SlideShare a Scribd company logo
1 of 7
Download to read offline
FOLDING TABLE WITH FASTLEG
                              USER MANUAL




                          2i srl   -. Sales Office




Manual Code R001-09/08   www.newtableconcept.com     All rights reserved
SUMMARY

1.   INTRODUCTION ____________________________________________________ 3
2.   PACKAGE CONTENT _______________________________________________ 3
3.   WARNINGS________________________________________________________ 4
     PLACEMENT OF TABLE – WALL STRESS ___________________________________________ 4
     FASTLEG – LOCKING MECHANISM _________________________________________________ 4
     SHOCK ABSORBER (Optional) _____________________________________________________ 4
4.   ASSEMBLY________________________________________________________ 4
5.   OPENING AND CLOSING ____________________________________________ 7
6.   CLEANING AND MAINTENAINCE______________________________________ 7
7.   WARRANTY _______________________________________________________ 7




R001-09/08                      www.newtableconcept.com                          pag. 2
1. INTRODUCTION
Dear Customer, thank you for choosing the FOLDING table!

The FOLDING table is built with high quality materials and extensive attention to detail. The quot;FastLegquot;
structure is 2I Srl’s exclusively patented marvel which is made of 18/10 stainless steel, a design which
ensures everlasting functionality and beauty.

We are confident that you will appreciate the value of our product and enjoy its convenient, space-saving
feature.


2. PACKAGE CONTENT
BASE
A - holes template (1)
B - FastLeg structures (2)
C - tabletop (1)
D - dowels (4)
E - mounting screws (4)
F - assembly screws (16)
G - washers (4, to be used only if the wall is uneven)




OPTIONAL
H - shock absorber (1)
I - shock absorber table mounting plate (1)
L - shock absorber wall mounting plate (1)
M - assembly screws (2)
N - dowels (2)
O - mounting screws (2)




WARNING! The screws and dowels we provide are suitable for walls made of solid bricks or concrete. In all
other cases you must use dowels and screws appropriate for the wall in question.



R001-09/08                               www.newtableconcept.com                                   pag. 3
3. WARNINGS
PLACEMENT OF TABLE – WALL STRESS

The table is attached to the wall: all the mechanical stresses are supported by the wall. It is essential to
position the table on a wall suitable to support the table with its load.

The 2I Srl ensures the robustness of the table, but is not responsible for any failure due to the wall or to an
insufficient mounting to the wall itself.


FASTLEG – LOCKING MECHANISM

Always check at every opening that the two FastLeg structures are locked (Fig. 1).




                                                      Fig. 1

This test can be done by pressing the slanting bar at the point indicated in Fig. 1 making sure that it is
locked and does not inadvertently slide closed.


SHOCK ABSORBER (Optional)
All tables are set up to accommodate the shock absorber that allows a controlled closure without having to
manually control the closure of the table until the closed position.

In the case of presence of children, IT IS MANDATORY TO USE THE OPTIONAL SHOCK ABSORBER to
prevent potential dangers resulting from the unlocking of the FastLeg structures by the children themselves.


4. ASSEMBLY
Before mounting the table, make sure the wall can adequately support the table and the stress that it will be
exposed to. Make sure the wall is flat and free from any obstacles (sockets, air intakes, etc.).

The tools you will need are: measuring tape, electric screwdriver / screwdriver, drill, drill bits: 5 and 8 mm
(3/16” and 5/16”), pencil, tape (Fig. 2).

    1. Determine the location and height of the table. The recommended height is 75 cm (30”).




R001-09/08                                www.newtableconcept.com                                         pag. 4
Fig. 2

   2. Place the holes template in the desired positions.

       IMPORTANT: The positions of the holes in the template (and therefore of the holes on the wall for
       the right mounting) it is not horizontally symmetrical, so there is a label on the template which
       identifies the side that must be on top when marking them. Note: The top of the holes template
       identifies the height of a table when opened while the bottom identifies the space occupied by the
       table when closed.




                                                     Fig. 3



   3. Place the template at the desired height and level. Note: this can be done by verifying that the right
      and left top corner are the same distance from the floor or simply using a spirit level.

   4. Block the template at the wall with tape. Note: This will ensure that the template will not move
      during the marking of the holes.

   5. Mark with a pencil the four holes of the two FastLeg structures and the two holes for the shock
      absorber, if present.

