1. A Presentation to
by
A Specialist Company in
Generation of Electricity by Other Sources
Engineering Services in Clean Energy
2. Solar-Driven Asia
Vision and Mission
•
•
Vision
– To aggregate into a leading Environmental Friendly State with emphasis on
research towards further developing and producing Environmental Friendly
Technologies.
Mission
– To create and make available Environmental Friendly Technologies that will:
Lower Green House Gas Emission
Utilizes Clean Energy (Renewable Energy)
Lower Cost, Increase Efficiency and Improve Returns
3. Solar-Driven Asia
Has Experience in Installing
•
SDA Products are developed for use in The Tropics
– Solar Power Generation Systems
• Incorporate wide range of photovoltaic power systems
o Originating from Japan, Taiwan, China and Denmark
– Wind Power Generation Systems
• Feature precise generators for precise deployment in Asian
Climate.
o
o
o
o
o
o
Telecom
Roof- top
Smart-Village Solutions
Remote Areas / Back-up
Wind Farm
Billboards
– Solar Street Lamps
o Stand alone street lights
o Centrally operated solar street lights
– L.E.D. Lights
–
–
–
–
Indicators and Signs
Lighting
Smart lighting
Sustainable lighting
4. Solar-Driven Asia
Work Process Model
Solar Generation System Installation Process Flow
Solar Generation System Installation Process Flow
STEP 1
STEP 1
Analyze & Design
Analyze & Design
(Power Consumption & House
(Power Consumption & House
Dimension)
Dimension)
Solar
Solar
Generation System
Generation System
Operating
Operating
STEP 2
STEP 2
Propose
Propose
(Simulation and Estimations)
(Simulation and Estimations)
STEP 5
STEP 5
Grid Connection
Grid Connection
(Connects to the Electricity Grid
(Connects to the Electricity Grid
System)
System)
STEP 3
STEP 3
Safety/Roof Check
Safety/Roof Check
(Inspection of the building and
(Inspection of the building and
application to relevant
application to relevant
government departments)
government departments)
STEP 4
STEP 4
Installation
Installation
(Duration will depend on the
(Duration will depend on the
proposed solution)
proposed solution)
5. Solar-Driven Asia Total Solutions
Solar-Driven Asia
Total Integration
Comprehensive Guarantee
& After-sales Service
Full Service Installation
Design & Development
Product introduction
Project
Identification
Manufacturer
Collaboration
KeTTAH
KeTTAH
& Sabah
& Sabah
Solar-Driven Asia Partners Asia’s Leading Manufacturer of Clean Energy Generation Systems Company
•
•
•
•
•
Comprehensive knowledge on roof construction
and electrical fitment
Fully certified technicians
Completely tailor-made installations
Diligent after-sales
Incorporates renewable 5-yearly maintenance programs
6. Solar-Driven Asia Solar System Capabilities
Solar System Applications
Module for High Buildings
Design to withstand:
Typhoon
Snow Storm
Earth Quake
High Efficiency Module
High Power Output
Power Conditioner
Inverter
Converter
Battery
Transparent Module
Install on Windows
UV Filtering
Thin Film Module
Solar L.E.D Lamp/Lights
Long Lifetime
High Efficiency
7. Solar-Driven Asia
Solar Generation Systems Customisation
Solar Energy
Power Conditioner
Electricity Generated from Solar Housing System
Household Electricity Consumed
Solar Power Consumed
Power Generated from Solar
Power Consumed
Solar Cell Module
Morning Noon
Battery / Electricity Grid
Consumption
Night
Morning Noon
Amount of power consumed in the average household
(H.K) about 4400kWh years, so this is the rated output
can cover 3 ~ 4kW solar system.
Solar Cell Module
Horizontal Holder
Solar Panel Frame
H-Mount for Roof
Night Morning Noon
Solar Cell
Module
Night
8. Solar- Driven Asia
Solar Generation System Extensions
Hybrid Solar Generation
Hybrid Solar Generation
System
System
Standalone Solar
Standalone Solar
Generation System
Generation System
9. Solar-Driven Asia Adheres to World Standard
Generic Power Rules & Regulations
Generic World Power Rules and Regulations
Generic World Power Rules and Regulations
a) On electrical installation aspects
a) On electrical installation aspects
1.
