Exposure Factor in a Controlled Demolition
M. Lucidi
Freelance Engineer, Rome
IF CRASC’15
III THIRD CONGRESS ON FORENSIC ENGINEERING
VI CONGRESS ON COLLAPSES, RELIABILITY AND RETROFIT OF STRUCTURES
SAPIENZA UNIVERSITY OF ROME, 14-16 MAY 2015
M. Lucidi
OVERALL VIEW EXPOSURE and ACTIONS on the STRUCTURES
2
“Exposure Factor in a Controlled Demolition”
STRUCTURAL
DAMAGE for
EXPLOSION CAUSE
UNFIT for USE for EVERYONE
TEMPORARY
REINFORCEMENT
UNFIT for HUMAN HABITATION , but NOT for TECHNICIANS
TECHNICAL EXHAUSTIVE STUDY INSPECTION
DEMOLITION PLAN
CONTROLLED
DEMOLITION with
EXPLOSIVE
DEMOLITION FAILURE
HIGHRISK
M. Lucidi
STRUCTURAL DAMAGE for EXPLOSION CAUSE
3
“Exposure Factor in a Controlled Demolition”
UNFIT for USE for
EVERYONE
U.S. and Saudi military personnel
survey the damage to Khobar Towers
caused by the explosion of a fuel truck
outside the northern fence of the
facility on King Abdul Aziz Air Base
near Dhahran, Saudi Arabia
Explosion Mariahilfer-Straße Wien
26.04.2014,
part of the roof collapsed and windows
of the building in the capital’s 15th
district were shattered.
Te
Emergency
Time
EXPOSED : 19 dead +
64 hospitalized + 200
injuries
EXPOSED : 1 dead
+ 5 injuries
M. Lucidi
STRUCTURAL DAMAGE for EXPLOSION CAUSE
4
“Exposure Factor in a Controlled Demolition”
UNFIT for USE for
EVERYONE –
EMERGENCY
110 FIREFIGHTERS AN MANY
PARAMADICS AND WERE
CALLED TO THE SCENE
PARAMEDICS ARRIVED WITH
THE SPECIALIZED “catastrophes
unit" WHICH CONTAINS
VEHICLES, EQUIPMENT AND
PERSONAL FOR LARGE NUMBER
OF CASUALTIES
Te
Emergency
Time
EXPOSED : 2
firefighters
NOT
EXPOSED :
paramedics
M. Lucidi
TEMPORARY REINFORCEMENT
5
“Exposure Factor in a Controlled Demolition”
FIREMAN in ACTION for
REALIZATION of TEMPORARY
REINFORCEMENT
TECHNICAL INSPECTION for
DETERMINATION of CONFORMITY to
STANDARD HUMAN HABITATION
UNFIT for HUMAN
HABITATION , but NOT for
TECHNICIANS
Te
Emergency
Time
Ta
Habitable
Time
EXPOSED : 5
firefighter
EXPOSED : 1 or
2technicians
M. Lucidi
CONTROLLED DEMOLITION with EXPLOSIVE
6
“Exposure Factor in a Controlled Demolition”
TIME
RISK
PRE
DEMOLITION
DEMOLITION DESIGN
ACCIDENTAL
COLLAPSE
TOTAL/PARTIAL
After
CONSTRUCTION
SITE OPENING
DURING
REALIZATION of
the DEMOLITION
DESIGN
for EXTRA
NATURAL EVENTS
(earthquake, wind)
For
CONTRADICTION
between
DESIGN/AS BUILT
For IMPROPER
USE of the
EXPLOSIVE
T*0d
Start
Preliminary
Operation
Demolition
Time
EXPOSED : 5explosive
technicians squad + 2responsibles
M. Lucidi
CONTROLLED DEMOLITION with EXPLOSIVE
7
“Exposure Factor in a Controlled Demolition”
T0d
Start
Demolition
Time
TIME
NOT EXPOSED : during
the explosion there isn’t
anyone inside blast security
area
M. Lucidi
DEMOLITION FAILURE
8
“Exposure Factor in a Controlled Demolition”
TIME
RISK
POST
DEMOLITION
INVESTIGATION – FAILURE CAUSES
NOT COLLAPSE or
ACCIDENTAL PARTIAL
COLLAPSE
For FAILURE
EXPLOSION
For WRONG
DEMOLITION
DESIGN
For CONTRADICTION
between DESIGN/AS
BUILT
T’d
Failure
Demolition
Time
NOT EXPOSED : after failure
must applied standard security
procedures before investigate the
structure
M. Lucidi
DEMOLITION FAILURE
9
“Exposure Factor in a Controlled Demolition”
T’d
Start
Investigation
Operation
Time
EXPLOSIVE INVESTIGATION:
- NOT CONTROL the QUALITY of EXPLOSIVE
MATERIALS
- NOT VERIFY FUSE JOINTS
- NOT EXACT POSITIONING EXPLOSIVE LIKE the
DEMOLITION PLANNING
DESIGN ANALYSIS:
- ERRORS in LINES of FIRE DESIGN
- ERRORS in SELECT PROGRAMMING SERIES
BLAST DELAYS
- ERRORS in SELECT LOCATION for EXPLOSIVES
- NOT VERIFY the COHERENCE between DESIGN
and AS BUILT
FAILURE
EXPLOSION
FAILURE
DESIGNER
NOT EXPOSED : study phases
NOT EXPOSED : study phases
M. Lucidi
HIGH RISK
10
“Exposure Factor in a Controlled Demolition”
the controlled demolition
with explosive is more
secure in the demolition
sector. But if I’ve had an
not collapse or a partial
collapse in place of total
demolition like design, it’s
less secure type of
demolition.
T”d
Extra Start
Operation
Demolition
Time
P P
V
V
E E
R
=
EXPOSED : 5
explosive technicians
squad + 2 responsibles
+ 3 machinists
M. Lucidi
REDUCE RISK with EXPOSURE
11
“Exposure Factor in a Controlled Demolition”
T”d or T*’d
Extra
Operation
Demolition
Time
96,30%
WHY USE EXPLOSIVE AGAIN?
HAVE A TIME CONSTRAINT?
HAVE A SPACE LIMIT?
I choose to induce a blow down with an
another type of controlled demolition, and
after, in a stable condition, use explosive

