Course Project
Objective
|
Guidelines
|
Milestones
|
Deliverables
|
Grading Rubrics
Objective
The objective of the Course Project is to give you an
opportunity to practice the skills learned in class regarding the
planning methodologies of a project. These skills are directly
applicable toward your senior project.
Guidelines
For this project you may choose one that is of interest to you or
you may choose to begin planning for your senior project. When
selecting a project, avoid picking one that is either too big or
too small. For example, do not decide to build a new stadium
for your local sports team (too big) or to plant your summer
garden (too small).
Here are some successful project ideas.
The opening of a coffee shop
An open house for a local social service agency
A meditation pool and platform
A redevelopment of a local playground
Design and installation of a computer network for a small
business
Software development project
A project to build a house is NOT acceptable.
Milestones
Due Week 2: Project Charter
Due Week 3: Scope Statement
Due Week 4: Work Breakdown Structure and Network Diagram
Due Week 5: Risk Management Plan
Due Week 6: Resource Management Plan
Due Week 7: Communication Plan
Due Week 8: Final Project Package
Deliverables
Due Week 2: Project Charter
Provide a
p
roject
c
harter of your selected project in accordance with the charter
template found in Doc Sharing. The project will be the project
your team will use for the remainder of this course.
For your new project, please develop a project team (citing
names, e-mail addresses, and telephone numbers).
Be certain to include the following.
Project Objectives
Project Statement of Work
Milestones
All other sections as required in the
p
roject
c
harter
Please put this in proper business writing format. Consider me
to be your boss.
If working in a group, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Deliverables:
Project charter (in MS Word)
If working in a group, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Due Week 3: Scope Statement
Prepare a scope statement using either the model on pages 144-
145 in the text as a template or the scope template in
D
oc
S
haring. Remember to be tangible, measurable, and specific. Be
sure to include all sections required in the Practitioner section
of the
W
eek 2
L
ecture.
Deliverables:
Project scope statement (in MS Word)
If working in a group, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Due Week 4: Work Breakdown Structure and Network Diagram
According to the PMBOK® Guide, "the WBS is a deliverable-
oriented hierarchical decomposition of the work to be executed
by the project team, to accomplish the project objectives and
create the required deliverables." In other words, it lists the
project's tasks, the subtasks, the sub-subtasks,
and so on
.
For this phase, you will create a
w
ork
b
reakdown
s
tructure (WBS) for the project you selected during phase one.
Remember that the WBS starts with your major deliverables
(that you stated in your scope management plan) at the highest
level. The lower levels have the tasks required to complete
those deliverables. You should have at least three tasks under
each deliverable, but you may have as many tasks as needed to
ensure that the deliverables are complete. Review the textbook
(and the
PMBOK® Guide
, if you have it) for some suggestions on how best to create a
WBS. From your work breakdown structure, develop a project
task list with dependencies,
a
dd durations,
and t
hen submit a network diagram (using MS Project) and a project
schedule.
Develop the Work Breakdown Structure
Your WBS should have a minimum of 25–30 tasks and be three
subtasks deep
.
Make sure to use verb
-
object task names (for example, "Develop software").
Enter tasks in MS Project.
Create the predecessor relationships to create a network
diagram.
DO NOT LINK SUMMARY TASKS!
In the Gantt Chart Tools tab, check the box marked Outline
Number in the Show/Hide group.
Deliverables:
In MS Project, print the following.
Gantt Chart Entry Table on no more than
three
pages [View > Tables > Entry]
Include Task Name, Duration, Start, Finish, and Predecessor
columns with Gantt Chart.
Schedule Table on
one
page [View > Tables > Schedule]
Include only the default columns (Task Mode, Task Name,
Start, Finish, Late Start, Late Finish, Free Slack, Total Slack)
and do not include the Gantt Chart. Make sure that all columns
are wide enough to read completely.
Network Diagram on
one
page [Task tab > View group > Network Diagram]
Highlight Critical Path and Circle Milestones.
Justify why you chose your milestones. (Hint: use milestones
from the scope statement or look for key merge or burst
activities.)
Also print out the network diagram on two to three pages so that
task information can be read.
Using the Resource Sheet (View > Resource Sheet), develop and
print a list of resources required for your project. Include
Max.Units and Costs (Std. Rate, Ovt. Rate, Cost/Use).
If working in a group, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
DO NOT ASSIGN RESOURCES AT THIS TIME!
Due Week 5: Risk Management Plan
Establish the project's priority matrix (constrain, enhance,
accept).
Identify a minimum of 10 project risks
and
when
each
will occur in the project life cycle, and then determine their
impact and probability of occurrence.
Create a matrix similar to the one from the your text (Pinto,
Figure 7.5
Classifying Project Risk on
page 222), making sure that it is consistent with your priority
matrix, or use the risk management process in the Practitioner
section of
W
eek 3.
Justify the use of your risk scoring matrix or use the risk
management process in the Practitioner section of Week 3.
Assess your risks according to your matrix.
Rank the risks according to their total risk score.
Prepare the Risk Response Matrix for each risk—Risk,
Response, Contingency, Trigger, Responsible Person—Using
the Risk Management Analysis Template in doc shr
Deliverables:
Use the Risk Management Analysis Template spreadsheet (risk
management analysis template.xls) found in Doc Sharing (there
is a separate tab for each portion of the risk management plan)
or use the risk management process in the Practitioner section
of
W
eek 3.
If working in a team, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Due Week 6: Resource Management Plan
A project plan cannot be considered complete until the