1. According to the Electricity Ordinance, owners of electrical installations should employ registered
According to the Electricity Ordinance, owners of electrical installations should employ registered
electrical contractors to carry out electrical work (including new installation, addition, alteration,
electrical contractors to carry out electrical work (including new installation, addition, alteration,
inspection, testing and repair). The registered electrical contractors should arrange registered
inspection, testing and repair). The registered electrical contractors should arrange registered
electrical workers of appropriate grades to carry out the work. AA Registered Electrical Contractor
electrical workers of appropriate grades to carry out the work. Registered Electrical Contractor
should be employed to carry out for the work.
should be employed to carry out for the work.
2. Code of Practice of Electricity (Wiring) Regulations, Electrical and Mechanical Services Department
2. Code of Practice of Electricity (Wiring) Regulations, Electrical and Mechanical Services Department
3. Supply Rules of the power company concerned
3. Supply Rules of the power company concerned
a) On grid connection aspects
a) On grid connection aspects
1. Technical Guidelines on Grid Connection of Small-scale Renewable Energy Power Systems
1. Technical Guidelines on Grid Connection of Small-scale Renewable Energy Power Systems
2. Renewable Energy Systems
2. Renewable Energy Systems
a) On building structure/space aspects
a) On building structure/space aspects
1. Concerning the building structure/space considerations, the building owner/occupant is advised to
1. Concerning the building structure/space considerations, the building owner/occupant is advised to
make reference to approved plans of the parent building and to consult building professionals to
make reference to approved plans of the parent building and to consult building professionals to
ensure that the existing building is structurally safe to support the additional system components,
ensure that the existing building is structurally safe to support the additional system components,
and that the prescribed windows as well as the means of escape including any roof designated as
and that the prescribed windows as well as the means of escape including any roof designated as
refuge floor thereof are not obstructed. Where alterations and additions to the existing building
refuge floor thereof are not obstructed. Where alterations and additions to the existing building
structure are involved to support the additional system components, prior approval and consent from
structure are involved to support the additional system components, prior approval and consent from
the Building Authority under the Building Ordinance and Lands Department are required. An
the Building Authority under the Building Ordinance and Lands Department are required. An
Authorized Person (AP) (Architect, Engineer or Surveyor registered under the Buildings Ordinance)
Authorized Person (AP) (Architect, Engineer or Surveyor registered under the Buildings Ordinance)
and the respective District Lands Offices should be consulted in case of doubt.
and the respective District Lands Offices should be consulted in case of doubt.
10. Solar-Driven Asia Recommended
Bundled Solar Street Lamp
L.E.D Lights
Lamp Pole
Solar
Lightings
Solar Module
Discharge timer controller
Overcharge Protection
Auto On/Off
according to Sunlight
Timer Controller
Top Cover
Alert Lighting Mode
Seismic Sensors
Cover
Battery
Controller
Seismic sensors
Power Box
Battery
11. Solar-Driven Asia
Solar L.E.D. Street Lamp Benefits
5X
Conventional
Lighting
Ap
pr
ox
Short
Lifetime
2Y
ea
rs
L.E.D. Lighting
0
x1
ro
pp
A
Lower Labour Cost
5 times longer
lifetime
s
ar
Ye
Maintenance
Free
(Daily Usage: 12hours/Day)
Cost Savings
Reduction in Electricity and Labour
Reduction in Electricity and Labour
Costs
Costs
Long-life LED light source adopted.
Long-life LED light source adopted.
In addition to economic benefits, itit
In addition to economic benefits,
also contributes significantly to the
also contributes significantly to the
improvement of the position
improvement of the position
established by considering the
established by considering the
environmental concerns.
environmental concerns.
Decouple with Electricity Grid
Electricity grid connection is not
Electricity grid connection is not
required.
required.
Installation is easy and
Installation is easy and
economical.
economical.
In addition, in the case of power
In addition, in the case of power
plant malfunction, the lamp can
plant malfunction, the lamp can
continue to operate solely relied
continue to operate solely relied
on battery up to 55- -77days.
on battery up to
days.
12. Solar-Driven Asia
Solar L.E.D. Street Lamp Components
Solar Street Lamp Overview
L.E.D. Lamp
Solar Module
1 - Solar Module
Solar panel featured efficient A-class
chip, charge stability of adequate
power. High transmittance of optical
glass dedicated.
3 - Controller
2 – L.E.D. Lamp
High performance L.E.D lamps,
with a guarantee working life time
of 40,000 hrs with 80% of its
brightness.
4 - Batteries
Controller
Rechargeable batteries have 11 overcharge and over-discharge protection
functions.
Batteries
Includes FM-switching technology
function modules, through digital
programming control and power
supply technology to replace the
conventional constant current source
The energy which solar panels
generated from sunshine is
transmitted and stored into high
efficient batteries.
