SlideShare a Scribd company logo
1 of 26
CHANDRAYAAN 3
A Mission Of Hope For The Future Of Space Exploration
Ppt. by moahammed shahid
Chandrayaan 3 is India's third lunar mission
to soft land on the lunar south pole region.
The mission will conduct scientific
experiments to study the lunar geology,
atmosphere, and environment.
Introduction Of
Chandrayaan 3
Three Mission Objectives
Demonstrate safe and
soft landing on the lunar
surface
Conduct rover
operations on the
Moon
Conduct on-site
experiments on the
lunar surface
1 2 3
Key Technologies
Hazard Detection and Avoidance
Lander Hazard Detection & Avoidance
Camera and Processing Algorithm Landing
Leg Mechanism.
Inertial Measurement
Laser Gyro based Inertial referencing and
Accelerometer package
Altimeters
Laser & RF based Altimeters
Propulsion System
800N Throttleable Liquid Engines, 58N
attitude thrusters & Throttleable Engine
Control Electronics
Velocimeters
Laser Doppler Velocimeter & Lander
Horizontal Velocity Camera
Navigation, Guidance & Control
Powered Descent Trajectory design and
associate software elements
1 2 3
4 5 6
Lander Special Tests
Integrated Cold Test: For the demonstration of
Integrated Sensors & Navigation performance test
using helicopter as test platform
Integrated Hot test: For the demonstration of closed
loop performance test with sensors, actuators and
NGC using Tower crane as test platform
Lander Leg mechanism performance test on a lunar
simulant test bed simulating different touch down
conditions.
Mission Components
Propulsion module
This module is responsible for carrying the
lander and rover configuration to the Moon. It
also has a scientific payload that will study the
Earth from lunar orbit.
Lander module
This module will land on the Moon and deploy
the rover. It also has a scientific payload that
will study the lunar surface.
Rover
This is a small, mobile vehicle that will conduct
on-site experiments on the lunar surface. It is
equipped with a variety of scientific
instruments, including a seismometer, a
spectrometer, and a camera.
Specifications For Chandrayaan-3
Sl No. Parameter Specifications Sl No. Parameter Specifications
1. Mission Life (Lander & Rover) One lunar day (~14 Earth days) 7. Communication
1.Propulsion Module: Communicates with IDSN
2.Lander Module: Communicates with IDSN and Rover. Chandrayaan-2 Orbiter is also planned for
contingency link.
3.Rover: Communicates only with Lander.
2. Landing Site (Prime) 4 km x 2.4 km 69.367621 S, 32.348126 E 8. Lander Sensors
1.Laser Inertial Referencing and Accelerometer Package (LIRAP)
2.Ka-Band Altimeter (KaRA)
3.Lander Position Detection Camera (LPDC)
4.LHDAC (Lander Hazard Detection & Avoidance Camera)
5.Laser Altimeter (LASA)
6.Laser Doppler Velocimeter (LDV)
7.Lander Horizontal Velocity Camera (LHVC)
8.Micro Star sensor
9.Inclinometer & Touchdown sensors
3. Science Payloads
1.Lander:Radio Anatomy of Moon Bound Hypersensitive ionosphere and
Atmosphere (RAMBHA)
2.Chandra’s Surface Thermo physical Experiment (ChaSTE)
3.Instrument for Lunar Seismic Activity (ILSA)
4.Laser Retroreflector Array (LRA) Rover:
5.Alpha Particle X-Ray Spectrometer (APXS)
6.Laser Induced Breakdown Spectroscope (LIBS) Propulsion Module:
7.Spectro-polarimetry of HAbitable Planet Earth (SHAPE)
9. Lander Actuators Reaction wheels – 4 nos (10 Nms & 0.1 Nm)
4. Two Module Configuration
1.Propulsion Module (Carries Lander from launch injection to Lunar orbit)
2.Lander Module (Rover is accommodated inside the Lander)
10. Lander Propulsion System
Bi-Propellant Propulsion System (MMH + MON3), 4 nos. of 800 N Throttleable engines & 8 nos. of 58 N;
Throttleable Engine Control Electronics
5. Mass
1.Propulsion Module: 2148 kg
2.Lander Module: 1752 kg including Rover of 26 kg
