Refractory installation
of a complete plant
static
predominantly castable
dynamic
predominantly bricks
Scheme of the refractory installation of a complete plant
static
predominantly castable
Water sources – physically bonded water
Installation of wet bricks Strictly follow guidelines
Avoid leaking water
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
0 12 24 36 48 60 72 84 96 108 120 132 144 156 168
t [h]
T [°C]
approx 13 K/h
approx 10 K/h
approx 30 K/h
approx 10 K/h
TrocknungTrocknungTrocknungTrocknung AufheizenAufheizenAufheizenAufheizen
Anmerkungen: Generell sollte vor dem Beginn der Trocknung und des Aufheizens ein mindestens 24 stündiges Aushärten der Masse stattgefunden haben!
1* > Ofendrehung 180° alle 45 minutes - Referenzmanteltemperatur in der Brennzone ca. 100 - 150°C
2* > Ofendrehung 90° alle 30 minutes - Referenzmanteltemperatur burning zone ca.. 200 - 235°C
3* > Ofendrehung kontinuierlich - Referenzmanteltemperatur burning zone ca. 260 - 310°C
* theoretical calculated shell temperature - depends on environment conditions
1*
2*
3*
Entfernen der
Abdichtungen / Start des
Hauptbrenners
850°C -1000°C
Inbetriebnahme
Typical dry out curve for complete new plant
Aufheizdiagrammfeuerfester Massen (LCC, MCC, SC, JC)
Heating diagrammof refractory concretes (LCC, MCC, SC, JC)
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
0 10 20 30 40 50 60 70 80 90 100 110
Zeit nach Einbau / h
Time after installation / hrs
Temperatur/°C
Temperature/°C
10 h/ 500 °C
min. 24 hErhärtungsdauer
min. 24 hrs setting time
20 h / 110 - 150 °C
15 °C/h
25 °C/h
30 °C/h
bis zur Einsatztemperatur
up to temp. of application
Heating Up
Drying
Time after installation / hTime after installation / hTime after installation / hTime after installation / h
Heating diagram of refractory concretesHeating diagram of refractory concretesHeating diagram of refractory concretesHeating diagram of refractory concretes
Heating diagram of refractory concretes (AR, LCC, SC, JC, G,Heating diagram of refractory concretes (AR, LCC, SC, JC, G,Heating diagram of refractory concretes (AR, LCC, SC, JC, G,Heating diagram of refractory concretes (AR, LCC, SC, JC, G,
MCG, LCG) Stationary areas wall thickness 50MCG, LCG) Stationary areas wall thickness 50MCG, LCG) Stationary areas wall thickness 50MCG, LCG) Stationary areas wall thickness 50---- 300 mm300 mm300 mm300 mm
Behaviour of drying rate
as a function of drying time
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13
Dryiing time
Dryingrate
Drying time [h]Drying time [h]Drying time [h]Drying time [h]
Dryingrate[quantity/h]Dryingrate[quantity/h]Dryingrate[quantity/h]Dryingrate[quantity/h] Drying rate as a function of timeDrying rate as a function of timeDrying rate as a function of timeDrying rate as a function of time
tkn
Phase 1Phase 1Phase 1Phase 1
continous drying
rate
Phase 2Phase 2Phase 2Phase 2
Decreasing drying rate
Low vapour pressure low drying rate
Ppore openingPmeniskus >Phase 1:
outletInlet
air
100100100100°°°°CCCC
/1 bar/1 bar/1 bar/1 bar
20202020°°°°CCCC
/0.02 bar/0.02 bar/0.02 bar/0.02 bar
T [°C]
Ppore opening
Pcapillary
Pmeniskus
∆P≈ 1 bar
Low temperatur, continous airstream with high ventilation
Ppore opening
Pcapillary
Pmeniscus
T [°C]
OutletInlet Air stream
350350350350°°°°CCCC
/165 bar/165 bar/165 bar/165 bar
100100100100°°°°CCCC
/1 bar/1 bar/1 bar/1 bar
< Ppore openingPMeniskusPhase 2:
∆P≈ 164 bar
High temperature, low ventilation and airstreamHigh temperature, low ventilation and airstreamHigh temperature, low ventilation and airstreamHigh temperature, low ventilation and airstream
Pressure- and temperatur gradient in a to be dried refractory body
(Dissertation: Modell zur Beschreibung der Trocknung von Feuerbetonen, Ingo Großwendt, 2007, p.25)
0
50
100
150
200
250
0 50 100 150 200 250 300 350 400
Temperature (°C)Temperature (°C)Temperature (°C)Temperature (°C)
Saturationvapourpressure(bar)Saturationvapourpressure(bar)Saturationvapourpressure(bar)Saturationvapourpressure(bar)
Aufheizdiagrammfeuerfester Massen (LCC, MCC, SC, JC)
Heating diagrammof refractory concretes (LCC, MCC, SC, JC)
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
0 10 20 30 40 50 60 70 80 90 100 110
Zeit nach Einbau / h
Time after installation / hrs
Temperatur/°C
Temperature/°C
10h / 500 °C
min. 24 h Erhärtungsdauer
min. 24 hrssetting time
20 h /110 -150 °C
15°C/h
25°C/h
30°C/h
biszur Einsatztemperatur
upto temp. of application
Explosive spalling of castable surface (satellite cooler)
Dry out - surface cracking
Typical view on a badly
predried castable , cooler
sidewalls
Explosive spalling of Castable
Spalling of wet LCC castable on burner
Optimized drying schedule
Exhaust gas – sealing of kiln and ducts
Protection against humid exhaust gases (filter, basic bricks)
Evaporation holes in the cycloneroof
lockable socket for controled evaporation
Heating up of kiln
Contraction at tyre
Limiting mechanical components
Temperaturedistribution in brick and kiln shell during heating up
In 8h to 1000°C
Too slowly heating up, too early turning of kiln
Loose lining
migration, relativ
movement
Too fast heating up
Axial and radial pressure
Spalling , cobblestone surface
Done: Drying and heating successfully finished
first clinker in cooler
Typical timing:
78 h – 120 h

