2. • Wallace Group, Feilding is an active plant
with moving machinery, vehicles, hazardous
substances and restricted areas
• Tanning is the major activity on site
• We safely and compliantly treat, process and
dispose of all waste received on site
EXPLANATION OF SITE
ACTIVITIES
3. • Upon hearing the emergency alarm, all
contractors must follow the fire warden or the
staff to assembly area
• Do not return to the work site unless
authorised to do so by site management
EVACUATION PROCEDURE
4. • All visitors and customers to be
escorted or inducted
• Stick to 15 Km/h speed limit
• Be aware of location of working
machinery and trucks
MAIN HAZARDS
MOVING VEHICLES
• Only authorised personnel and
trained contractors to handle
chemicals and hazardous
substances
5. MAIN HAZARDS
SLIPS, TRIPS AND
FALLS
• Do not leave items on the ground
• Watch where you walk
SPLASHES
• Wear your safety glasses at all times
• Before starting work ensure you know
the location of the nearest safety shower
and eyewash location
6. INCIDENT REPORTING
• All incidents, near misses, accidents and
hazards must be reported to the relevant
authority/ manager ASAP
• Environmental issues such as spills must also
be reported
• Contractors must not attempt to clean up
spills but must report them as soon as
observed
7. • The minimum PPE requirements (provided by the contractor) for entering the
operational area of the site are listed above.
• Additional PPE may be necessary depending on the task
PPE REQUIREMENTS
STEEL TOE
CAP BOOTS
HIGH VIZ VEST SAFETY GLASSES GLOVES
*IF HANDLING CHEMICALS
8. • ALL Contractors entering the
site must be inducted and
signed in
• ALL Contractors must report to
the appropriate manager upon
arrival
• Pedestrians should keep to the
yellow walkway, pedestrian
crossings and maintain a safe
distance between them and
moving machinery
OTHER SITE RULES
• This is a drug and alcohol free site
• Strictly no smoking, drinking or eating
(Except for designated areas)
• The environment within the plant includes
anaerobic ponds, dead and decaying
animal matter, decaying plant matter and
bacteria associated with them. Please
maintain good hygiene practices
• No running on site and be aware of
slip, trip and fall hazards
• Please DO NOT use your cell phones in
and near flammable substances and
sensitive areas
9. • Work on site can only be carried out
by an approved contractor
• Specific Permits must be obtained
for all working at heights,
excavation, restricted areas, Ponds
8 & 9, BIO GAS FLARE, PUMP
STATION RENDERING, crane-lift,
hot works and confined space work
CONSENT TO WORK AND
PERMIT
10. THANK YOU FOR COMPLETING THE INDUCTION
Please click on the ‘QUIZ’ button below
to complete a short quiz
to ensure you have understood
the information contained in
this presentation