      16 |Feature Project Management Software                                                                                                        Projects Info | 12 - 18 July | 2010




        Where the control should lie




     Project management requires management and propagation of the right information at the right
     time in the lifecycle of a project life cycle. Lack of coordination and fragmented information can lead
     to delays in decision making which further slows down the mobilisation of resources and projects.
     There are software packages to the rescue. Purva Khole writes.

      P
            roject managers often        The consequences are high          ers for which facility manage-       along with the capability of the       ment tools, learning curve and
            do not have the tools or     project failure rates and very     ment and the need to obtain          PM software that is required.          resource loading features as
            the training for track-      inefficient use of the company’s   and maintain a large amount          At this stage, a software tool         well as detailed performance
      ing actual performance versus      financial and human resourc-       of information on the build-         that simulates the project and         tracking.
      plan, optimise their schedule      es.                                ing for repairs, renovations and     the ones that reschedule and
      or make efficient use of their        Along with the information      emergencies. The construction        optimise it every time there is        Available options
      resources. They are regularly      management, development            industry is becoming a plat-         a change is required. Budget              Players in the architecture,
      surprised by problems that a       of design systems is becom-        form that provides collabora-        is now an important issue in           engineering and construc-
      bit of data would help them        ing an increasingly complicat-     tive project management, inte-       planning and tracking. At this         tion (AEC) industry made an
      anticipate. They are unable to     ed challenge for architecture,     grated design environment and        point, software that gives the         attempt to implement Product
      provide decision-making data       landscape and interior design-     real-time facility management.       capability to budget and sched-        Lifecycle Management (PLM),
      to executives on ways to finish    ers for space utilisation, usage   “The concept of project man-         ule internal employees as well         but there havent been where
      the project early or the cost of   of advanced materials. Many        agement is to ensure that there      as external consultants along          PLM has been successful. PLM
      changes the executives want to     builders retain properties and     is a higher chance of repeat-        with vendors, equipment and            tools like Enovia of Dassault
      make. As a result, the project     lease them out rather than         able and predictable results. By     travel expenses is required.           Systems have been tried for the
      can be guided by guesswork.        transferring ownership to buy-     definition, a project is a unique    The software needs to provide          AEC industry. But it is quite
                                                                            endeavour” says Raj Kalady,          more sophisticated earned val-         unlikely that these will make
                                                                            MD, Project Management               ue reporting, slack and delay          their way to capture the AEC
                                                                            Institute (India).                   reports for fine tuning as well        market as they have matured
                                                                                                                 as the usual critical path and         with inputs from auto and
                                                                            Managing projects                    resource level capability.             aero industries, and thus have
                                                                              Smaller Projects: Typically,          Multi-project Environment:          workflows that are suited for
                                                                            for smaller projects, project        At this level, managers are            these industries. In the global
                                                                            managers plan and schedule           managing multiple projects or          construction industry Building
                                                                            with only durations rather than      operating in a mature project          Information Modelling (BIM)
                                                                            work estimates and resource          organisation where resource            is used.
                                                                            capacity. Due to the size of these   utilisation is managed across             In the US, almost ten years
                                                                            projects, Project Managers do        all projects and there are exec-       ago, there were many BIM-
                                                                            not really have to track a project   utives with accountability for         oriented initiatives that were
                                                                            budget because status reports        portfolios of projects. At this        spearheaded by governmen-
                                                                            are limited to completion date       point, it is required to consoli-      tal agencies like National
                                                                            tracking. In such cases, there       date multiple projects and pro-        Institute of Building Sciences,
                                                                            are many options that will meet      vide consistent information so         universities and AEC software
                                                                            these limited needs with Gantt       decision makers can prioritise         companies like Autodesk and
                                                                            and PERT charts. At this level       projects, allocate resources and       Graphisoft. BIM is not limited
                                                                            where the automation process         schedule and track a pool of           upto 3D, it is also used as 4D
                                                                            of laying out plans, preparing       people working on multiple             and is extended to 5D model-
                                                                            occasional status reports and        projects. Organisation process-        ling. BIM architecture provide
                                                                            producing some simple Gantt          es for portfolio management            a virtual building development
                                                                            and PERT charts, the low end         and software that can identify         platform where the 3D build-
                                                                            PM software tools cater to the       conflicting demands for the            ing design is integrated on the
                                                                            needs.                               same resources as well as allow        schedule of the project with
                                                                              Larger Projects: As the scale of   the executives to set priorities       time being the fourth dimen-
                                                                            projects grows and their impact      among projects that require            sion and cost being the fifth.
                                                                            reaches beyond one functional        the same resource are required.        The 3D model in itself contains
                                                                            unit, the demand on the Project      In this category, users require        data about the design aspect.
                                                                            Manager’s technique grows            sophisticated risk assess-             Additional data is attached to



page 16-17 Feature.indd 2                                                                                                                                                       7/9/2010 9:23:32 PM
CMYK