13. Solar-Driven Asia
Anti-Insects Effect L.E.D.
LED lighting does not generate
LED lighting does not generate
ULTRAVIOLET which is only visible
ULTRAVIOLET which is only visible
frequency for insect
frequency for insect
LED lighting is anti-insect effect indoor
LED lighting is anti-insect effect indoor
and outdoor
and outdoor
Volume of ultraviolet is measured by
Volume of ultraviolet is measured by
tester with LED light(40LBM) and
tester with LED light(40LBM) and
fluorescent light(40W)
fluorescent light(40W)
LED Light (40LBM )
fluorescent light
(40W )
volume of
ultraviolet
0.5 ~ 0.8μW/cm2
113 ~ 159μW/cm2
LED light is only 1/200 in compare to
LED light is only 1/200 in compare to
fluorescent light.
fluorescent light.
LED replacing fluorescent light benefit:
LED replacing fluorescent light benefit:
Saving El
Saving El
Saving Electricity
Saving Electricity
Savings on Labour cost (frequent
Savings on Labour cost (frequent
replacement)
replacement)
Reducing CO2
Reducing CO2
Anti-insect effect
Anti-insect effect
Effectiveness by area in LED light
Effectiveness by area in LED light
(equivalent to 60W fluorescent
(equivalent to 60W fluorescent
light)
light)
15. Solar-Driven Asia Collaborate with
Japan No. 1 Solar Power Generation Company
•
Proven Channel Support
•
Partnership with No1. Solar
Power Generation System for
Commercial and Residential
Property in Japan
•
Safe and Speedy Installation by
SDA Engineers in collaboration
with Certified Engineers of
Ecosystem Japan Co.
•
Lowest industry rectification rate
•
A Comprehensive Installation
Service
•
Seamless and Integrated Service
Maintenance Program
•
Continuing New development of
Other Clean Energy Systems
(Hybrid Solar & Wind Generation
Systems)
•
Unparallel Application Know-How
16. Proven Track Record of Roof Top
Installations in Japan
Commercial Property – Added Security
Commercial Property – Added Security
Residential Property
Residential Property
– Limited Access
– Limited Access
Industrial Buildings – High Rise
Industrial Buildings – High Rise
Highways / /Toll
Highways Toll
– Restricted Space
– Restricted Space
17. Proven Track Record
of Vertical Fitment in Japan
Solar Generation System installed for Walls and Windows
Solar Generation System installed for Walls and Windows
18. Further Examples of Large Scale Application
and Track Record in Japan
Tokyo Train Station
Tokyo Train Station
Tokyo Bus Station
Tokyo Bus Station
19. More Samples of Solar Lighting Systems
Installed in Japan
Solar/Windmill Street Lamp Solution
Solar/Windmill Street Lamp Solution
20. Solar-Driven Asia
Next Steps with KeTTAH
•
SDA Products will be developed and deployed to specific Sabah requirements
– Solar Power Generation Systems
• SDA is recommending use of a Japanese photovoltaic power systems
owned by ITOCHU Corp.
o Primarily from Ecosystem Japan Co. Ltd.
Mr. Toshio Shegami
21. Solar-Driven Asia
Next Steps with KeTTAH
•
SDA Products will be developed and deployed to specific Sabah Requirements
– Consideration for Wind Power Generation Systems by Zephyr
• To develop electricity generation to support:
• Asian Climate.
o
o
o
o
o
o
Telecom
Roof- top
Smart-Village Solutions
Remote Areas / Back-up
Wind Farm
Billboards
Electrical Vehicle Charging Station
Zhangjiang High-Tech Park in Pudong
Truck Test - Tsukuba Racing Circuit
Field Test - WEICan
(Wind Energy Institute of Canada)
Iwaki-oki Gas Fields
22. Solar-Driven Asia
Next Steps with KeTTAH
•
SDA Products will be developed and deployed to specific Sabah Requirements
– Solar Street Lamps
o Stand alone street lights
o Centrally operated solar street lights
– L.E.D. Lights
–
–
–
–
Indicators and Signs
Lighting
Smart lighting
Sustainable lighting
23. Clean Energy Frequently Asked Questions
1. How does solar work?
Solar electricity works exactly the same as the electricity you buy from the utility
company. You turn on lights, plug in lamps and power appliances the same way you do
right now. In fact, if you didn't see solar modules on the roof, you'd never notice any
difference—except a lower electric bill. While the science of converting sunshine into
electricity is complex, the idea is pretty simple. Solar electricity is generated by a group of
solar modules called an array that's installed on your roof or in your yard. When sunlight
falls on the solar modules, a DC electrical current is created instantly. The DC electricity
is fed into an inverter that changes it to standard AC electricity—the same kind your
home already uses.
