Contractor (TGC) Concrete Structures and Landscaping
  26. 26. Tanavob General Contractor (TGC) Setting out the foundation and center of columns Foundation and Columns , Embankments
  27. 27. Tanavob General Contractor (TGC) Reinforcements of columns Concrete structure, landscaping and stone works
  28. 28. Persian Gulf Oil Company Bulk earth work and Oil tank construction 2007-2008 Excavation
  29. 29. Persian Gulf Oil Company Bulk earth work and Oil tank construction Embankment and leveling
  30. 30. Persian Gulf Oil Company Bulk earth work and Oil tank construction Drainage and compaction
  31. 31. Persian Gulf Oil Company Bulk earth work and Oil tank construction Welded above-ground oil tank construction
  32. 32. Persian Gulf Oil Company Bulk earth work and Oil tank construction Satellite pictures of the project (by Google Earth) June 2007 ~ September 2008
  33. 33. AAC Group 2004-2007 Construction of 52 piles , 24 meter depth each to increase bearing capacity of the soil
  34. 34. AAC Group 2004-2007 Construction of two 16-floor & two 9-floor residential towers Forming of columns and floors
  35. 35. AAC Group On-site concrete batching plant & tower cranes
  36. 36. AAC Group Earthwork and excavation, early 2004 Satellite pictures of the project (by Google Earth) General site view, late 2006

×