3.Total: 3900 kg
11. Lander Mechanisms
1.Lander leg
2.Rover Ramp (Primary & Secondary)
3.Rover
4.ILSA, Rambha & Chaste Payloads
5.Umbilical connector Protection Mechanism,
6.X- Band Antenna
6. Power generation
1.Propulsion Module: 758 W
2.Lander Module: 738W, WS with Bias
3.Rover: 50W
12. Lander Touchdown specifications
1.Vertical velocity: ≤ 2 m / sec
2.Horizontal velocity: ≤ 0.5 m / sec
3.Slope: ≤ 120
Objectives Of Scientific Payloads
SI. No Lander Payloads Objectives
1.
Radio Anatomy of Moon Bound
Hypersensitive ionosphere and
Atmosphere (RAMBHA)
Langmuir probe (LP)
To measure the near surface plasma (ions and electrons)
density and its changes with time
2.
Chandra’s Surface Thermo physical
Experiment (ChaSTE)
To carry out the measurements of thermal properties of lunar surface near polar
region.
3.
Instrument for Lunar Seismic Activity
(ILSA)
To measure seismicity around the landing site and delineating the structure of the
lunar crust and mantle.
4. LASER Retroreflector Array (LRA) It is a passive experiment to understand the dynamics of Moon system.
SI. No Rover Payloads Objectives
1.
LASER Induced Breakdown
Spectroscope (LIBS)
Qualitative and quantitative
elemental analysis & To derive
the chemical Composition and
infer mineralogical composition
to further our understanding of
Lunar-surface.
2.
Alpha Particle X-ray
Spectrometer (APXS)
To determine the elemental
composition (Mg, Al, Si, K, Ca,Ti,
Fe) of Lunar soil and rocks
around the lunar landing site.
Sl. No
Propulsion Module
Payload
Objectives
1.
Spectro-polarimetry of HAbitable
Planet Earth (SHAPE)
Future discoveries of
smaller planets in
reflected light would
allow us to probe into
variety of Exo-planets
which would qualify for
habitability (or for
presence of life).
Launch And Landing
Of Chandrayaan-3
Chandrayaan-3 was launched on July 14,
2023. It entered a lunar transfer orbit on July
15, 2023. The lander is expected to land on
the lunar south pole region on August 23 or
August 24, 2023.
Event Date
Launch July 14, 2023
Lunar transfer orbit July 15, 2023
Landing on the lunar
south pole region
August 23-24,
2023
First Indian mission
to land on the lunar
south pole region
First Indian mission
to carry a rover Advances India's
space exploration
capabilities
Promotes
international
cooperation in space
exploration
The Significance
Of Chandrayaan-3
Mission Life
Propulsion Module
3 to 6 months
Lander Rover
1 Lunar Day
Landing Site
69.36 degree S, 32.34 degree E; slightly off the site
for Chandrayaan-2
Integrated Module Phase
Lunar Transfer Trajectory
Injectio
n Orbit
EBNs
Lunar Orbit Insertion
Lunar Orbit
Lander
Deboost
Lander Propulsion
Model Separation
Touchdown
Mission Profile
Mission Profile
Animation of Chandrayaan-3
Chandrayaan-3 Earth Moon
The Earth-Moon average distance is
roughly 384,400 kilometers. To save fuel,
Chandrayaan-3 has chosen a longer route
to the Moon. This adjusted path aims to
ensure a gentle landing of the mission's
Vikram lander on the Moon's South Pole
area. The expected timeline for this soft
touchdown is approximately 42 days after
launch, specifically around August 23 or 24.
Trajectory
01
02
03
04
05
06 07
Nominal Flight
Sequence
S.No Event Flight Time (s) Altitude (km)
Inertial Velocity
(km/s)
1 2xS200 Ignition 0.00 0.024 0.452
2 L110 Ignition 108.10 44.668 1.788
3 2xS200 Separation 127.00 62.171 1.969
4 PLF Separation 194.96 114.805 2.560
5 L110 Separation 305.56 175.352 4.623
6 C25 Ignition 307.96 176.573 4.621
7 C25 Shut-off 954.42 174.695 10.242
8 Satellite Separation 969.42 179.192 10.269
LVM3-M4-Chandrayaan-3 Mission Timeline
July 14, 2023
LVM3 M4 vehicle successfully launched Chandrayaan-3 into orbit. Chandrayaan-3, in its
precise orbit, has begun its journey to the Moon. Health of the Spacecraft is normal.