   6. Remove the template and make the holes. Note: To obtain greater precision, we recommend that
      you drill the holes first with a 5 mm (3/16”) drill bit and then re-drill with the 8 mm (5/16”) drill bit to
      enlarge the 5 mm holes.

   7. Insert the dowels into the holes.

   8. Screw the first structure FastLeg to the wall without permanently tightening the screws. Note: the
      screws must be tight enough to support the structure, but must allow the horizontal movement of
      the structure within the screw slot.

   9. Screw the second structure FastLeg to the wall without permanently tightening the screws. Note:
      the screws must be tight enough to support the structure, but must allow the horizontal movement
      of the structure within the screw slot.

   10. The structures may not be placed well horizontally and/or vertically. Adjustments may be necessary

R001-09/08                                www.newtableconcept.com                                          pag. 5
for inserting the structures into their housing first, then fixing the distance from the wall.

       To account for this, first rest the tabletop onto the two structures. Enlarge or shrink the space
       between the two structures (horizontally) in order to position them correctly within their housings in
       the tabletop.

       If the wall surface is irregular, the two structures may not enter into their housing vertically (Fig. 4a),
       therefore you need to move them a few millimetres away from the wall. This is accomplished by
       inserting one or two washers (G) between the structures themselves and the wall (Fig. 4b). The
       proper placement is shown in Fig. 4c.




                                                     Fig. 4

   11. Screw the FastLeg structures to the tabletop. Note: Check that the two FastLeg structures are
       completely inside their housing in the tabletop (Fig. 4c).

   12. (Optional) Secure the shock absorber to the wall. Free the shock absorber by removing the scotch
       that keeps it in his tabletop housing and extend it completely pulling the shaft. Screw the mounting
       plate to the wall as shown in Figure 7a. Note: by setting the plate upside down, as in Figure 7b, the
       table does not close completely.




                                                     Fig. 5

   13. Close the table for the first time. Note: If it closes well, congratulations! Everything is aligned as it
       should be. If it does not close completely, the likely cause is that one of two structures or the shock
       absorbers are not well aligned within their housing in the tabletop.

       With the table closed, check that the two structures are parallel to the edges of the table. This can
       be done by checking that the distance from the table vertical edges to the leg bar fixed on the wall
       is the same at the top (Fig. 6a) and at the bottom of the table (Fig. 6b). If not, adjust the structures
       within the screw slots.




                                                     Fig. 6



R001-09/08                               www.newtableconcept.com                                           pag. 6
Make sure the shock absorber is positioned at the same distance from the two FastLeg structures
        (Fig. 7). If not, move it to the right or left as needed.




                                                      Fig. 7

    14. Tighten all screws.


5. OPENING AND CLOSING
To open the FOLDING table, raise the bottom of the table until it reaches the horizontal position in which
the two FastLeg structures lock automatically. For your safety, check that the two FastLeg structures are
both locked properly. To test this, press the slanting bar at the point indicated in Fig. 1 and make sure that it
is locked and does not start to slide closed.

To close the FOLDING table, pull the release buttons of the two FastLeg structures simultaneously and
slowly push the two structures toward the wall. During this operation the weight of the table passes from the
FastLeg structures to the arms of whoever is closing the table. In the absence of the shock absorber, the
tabletop’s weight must be controlled all the way to the closed position and not be allowed to drop freely.
This could damage the table or the wall, and could weaken the mounting of the table to the wall.


6. CLEANING AND MAINTENAINCE
The FOLDING table does not require special maintenance. Cleaning can simply be done with a damp cloth
or with a standard furniture cleaning product.


7. WARRANTY
The warranty is valid for two years from date of shipment of the product and covers only defective parts or
breakage due to production defects. The warranty does not cover breakage or damage due to improper
use of the table. The broken parts will be replaced free of charge. The shipping expenses are the
responsibility of the customer.

To make a claim under the warranty, send an e-mail to support@newtableconcept.com specifying the
customer number, the description (and possibly a picture) of the defect.

2I Srl reserves the right to modify the product without any notice.