More Related Content

What's hot

Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processNITIN ASNANI
 
Clinker formation
Clinker formationClinker formation
Clinker formationmkpq pasha
 
Cementformulae handbook v2
Cementformulae handbook v2Cementformulae handbook v2
Cementformulae handbook v2cesar hernandez
 
Kiln Training Module - kali.pptx
Kiln Training Module - kali.pptxKiln Training Module - kali.pptx
Kiln Training Module - kali.pptxJa Ti
 
Rotary kiln maintenance
Rotary kiln maintenanceRotary kiln maintenance
Rotary kiln maintenancetaghdiri
 
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...IAEME Publication
 
Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)Mohamed Gomaa
 
9 Lining Thickness
9 Lining Thickness9 Lining Thickness
9 Lining ThicknessRicardoMosci
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systemsIngrid McKenzie
 
54666070 kiln-operation
54666070 kiln-operation54666070 kiln-operation
54666070 kiln-operationDin Sokreach
 
Microsoft power point bag house corrosion
Microsoft power point   bag house corrosionMicrosoft power point   bag house corrosion
Microsoft power point bag house corrosionpradeepdeepi
 
How to control kiln shell corrosion
How to control kiln shell corrosionHow to control kiln shell corrosion
How to control kiln shell corrosionAnkit Karwa
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Karan Walia
 
Sintering Technology
Sintering   Technology  Sintering   Technology
Sintering Technology Sajan Agrawal
 
Use of diverting_gatesfor_kiln_preheater (1)
Use of diverting_gatesfor_kiln_preheater (1)Use of diverting_gatesfor_kiln_preheater (1)
Use of diverting_gatesfor_kiln_preheater (1)pradeepdeepi
 

What's hot (20)

Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Formulas kiln
Formulas kilnFormulas kiln
Formulas kiln
 
Direct vs. Indirect Rotary Kilns
Direct vs. Indirect Rotary KilnsDirect vs. Indirect Rotary Kilns
Direct vs. Indirect Rotary Kilns
 