July 22, 2023
The fourth orbit-raising maneuver (Earth-bound perigee firing) is completed. The
spacecraft is now in a 71351 km x 233 km orbit.
August 06, 2023
LBN#2 is successfully completed. The spacecarft is in 170 km x 4313 km orbit around the
moon
July 25, 2023
Orbit-raising maneuver performed on July 25, 2023. Next firing (TransLunar Injection), is
planned for August 1, 2023.
July 15, 2023
The first orbit-raising maneuver (Earthbound firing-1) is successfully performed
at ISTRAC/ISRO, Bengaluru. Spacecraft is now in 41762 km x 173 km orbit.
July 17, 2023
The second orbit-raising maneuver performed. The spacecraft is now in 41603
km x 226 km orbit.
August 05, 2023
Chandrayaan-3 is successfully inserted into the lunar orbit. The orbit achieved
is 164 km x 18074 km, as intended.
August 01, 2023
The spacecraft is inserted into the translunar orbit. The orbit achieved is 288
km x 369328 km. Lunar-Orbit Insertion (LOI) is planned for Aug 5, 2023.
LVM3-M4-Chandrayaan-3 Mission Timeline
August 09, 2023
Chandrayaan-3's orbit is reduced to 174 km x 1437 km following a manuevre performed
on August 9, 2023
August 17, 2023
Lander Module is successfully separated from the Propulsion Module. Deboosting
planned for August 18, 2023
August 19, 2023
The Lander Module is in 113 km x 157 km orbit around the moon. Second de-boosting
is planned for August 20, 2023.
August 14, 2023
The mission is in the orbit circularisation phase. The spacecraft is in 151 km x
179 km orbit.
August 16, 2023
The spacecraft is in an orbit of 153 km x 163 km after the firing on August 16,
2023.
August 23, 2023
Powered descent to commence on August 23, 2023, around 1745 Hrs. IST
August 20, 2023
The Lander Module is in 25 km x 134 km orbit.
Chandrayaan-3 Capture First Image
The Moon, as viewed by Chandrayaan-3 during Lunar Orbit Insertion
Chandrayaan-3 Mission Success
The Chandrayaan-3 mission was a success,
and India became the first country in the
world to land a spacecraft on the Moon's
south pole. The lander, named Vikram,
touched down on the lunar surface at 18:04
IST (12:34 UTC) on August 23, 2023. The
rover, named Pragyan, will now explore the
lunar surface for the next 14 days.
After the Vikram lander successfully lands on
the Moon, it will wait for a while to let the
lunar dust settle. This is to prevent the rover
from getting stuck in the dust. After about 4
hours, the Pragyan rover will be released
from the lander and will begin its journey to
explore the lunar surface.
Vikram Lander
After Landing
The rover's rollout was delayed to let Moon
dust settle after the lander's touchdown.
Moon's weaker gravity makes dust clearance
slower, ensuring rover instrument protection
was ISRO's focus.
Rover's Rollout Delay
The Pragyan rover rolled out of the Vikram
lander on the Moon at approximately 12:30
AM IST on August 24, 2023. This was about 3
hours and 25 minutes after the Vikram lander
touched down on the lunar surface.
Pragyan Rover
Rolled Out
Pragyan is crafted to mark the national
emblem and ISRO's logo on the lunar surface.
It will traverse unexplored lunar terrain,
transmitting data and visuals after its landing.
Pragyan's Symbolic
Imprints
The Vikram lander and Pragyan rover will have a
mission life of one lunar day (about 14 Earth days).
During this time, they will conduct a variety of
scientific experiments, including studying the lunar
surface, the lunar atmosphere, and the lunar water
resources.
About 14 Earth Days
Conclusion Of
Chandrayaan 3
The success of Chandrayaan-3 is a major
milestone for India's space program and a
testament to the hard work and dedication
of the ISRO team. It also opens up new
possibilities for scientific research on the
Moon.
chandrayan 3 ppt. (3).pptx