resources have been assigned (including the bottom-up cost
estimate) and leveled, ensuring that the resources are available
to complete the work.
Tasks
:
Assign resources to tasks.
Print
out the resource sheet.
Identify resources that are over-allocated.
Print
the Gantt chart and entry table.
Print
reports (or tables) showing the costs of the resources and the
cost by work package. Is this an acceptable cost for your
project? That is, is it within the budget proposed in the scope
statement?
Level the project within available slack.
Print
the new entry table (do not include the Gantt chart).
Identify resources that remain over-allocated.
If resources are still over allocated, clear leveling and then re-
level without the slack constraint.
Identify how this has affected the project duration (the number
of days and the new completion date).
Assume that no other resources are available. What will your
team do to complete the project on time? Instead of assigning
overtime, add a new resource for a cost 1.5 times the normal
labor cost. What is the cost for the additional resource and the
total project? Is this revised cost within the amount developed
in the scope statement? If you choose
not
to add a resource, your project completion may be delayed. Is a
delay in the project due date acceptable? Why or why not?
Submit supporting documentation from MS Project as needed.
Deliverables:
A journal of project activity. Describe what you did on each
step, and the results of your actions.
MS Project printouts (as above). Please indicate on the printouts
which step they support.
Final time and cost results. Describe how these meet the needs
as defined in the scope statement. If your team believes that the
original scope statement needs to change, describe the changes,
why the changes were necessary, and include the modified
scope statement in the deliverables.
Include a copy of your original (and revised, if necessary) scope
statement with the deliverables.
If working in a team, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Due Week 7: Communication Plan
According to the
PMBOK® Guide
, "the Communications Planning process determines the
information and communications needs of the stakeholders; for
example, who needs what information, when they will need it,
how it will be given to them, and by whom." In other words, it
lists the general communication requirements for the project.
This week, you will create a simple communication plan for the
execution of your project. This plan should have the following
information: contact information for all affected parties, major
deliverables and how progress on the deliverables will be
communicated to the affected parties (as well as who the
affected parties are and when communication will take place),
and any other miscellaneous information about communication
on the project (see the
C
ommunications
P
lan template in Doc
S
haring).
Deliverables:
Business memo summarizing the submission for the week
Communication plan
If working in a team, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Due Week 8: Final Project Package
You will need to create a project plan. This plan should be
completely integrated and presented in a logical order. It should
be written professionally and should be mistake-free in terms of
spelling and grammar. The final project plan should incorporate
any changes that occurred along the way, including corrections
and advice given by colleagues or your professor.
Any tables and/or graphs should be labeled correctly. Your final
project plan should consist of the following items.
Table of contents
Project charter
Scope statement
Work breakdown structure
Network diagram
Risk management plan
Resource management plan
Communication management plan
Deliverables:
Project plan consisting of the following
items
Business memo summarizing the submission for the week
Complete project plan,
including the project charter
Lessons learned document (to be completed individually, even
if the balance of the project was performed as part of a team)
1. What went well in the project? What could have gone better?
2. If working in a group
What did you learn from working in a project group? How did
the interpersonal dynamics affect your participation?
If there were conflicts, how were they resolved?
3. What did you learn in completing this project about yourself
and how you work in a team environment?
4. What could have made this project a better learning
experience?
If working in a group, include a statement of participation,
describing how each person contributed to this project
deliverable. Please have each person sign the statement.
Grading Rubrics
Grading Rubric (Week 2)
Category
Points
%
Description
Content
15
37.5%
Defines project plans in detail with specific description of
project and requirements for teams
Content
15
37.5%
Provides specific information as required from the Practitioner
section of the Week 1
L
ecture for the
p
roject charter.
Documentation and Formatting
10
25%
The deliverables should be formatted as a business document
correctly and should use APA formatting for cited sources.
Spelling and grammar must be accurate.
Total
40
100%
A quality paper will meet or exceed all of the above
requirements.
Grading Rubric (Weeks 3–7)
Category
Points
%
Description
Content
40
90%
Full points are granted for content that demonstrates full
understanding of the technical requirements for the deliverable.
Documentation and Formatting
10
10%
The deliverables should be formatted as a business document
correctly and should use APA formatting for cited sources.
Spelling and grammar must be accurate.
Total
50
100%
A quality paper will meet or exceed all of the above
requirements.
Final Project Package Grading Rubric
Category
Points
%
Description
Content
80
53%
The content should be complete (including all deliverables).
Business Memo
30
20%
The business memo completely describes the package of work.
The writing is clear, using proper grammar and spelling.
Lessons Learned
30
20%
Lessons learned are thoughtful and writing is clear, using
proper grammar and spelling.
Documentation and Formatting
10
7%
The deliverables should be formatted
correctly
as a business document and should use APA formatting for cited
sources. Spelling and grammar must be accurate.
Total
150
100%
A quality paper will meet or exceed all of the above
requirements.

