Here are the steps to translate a work breakdown structure (WBS) into a budget:1. For each task in the WBS, list the required inputs (materials, equipment, labor, etc.)2. Estimate the cost of each input. This could include unit costs (e.g. $5 per board) or total costs (e.g. $300 for a saw). 3. Estimate the time required to complete each task. This will be used to calculate labor costs. 4. Calculate labor costs by multiplying hourly rates by estimated task times. 5. Add up the total costs of all inputs for each task. 6. Repeat steps 1-5 for all tasks
The document discusses how to plan operations by creating a work breakdown structure (WBS) and budget. It explains how to break down activities into tasks, identify inputs and associated costs, and estimate time needed to complete each task. An effective budget includes projected income, expenses broken into categories and line items, and monthly or annual projections to cover costs. The document provides examples of how to build a WBS and translate it into a basic budget to plan operations.
The Economic History of the U.S. Lecture 30.pdfGale Pooley
More Related Content
Similar to Here are the steps to translate a work breakdown structure (WBS) into a budget:1. For each task in the WBS, list the required inputs (materials, equipment, labor, etc.)2. Estimate the cost of each input. This could include unit costs (e.g. $5 per board) or total costs (e.g. $300 for a saw). 3. Estimate the time required to complete each task. This will be used to calculate labor costs. 4. Calculate labor costs by multiplying hourly rates by estimated task times. 5. Add up the total costs of all inputs for each task. 6. Repeat steps 1-5 for all tasks
Similar to Here are the steps to translate a work breakdown structure (WBS) into a budget:1. For each task in the WBS, list the required inputs (materials, equipment, labor, etc.)2. Estimate the cost of each input. This could include unit costs (e.g. $5 per board) or total costs (e.g. $300 for a saw). 3. Estimate the time required to complete each task. This will be used to calculate labor costs. 4. Calculate labor costs by multiplying hourly rates by estimated task times. 5. Add up the total costs of all inputs for each task. 6. Repeat steps 1-5 for all tasks (20)
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
Here are the steps to translate a work breakdown structure (WBS) into a budget:1. For each task in the WBS, list the required inputs (materials, equipment, labor, etc.)2. Estimate the cost of each input. This could include unit costs (e.g. $5 per board) or total costs (e.g. $300 for a saw). 3. Estimate the time required to complete each task. This will be used to calculate labor costs. 4. Calculate labor costs by multiplying hourly rates by estimated task times. 5. Add up the total costs of all inputs for each task. 6. Repeat steps 1-5 for all tasks
1. Operations and Finance
Pre-Exercise: Think for a Moment
• What did you do today?
• Write out the series of major actions
you took today
• Next to each action, write down what it
took to complete these actions
• Next to each input, write associated
costs
3. Operations and Finance
Context in the Curriculum
Divergence Convergence Emergence
Inspiration Ideation Implementation
• Visioning & Sharing • Social Business • Operations & Finance
Vision Models • Volunteer Management
• Environmental • Prototyping & • Pitching and Friendraising
Scanning & Impacting Assessment
Environment
4. Operations and Finance
The Tent of Meeting Took Hard Work
• The People of Israel needed a place to
worship, so Moses develops a new
structure: The Tent of Meeting
• Moses’s vision is perfect – but he needs
to translate that vision into practice.
• He sets people to work through a
detailed structure.
5. Operations and Finance
The Tent of Meeting Took Hard Work
Moses passed on his plans in the following
format :
1.1 The tabernacle, its tent, and its
covering, its clasps, and its boards, its
bars, its pillars, and its sockets;
1.2 The ark, and the staves thereof, the
ark-cover, and the veil of the screen;
1.3 The table, and its staves, and all its
vessels, and the showbread.
(Exodus 35)
In modern terms, this plan is a
Work Breakdown Structure (WBS).
6. Operations and Finance
WBS: Each Breakdown Breaks Down
1.2 The ark, and the staves thereof, the
ark-cover, and the veil of the screen;
1.2.1 Ark and Staves Thereof
1.2.1.1 Walls of Ark (day 1-3)
1.2.1.2 Staves of Ark (day 2-3)
1.2.1.3 Cherubs (day 3-6)
1.2.1.4 Veil of the Screen (Day
4-8)
Break each activity into tasks:
1.2.1.1 Walls of Ark (day 1-3)
1.2.1.1.1 Gather Wood (2hrs)
1.2.1.1.2 Hew Wood (4hrs)
1.2.1.1.3 Piece together Wood
(4hrs)
1.2.1.1.4 Cover with Gold (2hrs)
7. Operations and Finance
How Does One Plan Operations?
• One plans for operations by creating a workplan.
• A Workplan reflects the activities the venture
needs to carry out order to produce its desired
outputs. Every activity has required inputs.
• A Budget then takes those inputs and lists the
costs and labor hours they require to carry out
the activities.
A Good Plan Makes Operations Easy.
8. Operations and Finance
First, Detail Your List of Activities
• List activities from social business model,
and add as necessary
• Break activities into tasks
• Order chronologically
• Determine timeframe for each
9. Operations and Finance
Example: Jewish Kids Groups
Work
Breakdown
Structure
1.0
Volunteer
Engagement
(Sep-‐Oct)
1.1
Iden3fy
poten3al
Volunteers
1.1.1
Build
a
prospects
list
1.1.2
Contact
prospects
in
ranked
order
1.1.3
Hold
informa3on
Session
1.2
Select
Volunteers
1.2.1
Conduct
Interviews
1.2.2
Iden3fy
roles
and
commiAees
2.0
MarkeBng
&
Social
Media
(Oct
-‐
Nov)
3.0
School
Partnerships
(Nov
–
Dec)
4.0
Curriculum
Development
(Jan
–
Mar)
10. Operations and Finance
Then Get SMART
Your tasks should be:
• Specific (Can anyone understand them?)
