1. PROFILE
NAME : ISMAIL FAMILY NAME : MOHD TAHIR
MARITAL STATUS: :MARRIED
NATIONALITY MALAYSIA
D.O.B :08 APRIL 1941
TELEPHONE (H.P) : +60111-6333910
RELIGION ISLAM
HEALTH : EXCELENT
EDUCATION : ASSOCIATE in APPLIED SCIENCE (MARINE TECHNOLOGY).
COLLAGE / : SEATTLE, USA
UNIVERSITY
YEARS : 1978 – 1982
EMPLOYERS : PETRONAS (MALAYSIAN NATIONAL & GAS COMPANY)
PETRONAS STAFF NO -18538
1982 – 1992.
JOIND AY ENGINEERING – 1992 – 1996
NOTIFICATION OF EMPLOYMENT ONE (20) DAYS
Preferable area Middle-East
PROFESSIONAL COURSE / CERTIFICATE OBTAIN
MEMBER of AWS 5 NOVEMBER 1985 -
WELDING INSPECTION & QUALITY CONTROL – 4 / 10 / 1985
( American Society Of Metal )
NDT : NON DESTRUCTIVE TESTING
ASNT LEVEL 11. - 8 FABUARY 1985
SSPC.SWIDISH STANDARD for PAINTING
COATING & COATING INSPECTION – JANUARY 1983
( STEEL PROTECTION BUREAU - AMERICA)
AREA OF CONCERN
FABRICATION / CONSTRUCTION of OIL & GAS INDUSTRIES
QUALITY CONTROL / INSPECTION
September 2014 – PRESENT INSPECTION OF VESSELS AND ITS RELETED
FESILITIES. INSTALLATION OF RISER GUARDS,
CONDUCTOR AND PILES.
September 2010- : BKT FRASER THERMAL TECHNOLOGY SDN BHD.
POSITION : CONSTRUCTION MANAGER
FABRICATION PRESSURE VESSELS, HEAT EXCHANGERS, AIR
COOLED HEAT EXCHANGERS, BOILERS, FIRED HEAT
EXCHANGERS AND DOUBLE PIPE & HAIRPIN HEAT
EXCHANGERS.
RESPONSIBILITIES : TO APPROVE FABRICATION PROCEDURES AS PER CLIENT’S
SCOPE OF WORKS.
INVOLVED IN KICK-OF-MEETING WITH PETRONAS REFINERY,
MELACCA, PETROBRAS BRAZIL, ONGC, MOPUSTOR – YME
FIELD REDEVOLOPMENT PROJECT.
May 2007 – : RAMUNIA FABRICATORS SDN. BHD.
POSITION : CONSTRUCTION MANAGER
PROJECT : BELUMUT A NEW FIELD
1
2. NOV 1992 – 1997 : AY FABRICATOR SDN. BHD
POSITION : GENERAL MANAGER
(FABRICATION)
PROJECT INVOLVED : TEBENGO JACKET, PILES & CONDUCTO
SELIGI JACKETS, PILES & CONDUCTOR
GUNTONG D JACKET & JACKET CAP, PILES & CONDUCTOR
RESPONSIBILITIES
MAKE MONITORING PROGRESS AND PERFORMANCE OF DONE
TO IMPLEMENT SAFETY RULES AND REGULATION AT WORK SITE INCLUDING HOUSE-
KEEPING
? MONITORING MATERIAL RECEIVING AND STORAGE AREA
? SCHEDULES OF WORK
? EQUIPMENT AND MANPOWER LOADING AND PLANNING.
? REVIEW FABRICATION AND ERRECTIION SEQUENCE'
.MONITOR LIFTING AND WEIGHING OF JACKET AND TOPSIDE
TO REVIEW PROJECT PROGRESS AND WORKSCOOPING OF SUB
C ONTRACTOR.. .ANALYSE PROJECT PROBLEM..
IDENTIFY RECEIVING AND STORAGE AREA
SCHEDULES OF WORK
EQUIPMENT AND MANPOWER LOADING.
- SUPERVISE PROJECT TEAM ON FABRICATION, ERECTION AND
INSTALLATION WORKS.TO REVIEW ANY CATCH UP PLAN IN
- VIEW OF DELAYS TO SCHEDULE
JAN 1992 - APRIL 1992 : TENDER COMITEE FOR BAP-AA ROJECT DURING THE
BIDDING PHASE.
PROJECT INVOLVED : BAP-AA PROJECT. TO LEAD A GROUP OF ENGINEERS
DURING THE TENDER EVALUATION OF THE PROJECT.
MAKE RECOMMENDATION TO TENDER COMMITTEE
FOR AWARD.