R001-09/08                                www.newtableconcept.com                                         pag. 7

More Related Content

Viewers also liked

newtableconcept assembly instructions sheet
newtableconcept assembly instructions sheetnewtableconcept assembly instructions sheet
newtableconcept assembly instructions sheetRenzo Lisei
 
Tavolo Pieghevole - Manuale Utente Rev. 02
Tavolo Pieghevole - Manuale Utente Rev. 02Tavolo Pieghevole - Manuale Utente Rev. 02
Tavolo Pieghevole - Manuale Utente Rev. 02Renzo Lisei
 
Tavolo Pieghevole Compact - Manuale Utente Rev. 05
Tavolo Pieghevole Compact - Manuale Utente Rev. 05Tavolo Pieghevole Compact - Manuale Utente Rev. 05
Tavolo Pieghevole Compact - Manuale Utente Rev. 05Renzo Lisei
 
Folding Table Compact - Assembly Instructions Rev. 05
Folding Table Compact - Assembly Instructions Rev. 05Folding Table Compact - Assembly Instructions Rev. 05
Folding Table Compact - Assembly Instructions Rev. 05Renzo Lisei
 
Il tavolo che Scompare - Tavolo pieghevole a muro salvaspazio
Il tavolo che Scompare - Tavolo pieghevole a muro salvaspazioIl tavolo che Scompare - Tavolo pieghevole a muro salvaspazio
Il tavolo che Scompare - Tavolo pieghevole a muro salvaspazioRenzo Lisei
 
Folding Table Standard - Assembly Instructions Rev. 05
Folding Table Standard - Assembly Instructions Rev. 05Folding Table Standard - Assembly Instructions Rev. 05
Folding Table Standard - Assembly Instructions Rev. 05Renzo Lisei
 
Climate Change in Portugal: state of the art
Climate Change in Portugal: state of the artClimate Change in Portugal: state of the art
Climate Change in Portugal: state of the artJoaquim Flores
 
The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001Joaquim Flores
 
Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...
Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...
Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...Joaquim Flores
 
Vi Feria De La Cebolla (Nxpowerlite)
Vi Feria De La Cebolla (Nxpowerlite)Vi Feria De La Cebolla (Nxpowerlite)
Vi Feria De La Cebolla (Nxpowerlite)guestd14b9
 
EL PROCÉS D'EMMALALTIR
EL PROCÉS D'EMMALALTIREL PROCÉS D'EMMALALTIR
EL PROCÉS D'EMMALALTIRjborra10
 
P0001 File Articles 104783 Archivo Power Point 0
P0001 File Articles 104783 Archivo Power Point 0P0001 File Articles 104783 Archivo Power Point 0
P0001 File Articles 104783 Archivo Power Point 0guest636595
 
Om Group, Ahmedabad, Anaesthetic Gas Scavenging System
Om Group, Ahmedabad, Anaesthetic Gas Scavenging SystemOm Group, Ahmedabad, Anaesthetic Gas Scavenging System
Om Group, Ahmedabad, Anaesthetic Gas Scavenging SystemIndiaMART InterMESH Limited
 

Viewers also liked (18)

newtableconcept assembly instructions sheet
newtableconcept assembly instructions sheetnewtableconcept assembly instructions sheet
newtableconcept assembly instructions sheet
 
Cell Cycle
Cell CycleCell Cycle
Cell Cycle
 
Tavolo Pieghevole - Manuale Utente Rev. 02
Tavolo Pieghevole - Manuale Utente Rev. 02Tavolo Pieghevole - Manuale Utente Rev. 02
Tavolo Pieghevole - Manuale Utente Rev. 02
 
Tavolo Pieghevole Compact - Manuale Utente Rev. 05
Tavolo Pieghevole Compact - Manuale Utente Rev. 05Tavolo Pieghevole Compact - Manuale Utente Rev. 05
Tavolo Pieghevole Compact - Manuale Utente Rev. 05
 
Folding Table Compact - Assembly Instructions Rev. 05
Folding Table Compact - Assembly Instructions Rev. 05Folding Table Compact - Assembly Instructions Rev. 05
Folding Table Compact - Assembly Instructions Rev. 05
 
Il tavolo che Scompare - Tavolo pieghevole a muro salvaspazio
Il tavolo che Scompare - Tavolo pieghevole a muro salvaspazioIl tavolo che Scompare - Tavolo pieghevole a muro salvaspazio
Il tavolo che Scompare - Tavolo pieghevole a muro salvaspazio
 
Folding Table Standard - Assembly Instructions Rev. 05
Folding Table Standard - Assembly Instructions Rev. 05Folding Table Standard - Assembly Instructions Rev. 05
Folding Table Standard - Assembly Instructions Rev. 05
 
Climate Change in Portugal: state of the art
Climate Change in Portugal: state of the artClimate Change in Portugal: state of the art
Climate Change in Portugal: state of the art
 
The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001The Historical City as the Sustainable Compact City Model_2001
The Historical City as the Sustainable Compact City Model_2001
 
Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...
Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...
Gondomar Polis Project - Sustainable Requalification of Gondomar’s River Dour...
 