More Related Content

Similar to Course Project Planning and Execution

Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursesacascscasc
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursefdbdfbdx
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursedfdhdfhdg
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole courseadadscacascas
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole courseiutiuriaolcom
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursedsvxxcvxc
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursescorpiosns123
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitydgahdazncvn
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityiutiuriaolcom
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitydfdhdfhdg
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityadadscacascas
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityfdbdfbdx
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitydsvxxcvxc
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityscorpiosns123
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitykghkghfh
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityliam111221
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityfnfgnvcn
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitysmith54655
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitysacascscasc
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityadadscacascas
 

Similar to Course Project Planning and Execution (20)

Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 

More from marilucorr

Cover LetterOne aspect of strategic planning is to develop a str.docx
Cover LetterOne aspect of strategic planning is to develop a str.docxCover LetterOne aspect of strategic planning is to develop a str.docx
Cover LetterOne aspect of strategic planning is to develop a str.docxmarilucorr
 
Cover Letter, Resume, and Portfolio Toussaint Casimir.docx
Cover Letter, Resume, and Portfolio Toussaint Casimir.docxCover Letter, Resume, and Portfolio Toussaint Casimir.docx
Cover Letter, Resume, and Portfolio Toussaint Casimir.docxmarilucorr
 