      12 - 18 July | 2010 | Projects Info                                                   Project Management Software Feature | 17
          "The government should take initiatives in promot-
          ing the role of Project Management through IT"
          Nishant Kumar Dean, Director - Marketing, Glozon Technologies in an interaction
          with Projects Info

        Will PM software work well in       operate through IT. The gov-
        industries such as construc-        ernment should take initia-
        tion, whose processes are           tives in promoting the role of
        not necessarily tech-savvy in       Project Management through
        India?                              IT while promoting infrastruc-
           Definitely, it’s not only        ture projects in India.
        about being tech savvy or
        being aware of technology. It       What are the hurdles that you
        is about redefining processes,      are facing currently? Does
        making it more efficient and        cost of the package (instal-
        error-free with efficient utili-    lation and future changes in
        sation of resources and teams       the organisation) deter cus-                                              The consensus
        and developing capabilities         tomers?                             How is the use of technol-         of opinion is that the use of soft-   to a pro-
        to handle more number of               Cost is definitely a deter-      ogy in managing processes          ware solutions is worthwhile          cess-based way of working.
        projects, all in one go. From       rent in making IT an integral       in India different from that       only in the case of projects with
        my experiences I found PM           part of infrastructure proj-        abroad?                            a minimum area of 50,000 sq ft.
        tools/ERPs are always useful        ects in India. However, pro-          Indian process manage-           Individual units of about 10,000
        to enforce standardisation,         viding modular solutions as         ment and their standardi-          sq ft, will not find software solu-     Advantages offered
        efficient working and defining      per client’s requirement, with      sations are different from for-    tions either cost-effective or
        accountability, reducing pro-       reduced costs per module is         eign construction companies        necessary. With regard to task-         • The software is developed
        cessing time, errors in calcula-    working well in Indian con-         - Work force management,           specific tools, AutoCAD seems             to provide project man-
        tion and hence adding value         ditions. We can also focus          material management, supply        to be the most commonly used              agers with time-saving
        to all aspects of construction      on providing small need/            chain processes, target setting    software among architects. This           scheduling and analysis
        management.                         solution based packages and         and deadlines, resource map-       is specifically used for two and          tools as well as archive
                                            retailing of such products on       ping and allocations, adjust-      three-dimensional design and              data for use on future
        With the growth in scope of         lower scales as well (for Rs.       ments and re-targetting are        drafting, it allows customisa-            projects.
        infrastructure projects where       0-100 Crore turnover com-           managed differently in India.      tion and automation and to top          • Scheduling skills include
        do you see the construction         panies). Mostly companies           In India we need more of an        it, it is user-friendly.                  analysis of the critical
        software industry headed?           below a turnover of Rs 100          IT analytical tool to support         Autodesk is useful software            path using slack and
           The construction software        crore do not have a proper          construction project               where the user can make chang-            delay data for optimisa-
        industry has picked up gradu-       IT department or IT infra-                                             es to one document, which                 tion of resources to finish
        ally but the speed is definitely    structure to use such prod-         How do you think you are set       will be automatically reflected           it at the earliest.
        slow. The Indian construction       ucts, cost being a major factor.    to grow by in the next three       in other levels. For example if         • Project software can be
        industry needs to be more           Companies with a turnover of        years?                             changes are made in the floor             used to identify problems
        aware of relevant IT softwares      more than Rs 500 crore rely           As per the Government’s          plan, the elevation, the material         early and model alterna-
        and services. Acceptance and        on big packages like ERPs/          plan of investing Rs 50,000        needed and other parameters               tive solutions quickly. All
        appreciation of IT in man-          SAP and Primeverra. But there       crore by 2012 in infrastructure    automatically get updated. He             of those tasks are best
        aging construction and EPC          is definitely a market of retail    development across India, I        doesn’t have to manually go to            done with project man-
        projects needs to be under-         IT products and small pack-         see a really good opportunity.     each level and make changes.              agement software since
        stood. It is a specific domain      ages to satisfy companies fall-     I believe it is just 10 per cent   Pune- based Bentley Systems               even a small project can
        and needs to have more              ing between Rs 100-500 crore        value of total market available    provides Staad.Pro which is               waste a considerable
        industry experts come up and        turnover in the country.            for IT in such huge plans.         construction software that is             amount of a PM’s time
                                                                                                                   used for total design needs.              if those tasks are done
                                                                                                                      Architects adapt 2D and 3D             manually.
      the 3D model that helps inte-         and ArchiCAD. In India too,         India. Asta Power Project is       CAD for making layouts and              • The value of an archive
      grate workflows across all stages     BIM has started picking up with     professional project manage-       plans of which 3D CAD has                 is that it makes future
      of the building lifecycle, start-     the presence of global BIM soft-    ment software designed to plan     grown very popular for inte-              estimates much easier
      ing from planning. A major-           ware companies. The influx of       and deliver construction proj-     rior designs and walkthroughs             and much more accu-
      ity of large-scale construction       multinational companies will        ects on time and within budget.    simulation and visualisation.             rate. With the appropri-
      companies are on a BIM plat-          boost BIM usage as they will        This tool offers a comprehen-      The real challenge in this is to          ate project management