More Related Content

Viewers also liked

L’INGEGNERIA FORENSE STRUTTURALE: INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...
L’INGEGNERIA FORENSE STRUTTURALE:  INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...L’INGEGNERIA FORENSE STRUTTURALE:  INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...
L’INGEGNERIA FORENSE STRUTTURALE: INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...
Franco Bontempi Org Didattica
 

Viewers also liked (6)

INFRASTRUTTURE CRITICHE_sicurezza fisica nelle fasi progettuali, costruttive ...
INFRASTRUTTURE CRITICHE_sicurezza fisica nelle fasi progettuali, costruttive ...INFRASTRUTTURE CRITICHE_sicurezza fisica nelle fasi progettuali, costruttive ...
INFRASTRUTTURE CRITICHE_sicurezza fisica nelle fasi progettuali, costruttive ...
 
Presentazione Tesi di Laurea Magistrale - LM 26
Presentazione Tesi di Laurea Magistrale - LM 26Presentazione Tesi di Laurea Magistrale - LM 26
Presentazione Tesi di Laurea Magistrale - LM 26
 
Seminario Area Tecnica su "DEMOLIZIONI E SICUREZZA" Studio Amati Architetti_M...
Seminario Area Tecnica su "DEMOLIZIONI E SICUREZZA" Studio Amati Architetti_M...Seminario Area Tecnica su "DEMOLIZIONI E SICUREZZA" Studio Amati Architetti_M...
Seminario Area Tecnica su "DEMOLIZIONI E SICUREZZA" Studio Amati Architetti_M...
 
UN MESTIERE DIFFICILE: come non andare in prigione facendo l’ingegnere. - BON...
UN MESTIERE DIFFICILE: come non andare in prigione facendo l’ingegnere. - BON...UN MESTIERE DIFFICILE: come non andare in prigione facendo l’ingegnere. - BON...
UN MESTIERE DIFFICILE: come non andare in prigione facendo l’ingegnere. - BON...
 
Connessioni in Acciaio - Lezione 14 dicembre2012
Connessioni in Acciaio - Lezione 14 dicembre2012Connessioni in Acciaio - Lezione 14 dicembre2012
Connessioni in Acciaio - Lezione 14 dicembre2012
 
L’INGEGNERIA FORENSE STRUTTURALE: INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...
L’INGEGNERIA FORENSE STRUTTURALE:  INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...L’INGEGNERIA FORENSE STRUTTURALE:  INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...
L’INGEGNERIA FORENSE STRUTTURALE: INVESTIGAZIONE DI SCENARI DI COLLASSO FIRE...
 