Cover Executive Summary (mention organization, key ‘out-take.docx
Cover Executive Summary (mention organization, key ‘out-take.docxCover Executive Summary (mention organization, key ‘out-take.docx
Cover Executive Summary (mention organization, key ‘out-take.docxmarilucorr
 
couse name Enterprise risk management  From your research, dis.docx
couse name  Enterprise risk management  From your research, dis.docxcouse name  Enterprise risk management  From your research, dis.docx
couse name Enterprise risk management  From your research, dis.docxmarilucorr
 
Courts have reasoned that hospitals have a duty to reserve their b.docx
Courts have reasoned that hospitals have a duty to reserve their b.docxCourts have reasoned that hospitals have a duty to reserve their b.docx
Courts have reasoned that hospitals have a duty to reserve their b.docxmarilucorr
 
Court Operations and Sentencing GuidelinesPeriodically, se.docx
Court Operations and Sentencing GuidelinesPeriodically, se.docxCourt Operations and Sentencing GuidelinesPeriodically, se.docx
Court Operations and Sentencing GuidelinesPeriodically, se.docxmarilucorr
 
Course Competencies Learning ObjectivesCourse Learning Objectiv.docx
Course Competencies Learning ObjectivesCourse Learning Objectiv.docxCourse Competencies Learning ObjectivesCourse Learning Objectiv.docx
Course Competencies Learning ObjectivesCourse Learning Objectiv.docxmarilucorr
 
Coursework 2 – Presentation Report The aim of this 1000-word r.docx
Coursework 2 – Presentation Report  The aim of this 1000-word r.docxCoursework 2 – Presentation Report  The aim of this 1000-word r.docx
Coursework 2 – Presentation Report The aim of this 1000-word r.docxmarilucorr
 
CourseOverview-MarketingChannelConceptsLecture1.docx
CourseOverview-MarketingChannelConceptsLecture1.docxCourseOverview-MarketingChannelConceptsLecture1.docx
CourseOverview-MarketingChannelConceptsLecture1.docxmarilucorr
 
course-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docx
course-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docxcourse-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docx
course-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docxmarilucorr
 
COURSE  InfoTech in a Global Economy Do you feel that countri.docx
COURSE  InfoTech in a Global Economy Do you feel that countri.docxCOURSE  InfoTech in a Global Economy Do you feel that countri.docx
COURSE  InfoTech in a Global Economy Do you feel that countri.docxmarilucorr
 
Course Themes Guide The English 112 course will focus o.docx
Course Themes Guide  The English 112 course will focus o.docxCourse Themes Guide  The English 112 course will focus o.docx
Course Themes Guide The English 112 course will focus o.docxmarilucorr
 
Course SyllabusPrerequisitesThere are no prerequisites for PHI20.docx
Course SyllabusPrerequisitesThere are no prerequisites for PHI20.docxCourse SyllabusPrerequisitesThere are no prerequisites for PHI20.docx
Course SyllabusPrerequisitesThere are no prerequisites for PHI20.docxmarilucorr
 
COURSE SYLLABUSData Analysis and Reporting Spring 2019.docx
COURSE SYLLABUSData Analysis and Reporting Spring 2019.docxCOURSE SYLLABUSData Analysis and Reporting Spring 2019.docx
COURSE SYLLABUSData Analysis and Reporting Spring 2019.docxmarilucorr
 
COURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docx
COURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docxCOURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docx
COURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docxmarilucorr
 
Course SuccessHabits Matter1. Professors are influenced by you.docx
Course SuccessHabits Matter1. Professors are influenced by you.docxCourse SuccessHabits Matter1. Professors are influenced by you.docx
Course SuccessHabits Matter1. Professors are influenced by you.docxmarilucorr
 
Course ScenarioYou have been hired as the Human Resources Di.docx
Course ScenarioYou have been hired as the Human Resources Di.docxCourse ScenarioYou have been hired as the Human Resources Di.docx
Course ScenarioYou have been hired as the Human Resources Di.docxmarilucorr
 
Course ScenarioPresently, your multinational organization us.docx
Course ScenarioPresently, your multinational organization us.docxCourse ScenarioPresently, your multinational organization us.docx
Course ScenarioPresently, your multinational organization us.docxmarilucorr
 