      form using advanced software.         undoubtedly bring in global         sive range of project planning,    prepare business processes and            software, tracking actual
      Autodesk Revit is the global          practices.                          resource and cost management       workflows and implement them              performance in terms
                                               Interactive      Multimedia      features that are both power-      in these tools. So the success of         of hours of work and
                                            Technologies       (IMT)     has    ful and easy to use. Material      investment and implementa-                completion dates builds
         Major Players                      launched a web-based ERP            manufacturing companies can        tion of these strategies depends          a database for estimating
         • Autodesk                         solution eBuild with applica-       also use this software.            on how well people change their           on the next project.
         • Bentley Systems                  tions solely adapted for the real     In the project management        conventional working mindset.
         • Aurigo Software                  estate and construction market.     software, specific parameters
           Technologies                     IMT eBuild can be modularised       cover real estate, civil engi-
         • INS E-Solutions
         • Interactive Multimedia
                                            and each module can be linked
                                            at any time as per customer’s
                                                                                neering, structural engineering
                                                                                and architecture, dealing with
                                                                                                                      Featured companies
           Technologies                     requirement. The software can       areas like blueprints and build-
         • Graphisoft                       be used to carry out functions      ing codes, while the industry       Glozon Technologies
         • Nemetschek                       of release of indent or purchase    shares with others such fields
         • Tekla
         • Construction Computer
                                            order, billing/transactions and
                                            dispatch of material/consign-
                                                                                as accounting, payrolls, human
                                                                                resources and overall project
                                                                                                                    G   lozon Technologies is an ISO 9001:2000 company, led by a team
                                                                                                                        of two IITians with a common goal of networking and database
                                                                                                                    management through innovative ideas and models. The company
           Software                         ment, etc. Material manufac-        management. So then, it is a        develops Esticon which is used for construction and EPC world to
         • Penta                            turing companies can also col-      given that this is a field that     deal with BOQ, definitive and control estimation, status tracking, bid
                                            laborate with real estate and       will benefit vastly from the use    analysis and evaluation, and reconciliation. It can be integrated with
                                            construction companies using        of software solutions. There        ERPs and designed to provide reports to check time cost resource.
      leader followed by Bentley            IMT eBuild as a vendor.             are several software solutions      The software is built on J2EE, compatible with all databases; web-
      microstation V8 XM that is               INS E-Solutions offers Asta’s    for the construction industry.      based, access controlled and automated data backup facilities. The
      being used. Nemetschek is the         software solutions into the con-    Some are suites, incorporat-        company has a strong technical team that is conversant with func-
      BIM leader in the European            struction market in                 ing solutions for many param-       tional areas, solution development and system integration.
      market with Vector Works                                                  eters, like bidding, equipment
                                                                                maintenance, cost monitoring,       Email: marketing@glozon.com
                                                                                change orders and invoicing.        Website: www.glozon.com
                                                                                These solutions vary in terms
                                                                                of complexity, and users have
                                                                                to decide on one or another
                                                                                based on needs. According           Nissi Infotech
                                                                                to Nishant Kumar Dean,
                                                                                Director – Marketing, Glozon        N   issi Infotech is into development of softwares for the infra,
                                                                                                                        road, and construction and logistics companies. The company
                                                                                                                    has an Infraconsoft road and construction management system as
                                                                                Technolgies, “In India we need
                                                                                more of an IT analytical tool to    a solution for infra companies for tracking and managing inven-
                                                                                support construction projects.      tory and tracking of vehicles of multiple branches remotely. This
                                                                                Indian Construction companies       software also has a vehicle and machinery management module
                                                                                have to be made aware about         that offers host of facilities to solve the problem faced by fleet and
                                                                                the available packages made         heavy vehicle owners having multiple branches. This software is a
                                                                                in India exclusively for them       web based; the management can get the reports from anywhere,
                                                                                through their understanding         anytime of their convenience.
                                                                                about the Indian processes and      Email: sales@nissiinfotech.com
                                                                                systems and not rely only on        Website: www.nissiinfotech.com
                                                                                big packages.”