Clinker formation
Clinker formationClinker formation
Clinker formation
 
Cementformulae handbook v2
Cementformulae handbook v2Cementformulae handbook v2
Cementformulae handbook v2
 
Kiln Training Module - kali.pptx
Kiln Training Module - kali.pptxKiln Training Module - kali.pptx
Kiln Training Module - kali.pptx
 
Rotary kiln maintenance
Rotary kiln maintenanceRotary kiln maintenance
Rotary kiln maintenance
 
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
 
Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)
 
Kiln training
Kiln trainingKiln training
Kiln training
 
9 Lining Thickness
9 Lining Thickness9 Lining Thickness
9 Lining Thickness
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systems
 
54666070 kiln-operation
54666070 kiln-operation54666070 kiln-operation
54666070 kiln-operation
 
Microsoft power point bag house corrosion
Microsoft power point   bag house corrosionMicrosoft power point   bag house corrosion
Microsoft power point bag house corrosion
 
How to control kiln shell corrosion
How to control kiln shell corrosionHow to control kiln shell corrosion
How to control kiln shell corrosion
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
 
Cement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawyCement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawy
 
Sintering Technology
Sintering   Technology  Sintering   Technology
Sintering Technology
 
Use of diverting_gatesfor_kiln_preheater (1)
Use of diverting_gatesfor_kiln_preheater (1)Use of diverting_gatesfor_kiln_preheater (1)
Use of diverting_gatesfor_kiln_preheater (1)
 

Similar to Dry out-heating-up-of-cement-kiln-refractories

SK-IRE-2017.compressed.pdf
SK-IRE-2017.compressed.pdfSK-IRE-2017.compressed.pdf
SK-IRE-2017.compressed.pdfssuserbf9a4d
 
TDS BFW-400(SR Type)
TDS BFW-400(SR Type)TDS BFW-400(SR Type)
TDS BFW-400(SR Type)Paul Kim
 
Eaf Makale
Eaf MakaleEaf Makale
Eaf Makalemetudgn
 
NEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINA
NEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINANEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINA
NEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINAmetudgn
 
Ihcp analysis of qc10 vs nak80 (9 nov 2010)linkedin
Ihcp analysis of qc10 vs nak80 (9 nov 2010)linkedinIhcp analysis of qc10 vs nak80 (9 nov 2010)linkedin
Ihcp analysis of qc10 vs nak80 (9 nov 2010)linkedinmikekraemer
 
Ihcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)Linkedin
Ihcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)LinkedinIhcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)Linkedin
Ihcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)Linkedinmikekraemer
 
NANOBOND The next generation of refractory technology
NANOBOND The next generation of refractory technologyNANOBOND The next generation of refractory technology
NANOBOND The next generation of refractory technologyRefratechnik Group
 
Thapar_Paarth_2015GOMD-hj
Thapar_Paarth_2015GOMD-hjThapar_Paarth_2015GOMD-hj
Thapar_Paarth_2015GOMD-hjPaarth Thapar
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc DRP Joint
 
MSEC2012_poster_Cisneros_Jorge
MSEC2012_poster_Cisneros_JorgeMSEC2012_poster_Cisneros_Jorge
MSEC2012_poster_Cisneros_JorgeJorge Cisneros
 
Petrographic investigation to assess condition of concrete exposed to fire
Petrographic investigation to assess condition of concrete exposed to firePetrographic investigation to assess condition of concrete exposed to fire
Petrographic investigation to assess condition of concrete exposed to fireIRJET Journal
 
STEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINA
STEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINASTEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINA
STEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINAmetudgn
 
Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)
Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)
Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)Piti Sukontasukkul
 

Similar to Dry out-heating-up-of-cement-kiln-refractories (20)

C8000 Datasheet
C8000 DatasheetC8000 Datasheet
C8000 Datasheet
 
1Malaysia Cabin
1Malaysia Cabin1Malaysia Cabin
1Malaysia Cabin
 
ResearchSummary
ResearchSummaryResearchSummary
ResearchSummary
 
SK-IRE-2017.compressed.pdf
SK-IRE-2017.compressed.pdfSK-IRE-2017.compressed.pdf
SK-IRE-2017.compressed.pdf
 