More Related Content

What's hot

CHANDRAYAAN 3 BY SR & BB.pptx
CHANDRAYAAN 3 BY SR & BB.pptxCHANDRAYAAN 3 BY SR & BB.pptx
CHANDRAYAAN 3 BY SR & BB.pptxHeartByRayuu
 
chandrayan 2.pptx
chandrayan 2.pptxchandrayan 2.pptx
chandrayan 2.pptxHaewin5
 
Chandrayaan 2 | Facts You Should Know | India's Second Lunar Mission
Chandrayaan 2 | Facts You Should Know | India's Second Lunar MissionChandrayaan 2 | Facts You Should Know | India's Second Lunar Mission
Chandrayaan 2 | Facts You Should Know | India's Second Lunar MissionAlan Das Mannoosseril
 
India's Mission Moon : Chandrayaan - I
India's Mission Moon : Chandrayaan - IIndia's Mission Moon : Chandrayaan - I
India's Mission Moon : Chandrayaan - IRahul_M_BRF
 
A seminar on chandrayaan mission
A seminar on chandrayaan missionA seminar on chandrayaan mission
A seminar on chandrayaan missionShahn Tee
 
SlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptxSlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptxMohdTabish42
 
Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)prathik_gs
 
Chandrayaan 1
Chandrayaan 1Chandrayaan 1
Chandrayaan 1STUDYSCAN
 

What's hot (20)

Chandrayan final
Chandrayan finalChandrayan final
Chandrayan final
 
CHANDRAYAAN 3 BY SR & BB.pptx
CHANDRAYAAN 3 BY SR & BB.pptxCHANDRAYAAN 3 BY SR & BB.pptx
CHANDRAYAAN 3 BY SR & BB.pptx
 
chandrayan 2.pptx
chandrayan 2.pptxchandrayan 2.pptx
chandrayan 2.pptx
 
Chandrayaan 3
Chandrayaan 3 Chandrayaan 3
Chandrayaan 3
 
Chandrayan 2
Chandrayan 2Chandrayan 2
Chandrayan 2
 
Chandrayaan 2 | Facts You Should Know | India's Second Lunar Mission
Chandrayaan 2 | Facts You Should Know | India's Second Lunar MissionChandrayaan 2 | Facts You Should Know | India's Second Lunar Mission
Chandrayaan 2 | Facts You Should Know | India's Second Lunar Mission
 
Mangalyaan
MangalyaanMangalyaan
Mangalyaan
 
India's Mission Moon : Chandrayaan - I
India's Mission Moon : Chandrayaan - IIndia's Mission Moon : Chandrayaan - I
India's Mission Moon : Chandrayaan - I
 
Chandrayaan 2
Chandrayaan  2Chandrayaan  2
Chandrayaan 2
 
MANGALYAAN
MANGALYAANMANGALYAAN
MANGALYAAN
 
Chandrayaan 3
Chandrayaan 3Chandrayaan 3
Chandrayaan 3
 
A seminar on chandrayaan mission
A seminar on chandrayaan missionA seminar on chandrayaan mission
A seminar on chandrayaan mission
 
SlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptxSlideEgg_200407-Chandrayaan 3.pptx
SlideEgg_200407-Chandrayaan 3.pptx
 
Chandrayaan 2 By, Er. Swapnil V. Kaware
Chandrayaan 2 By, Er. Swapnil V. KawareChandrayaan 2 By, Er. Swapnil V. Kaware
Chandrayaan 2 By, Er. Swapnil V. Kaware
 
MANGALYAAN
MANGALYAANMANGALYAAN
MANGALYAAN
 
Mangalyaan
Mangalyaan Mangalyaan
Mangalyaan
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
 
Mangalyaan presentation
Mangalyaan presentationMangalyaan presentation
Mangalyaan presentation
 
Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)
 
Chandrayaan 1
Chandrayaan 1Chandrayaan 1
Chandrayaan 1
 

Similar to chandrayan 3 ppt. (3).pptx

Similar to chandrayan 3 ppt. (3).pptx (20)

chandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptxchandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptx
 
Chandrayaan 3.pptx
Chandrayaan 3.pptxChandrayaan 3.pptx
Chandrayaan 3.pptx
 
Chandrayan
Chandrayan Chandrayan
Chandrayan
 
sourav jee.docx
sourav jee.docxsourav jee.docx
sourav jee.docx
 
mars orbitter mission success
mars orbitter mission successmars orbitter mission success
mars orbitter mission success
 
M.O.M
M.O.MM.O.M
M.O.M
 
Journey of Mangalyaan
Journey of MangalyaanJourney of Mangalyaan
Journey of Mangalyaan
 
Chandrayaan.pdf
Chandrayaan.pdfChandrayaan.pdf
Chandrayaan.pdf
 
Mars Mission
Mars MissionMars Mission
Mars Mission
 
Aksh's PPT.pptx
Aksh's PPT.pptxAksh's PPT.pptx
Aksh's PPT.pptx
 
Mars orbiter Mission
Mars orbiter MissionMars orbiter Mission
Mars orbiter Mission
 
Chandrayaan - 3
Chandrayaan - 3Chandrayaan - 3
Chandrayaan - 3
 
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptxLVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
 
Chandryan 2 : The Indian Orbiter
Chandryan 2  : The Indian OrbiterChandryan 2  : The Indian Orbiter
Chandryan 2 : The Indian Orbiter
 
Mangalyaan - wiki
Mangalyaan - wikiMangalyaan - wiki
Mangalyaan - wiki
 
Chandrayaan I
Chandrayaan IChandrayaan I
Chandrayaan I
 
CHANDRAYAAN 1 AND 2
 CHANDRAYAAN 1 AND 2 CHANDRAYAAN 1 AND 2
CHANDRAYAAN 1 AND 2
 
Chandrayan-3.pptx
Chandrayan-3.pptxChandrayan-3.pptx
Chandrayan-3.pptx
 
Mission Mars.pptx
Mission Mars.pptxMission Mars.pptx
Mission Mars.pptx
 
MOM Mission
MOM MissionMOM Mission
MOM Mission
 

Recently uploaded

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 

Recently uploaded (20)