COURSE RTM 300 (Recreation and Community Development (V. Ward)).docx
COURSE RTM 300 (Recreation and Community Development (V. Ward)).docxCOURSE RTM 300 (Recreation and Community Development (V. Ward)).docx
COURSE RTM 300 (Recreation and Community Development (V. Ward)).docxmarilucorr
 
Course Retail ManagementPart1DraftPart2Fin.docx
Course Retail ManagementPart1DraftPart2Fin.docxCourse Retail ManagementPart1DraftPart2Fin.docx
Course Retail ManagementPart1DraftPart2Fin.docxmarilucorr
 

More from marilucorr (20)

Cover LetterOne aspect of strategic planning is to develop a str.docx
Cover LetterOne aspect of strategic planning is to develop a str.docxCover LetterOne aspect of strategic planning is to develop a str.docx
Cover LetterOne aspect of strategic planning is to develop a str.docx
 
Cover Letter, Resume, and Portfolio Toussaint Casimir.docx
Cover Letter, Resume, and Portfolio Toussaint Casimir.docxCover Letter, Resume, and Portfolio Toussaint Casimir.docx
Cover Letter, Resume, and Portfolio Toussaint Casimir.docx
 
Cover Executive Summary (mention organization, key ‘out-take.docx
Cover Executive Summary (mention organization, key ‘out-take.docxCover Executive Summary (mention organization, key ‘out-take.docx
Cover Executive Summary (mention organization, key ‘out-take.docx
 
couse name Enterprise risk management  From your research, dis.docx
couse name  Enterprise risk management  From your research, dis.docxcouse name  Enterprise risk management  From your research, dis.docx
couse name Enterprise risk management  From your research, dis.docx
 
Courts have reasoned that hospitals have a duty to reserve their b.docx
Courts have reasoned that hospitals have a duty to reserve their b.docxCourts have reasoned that hospitals have a duty to reserve their b.docx
Courts have reasoned that hospitals have a duty to reserve their b.docx
 
Court Operations and Sentencing GuidelinesPeriodically, se.docx
Court Operations and Sentencing GuidelinesPeriodically, se.docxCourt Operations and Sentencing GuidelinesPeriodically, se.docx
Court Operations and Sentencing GuidelinesPeriodically, se.docx
 
Course Competencies Learning ObjectivesCourse Learning Objectiv.docx
Course Competencies Learning ObjectivesCourse Learning Objectiv.docxCourse Competencies Learning ObjectivesCourse Learning Objectiv.docx
Course Competencies Learning ObjectivesCourse Learning Objectiv.docx
 
Coursework 2 – Presentation Report The aim of this 1000-word r.docx
Coursework 2 – Presentation Report  The aim of this 1000-word r.docxCoursework 2 – Presentation Report  The aim of this 1000-word r.docx
Coursework 2 – Presentation Report The aim of this 1000-word r.docx
 
CourseOverview-MarketingChannelConceptsLecture1.docx
CourseOverview-MarketingChannelConceptsLecture1.docxCourseOverview-MarketingChannelConceptsLecture1.docx
CourseOverview-MarketingChannelConceptsLecture1.docx
 
course-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docx
course-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docxcourse-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docx
course-text-booksKeri E. Pearlson_ Carol S. Saunders - Managing.docx
 
COURSE  InfoTech in a Global Economy Do you feel that countri.docx
COURSE  InfoTech in a Global Economy Do you feel that countri.docxCOURSE  InfoTech in a Global Economy Do you feel that countri.docx
COURSE  InfoTech in a Global Economy Do you feel that countri.docx
 
Course Themes Guide The English 112 course will focus o.docx
Course Themes Guide  The English 112 course will focus o.docxCourse Themes Guide  The English 112 course will focus o.docx
Course Themes Guide The English 112 course will focus o.docx
 