C4800 Datasheet
C4800 DatasheetC4800 Datasheet
C4800 Datasheet
 
TDS BFW-400(SR Type)
TDS BFW-400(SR Type)TDS BFW-400(SR Type)
TDS BFW-400(SR Type)
 
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
 
Eaf Makale
Eaf MakaleEaf Makale
Eaf Makale
 
NEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINA
NEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINANEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINA
NEW INNOVATIONS IN ARC FURNACE TECHNOLOGY BY CVS MAKINA
 
Ihcp analysis of qc10 vs nak80 (9 nov 2010)linkedin
Ihcp analysis of qc10 vs nak80 (9 nov 2010)linkedinIhcp analysis of qc10 vs nak80 (9 nov 2010)linkedin
Ihcp analysis of qc10 vs nak80 (9 nov 2010)linkedin
 
Ihcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)Linkedin
Ihcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)LinkedinIhcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)Linkedin
Ihcp Analysis Of Qc10 Vs Nak80 (9 Nov 2010)Linkedin
 
NANOBOND The next generation of refractory technology
NANOBOND The next generation of refractory technologyNANOBOND The next generation of refractory technology
NANOBOND The next generation of refractory technology
 
Thapar_Paarth_2015GOMD-hj
Thapar_Paarth_2015GOMD-hjThapar_Paarth_2015GOMD-hj
Thapar_Paarth_2015GOMD-hj
 
UniCase Master®
UniCase Master®UniCase Master®
UniCase Master®
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc
 
MSEC2012_poster_Cisneros_Jorge
MSEC2012_poster_Cisneros_JorgeMSEC2012_poster_Cisneros_Jorge
MSEC2012_poster_Cisneros_Jorge
 
Corrosion Under Insulation
Corrosion Under InsulationCorrosion Under Insulation
Corrosion Under Insulation
 
Petrographic investigation to assess condition of concrete exposed to fire
Petrographic investigation to assess condition of concrete exposed to firePetrographic investigation to assess condition of concrete exposed to fire
Petrographic investigation to assess condition of concrete exposed to fire
 
STEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINA
STEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINASTEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINA
STEELMAKING TECHNOLOGIES AND NEW INNOVATIONS IN MELTSHOPS - CVS MAKINA
 
Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)
Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)
Performance of Steel Fiber under Fire and Impact Loading (Piti Sukontasukkul)
 

More from mkpq pasha

Pipe line activities To know about fabrication and modifications work Instal...
Pipe line activities  To know about fabrication and modifications work Instal...Pipe line activities  To know about fabrication and modifications work Instal...
Pipe line activities To know about fabrication and modifications work Instal...mkpq pasha
 
Zig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdfZig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdfmkpq pasha
 
Strategic safety managment in construction and engineering
Strategic safety managment in construction and engineeringStrategic safety managment in construction and engineering
Strategic safety managment in construction and engineeringmkpq pasha
 
Job safety analysis jsa
Job safety analysis   jsaJob safety analysis   jsa
Job safety analysis jsamkpq pasha
 
Hazardous waste compliance
Hazardous waste complianceHazardous waste compliance
Hazardous waste compliancemkpq pasha
 
Safety procedures
Safety procedures Safety procedures
Safety procedures mkpq pasha
 
Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556mkpq pasha
 
General v8.compressed15.compressed
General v8.compressed15.compressedGeneral v8.compressed15.compressed
General v8.compressed15.compressedmkpq pasha
 
Deca catalogo 2012 i en-fr
Deca catalogo 2012 i en-frDeca catalogo 2012 i en-fr
Deca catalogo 2012 i en-frmkpq pasha
 
Bag house dust-collection-system
Bag house dust-collection-systemBag house dust-collection-system
Bag house dust-collection-systemmkpq pasha
 
Brochure bag-houses
Brochure bag-housesBrochure bag-houses
Brochure bag-housesmkpq pasha
 
Bearing self study guide
Bearing self study guideBearing self study guide
Bearing self study guidemkpq pasha
 
Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17mkpq pasha
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening mkpq pasha
 
داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳mkpq pasha
 
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہمجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہmkpq pasha
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentmkpq pasha
 

More from mkpq pasha (20)

Pipe line activities To know about fabrication and modifications work Instal...
Pipe line activities  To know about fabrication and modifications work Instal...Pipe line activities  To know about fabrication and modifications work Instal...
Pipe line activities To know about fabrication and modifications work Instal...
 