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 

chandrayan 3 ppt. (3).pptx

  • 1. CHANDRAYAAN 3 A Mission Of Hope For The Future Of Space Exploration Ppt. by moahammed shahid
  • 2. Chandrayaan 3 is India's third lunar mission to soft land on the lunar south pole region. The mission will conduct scientific experiments to study the lunar geology, atmosphere, and environment. Introduction Of Chandrayaan 3
  • 3. Three Mission Objectives Demonstrate safe and soft landing on the lunar surface Conduct rover operations on the Moon Conduct on-site experiments on the lunar surface 1 2 3
  • 4. Key Technologies Hazard Detection and Avoidance Lander Hazard Detection & Avoidance Camera and Processing Algorithm Landing Leg Mechanism. Inertial Measurement Laser Gyro based Inertial referencing and Accelerometer package Altimeters Laser & RF based Altimeters Propulsion System 800N Throttleable Liquid Engines, 58N attitude thrusters & Throttleable Engine Control Electronics Velocimeters Laser Doppler Velocimeter & Lander Horizontal Velocity Camera Navigation, Guidance & Control Powered Descent Trajectory design and associate software elements 1 2 3 4 5 6
  • 5. Lander Special Tests Integrated Cold Test: For the demonstration of Integrated Sensors & Navigation performance test using helicopter as test platform Integrated Hot test: For the demonstration of closed loop performance test with sensors, actuators and NGC using Tower crane as test platform Lander Leg mechanism performance test on a lunar simulant test bed simulating different touch down conditions.
  • 6. Mission Components Propulsion module This module is responsible for carrying the lander and rover configuration to the Moon. It also has a scientific payload that will study the Earth from lunar orbit. Lander module This module will land on the Moon and deploy the rover. It also has a scientific payload that will study the lunar surface. Rover This is a small, mobile vehicle that will conduct on-site experiments on the lunar surface. It is equipped with a variety of scientific instruments, including a seismometer, a spectrometer, and a camera.
  • 7. Specifications For Chandrayaan-3 Sl No. Parameter Specifications Sl No. Parameter Specifications 1. Mission Life (Lander & Rover) One lunar day (~14 Earth days) 7. Communication 1.Propulsion Module: Communicates with IDSN 2.Lander Module: Communicates with IDSN and Rover. Chandrayaan-2 Orbiter is also planned for contingency link. 3.Rover: Communicates only with Lander. 2. Landing Site (Prime) 4 km x 2.4 km 69.367621 S, 32.348126 E 8. Lander Sensors 1.Laser Inertial Referencing and Accelerometer Package (LIRAP) 2.Ka-Band Altimeter (KaRA) 3.Lander Position Detection Camera (LPDC) 4.LHDAC (Lander Hazard Detection & Avoidance Camera) 5.Laser Altimeter (LASA) 6.Laser Doppler Velocimeter (LDV) 7.Lander Horizontal Velocity Camera (LHVC) 8.Micro Star sensor 9.Inclinometer & Touchdown sensors 3. Science Payloads 1.Lander:Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) 2.Chandra’s Surface Thermo physical Experiment (ChaSTE) 3.Instrument for Lunar Seismic Activity (ILSA) 4.Laser Retroreflector Array (LRA) Rover: 5.Alpha Particle X-Ray Spectrometer (APXS) 6.Laser Induced Breakdown Spectroscope (LIBS) Propulsion Module: 7.Spectro-polarimetry of HAbitable Planet Earth (SHAPE) 9. Lander Actuators Reaction wheels – 4 nos (10 Nms & 0.1 Nm) 4. Two Module Configuration 1.Propulsion Module (Carries Lander from launch injection to Lunar orbit) 2.Lander Module (Rover is accommodated inside the Lander) 10. Lander Propulsion System Bi-Propellant Propulsion System (MMH + MON3), 4 nos. of 800 N Throttleable engines & 8 nos. of 58 N; Throttleable Engine Control Electronics 5. Mass 1.Propulsion Module: 2148 kg 2.Lander Module: 1752 kg including Rover of 26 kg 3.Total: 3900 kg 11. Lander Mechanisms 1.Lander leg 2.Rover Ramp (Primary & Secondary) 3.Rover 4.ILSA, Rambha & Chaste Payloads 5.Umbilical connector Protection Mechanism, 6.X- Band Antenna 6. Power generation 1.Propulsion Module: 758 W 2.Lander Module: 738W, WS with Bias 3.Rover: 50W 12. Lander Touchdown specifications 1.Vertical velocity: ≤ 2 m / sec 2.Horizontal velocity: ≤ 0.5 m / sec 3.Slope: ≤ 120