Vi Feria De La Cebolla (Nxpowerlite)
Vi Feria De La Cebolla (Nxpowerlite)Vi Feria De La Cebolla (Nxpowerlite)
Vi Feria De La Cebolla (Nxpowerlite)
 
EL PROCÉS D'EMMALALTIR
EL PROCÉS D'EMMALALTIREL PROCÉS D'EMMALALTIR
EL PROCÉS D'EMMALALTIR
 
P0001 File Articles 104783 Archivo Power Point 0
P0001 File Articles 104783 Archivo Power Point 0P0001 File Articles 104783 Archivo Power Point 0
P0001 File Articles 104783 Archivo Power Point 0
 
Rich Media
Rich MediaRich Media
Rich Media
 
te vi venir
te vi venirte vi venir
te vi venir
 
Om Group, Ahmedabad, Anaesthetic Gas Scavenging System
Om Group, Ahmedabad, Anaesthetic Gas Scavenging SystemOm Group, Ahmedabad, Anaesthetic Gas Scavenging System
Om Group, Ahmedabad, Anaesthetic Gas Scavenging System
 
neue Technologien
neue Technologienneue Technologien
neue Technologien
 
Hello Ibm
Hello IbmHello Ibm
Hello Ibm
 

Similar to newtableconcept user manual

Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphaltdteich
 
Ug lunette projection screen
Ug lunette projection screenUg lunette projection screen
Ug lunette projection screenDukaneAVMarketing
 
UpTown Adjustable-Height Desk System Installation Manual
UpTown Adjustable-Height Desk System Installation ManualUpTown Adjustable-Height Desk System Installation Manual
UpTown Adjustable-Height Desk System Installation ManualiMovR
 
Fabral SSR Metal Roofing Installation Manual
Fabral SSR Metal Roofing Installation ManualFabral SSR Metal Roofing Installation Manual
Fabral SSR Metal Roofing Installation ManualWestern-Building-Center
 
How To Install DIY Faux Stone Panels
How To Install DIY Faux Stone PanelsHow To Install DIY Faux Stone Panels
How To Install DIY Faux Stone PanelsFaux Stone Depot
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactTrần Khánh
 
Sluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch TechnologiesSluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch TechnologiesWatch Technologies
 
Basic ShoreMaster Kit Dock Instruction
Basic ShoreMaster Kit Dock InstructionBasic ShoreMaster Kit Dock Instruction
Basic ShoreMaster Kit Dock InstructionKurt Welch
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guidejaydeedee
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60Domain CabinetsDirect
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guidDon Pell
 
How to Measure - Part 1
How to Measure - Part 1How to Measure - Part 1
How to Measure - Part 1Julian Kinkaid
 
Omega Everest Electric Adjustable-Height Desk Manual
Omega Everest Electric Adjustable-Height Desk ManualOmega Everest Electric Adjustable-Height Desk Manual
Omega Everest Electric Adjustable-Height Desk ManualiMovR
 

Similar to newtableconcept user manual (20)

Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
 
Ug lunette
Ug lunette Ug lunette
Ug lunette
 
Ug lunette projection screen
Ug lunette projection screenUg lunette projection screen
Ug lunette projection screen
 
Ug lunette
Ug lunette Ug lunette
Ug lunette
 
Ug lunette rev101012
Ug lunette rev101012Ug lunette rev101012
Ug lunette rev101012
 
Fox Blocks Installation Checklist
Fox Blocks Installation ChecklistFox Blocks Installation Checklist
Fox Blocks Installation Checklist
 
UpTown Adjustable-Height Desk System Installation Manual
UpTown Adjustable-Height Desk System Installation ManualUpTown Adjustable-Height Desk System Installation Manual
UpTown Adjustable-Height Desk System Installation Manual
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
 
Fabral SSR Metal Roofing Installation Manual
Fabral SSR Metal Roofing Installation ManualFabral SSR Metal Roofing Installation Manual
Fabral SSR Metal Roofing Installation Manual
 
How To Install DIY Faux Stone Panels
How To Install DIY Faux Stone PanelsHow To Install DIY Faux Stone Panels
How To Install DIY Faux Stone Panels
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
 