Similar to Exposure Factor in a Controlled Demolition_Eng Marco Lucidi

JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structure
Loga Raja
 
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACHDEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
A Makwana
 

Similar to Exposure Factor in a Controlled Demolition_Eng Marco Lucidi (20)

2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt
 
Blast Loading
Blast LoadingBlast Loading
Blast Loading
 
sci.pptx
sci.pptxsci.pptx
sci.pptx
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
 
Construction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 08_Demolition using ExplosivesConstruction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 08_Demolition using Explosives
 
emergency plan.ppt
emergency plan.pptemergency plan.ppt
emergency plan.ppt
 
Copy of mis 004-pgdm-1 (full & final)
Copy of mis 004-pgdm-1 (full & final)Copy of mis 004-pgdm-1 (full & final)
Copy of mis 004-pgdm-1 (full & final)
 
Bs bab 4
Bs bab 4Bs bab 4
Bs bab 4
 
Techniques for Demolition of Structure
Techniques for Demolition of StructureTechniques for Demolition of Structure
Techniques for Demolition of Structure
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
ACE Security Laminates
ACE Security LaminatesACE Security Laminates
ACE Security Laminates
 
Building Service Chapter 4
Building Service Chapter 4Building Service Chapter 4
Building Service Chapter 4
 
Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)
 
Excavation and-trenching safety 03
Excavation and-trenching safety 03Excavation and-trenching safety 03
Excavation and-trenching safety 03
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structure
 
Building Construction Final
Building Construction FinalBuilding Construction Final
Building Construction Final
 
ANALYSIS OF BLAST RESISTANT STRUCTURE
ANALYSIS OF BLAST RESISTANT STRUCTUREANALYSIS OF BLAST RESISTANT STRUCTURE
ANALYSIS OF BLAST RESISTANT STRUCTURE
 
Study of Blast Analysis for Structural Building
Study of Blast Analysis for Structural BuildingStudy of Blast Analysis for Structural Building
Study of Blast Analysis for Structural Building
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACHDEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
DEMOLITION OF BUILDINGS: INTEGRATED NOVEL APPROACH
 

Recently uploaded

If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Kayode Fayemi
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
raffaeleoman
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
Kayode Fayemi
 

Recently uploaded (20)

Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Causes of poverty in France presentation.pptx
Causes of poverty in France presentation.pptxCauses of poverty in France presentation.pptx
Causes of poverty in France presentation.pptx
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 