page 16-17 Feature.indd 3                                                                                                                                                         7/9/2010 9:23:34 PM

More Related Content

What's hot

TAPUniversity - Use Case Driven Vendor Selection
TAPUniversity - Use Case Driven Vendor SelectionTAPUniversity - Use Case Driven Vendor Selection
TAPUniversity - Use Case Driven Vendor SelectionDave Kohrell
 
More on Software Project Management
More on Software Project ManagementMore on Software Project Management
More on Software Project ManagementEmanuele Della Valle
 
Is PPM Enough?
Is PPM Enough?Is PPM Enough?
Is PPM Enough?Digite Inc
 
Project Management on one foot
Project Management on one footProject Management on one foot
Project Management on one footAri Davidow
 
thismedia 009
thismedia 009thismedia 009
thismedia 009thismedia
 
Difference between smart and smarter
Difference between smart and smarterDifference between smart and smarter
Difference between smart and smarterDhiren Gala
 
Power, Process & Marine
Power, Process & MarinePower, Process & Marine
Power, Process & MarineTauladan
 
10 tips to manage project portfolio management (ppm) processes
10 tips to manage project portfolio management (ppm) processes10 tips to manage project portfolio management (ppm) processes
10 tips to manage project portfolio management (ppm) processesgianarosetti
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...IRJET Journal
 

What's hot (20)

TAPUniversity - Use Case Driven Vendor Selection
TAPUniversity - Use Case Driven Vendor SelectionTAPUniversity - Use Case Driven Vendor Selection
TAPUniversity - Use Case Driven Vendor Selection
 
More on Software Project Management
More on Software Project ManagementMore on Software Project Management
More on Software Project Management
 
5 pmit
5 pmit5 pmit
5 pmit
 
PARAG DESHMUKH - CV
PARAG DESHMUKH - CVPARAG DESHMUKH - CV
PARAG DESHMUKH - CV
 
Future State for Lean Prod Dev by Ron Mascitelli Ame10.2
Future State for Lean Prod Dev by Ron Mascitelli Ame10.2Future State for Lean Prod Dev by Ron Mascitelli Ame10.2
Future State for Lean Prod Dev by Ron Mascitelli Ame10.2
 
Siemens plm-key ox-industrial-design-cs-z5
Siemens plm-key ox-industrial-design-cs-z5Siemens plm-key ox-industrial-design-cs-z5
Siemens plm-key ox-industrial-design-cs-z5
 
Is PPM Enough?
Is PPM Enough?Is PPM Enough?
Is PPM Enough?
 