Zig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdfZig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdf
 
Strategic safety managment in construction and engineering
Strategic safety managment in construction and engineeringStrategic safety managment in construction and engineering
Strategic safety managment in construction and engineering
 
Job safety analysis jsa
Job safety analysis   jsaJob safety analysis   jsa
Job safety analysis jsa
 
Hazardous waste compliance
Hazardous waste complianceHazardous waste compliance
Hazardous waste compliance
 
Guide to ehs
Guide to ehsGuide to ehs
Guide to ehs
 
Safety procedures
Safety procedures Safety procedures
Safety procedures
 
Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556
 
General v8.compressed15.compressed
General v8.compressed15.compressedGeneral v8.compressed15.compressed
General v8.compressed15.compressed
 
Deca catalogo 2012 i en-fr
Deca catalogo 2012 i en-frDeca catalogo 2012 i en-fr
Deca catalogo 2012 i en-fr
 
Catalogo gga
Catalogo ggaCatalogo gga
Catalogo gga
 
Bag house dust-collection-system
Bag house dust-collection-systemBag house dust-collection-system
Bag house dust-collection-system
 
Brochure bag-houses
Brochure bag-housesBrochure bag-houses
Brochure bag-houses
 
Bearing self study guide
Bearing self study guideBearing self study guide
Bearing self study guide
 
Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening
 
Ya hafizo
Ya hafizoYa hafizo
Ya hafizo
 
داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳
 
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہمجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 

Recently uploaded

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 

Recently uploaded (20)