  • 8. Objectives Of Scientific Payloads SI. No Lander Payloads Objectives 1. Radio Anatomy of Moon Bound Hypersensitive ionosphere and Atmosphere (RAMBHA) Langmuir probe (LP) To measure the near surface plasma (ions and electrons) density and its changes with time 2. Chandra’s Surface Thermo physical Experiment (ChaSTE) To carry out the measurements of thermal properties of lunar surface near polar region. 3. Instrument for Lunar Seismic Activity (ILSA) To measure seismicity around the landing site and delineating the structure of the lunar crust and mantle. 4. LASER Retroreflector Array (LRA) It is a passive experiment to understand the dynamics of Moon system. SI. No Rover Payloads Objectives 1. LASER Induced Breakdown Spectroscope (LIBS) Qualitative and quantitative elemental analysis & To derive the chemical Composition and infer mineralogical composition to further our understanding of Lunar-surface. 2. Alpha Particle X-ray Spectrometer (APXS) To determine the elemental composition (Mg, Al, Si, K, Ca,Ti, Fe) of Lunar soil and rocks around the lunar landing site. Sl. No Propulsion Module Payload Objectives 1. Spectro-polarimetry of HAbitable Planet Earth (SHAPE) Future discoveries of smaller planets in reflected light would allow us to probe into variety of Exo-planets which would qualify for habitability (or for presence of life).
  • 9. Launch And Landing Of Chandrayaan-3 Chandrayaan-3 was launched on July 14, 2023. It entered a lunar transfer orbit on July 15, 2023. The lander is expected to land on the lunar south pole region on August 23 or August 24, 2023. Event Date Launch July 14, 2023 Lunar transfer orbit July 15, 2023 Landing on the lunar south pole region August 23-24, 2023
  • 10. First Indian mission to land on the lunar south pole region First Indian mission to carry a rover Advances India's space exploration capabilities Promotes international cooperation in space exploration The Significance Of Chandrayaan-3
  • 11. Mission Life Propulsion Module 3 to 6 months Lander Rover 1 Lunar Day Landing Site 69.36 degree S, 32.34 degree E; slightly off the site for Chandrayaan-2
  • 12. Integrated Module Phase Lunar Transfer Trajectory Injectio n Orbit EBNs Lunar Orbit Insertion Lunar Orbit Lander Deboost Lander Propulsion Model Separation Touchdown Mission Profile
  • 13. Mission Profile Animation of Chandrayaan-3 Chandrayaan-3 Earth Moon
  • 14. The Earth-Moon average distance is roughly 384,400 kilometers. To save fuel, Chandrayaan-3 has chosen a longer route to the Moon. This adjusted path aims to ensure a gentle landing of the mission's Vikram lander on the Moon's South Pole area. The expected timeline for this soft touchdown is approximately 42 days after launch, specifically around August 23 or 24. Trajectory
  • 15. 01 02 03 04 05 06 07 Nominal Flight Sequence S.No Event Flight Time (s) Altitude (km) Inertial Velocity (km/s) 1 2xS200 Ignition 0.00 0.024 0.452 2 L110 Ignition 108.10 44.668 1.788 3 2xS200 Separation 127.00 62.171 1.969 4 PLF Separation 194.96 114.805 2.560 5 L110 Separation 305.56 175.352 4.623 6 C25 Ignition 307.96 176.573 4.621 7 C25 Shut-off 954.42 174.695 10.242 8 Satellite Separation 969.42 179.192 10.269