Project Management on one foot
Project Management on one footProject Management on one foot
Project Management on one foot
 
R overcash bio
R overcash bioR overcash bio
R overcash bio
 
Agile It 20091020
Agile It 20091020Agile It 20091020
Agile It 20091020
 
E Resume
E ResumeE Resume
E Resume
 
thismedia 009
thismedia 009thismedia 009
thismedia 009
 
2012-10-11 Solutions for Proj Driven Orgs
2012-10-11 Solutions for Proj Driven Orgs2012-10-11 Solutions for Proj Driven Orgs
2012-10-11 Solutions for Proj Driven Orgs
 
Difference between smart and smarter
Difference between smart and smarterDifference between smart and smarter
Difference between smart and smarter
 
Power, Process & Marine
Power, Process & MarinePower, Process & Marine
Power, Process & Marine
 
10 tips to manage project portfolio management (ppm) processes
10 tips to manage project portfolio management (ppm) processes10 tips to manage project portfolio management (ppm) processes
10 tips to manage project portfolio management (ppm) processes
 
Gurtu 2010
Gurtu 2010Gurtu 2010
Gurtu 2010
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
 
Roi Charts
Roi ChartsRoi Charts
Roi Charts
 
2013-03-14 Professional Services Seminar
2013-03-14 Professional Services Seminar2013-03-14 Professional Services Seminar
2013-03-14 Professional Services Seminar
 

Similar to Role of Project Management Through IT for "Construction and EPC World"

907093 Vr Leasing Cs En A4
907093 Vr Leasing Cs En A4907093 Vr Leasing Cs En A4
907093 Vr Leasing Cs En A4Friedel Jonker
 
Exploration Production Portals
Exploration Production Portals Exploration Production Portals
Exploration Production Portals Infosys
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio ManagementDigite Inc
 
70% of GCC Projects not using Collaboration Software
70% of GCC Projects not using Collaboration Software70% of GCC Projects not using Collaboration Software
70% of GCC Projects not using Collaboration SoftwarePhil Auguste
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...Djadja Sardjana
 
PPT_Management of Large and Complex Software Projects
PPT_Management of Large and Complex Software ProjectsPPT_Management of Large and Complex Software Projects
PPT_Management of Large and Complex Software ProjectsSudipta Das
 
Chapter 1(1).pptx
Chapter 1(1).pptxChapter 1(1).pptx
Chapter 1(1).pptxmegzgreat
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
How GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxHow GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxiFieldsmart Technologies
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
alfabet A.G./Whitepaper Planning It
alfabet A.G./Whitepaper Planning Italfabet A.G./Whitepaper Planning It
alfabet A.G./Whitepaper Planning Italfabet A.G.
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and controlJanak Singh Chauhan
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementIRJET Journal
 
A Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementA Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementCrystal Sanchez
 
How GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfHow GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfiFieldsmart Technologies
 
Dr Lango - Lecture Notes Trends in PM.pptx
Dr Lango - Lecture Notes Trends in PM.pptxDr Lango - Lecture Notes Trends in PM.pptx
Dr Lango - Lecture Notes Trends in PM.pptxssuser7f8072
 
Agile Project Manager
Agile Project ManagerAgile Project Manager
Agile Project ManagerYogesh Hubli
 
3.Tools and Techniques of Project Management.pdf
3.Tools and Techniques of Project Management.pdf3.Tools and Techniques of Project Management.pdf
3.Tools and Techniques of Project Management.pdfShoDp
 
Why Adopt Nearshore Agile Development - Ciklum White Paper
Why Adopt Nearshore Agile Development - Ciklum White PaperWhy Adopt Nearshore Agile Development - Ciklum White Paper
Why Adopt Nearshore Agile Development - Ciklum White PaperCiklum Ukraine
 

Similar to Role of Project Management Through IT for "Construction and EPC World" (20)

907093 Vr Leasing Cs En A4
907093 Vr Leasing Cs En A4907093 Vr Leasing Cs En A4
907093 Vr Leasing Cs En A4
 
Exploration Production Portals
Exploration Production Portals Exploration Production Portals
Exploration Production Portals
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
70% of GCC Projects not using Collaboration Software
70% of GCC Projects not using Collaboration Software70% of GCC Projects not using Collaboration Software
70% of GCC Projects not using Collaboration Software
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
 
PPT_Management of Large and Complex Software Projects
PPT_Management of Large and Complex Software ProjectsPPT_Management of Large and Complex Software Projects
PPT_Management of Large and Complex Software Projects
 
Chapter 1(1).pptx
Chapter 1(1).pptxChapter 1(1).pptx
Chapter 1(1).pptx
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
How GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptxHow GCs can diminish onsite risks with preemptive field data-converted.pptx
How GCs can diminish onsite risks with preemptive field data-converted.pptx
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
alfabet A.G./Whitepaper Planning It
alfabet A.G./Whitepaper Planning Italfabet A.G./Whitepaper Planning It
alfabet A.G./Whitepaper Planning It
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project Management
 
A Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementA Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project Management
 
How GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdfHow GCs can diminish onsite risks with preemptive field data.pdf
How GCs can diminish onsite risks with preemptive field data.pdf
 
Dr Lango - Lecture Notes Trends in PM.pptx
Dr Lango - Lecture Notes Trends in PM.pptxDr Lango - Lecture Notes Trends in PM.pptx
Dr Lango - Lecture Notes Trends in PM.pptx
 
Agile Project Manager
Agile Project ManagerAgile Project Manager
Agile Project Manager
 
3.Tools and Techniques of Project Management.pdf
3.Tools and Techniques of Project Management.pdf3.Tools and Techniques of Project Management.pdf
3.Tools and Techniques of Project Management.pdf
 
Why Adopt Nearshore Agile Development - Ciklum White Paper
Why Adopt Nearshore Agile Development - Ciklum White PaperWhy Adopt Nearshore Agile Development - Ciklum White Paper
Why Adopt Nearshore Agile Development - Ciklum White Paper
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio managementJunaidKhan750825
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 

Recently uploaded (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio management
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 

Role of Project Management Through IT for "Construction and EPC World"

  • 1. CMYK 16 |Feature Project Management Software Projects Info | 12 - 18 July | 2010 Where the control should lie Project management requires management and propagation of the right information at the right time in the lifecycle of a project life cycle. Lack of coordination and fragmented information can lead to delays in decision making which further slows down the mobilisation of resources and projects. There are software packages to the rescue. Purva Khole writes. P roject managers often The consequences are high ers for which facility manage- along with the capability of the ment tools, learning curve and do not have the tools or project failure rates and very ment and the need to obtain PM software that is required. resource loading features as the training for track- inefficient use of the company’s and maintain a large amount At this stage, a software tool well as detailed performance ing actual performance versus financial and human resourc- of information on the build- that simulates the project and tracking. plan, optimise their schedule es. ing for repairs, renovations and the ones that reschedule and or make efficient use of their Along with the information emergencies. The construction optimise it every time there is Available options resources. They are regularly management, development industry is becoming a plat- a change is required. Budget Players in the architecture, surprised by problems that a of design systems is becom- form that provides collabora- is now an important issue in engineering and construc- bit of data would help them ing an increasingly complicat- tive project management, inte- planning and tracking. At this tion (AEC) industry made an anticipate. They are unable to ed challenge for architecture, grated design environment and point, software that gives the attempt to implement Product provide decision-making data landscape and interior design- real-time facility management. capability to budget and sched- Lifecycle Management (PLM), to executives on ways to finish ers for space utilisation, usage “The concept of project man- ule internal employees as well but there havent been where the project early or the cost of of advanced materials. Many agement is to ensure that there as external consultants along PLM has been successful. PLM changes the executives want to builders retain properties and is a higher chance of repeat- with vendors, equipment and tools like Enovia of Dassault make. As a result, the project lease them out rather than able and predictable results. By travel expenses is required. Systems have been tried for the can be guided by guesswork. transferring ownership to buy- definition, a project is a unique The software needs to provide AEC industry. But it is quite endeavour” says Raj Kalady, more sophisticated earned val- unlikely that these will make MD, Project Management ue reporting, slack and delay their way to capture the AEC Institute (India). reports for fine tuning as well market as they have matured as the usual critical path and with inputs from auto and Managing projects resource level capability. aero industries, and thus have Smaller Projects: Typically, Multi-project Environment: workflows that are suited for for smaller projects, project At this level, managers are these industries. In the global managers plan and schedule managing multiple projects or construction industry Building with only durations rather than operating in a mature project Information Modelling (BIM) work estimates and resource organisation where resource is used. capacity. Due to the size of these utilisation is managed across In the US, almost ten years projects, Project Managers do all projects and there are exec- ago, there were many BIM- not really have to track a project utives with accountability for oriented initiatives that were budget because status reports portfolios of projects. At this spearheaded by governmen- are limited to completion date point, it is required to consoli- tal agencies like National tracking. In such cases, there date multiple projects and pro- Institute of Building Sciences, are many options that will meet vide consistent information so universities and AEC software these limited needs with Gantt decision makers can prioritise companies