WOM Owners Manual
WOM Owners ManualWOM Owners Manual
WOM Owners Manual
 
Sluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch TechnologiesSluice Gate Installation Guide - Watch Technologies
Sluice Gate Installation Guide - Watch Technologies
 
Basic ShoreMaster Kit Dock Instruction
Basic ShoreMaster Kit Dock InstructionBasic ShoreMaster Kit Dock Instruction
Basic ShoreMaster Kit Dock Instruction
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
How to assemble a sink base vanity
How to assemble a sink base vanityHow to assemble a sink base vanity
How to assemble a sink base vanity
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
 
How to Measure - Part 1
How to Measure - Part 1How to Measure - Part 1
How to Measure - Part 1
 
Omega Everest Electric Adjustable-Height Desk Manual
Omega Everest Electric Adjustable-Height Desk ManualOmega Everest Electric Adjustable-Height Desk Manual
Omega Everest Electric Adjustable-Height Desk Manual
 

More from Renzo Lisei

New Table Concept Termini e Condizioni di Vendita
New Table Concept Termini e Condizioni di VenditaNew Table Concept Termini e Condizioni di Vendita
New Table Concept Termini e Condizioni di VenditaRenzo Lisei
 
Tavolo Pieghevole Standard - Manuale Utente Rev. 05
Tavolo Pieghevole Standard - Manuale Utente Rev. 05Tavolo Pieghevole Standard - Manuale Utente Rev. 05
Tavolo Pieghevole Standard - Manuale Utente Rev. 05Renzo Lisei
 
Folding Table Sales Terms and Conditions Rev. 03
Folding Table Sales Terms and Conditions Rev. 03Folding Table Sales Terms and Conditions Rev. 03
Folding Table Sales Terms and Conditions Rev. 03Renzo Lisei
 
Design Foldable Tables - Technical Drawing
Design Foldable Tables - Technical DrawingDesign Foldable Tables - Technical Drawing
Design Foldable Tables - Technical DrawingRenzo Lisei
 
Folding Table - Assembly Instructions Rev. 03
Folding Table - Assembly Instructions Rev. 03Folding Table - Assembly Instructions Rev. 03
Folding Table - Assembly Instructions Rev. 03Renzo Lisei
 
Tavolo Pieghevole - Manuale Utente Rev. 03
Tavolo Pieghevole - Manuale Utente Rev. 03Tavolo Pieghevole - Manuale Utente Rev. 03
Tavolo Pieghevole - Manuale Utente Rev. 03Renzo Lisei
 
Folding Table - User Manual rev. 02
Folding Table - User Manual  rev. 02Folding Table - User Manual  rev. 02
Folding Table - User Manual rev. 02Renzo Lisei
 
Foldable Table Name List
Foldable Table Name ListFoldable Table Name List
Foldable Table Name ListRenzo Lisei
 
Newtableconcept Graphics Artigianato 2008 Exhibition
Newtableconcept Graphics Artigianato 2008 Exhibition Newtableconcept Graphics Artigianato 2008 Exhibition
Newtableconcept Graphics Artigianato 2008 Exhibition Renzo Lisei
 

More from Renzo Lisei (9)

New Table Concept Termini e Condizioni di Vendita
New Table Concept Termini e Condizioni di VenditaNew Table Concept Termini e Condizioni di Vendita
New Table Concept Termini e Condizioni di Vendita
 
Tavolo Pieghevole Standard - Manuale Utente Rev. 05
Tavolo Pieghevole Standard - Manuale Utente Rev. 05Tavolo Pieghevole Standard - Manuale Utente Rev. 05
Tavolo Pieghevole Standard - Manuale Utente Rev. 05
 
Folding Table Sales Terms and Conditions Rev. 03
Folding Table Sales Terms and Conditions Rev. 03Folding Table Sales Terms and Conditions Rev. 03
Folding Table Sales Terms and Conditions Rev. 03
 
Design Foldable Tables - Technical Drawing
Design Foldable Tables - Technical DrawingDesign Foldable Tables - Technical Drawing
Design Foldable Tables - Technical Drawing
 
Folding Table - Assembly Instructions Rev. 03
Folding Table - Assembly Instructions Rev. 03Folding Table - Assembly Instructions Rev. 03
Folding Table - Assembly Instructions Rev. 03
 