Course SyllabusPrerequisitesThere are no prerequisites for PHI20.docx
Course SyllabusPrerequisitesThere are no prerequisites for PHI20.docxCourse SyllabusPrerequisitesThere are no prerequisites for PHI20.docx
Course SyllabusPrerequisitesThere are no prerequisites for PHI20.docx
 
COURSE SYLLABUSData Analysis and Reporting Spring 2019.docx
COURSE SYLLABUSData Analysis and Reporting Spring 2019.docxCOURSE SYLLABUSData Analysis and Reporting Spring 2019.docx
COURSE SYLLABUSData Analysis and Reporting Spring 2019.docx
 
COURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docx
COURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docxCOURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docx
COURSE SYLLABUS ADDENDUM INTEGRATED CASE ANALYSIS CRITERIA.docx
 
Course SuccessHabits Matter1. Professors are influenced by you.docx
Course SuccessHabits Matter1. Professors are influenced by you.docxCourse SuccessHabits Matter1. Professors are influenced by you.docx
Course SuccessHabits Matter1. Professors are influenced by you.docx
 
Course ScenarioYou have been hired as the Human Resources Di.docx
Course ScenarioYou have been hired as the Human Resources Di.docxCourse ScenarioYou have been hired as the Human Resources Di.docx
Course ScenarioYou have been hired as the Human Resources Di.docx
 
Course ScenarioPresently, your multinational organization us.docx
Course ScenarioPresently, your multinational organization us.docxCourse ScenarioPresently, your multinational organization us.docx
Course ScenarioPresently, your multinational organization us.docx
 
COURSE RTM 300 (Recreation and Community Development (V. Ward)).docx
COURSE RTM 300 (Recreation and Community Development (V. Ward)).docxCOURSE RTM 300 (Recreation and Community Development (V. Ward)).docx
COURSE RTM 300 (Recreation and Community Development (V. Ward)).docx
 
Course Retail ManagementPart1DraftPart2Fin.docx
Course Retail ManagementPart1DraftPart2Fin.docxCourse Retail ManagementPart1DraftPart2Fin.docx
Course Retail ManagementPart1DraftPart2Fin.docx
 

Recently uploaded

EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 

Recently uploaded (20)

EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 

Course Project Planning and Execution

  • 1. Course Project Objective | Guidelines | Milestones | Deliverables | Grading Rubrics Objective The objective of the Course Project is to give you an opportunity to practice the skills learned in class regarding the planning methodologies of a project. These skills are directly applicable toward your senior project. Guidelines For this project you may choose one that is of interest to you or you may choose to begin planning for your senior project. When selecting a project, avoid picking one that is either too big or too small. For example, do not decide to build a new stadium for your local sports team (too big) or to plant your summer garden (too small). Here are some successful project ideas. The opening of a coffee shop An open house for a local social service agency A meditation pool and platform A redevelopment of a local playground Design and installation of a computer network for a small business Software development project A project to build a house is NOT acceptable.
  • 2. Milestones Due Week 2: Project Charter Due Week 3: Scope Statement Due Week 4: Work Breakdown Structure and Network Diagram Due Week 5: Risk Management Plan Due Week 6: Resource Management Plan Due Week 7: Communication Plan Due Week 8: Final Project Package Deliverables Due Week 2: Project Charter Provide a p roject c harter of your selected project in accordance with the charter template found in Doc Sharing. The project will be the project your team will use for the remainder of this course. For your new project, please develop a project team (citing names, e-mail addresses, and telephone numbers). Be certain to include the following. Project Objectives Project Statement of Work Milestones All other sections as required in the p roject c harter Please put this in proper business writing format. Consider me to be your boss. If working in a group, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement.
  • 3. Deliverables: Project charter (in MS Word) If working in a group, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement. Due Week 3: Scope Statement Prepare a scope statement using either the model on pages 144- 145 in the text as a template or the scope template in D oc S haring. Remember to be tangible, measurable, and specific. Be sure to include all sections required in the Practitioner section of the W eek 2 L ecture. Deliverables: Project scope statement (in MS Word) If working in a group, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement. Due Week 4: Work Breakdown Structure and Network Diagram According to the PMBOK® Guide, "the WBS is a deliverable- oriented hierarchical decomposition of the work to be executed by the project team, to accomplish the project objectives and create the required deliverables." In other words, it lists the project's tasks, the subtasks, the sub-subtasks, and so on . For this phase, you will create a w ork
  • 4. b reakdown s tructure (WBS) for the project you selected during phase one. Remember that the WBS starts with your major deliverables (that you stated in your scope management plan) at the highest level. The lower levels have the tasks required to complete those deliverables. You should have at least three tasks under each deliverable, but you may have as many tasks as needed to ensure that the deliverables are complete. Review the textbook (and the PMBOK® Guide , if you have it) for some suggestions on how best to create a WBS. From your work breakdown structure, develop a project task list with dependencies, a dd durations, and t hen submit a network diagram (using MS Project) and a project schedule. Develop the Work Breakdown Structure Your WBS should have a minimum of 25–30 tasks and be three subtasks deep . Make sure to use verb - object task names (for example, "Develop software"). Enter tasks in MS Project. Create the predecessor relationships to create a network diagram. DO NOT LINK SUMMARY TASKS! In the Gantt Chart Tools tab, check the box marked Outline Number in the Show/Hide group. Deliverables: In MS Project, print the following. Gantt Chart Entry Table on no more than
  • 5. three pages [View > Tables > Entry] Include Task Name, Duration, Start, Finish, and Predecessor columns with Gantt Chart. Schedule Table on one page [View > Tables > Schedule] Include only the default columns (Task Mode, Task Name, Start, Finish, Late Start, Late Finish, Free Slack, Total Slack) and do not include the Gantt Chart. Make sure that all columns are wide enough to read completely. Network Diagram on one page [Task tab > View group > Network Diagram] Highlight Critical Path and Circle Milestones. Justify why you chose your milestones. (Hint: use milestones from the scope statement or look for key merge or burst activities.) Also print out the network diagram on two to three pages so that task information can be read. Using the Resource Sheet (View > Resource Sheet), develop and print a list of resources required for your project. Include Max.Units and Costs (Std. Rate, Ovt. Rate, Cost/Use). If working in a group, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement. DO NOT ASSIGN RESOURCES AT THIS TIME! Due Week 5: Risk Management Plan Establish the project's priority matrix (constrain, enhance, accept). Identify a minimum of 10 project risks and when each will occur in the project life cycle, and then determine their impact and probability of occurrence.
  • 6. Create a matrix similar to the one from the your text (Pinto, Figure 7.5 Classifying Project Risk on page 222), making sure that it is consistent with your priority matrix, or use the risk management process in the Practitioner section of W eek 3. Justify the use of your risk scoring matrix or use the risk management process in the Practitioner section of Week 3. Assess your risks according to your matrix. Rank the risks according to their total risk score. Prepare the Risk Response Matrix for each risk—Risk, Response, Contingency, Trigger, Responsible Person—Using the Risk Management Analysis Template in doc shr Deliverables: Use the Risk Management Analysis Template spreadsheet (risk management analysis template.xls) found in Doc Sharing (there is a separate tab for each portion of the risk management plan) or use the risk management process in the Practitioner section of W eek 3. If working in a team, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement. Due Week 6: Resource Management Plan A project plan cannot be considered complete until the resources have been assigned (including the bottom-up cost estimate) and leveled, ensuring that the resources are available to complete the work. Tasks : Assign resources to tasks. Print