According to the American Solar Energy Society, the amount of sunlight hitting the earth
in just one hour is enough to provide the world's energy needs for an entire year.
2. How do I know if solar will work on my home?
We offers more than one way to go solar. With so many options to choose from, you can
decide what's right for your home and your family. Much of the decision is based on the
amount of roof space you have and which direction your home faces. South-facing roofs
produce the highest annual output; however, east- and west-facing roofs can also harvest
good results. It is important that your system will not be shaded by trees, buildings or
other obstacles for long periods throughout the day.
24. Solar-Driven Asia FAQ
3. Does solar work on cloudy days?
Yes, solar modules produce electricity on cloudy days, it is just less electricity. If the solar
modules are completely covered in snow, they will not produce electricity. As a rule of
thumb, if there is enough sunlight to cast a shadow, then solar panels can produce
electricity. Of course, in areas where there is abundant sunshine—like California—a
smaller solar electricity system will provide as much power as a larger system located in
Maine or Washington. But, solar works just about anywhere and makes a difference on
your utility bills.
4. Are solar modules dangerous?
All the modules that we use are UL 1703 certified and hold a Fire Rating of Class C.
Solar systems should be installed by a certified solar installer, which will include work
done by a licensed electrician.
5. How long does it take to install a solar system?
It takes approximately 1 month for the average residential rooftop system to be installed.
One should expect 2 - 3 months for the entire process, which includes everything from a
site evaluation to the switch being turned on.
25. Solar-Driven Asia FAQ
6. Will a solar installation ruin my roof?
Green Power Industrial solar residential system creates a new dimension in solar
aesthetics and reliability. Its clean, elegant appearance blends beautifully with rooflines,
and sleek front, top and side trim covers improve water channeling and decrease wind
drag. Custom-engineered tile attachments and ultra low-profile sliders atop hidden butyl
sealant pads provide superior water protection.
We performed extensive testing to ensure that water leakage is not an issue when our
Solar Generation system is used on residential roofs. Our system has special sealant
pads that instantly create a waterproof seal at all roof penetrations. A black silicone
caulking is then added for additional protection.
7. How does using solar electricity help the environment? Does solar help offset
climate change?
Coal-fired electrical power plants are responsible for 72% of all sulfur dioxide emissions
in the U.S. On the other hand, solar electricity produces absolutely no pollution. One
million homes going solar would result in a carbon dioxide emissions reduction of 4.3
million tons per year! That's the equivalent of removing 850,000 cars from the road. By
using more solar electricity, fewer greenhouse gas-producing power plants need to be
built. This is one major step to reducing climate change.
26. Solar-Driven Asia FAQ
8. What if there is a black out, will I have power?
If you have a typical residential system, they you will lose power during a black out. This
is due to safety precautions. Electrical workers need to know if electricity is running
through power lines when working. If they believe there isn't electricity in the lines,
because of the blackout, but your system is adding electricity to the grid, this could cause
safety issues.
You can still produce electricity when there is a black out if you have a battery back up
system. Batteries add a significant cost of the overall system. Installing a battery back up
system is not necessary unless you are in an area with severe black out issues, or intend
not to connect to the utility.
9. How big of a solar system do I need?
The size of your system depends on how much electricity your household uses on a
regular basis. You can figure this out by looking at the last 12 months of electric usage in
kilowatt hours (kWh) on your utility bills.
The most efficient use of your money is to offset your highest rates if you pay based on a
tiered rate schedule. Instead of attempting to offset 100% of you’re your use, you may
consider offsetting a portion of your consumption.
27. Solar-Driven Asia FAQ
10. Is there maintenance required to keep a solar system operational?
Occasionally, a solar array should be rinsed off with a hose to clear the dust or debris that
blocks sunlight and reduces efficiency. That’s about all that's required.
11. How do I get electricity at night? Can my solar system store energy for use at
night?
While sunlight is required for solar modules to create electricity, your home will draw
power from the utility grid during nighttime hours, unless you have a battery backup
system for your home. While batteries are helpful during blackouts, this option is really
only necessary for remote homes and cabins that are not connected to the utility grid.
Editor's Notes
Help reducing green house gas emission
Research and Develop emission free technologies that can replace current technologies
Uses clean energy (renewable energy)
Solar power at the first stage
Low cost and high efficiency
Our aim is to develop marketable technologies with a relative short ROI, and able result in reduce energy cost (cost savings)