• Measurable (Can you know if it is done?)
• Achievable (Can it be done?)
• Relevant (How relevant is it to success?)
• Time-bound (When does it need to be done?)
• Anyone should be able to understand what
needs to be done and how long it should take.
11. Operations and Finance
And SMARTer
Work
Breakdown
Structure
Phase
1.0
Volunteer
Engagement
(Sept-‐Oct)
1.1
IdenBfy
15
potenBal
Volunteers
(Sept)
Activity
1.1.1
Build
a
ranked
prospects
list
of
30
volunteers
Task
based
on
research
and
referrals
(Sept
1
-‐
8)
1.1.2
Contact
prospects
-‐
phone
&
email
(Sep
8
-‐
15)
1.1.3
Hold
informa3on
session
at
JCC
for
one
hour,
with
call-‐in
capabili3es
(Sept
20)
1.2
Select
Volunteers
1.2.1
Conduct
Interviews
by
phone
and
in
person
-‐
have
your
top
two
volunteers
conduct
interviews
as
well
(Sept
21
-‐
30)
1.2.2
Ask
for
commitments
from
volunteers
(Oct
10)
1.2.3
Assign
roles
and
commiAees
(Oct
15)
12. Operations and Finance
Next, Identify Your Inputs
Phase: Volunteer Engagement
Identify
Activity: Volunteers
Tasks: Build prospect list Contact prospects Plan & hold info session
Inputs:
Friends
&
Family
Phone
Venue
Computer
Computer,
Internet
Food
Internet
resources
Data
system?
A/V,
materials
Intel
on
community
13. Operations and Finance
Workshop: Build a Quick Workplan
• In groups of three, choose one
venture.
• Describe the key activities for the
Identify first three months.
Activity: Volunteers
• Identify 3 tasks for one activity
• Identify 5 inputs for one task, and
Build prospect
Tasks:
list
note the due date for the task
• List each task on an individual
Inputs:
Friends
&
Family
post-it.
14. Operations and Finance
How Do You Translate WBS to Budget?
Walls
of
Ark
Needed
Inputs
Input
Cost
Gather
Worker
salary
20
shekel/hr
Wood
Wood
No
cost
Hew
Wood
Worker
salary
20
shekel/hr
Sawing
Tools
(saw,
workbench,
clamps)
300
shekel
Piece
Worker
salary
20
shekel/hr
together
Glue
15
shekel
Wood
Clamps
(paid
for
above)
Cover
with
Goldsmith
salary
40
shekel/hr
Gold
Gold
7000
shekel
Mold
300
shekel
Smel3ng
Equipment
(tongs,
pot,
etc)
500
shekel
15. Operations and Finance
Match Task With the Time It Takes
Walls
of
Ark
Input
Cost
Time
Gather
20
shekel/hr
2hrs
Wood
Hew
Wood
20
shekel/hr
4hrs
300
shekel
Piece
20
shekel/hr
4hrs
together
15
shekel
Wood
(paid
for
above)
Cover
with
40
shekel/hr
2hrs
Gold
7000
shekel
300
shekel
500
shekel
16. Operations and Finance
Lay Out Costs Per Day
Inputs
Day
One
Day
Two
Day
Three
Total
Walls
of
Ark
budget
Salaries
40
shekel
160
shekel
80
shekel
280
shekel
Equipment
315
shekel
350
shekel
665
shekel
Materials
7000
shekel
7000
shekel
17. Operations and Finance
Workbook: Basic Budget Worksheet
Goal
Needed
Inputs
Input
Cost
Time/Units
Task
#1
List
inputs
needed
here
List
cost
per
List
quan3ty
unit
of
input
of
units
or
here
amount
of
3me
here
Task
#2
Inputs
Cost/Unit
Quan3ty
Task
#3
Inputs
Cost/Unit
Quan3ty
Task
#4
Inputs
Cost/Unit
Quan3ty
18. Operations and Finance
Elements of an Organizational Budget:
• Projected income
• Projected expenses
• Categories and line items
• Monthly and annual projections
19. Operations and Finance
How Will You Cover Your Costs?
• Plan to match revenues accordingly
• (Basic) sources of revenue:
– Program revenues
– For-profits: Investments
– Nonprofits: Grants and donations
• Cash
• In-kind
• Remember: Those giving you money want to see what
you are spending it on!
20. Operations and Finance
Workshop: Build a Quick Budget
• In groups of three, choose one venture
• Revisit the inputs listed in the workplan
from your last workshop
• Group similar line items (budget
categories)
• Discuss potential sources of revenue
• If you have time, do it for another
venture
22. Operations and Finance
Remember: It Takes Time
• No one expects you to launch everything
at once
• Developing a roll-out plan and a budget
are critical to gaining credibility
• Always start with low resource needs, and
build requirements as you go
• Revisit your workplan and budget
monthly!
23. Operations and Finance
A Look at the Venture Milestone
• Please provide a detailed workplan for at least
three phases over the course of the first year and a
supplementary budget expressing the financial
implications of taking those steps.
• If you’d like, you can use the Work
Breakdown Structure (WBS), expressing all
tasks SMARTly: Specific, Measurable,
Attainable, Relevant and Timebound.
• You can use the Simple Budget Template
that’s online, or another template for your
budget.
24. Operations and Finance
Every Gold Loop Counts
• While everything is a work in
progress, the Workplan should
try to anticipate your venture
needs
• Be conservative in planning:
things always take longer and
cost more
• The more you think through the
details, the less you’ll worry
about them later.
Ventures are a collection of details –