like Autodesk and and PERT charts. At this level projects, allocate resources and Graphisoft. BIM is not limited where the automation process schedule and track a pool of upto 3D, it is also used as 4D of laying out plans, preparing people working on multiple and is extended to 5D model- occasional status reports and projects. Organisation process- ling. BIM architecture provide producing some simple Gantt es for portfolio management a virtual building development and PERT charts, the low end and software that can identify platform where the 3D build- PM software tools cater to the conflicting demands for the ing design is integrated on the needs. same resources as well as allow schedule of the project with Larger Projects: As the scale of the executives to set priorities time being the fourth dimen- projects grows and their impact among projects that require sion and cost being the fifth. reaches beyond one functional the same resource are required. The 3D model in itself contains unit, the demand on the Project In this category, users require data about the design aspect. Manager’s technique grows sophisticated risk assess- Additional data is attached to page 16-17 Feature.indd 2 7/9/2010 9:23:32 PM
  • 2. CMYK 12 - 18 July | 2010 | Projects Info Project Management Software Feature | 17 "The government should take initiatives in promot- ing the role of Project Management through IT" Nishant Kumar Dean, Director - Marketing, Glozon Technologies in an interaction with Projects Info Will PM software work well in operate through IT. The gov- industries such as construc- ernment should take initia- tion, whose processes are tives in promoting the role of not necessarily tech-savvy in Project Management through India? IT while promoting infrastruc- Definitely, it’s not only ture projects in India. about being tech savvy or being aware of technology. It What are the hurdles that you is about redefining processes, are facing currently? Does making it more efficient and cost of the package (instal- error-free with efficient utili- lation and future changes in sation of resources and teams the organisation) deter cus- The consensus and developing capabilities tomers? How is the use of technol- of opinion is that the use of soft- to a pro- to handle more number of Cost is definitely a deter- ogy in managing processes ware solutions is worthwhile cess-based way of working. projects, all in one go. From rent in making IT an integral in India different from that only in the case of projects with my experiences I found PM part of infrastructure proj- abroad? a minimum area of 50,000 sq ft. tools/ERPs are always useful ects in India. However, pro- Indian process manage- Individual units of about 10,000 to enforce standardisation, viding modular solutions as ment and their standardi- sq ft, will not find software solu- Advantages offered efficient working and defining per client’s requirement, with sations are different from for- tions either cost-effective or accountability, reducing pro- reduced costs per module is eign construction companies necessary. With regard to task- • The software is developed cessing time, errors in calcula- working well in Indian con- - Work force management, specific tools, AutoCAD seems to provide project man- tion and hence adding value ditions. We can also focus material management, supply to be the most commonly used agers with time-saving to all aspects of construction on providing small need/ chain processes, target setting software among architects. This scheduling and analysis management. solution based packages and and deadlines, resource map- is specifically used for two and tools as well as archive retailing of such products on ping and allocations, adjust- three-dimensional design and data for use on future With the growth in scope of lower scales as well (for Rs. ments and re-targetting are drafting, it allows customisa- projects. infrastructure projects where 0-100 Crore turnover com- managed differently in India. tion and automation and to top • Scheduling skills include do you see the construction panies). Mostly companies In India we need more of an it, it is user-friendly. analysis of the critical software industry headed? below a turnover of Rs 100 IT analytical tool to support Autodesk is useful software path using slack and The construction software crore do not have a proper construction project where the user can make chang- delay data for optimisa- industry has picked up gradu- IT department or IT infra- es to one document, which tion of resources to finish ally but the speed is definitely structure to use such prod- How do you think you are set will be automatically reflected it at the earliest. slow. The Indian construction ucts, cost being a major factor. to grow by in the next three in other levels. For example if • Project software can be industry needs to be more Companies with a turnover of years? changes are made in the floor used to identify problems aware of relevant IT softwares more than Rs 500 crore rely As per the Government’s plan, the elevation, the material early and model alterna- and services. Acceptance and on big packages like ERPs/ plan of investing Rs 50,000 needed and other parameters tive solutions quickly. All appreciation of IT in man- SAP and Primeverra. But there crore by 2012 in infrastructure automatically get updated. He of those tasks are best aging construction and EPC is definitely a market of retail development across India, I doesn’t have to manually go to done with project man- projects needs to be under- IT products and small pack- see a really good opportunity. each level and make