Exposure Factor in a Controlled Demolition_Eng Marco Lucidi

  • 1. Exposure Factor in a Controlled Demolition M. Lucidi Freelance Engineer, Rome IF CRASC’15 III THIRD CONGRESS ON FORENSIC ENGINEERING VI CONGRESS ON COLLAPSES, RELIABILITY AND RETROFIT OF STRUCTURES SAPIENZA UNIVERSITY OF ROME, 14-16 MAY 2015
  • 2. M. Lucidi OVERALL VIEW EXPOSURE and ACTIONS on the STRUCTURES 2 “Exposure Factor in a Controlled Demolition” STRUCTURAL DAMAGE for EXPLOSION CAUSE UNFIT for USE for EVERYONE TEMPORARY REINFORCEMENT UNFIT for HUMAN HABITATION , but NOT for TECHNICIANS TECHNICAL EXHAUSTIVE STUDY INSPECTION DEMOLITION PLAN CONTROLLED DEMOLITION with EXPLOSIVE DEMOLITION FAILURE HIGHRISK
  • 3. M. Lucidi STRUCTURAL DAMAGE for EXPLOSION CAUSE 3 “Exposure Factor in a Controlled Demolition” UNFIT for USE for EVERYONE U.S. and Saudi military personnel survey the damage to Khobar Towers caused by the explosion of a fuel truck outside the northern fence of the facility on King Abdul Aziz Air Base near Dhahran, Saudi Arabia Explosion Mariahilfer-Straße Wien 26.04.2014, part of the roof collapsed and windows of the building in the capital’s 15th district were shattered. Te Emergency Time EXPOSED : 19 dead + 64 hospitalized + 200 injuries EXPOSED : 1 dead + 5 injuries
  • 4. M. Lucidi STRUCTURAL DAMAGE for EXPLOSION CAUSE 4 “Exposure Factor in a Controlled Demolition” UNFIT for USE for EVERYONE – EMERGENCY 110 FIREFIGHTERS AN MANY PARAMADICS AND WERE CALLED TO THE SCENE PARAMEDICS ARRIVED WITH THE SPECIALIZED “catastrophes unit" WHICH CONTAINS VEHICLES, EQUIPMENT AND PERSONAL FOR LARGE NUMBER OF CASUALTIES Te Emergency Time EXPOSED : 2 firefighters NOT EXPOSED : paramedics
  • 5. M. Lucidi TEMPORARY REINFORCEMENT 5 “Exposure Factor in a Controlled Demolition” FIREMAN in ACTION for REALIZATION of TEMPORARY REINFORCEMENT TECHNICAL INSPECTION for DETERMINATION of CONFORMITY to STANDARD HUMAN HABITATION UNFIT for HUMAN HABITATION , but NOT for TECHNICIANS Te Emergency Time Ta Habitable Time EXPOSED : 5 firefighter EXPOSED : 1 or 2technicians
  • 6. M. Lucidi CONTROLLED DEMOLITION with EXPLOSIVE 6 “Exposure Factor in a Controlled Demolition” TIME RISK PRE DEMOLITION DEMOLITION DESIGN ACCIDENTAL COLLAPSE TOTAL/PARTIAL After CONSTRUCTION SITE OPENING DURING REALIZATION of the DEMOLITION DESIGN for EXTRA NATURAL EVENTS (earthquake, wind) For CONTRADICTION between DESIGN/AS BUILT For IMPROPER USE of the EXPLOSIVE T*0d Start Preliminary Operation Demolition Time EXPOSED : 5explosive technicians squad + 2responsibles
  • 7. M. Lucidi CONTROLLED DEMOLITION with EXPLOSIVE 7 “Exposure Factor in a Controlled Demolition” T0d Start Demolition Time TIME NOT EXPOSED : during the explosion there isn’t anyone inside blast security area
  • 8. M. Lucidi DEMOLITION FAILURE 8 “Exposure Factor in a Controlled Demolition” TIME RISK POST DEMOLITION INVESTIGATION – FAILURE CAUSES NOT COLLAPSE or ACCIDENTAL PARTIAL COLLAPSE For FAILURE EXPLOSION For WRONG DEMOLITION DESIGN For CONTRADICTION between DESIGN/AS BUILT T’d Failure Demolition Time NOT EXPOSED : after failure must applied standard security procedures before investigate the structure
  • 9. M. Lucidi DEMOLITION FAILURE 9 “Exposure Factor in a Controlled Demolition” T’d Start Investigation Operation Time EXPLOSIVE INVESTIGATION: - NOT CONTROL the QUALITY of EXPLOSIVE MATERIALS - NOT VERIFY FUSE JOINTS - NOT EXACT POSITIONING EXPLOSIVE LIKE the DEMOLITION PLANNING DESIGN ANALYSIS: - ERRORS in LINES of FIRE DESIGN - ERRORS in SELECT PROGRAMMING SERIES BLAST DELAYS - ERRORS in SELECT LOCATION for EXPLOSIVES - NOT VERIFY the COHERENCE between DESIGN and AS BUILT FAILURE EXPLOSION FAILURE DESIGNER NOT EXPOSED : study phases NOT EXPOSED : study phases
  • 10. M. Lucidi HIGH RISK 10 “Exposure Factor in a Controlled Demolition” the controlled demolition with explosive is more secure in the demolition sector. But if I’ve had an not collapse or a partial collapse in place of total demolition like design, it’s less secure type of demolition. T”d Extra Start Operation Demolition Time P P V V E E R = EXPOSED : 5 explosive technicians squad + 2 responsibles + 3 machinists
  • 11. M. Lucidi REDUCE RISK with EXPOSURE 11 “Exposure Factor in a Controlled Demolition” T”d or T*’d Extra Operation Demolition Time 96,30% WHY USE EXPLOSIVE AGAIN? HAVE A TIME CONSTRAINT? HAVE A SPACE LIMIT? I choose to induce a blow down with an another type of controlled demolition, and after, in a stable condition, use explosive