Tavolo Pieghevole - Manuale Utente Rev. 03
Tavolo Pieghevole - Manuale Utente Rev. 03Tavolo Pieghevole - Manuale Utente Rev. 03
Tavolo Pieghevole - Manuale Utente Rev. 03
 
Folding Table - User Manual rev. 02
Folding Table - User Manual  rev. 02Folding Table - User Manual  rev. 02
Folding Table - User Manual rev. 02
 
Foldable Table Name List
Foldable Table Name ListFoldable Table Name List
Foldable Table Name List
 
Newtableconcept Graphics Artigianato 2008 Exhibition
Newtableconcept Graphics Artigianato 2008 Exhibition Newtableconcept Graphics Artigianato 2008 Exhibition
Newtableconcept Graphics Artigianato 2008 Exhibition
 

Recently uploaded

Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 

Recently uploaded (20)

Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 

newtableconcept user manual

  • 1. FOLDING TABLE WITH FASTLEG USER MANUAL 2i srl -. Sales Office Manual Code R001-09/08 www.newtableconcept.com All rights reserved
  • 2. SUMMARY 1. INTRODUCTION ____________________________________________________ 3 2. PACKAGE CONTENT _______________________________________________ 3 3. WARNINGS________________________________________________________ 4 PLACEMENT OF TABLE – WALL STRESS ___________________________________________ 4 FASTLEG – LOCKING MECHANISM _________________________________________________ 4 SHOCK ABSORBER (Optional) _____________________________________________________ 4 4. ASSEMBLY________________________________________________________ 4 5. OPENING AND CLOSING ____________________________________________ 7 6. CLEANING AND MAINTENAINCE______________________________________ 7 7. WARRANTY _______________________________________________________ 7 R001-09/08 www.newtableconcept.com pag. 2
  • 3. 1. INTRODUCTION Dear Customer, thank you for choosing the FOLDING table! The FOLDING table is built with high quality materials and extensive attention to detail. The quot;FastLegquot; structure is 2I Srl’s exclusively patented marvel which is made of 18/10 stainless steel, a design which ensures everlasting functionality and beauty. We are confident that you will appreciate the value of our product and enjoy its convenient, space-saving feature. 2. PACKAGE CONTENT BASE A - holes template (1) B - FastLeg structures (2) C - tabletop (1) D - dowels (4) E - mounting screws (4) F - assembly screws (16) G - washers (4, to be used only if the wall is uneven) OPTIONAL H - shock absorber (1) I - shock absorber table mounting plate (1) L - shock absorber wall mounting plate (1) M - assembly screws (2) N - dowels (2) O - mounting screws (2) WARNING! The screws and dowels we provide are suitable for walls made of solid bricks or concrete. In all other cases you must use dowels and screws appropriate for the wall in question. R001-09/08 www.newtableconcept.com pag. 3
  • 4. 3. WARNINGS PLACEMENT OF TABLE – WALL STRESS The table is attached to the wall: all the mechanical stresses are supported by the wall. It is essential to position the table on a wall suitable to support the table with its load. The 2I Srl ensures the robustness of the table, but is not responsible for any failure due to the wall or to an insufficient mounting to the wall itself. FASTLEG – LOCKING MECHANISM Always check at every opening that the two FastLeg structures are locked (Fig. 1). Fig. 1 This test can be done by pressing the slanting bar at the point indicated in Fig. 1 making sure that it is locked and does not inadvertently slide closed. SHOCK ABSORBER (Optional) All tables are set up to accommodate the shock absorber that allows a controlled closure without having to manually control the closure of the table until the closed position. In the case of presence of children, IT IS MANDATORY TO USE THE OPTIONAL SHOCK ABSORBER to prevent potential dangers resulting from the unlocking of the FastLeg structures by the children themselves. 4. ASSEMBLY Before mounting the table, make sure the wall can adequately support the table and the stress that it will be exposed to. Make sure the wall is flat and free from any obstacles (sockets, air intakes, etc.). The tools you will need are: measuring tape, electric screwdriver / screwdriver, drill, drill bits: 5 and 8 mm (3/16” and 5/16”), pencil, tape (Fig. 2). 1. Determine the location and height of the table. The recommended height is 75 cm (30”). R001-09/08 www.newtableconcept.com pag. 4