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 

Dry out-heating-up-of-cement-kiln-refractories

  • 1. Drying out and Heating up of refractory installations in the cement industry Dirk Basten Refratechnik Cement Supervisor Training Course 2012
  • 3. static predominantly castable dynamic predominantly bricks Scheme of the refractory installation of a complete plant static predominantly castable
  • 4. Water sources – physically bonded water Installation of wet bricks Strictly follow guidelines Avoid leaking water
  • 5. 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 0 12 24 36 48 60 72 84 96 108 120 132 144 156 168 t [h] T [°C] approx 13 K/h approx 10 K/h approx 30 K/h approx 10 K/h TrocknungTrocknungTrocknungTrocknung AufheizenAufheizenAufheizenAufheizen Anmerkungen: Generell sollte vor dem Beginn der Trocknung und des Aufheizens ein mindestens 24 stündiges Aushärten der Masse stattgefunden haben! 1* > Ofendrehung 180° alle 45 minutes - Referenzmanteltemperatur in der Brennzone ca. 100 - 150°C 2* > Ofendrehung 90° alle 30 minutes - Referenzmanteltemperatur burning zone ca.. 200 - 235°C 3* > Ofendrehung kontinuierlich - Referenzmanteltemperatur burning zone ca. 260 - 310°C * theoretical calculated shell temperature - depends on environment conditions 1* 2* 3* Entfernen der Abdichtungen / Start des Hauptbrenners 850°C -1000°C Inbetriebnahme
  • 6. Typical dry out curve for complete new plant
  • 7. Aufheizdiagrammfeuerfester Massen (LCC, MCC, SC, JC) Heating diagrammof refractory concretes (LCC, MCC, SC, JC) 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 0 10 20 30 40 50 60 70 80 90 100 110 Zeit nach Einbau / h Time after installation / hrs Temperatur/°C Temperature/°C 10 h/ 500 °C min. 24 hErhärtungsdauer min. 24 hrs setting time 20 h / 110 - 150 °C 15 °C/h 25 °C/h 30 °C/h bis zur Einsatztemperatur up to temp. of application Heating Up Drying Time after installation / hTime after installation / hTime after installation / hTime after installation / h Heating diagram of refractory concretesHeating diagram of refractory concretesHeating diagram of refractory concretesHeating diagram of refractory concretes Heating diagram of refractory concretes (AR, LCC, SC, JC, G,Heating diagram of refractory concretes (AR, LCC, SC, JC, G,Heating diagram of refractory concretes (AR, LCC, SC, JC, G,Heating diagram of refractory concretes (AR, LCC, SC, JC, G, MCG, LCG) Stationary areas wall thickness 50MCG, LCG) Stationary areas wall thickness 50MCG, LCG) Stationary areas wall thickness 50MCG, LCG) Stationary areas wall thickness 50---- 300 mm300 mm300 mm300 mm
  • 8. Behaviour of drying rate as a function of drying time 0 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 Dryiing time Dryingrate Drying time [h]Drying time [h]Drying time [h]Drying time [h] Dryingrate[quantity/h]Dryingrate[quantity/h]Dryingrate[quantity/h]Dryingrate[quantity/h] Drying rate as a function of timeDrying rate as a function of timeDrying rate as a function of timeDrying rate as a function of time tkn Phase 1Phase 1Phase 1Phase 1 continous drying rate Phase 2Phase 2Phase 2Phase 2 Decreasing drying rate Low vapour pressure low drying rate
  • 9. Ppore openingPmeniskus >Phase 1: outletInlet air 100100100100°°°°CCCC /1 bar/1 bar/1 bar/1 bar 20202020°°°°CCCC /0.02 bar/0.02 bar/0.02 bar/0.02 bar T [°C] Ppore opening Pcapillary Pmeniskus ∆P≈ 1 bar Low temperatur, continous airstream with high ventilation
  • 10. Ppore opening Pcapillary Pmeniscus T [°C] OutletInlet Air stream 350350350350°°°°CCCC /165 bar/165 bar/165 bar/165 bar 100100100100°°°°CCCC /1 bar/1 bar/1 bar/1 bar < Ppore openingPMeniskusPhase 2: ∆P≈ 164 bar High temperature, low ventilation and airstreamHigh temperature, low ventilation and airstreamHigh temperature, low ventilation and airstreamHigh temperature, low ventilation and airstream
  • 11. Pressure- and temperatur gradient in a to be dried refractory body (Dissertation: Modell zur Beschreibung der Trocknung von Feuerbetonen, Ingo Großwendt, 2007, p.25) 0 50 100 150 200 250 0 50 100 150 200 250 300 350 400 Temperature (°C)Temperature (°C)Temperature (°C)Temperature (°C) Saturationvapourpressure(bar)Saturationvapourpressure(bar)Saturationvapourpressure(bar)Saturationvapourpressure(bar) Aufheizdiagrammfeuerfester Massen (LCC, MCC, SC, JC) Heating diagrammof refractory concretes (LCC, MCC, SC, JC) 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 0 10 20 30 40 50 60 70 80 90 100 110 Zeit nach Einbau / h Time after installation / hrs Temperatur/°C Temperature/°C 10h / 500 °C min. 24 h Erhärtungsdauer min. 24 hrssetting time 20 h /110 -150 °C 15°C/h 25°C/h 30°C/h biszur Einsatztemperatur upto temp. of application
  • 12. Explosive spalling of castable surface (satellite cooler)
  • 13. Dry out - surface cracking Typical view on a badly predried castable , cooler sidewalls
  • 15. Spalling of wet LCC castable on burner
  • 17. Exhaust gas – sealing of kiln and ducts Protection against humid exhaust gases (filter, basic bricks)
  • 18. Evaporation holes in the cycloneroof lockable socket for controled evaporation
  • 20. Contraction at tyre Limiting mechanical components
  • 21. Temperaturedistribution in brick and kiln shell during heating up In 8h to 1000°C
  • 22. Too slowly heating up, too early turning of kiln Loose lining migration, relativ movement
  • 23. Too fast heating up Axial and radial pressure Spalling , cobblestone surface
  • 24. Done: Drying and heating successfully finished first clinker in cooler Typical timing: 78 h – 120 h