JAN 1991 - DEC 1992
: PETRONAS CARIGALI SDN BHD
POSITION : SENIOR FABRICATION ENGINEER
PROJECT INVOLVED FABRICATION OF BARAM B & Q PROJECT AT AYE YARD PASIR
GUDANG
OCT 1990 - DEC 1990 : PETRONAS CARIGALI SDN BH
POSITION : CONSTRUCTION LIAISON ENGINEER
PROJECT INVOLVED : ATTACHED TO CARIGALI / SHELL FOR BDO
(BARAM DELTA OPERATION) FOR THE
REINSTATEMENT OF MCOT (MIRI CRUDE OIL TERMINAL
(STORAGE TANKS )
FEB 1990 - SEPT 1990 : PETRONAS CARIGALI SDN BHD
POSITION : DNV COORDINATOR FOR DEPARTMENT
JOBS INVOLVED : TO LIASE WITH SAFETY AND TECHNICAL GROUP
(CARIGALI) AND DULANG PROJECT TEAM. TO CONDUCT
INSPECTION TECHNICAL AUDIT ON ALL THE
FABRICATION YARD.
MAR 1989 - JAN 1990 : PETRONAS CARIGALI REP.
PROJECT INVOLVED : MEMBER OF DULANG PROJECT TEAM AT MALAYSIA
SHIPYARD & ENGINEERING, PASIR GUDANG, JOHOR.
TO MONITOR FABRICATION ACTIVITIES.
TO ADVISE THE RESIDENT ENGINEER WITH REGARD TO
QUALITY CONTROL / ASSURANCE MATTERS / HSH
FEB 1986 - JUNE 1988 : SIME SMBAWANG ENGINEERING PASIR GUDANG
: HEAD OF QA/QC DEPARTMENT.
PROJECT INVOLVED : ESSO PRODUCTION MALAYSIA INC.
- GUNTONG ‘B’ & GUNTONG ‘C’
- SELIGI ‘B’ & ‘C’
- PALAS ‘A’
JOB INCLUDE OF SETTING UP WELDING DEPARTMET
AUG 1986 - DEC 1986 : PETRONAS CARIGALI REP.
PROJECT INVOLVED : ONBOARD MV DIPLOMA TFOR SUBSEA
INSPECTION OF DUYUNG COMPLEX AND ITS RELATED
2
3. FACILITIES INCLUDING PIPELINE SURVEY FROM
DUYUNG COMPLEX TO ONSHORE, KERTEH - 170 KM LONG
WITNESS UNDER WATER TESTING USING ROV SYSTEM
MAY 1985 - FEB 1986 : PETRONAS CARIGALI SDN BHD
POSITION : SENIOR CONSTUCTION ENGINEER
PROJECT INVOLVED : CONSTRUCTION OF ONSHORE SLUGCATCHER AND ITS
RELATED FACILITIES IN KERTEH. TO MONITOR
INSPECTORS AND ENGINEERING DAILY ACTIVITIES.
MAR 1985 - MAY 1985 : PETRONAS CARIGALI SDN BHD
POSITION : SENIOR INSTALLATION SUPERVISOR
PROJECT INVOLVED : LAYING OF 170 KM BARGE SUBMARINE PIPELINE
FROM DUYUNG COMPLEX TO ONSHORE KERTEH.
MONITORING INSTALLER’S ACTIVITIES.
JAN 1984 - MAR 1984 : TO HOUSTON (USA) TO QUALIFIED WPQT (WELDING
PROCEDURE QUALIFYING TEST) FOR BROWN & ROOT
ON RESOURCES AND GUTTER AUTOMATIC WELDING
MACHINE AND HYPERBARIC WELDING PROCEDURE
FOR TYLOR DIVING IN NEW ORLEAN
1983 - LATE 1983 : PETRONAS CARIGALI SDN BHD
POSITION : ASST RESIDENT ENGINEER AT BREDERO PRICE
COATING YARD - KUANTAN.
PROJECT INVOLVED : COATING OF 170 KM PIPELINE FROM DUYUNG
OFFSHORE COMPLEX TO ONSHORE SLUGCATCHER AT
KERTEH.
MAY 1981 – OCT 1982 : PETRONAS CARIGALI SDN. BHD.
POSITION : ASST. RESIDENT ENGINEER
PROJECT INVOLVED : FABRICATION OF 2 UNITS OF 4 LEGGED JACKET OF
DUYUNG FIELD
RESPONSIBLE FOR ALL THE FABRICATION ACTIVITIES.
CONDUCT PROGRESS MEETING WITH THE Fabricator
LIAISE WITH CARIGALI OFFICE IN KUALA LUMPUR WITH
REGARD TO THE PROGRESS / STATUS.
RESPONSIBILITIES
- MANAGE PROJECT CONSTRUCTION, COMMISSIONING &
PERFORMANCE TESTING AND START-UP PROJECT.
- TO ENSURE THAT ALL CONSTRUCTION ACTIVITIES ARE CONDUCTED
INLINE TO SAFETY STANDARD
HOLDING WEEKLY CONSTRUCTION AND SAFETY MEETING WITH CONTRACTOR. MONITOR
EQUIPMENT DELIVERY STATUS
- REVIEW CONTRACTOR CONSTRUCTION PROGRESS REPORT
- REVIEW CONSTRUCTION OF SCHEDULE CONTRACTOR CPM (CRITICAL
PATH NETWORK)
- REVIEW WEEKLY & MONTHLY REPORT CONSTRUCTION STATUS.
- REVIEW VENDOR DRAWING.
- TO ENSURING VARIOUS PROJECT AS PER ENGINEERING STANDARD,
DEFINE SCOPE OF WORK AND PERFORM COMMISSIONING