  • 5. Fig. 2 2. Place the holes template in the desired positions. IMPORTANT: The positions of the holes in the template (and therefore of the holes on the wall for the right mounting) it is not horizontally symmetrical, so there is a label on the template which identifies the side that must be on top when marking them. Note: The top of the holes template identifies the height of a table when opened while the bottom identifies the space occupied by the table when closed. Fig. 3 3. Place the template at the desired height and level. Note: this can be done by verifying that the right and left top corner are the same distance from the floor or simply using a spirit level. 4. Block the template at the wall with tape. Note: This will ensure that the template will not move during the marking of the holes. 5. Mark with a pencil the four holes of the two FastLeg structures and the two holes for the shock absorber, if present. 6. Remove the template and make the holes. Note: To obtain greater precision, we recommend that you drill the holes first with a 5 mm (3/16”) drill bit and then re-drill with the 8 mm (5/16”) drill bit to enlarge the 5 mm holes. 7. Insert the dowels into the holes. 8. Screw the first structure FastLeg to the wall without permanently tightening the screws. Note: the screws must be tight enough to support the structure, but must allow the horizontal movement of the structure within the screw slot. 9. Screw the second structure FastLeg to the wall without permanently tightening the screws. Note: the screws must be tight enough to support the structure, but must allow the horizontal movement of the structure within the screw slot. 10. The structures may not be placed well horizontally and/or vertically. Adjustments may be necessary R001-09/08 www.newtableconcept.com pag. 5
  • 6. for inserting the structures into their housing first, then fixing the distance from the wall. To account for this, first rest the tabletop onto the two structures. Enlarge or shrink the space between the two structures (horizontally) in order to position them correctly within their housings in the tabletop. If the wall surface is irregular, the two structures may not enter into their housing vertically (Fig. 4a), therefore you need to move them a few millimetres away from the wall. This is accomplished by inserting one or two washers (G) between the structures themselves and the wall (Fig. 4b). The proper placement is shown in Fig. 4c. Fig. 4 11. Screw the FastLeg structures to the tabletop. Note: Check that the two FastLeg structures are completely inside their housing in the tabletop (Fig. 4c). 12. (Optional) Secure the shock absorber to the wall. Free the shock absorber by removing the scotch that keeps it in his tabletop housing and extend it completely pulling the shaft. Screw the mounting plate to the wall as shown in Figure 7a. Note: by setting the plate upside down, as in Figure 7b, the table does not close completely. Fig. 5 13. Close the table for the first time. Note: If it closes well, congratulations! Everything is aligned as it should be. If it does not close completely, the likely cause is that one of two structures or the shock absorbers are not well aligned within their housing in the tabletop. With the table closed, check that the two structures are parallel to the edges of the table. This can be done by checking that the distance from the table vertical edges to the leg bar fixed on the wall is the same at the top (Fig. 6a) and at the bottom of the table (Fig. 6b). If not, adjust the structures within the screw slots. Fig. 6 R001-09/08 www.newtableconcept.com pag. 6
  • 7. Make sure the shock absorber is positioned at the same distance from the two FastLeg structures (Fig. 7). If not, move it to the right or left as needed. Fig. 7 14. Tighten all screws. 5. OPENING AND CLOSING To open the FOLDING table, raise the bottom of the table until it reaches the horizontal position in which the two FastLeg structures lock automatically. For your safety, check that the two FastLeg structures are both locked properly. To test this, press the slanting bar at the point indicated in Fig. 1 and make sure that it is locked and does not start to slide closed. To close the FOLDING table, pull the release buttons of the two FastLeg structures simultaneously and slowly push the two structures toward the wall. During this operation the weight of the table passes from the FastLeg structures to the arms of whoever is closing the table. In the absence of the shock absorber, the tabletop’s weight must be controlled all the way to the closed position and not be allowed to drop freely. This could damage the table or the wall, and could weaken the mounting of the table to the wall. 6. CLEANING AND MAINTENAINCE The FOLDING table does not require special maintenance. Cleaning can simply be done with a damp cloth or with a standard furniture cleaning product. 7. WARRANTY The warranty is valid for two years from date of shipment of the product and covers only defective parts or breakage due to production defects. The warranty does not cover breakage or damage due to improper use of the table. The broken parts will be replaced free of charge. The shipping expenses are the responsibility of the customer. To make a claim under the warranty, send an e-mail to support@newtableconcept.com specifying the customer number, the description (and possibly a picture) of the defect. 2I Srl reserves the right to modify the product without any notice. R001-09/08 www.newtableconcept.com pag. 7