changes. agement software since stood. It is a specific domain ages to satisfy companies fall- I believe it is just 10 per cent Pune- based Bentley Systems even a small project can and needs to have more ing between Rs 100-500 crore value of total market available provides Staad.Pro which is waste a considerable industry experts come up and turnover in the country. for IT in such huge plans. construction software that is amount of a PM’s time used for total design needs. if those tasks are done Architects adapt 2D and 3D manually. the 3D model that helps inte- and ArchiCAD. In India too, India. Asta Power Project is CAD for making layouts and • The value of an archive grate workflows across all stages BIM has started picking up with professional project manage- plans of which 3D CAD has is that it makes future of the building lifecycle, start- the presence of global BIM soft- ment software designed to plan grown very popular for inte- estimates much easier ing from planning. A major- ware companies. The influx of and deliver construction proj- rior designs and walkthroughs and much more accu- ity of large-scale construction multinational companies will ects on time and within budget. simulation and visualisation. rate. With the appropri- companies are on a BIM plat- boost BIM usage as they will This tool offers a comprehen- The real challenge in this is to ate project management form using advanced software. undoubtedly bring in global sive range of project planning, prepare business processes and software, tracking actual Autodesk Revit is the global practices. resource and cost management workflows and implement them performance in terms Interactive Multimedia features that are both power- in these tools. So the success of of hours of work and Technologies (IMT) has ful and easy to use. Material investment and implementa- completion dates builds Major Players launched a web-based ERP manufacturing companies can tion of these strategies depends a database for estimating • Autodesk solution eBuild with applica- also use this software. on how well people change their on the next project. • Bentley Systems tions solely adapted for the real In the project management conventional working mindset. • Aurigo Software estate and construction market. software, specific parameters Technologies IMT eBuild can be modularised cover real estate, civil engi- • INS E-Solutions • Interactive Multimedia and each module can be linked at any time as per customer’s neering, structural engineering and architecture, dealing with Featured companies Technologies requirement. The software can areas like blueprints and build- • Graphisoft be used to carry out functions ing codes, while the industry Glozon Technologies • Nemetschek of release of indent or purchase shares with others such fields • Tekla • Construction Computer order, billing/transactions and dispatch of material/consign- as accounting, payrolls, human resources and overall project G lozon Technologies is an ISO 9001:2000 company, led by a team of two IITians with a common goal of networking and database management through innovative ideas and models. The company Software ment, etc. Material manufac- management. So then, it is a develops Esticon which is used for construction and EPC world to • Penta turing companies can also col- given that this is a field that deal with BOQ, definitive and control estimation, status tracking, bid laborate with real estate and will benefit vastly from the use analysis and evaluation, and reconciliation. It can be integrated with construction companies using of software solutions. There ERPs and designed to provide reports to check time cost resource. leader followed by Bentley IMT eBuild as a vendor. are several software solutions The software is built on J2EE, compatible with all databases; web- microstation V8 XM that is INS E-Solutions offers Asta’s for the construction industry. based, access controlled and automated data backup facilities. The being used. Nemetschek is the software solutions into the con- Some are suites, incorporat- company has a strong technical team that is conversant with func- BIM leader in the European struction market in ing solutions for many param- tional areas, solution development and system integration. market with Vector Works eters, like bidding, equipment maintenance, cost monitoring, Email: marketing@glozon.com change orders and invoicing. Website: www.glozon.com These solutions vary in terms of complexity, and users have to decide on one or another based on needs. According Nissi Infotech to Nishant Kumar Dean, Director – Marketing, Glozon N issi Infotech is into development of softwares for the infra, road, and construction and logistics companies. The company has an Infraconsoft road and construction management system as Technolgies, “In India we need more of an IT analytical tool to a solution for infra companies for tracking and managing inven- support construction projects. tory and tracking of vehicles of multiple branches remotely. This Indian Construction companies software also has a vehicle and machinery management module have to be made aware about that offers host of facilities to solve the problem faced by fleet and the available packages made heavy vehicle owners having multiple branches. This software is a in India exclusively for them web based; the management can get the reports from anywhere, through their understanding anytime of their convenience. about the Indian processes and Email: sales@nissiinfotech.com systems and not rely only on Website: www.nissiinfotech.com big packages.” page 16-17 Feature.indd 3 7/9/2010 9:23:34 PM