  • 7. out the resource sheet. Identify resources that are over-allocated. Print the Gantt chart and entry table. Print reports (or tables) showing the costs of the resources and the cost by work package. Is this an acceptable cost for your project? That is, is it within the budget proposed in the scope statement? Level the project within available slack. Print the new entry table (do not include the Gantt chart). Identify resources that remain over-allocated. If resources are still over allocated, clear leveling and then re- level without the slack constraint. Identify how this has affected the project duration (the number of days and the new completion date). Assume that no other resources are available. What will your team do to complete the project on time? Instead of assigning overtime, add a new resource for a cost 1.5 times the normal labor cost. What is the cost for the additional resource and the total project? Is this revised cost within the amount developed in the scope statement? If you choose not to add a resource, your project completion may be delayed. Is a delay in the project due date acceptable? Why or why not? Submit supporting documentation from MS Project as needed. Deliverables: A journal of project activity. Describe what you did on each step, and the results of your actions. MS Project printouts (as above). Please indicate on the printouts which step they support. Final time and cost results. Describe how these meet the needs as defined in the scope statement. If your team believes that the original scope statement needs to change, describe the changes,
  • 8. why the changes were necessary, and include the modified scope statement in the deliverables. Include a copy of your original (and revised, if necessary) scope statement with the deliverables. If working in a team, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement. Due Week 7: Communication Plan According to the PMBOK® Guide , "the Communications Planning process determines the information and communications needs of the stakeholders; for example, who needs what information, when they will need it, how it will be given to them, and by whom." In other words, it lists the general communication requirements for the project. This week, you will create a simple communication plan for the execution of your project. This plan should have the following information: contact information for all affected parties, major deliverables and how progress on the deliverables will be communicated to the affected parties (as well as who the affected parties are and when communication will take place), and any other miscellaneous information about communication on the project (see the C ommunications P lan template in Doc S haring). Deliverables: Business memo summarizing the submission for the week Communication plan If working in a team, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement.
  • 9. Due Week 8: Final Project Package You will need to create a project plan. This plan should be completely integrated and presented in a logical order. It should be written professionally and should be mistake-free in terms of spelling and grammar. The final project plan should incorporate any changes that occurred along the way, including corrections and advice given by colleagues or your professor. Any tables and/or graphs should be labeled correctly. Your final project plan should consist of the following items. Table of contents Project charter Scope statement Work breakdown structure Network diagram Risk management plan Resource management plan Communication management plan Deliverables: Project plan consisting of the following items Business memo summarizing the submission for the week Complete project plan, including the project charter Lessons learned document (to be completed individually, even if the balance of the project was performed as part of a team) 1. What went well in the project? What could have gone better? 2. If working in a group What did you learn from working in a project group? How did the interpersonal dynamics affect your participation? If there were conflicts, how were they resolved? 3. What did you learn in completing this project about yourself and how you work in a team environment?
  • 10. 4. What could have made this project a better learning experience? If working in a group, include a statement of participation, describing how each person contributed to this project deliverable. Please have each person sign the statement. Grading Rubrics Grading Rubric (Week 2) Category Points % Description Content 15 37.5% Defines project plans in detail with specific description of project and requirements for teams Content 15 37.5% Provides specific information as required from the Practitioner section of the Week 1 L ecture for the p roject charter. Documentation and Formatting 10 25% The deliverables should be formatted as a business document correctly and should use APA formatting for cited sources. Spelling and grammar must be accurate.
  • 11. Total 40 100% A quality paper will meet or exceed all of the above requirements. Grading Rubric (Weeks 3–7) Category Points % Description Content 40 90% Full points are granted for content that demonstrates full understanding of the technical requirements for the deliverable. Documentation and Formatting 10 10% The deliverables should be formatted as a business document correctly and should use APA formatting for cited sources. Spelling and grammar must be accurate. Total 50 100% A quality paper will meet or exceed all of the above requirements. Final Project Package Grading Rubric Category Points % Description Content
  • 12. 80 53% The content should be complete (including all deliverables). Business Memo 30 20% The business memo completely describes the package of work. The writing is clear, using proper grammar and spelling. Lessons Learned 30 20% Lessons learned are thoughtful and writing is clear, using proper grammar and spelling. Documentation and Formatting 10 7% The deliverables should be formatted correctly as a business document and should use APA formatting for cited sources. Spelling and grammar must be accurate. Total 150 100% A quality paper will meet or exceed all of the above requirements.