  • 16. LVM3-M4-Chandrayaan-3 Mission Timeline July 14, 2023 LVM3 M4 vehicle successfully launched Chandrayaan-3 into orbit. Chandrayaan-3, in its precise orbit, has begun its journey to the Moon. Health of the Spacecraft is normal. July 22, 2023 The fourth orbit-raising maneuver (Earth-bound perigee firing) is completed. The spacecraft is now in a 71351 km x 233 km orbit. August 06, 2023 LBN#2 is successfully completed. The spacecarft is in 170 km x 4313 km orbit around the moon July 25, 2023 Orbit-raising maneuver performed on July 25, 2023. Next firing (TransLunar Injection), is planned for August 1, 2023. July 15, 2023 The first orbit-raising maneuver (Earthbound firing-1) is successfully performed at ISTRAC/ISRO, Bengaluru. Spacecraft is now in 41762 km x 173 km orbit. July 17, 2023 The second orbit-raising maneuver performed. The spacecraft is now in 41603 km x 226 km orbit. August 05, 2023 Chandrayaan-3 is successfully inserted into the lunar orbit. The orbit achieved is 164 km x 18074 km, as intended. August 01, 2023 The spacecraft is inserted into the translunar orbit. The orbit achieved is 288 km x 369328 km. Lunar-Orbit Insertion (LOI) is planned for Aug 5, 2023.
  • 17. LVM3-M4-Chandrayaan-3 Mission Timeline August 09, 2023 Chandrayaan-3's orbit is reduced to 174 km x 1437 km following a manuevre performed on August 9, 2023 August 17, 2023 Lander Module is successfully separated from the Propulsion Module. Deboosting planned for August 18, 2023 August 19, 2023 The Lander Module is in 113 km x 157 km orbit around the moon. Second de-boosting is planned for August 20, 2023. August 14, 2023 The mission is in the orbit circularisation phase. The spacecraft is in 151 km x 179 km orbit. August 16, 2023 The spacecraft is in an orbit of 153 km x 163 km after the firing on August 16, 2023. August 23, 2023 Powered descent to commence on August 23, 2023, around 1745 Hrs. IST August 20, 2023 The Lander Module is in 25 km x 134 km orbit.
  • 18. Chandrayaan-3 Capture First Image The Moon, as viewed by Chandrayaan-3 during Lunar Orbit Insertion
  • 19. Chandrayaan-3 Mission Success The Chandrayaan-3 mission was a success, and India became the first country in the world to land a spacecraft on the Moon's south pole. The lander, named Vikram, touched down on the lunar surface at 18:04 IST (12:34 UTC) on August 23, 2023. The rover, named Pragyan, will now explore the lunar surface for the next 14 days.
  • 20. After the Vikram lander successfully lands on the Moon, it will wait for a while to let the lunar dust settle. This is to prevent the rover from getting stuck in the dust. After about 4 hours, the Pragyan rover will be released from the lander and will begin its journey to explore the lunar surface. Vikram Lander After Landing
  • 21. The rover's rollout was delayed to let Moon dust settle after the lander's touchdown. Moon's weaker gravity makes dust clearance slower, ensuring rover instrument protection was ISRO's focus. Rover's Rollout Delay
  • 22. The Pragyan rover rolled out of the Vikram lander on the Moon at approximately 12:30 AM IST on August 24, 2023. This was about 3 hours and 25 minutes after the Vikram lander touched down on the lunar surface. Pragyan Rover Rolled Out
  • 23. Pragyan is crafted to mark the national emblem and ISRO's logo on the lunar surface. It will traverse unexplored lunar terrain, transmitting data and visuals after its landing. Pragyan's Symbolic Imprints
  • 24. The Vikram lander and Pragyan rover will have a mission life of one lunar day (about 14 Earth days). During this time, they will conduct a variety of scientific experiments, including studying the lunar surface, the lunar atmosphere, and the lunar water resources. About 14 Earth Days
  • 25. Conclusion Of Chandrayaan 3 The success of Chandrayaan-3 is a major milestone for India's space program and a testament to the hard work and dedication of the ISRO team. It also opens up new possibilities for scientific research on the Moon.