CENTRAL RAILWAY WORKSHOP,KURDUWADI
A
Project Work
On
“ Distributor Valve.”
Submitted in the partial fulfillment of the requirement for the award of
Final Year,Mechanical Engineering
By
1).Mr. Kshirsagar Mangesh Ankush.
2).Mr. Kulkarni Chaitanya Shashank.
Under the Guidance of
Prof. Ghogare R.N.
DEPARTMENT OF MECHANICAL ENGINEERING
SKN SINHGAD COLLEGE OF ENGINEERING, KORTI,
PANDHARPUR
ACADEMIC YEAR 2016-17
Savitribai Phule Shikshan Prasarak Mandal’s
SKN SINHGAD COLLEGE OF ENGINEERING, KORTI, PANDHARPUR
CERTIFICATE
This is to certify that the project entitled “DISTRIBUTOR VALVE”has been
submitted by Mr.Kshirsagar M.A And Mr.Kulkarni C.S. In Final Year Of
Mechanical Engineering as per curriculum laid by the Solapur University,
Solapur during the academic year 2016-2017.
ACKNOWLEDGEMENT:-
It is my pleasure to get this opportunity to thank my beloved and
respected Guide Prof. who imparted valuable knowledge of Project
“Distributor Valve .”
I am grateful to Works Manager Mr. Shobhit Pratap Singh
for his encouragement and guidance throughout the training period.
I express my sincere thanks to all the staff, faculties and All
Department , who have helped me directly or indirectly in completing
this Training Report.
I also like to grateful my parents for wishes and moral support
during the preparation and all concerned for helping and encouraging
me. I am grateful for the many useful comments and suggestions
provided by reviewers, which have resulted significant improvements in
the dissertation.
Introduction:-
Distributer Valve is The Brain Of The Air Brake System. It's
main function is to charging the air into the cylinder & Apply
The Brake In The 18 to 30 Sec. Also It another Most Important
Function is to Release The Brake After 45 to 60 sec.
Principle:-
To Give the Sufficient Amount Of Air To Charge The cylinder
& This Air Is Supplied To Every Part For Applying The Brake
As well as Release the brake in the accurate time.
Working:-
It is used to charge the cylinder i.e. control reservior Also
charge Sub reservior. To apply the brake in the brake cylinder
by supplying sufficient amount of air about 3.8 Kg/Cm^2.
To apply the brake as early as possible as well as release
brake. It can remove air the air from cyclinder & It can charge
cylinder by hand to push the relese lever.
It can control the the timing of applying the brake &
releasing the brake as per Bougie & Coach.
Working Of Brake cylinder:
To charge the air into brake system into the brake
cylinder .In The brake cylinder only atmospheric air is present
also there is no another any pressure in that cylinder.
In timing of the brake apply the brake pipe pressure
(B.P) of air is about 5 Kg/cm^2 .
To release the brake charging of the air into the cylinder
is important so that after that three pressure valve of D.V to get
Oringinal position & exhaust the air to get the joint. the whole
air is goes inside the D.V. & return spring piston to get it's
original position.
The following pressure are required for testing of the distributer
valve:-
1) M.R (main master reserviour):-
when braking pressure is 7.6 kg/cm^2 the main master
reserviour pressure is 6.5 kg/cm^2.
2) B.P (brake pipe pressure):-
the brake pipe pressure is about 5kg/cm^2. chmber
timing is 160 to 210 sec.
3) C.R(control reservior):-
its pressure is about 5 kg/cm^2.
4) A.R(auxiliary reserviour):-
the 5kg/cm^2 pressure is present into this reserviour.
5) B.C(brake cylinder):-
in this the pressure is 3.8 kg/cm^2.
TEST FOR DISTRIBUTER VALVE:-
1).Single Test:-
To find out leakages to charging the D.V then use soap
solution.
2).Charging Time:-
A.R pressure is o - 4.8 kg.cm^2. brake timing is 160 to 210
sec C.R is also charge.
3).Full Service Application:-
release the brake cylinder in 18-30 sec & pressure is about 0 -
3.8 kg/cm^2.
4).Emergency Application:-
feeding time is 18 to 30 sec for B.C 3.6 kg/cm^2 & releasing
time is 45-60 sec.
5).Sensitivity Application:-
To sense upto 6 sec to apply the brake in that CR-AR-BP is
5kg/cm^2 & close the FP & open the sense the valve. in that
time is 0.6 sec to apply the brake minimize the AR.
6).Insensitivity:-
when we open the valve B.P is 0.3 kg/cm^2 in the below 60
sec . to apply the brake BP pressure 0.3 to get minimize BP is
apply is not apply in 60 sec.
Application:-
1). Wide range of the different vehicle.
2).All sizes of the brake cylinder.
3).Single & Twin pipes of the brake system.
4). Used in the rail way as per application.

More Related Content

What's hot (18)

DIESEL ENGINES
DIESEL ENGINESDIESEL ENGINES
DIESEL ENGINES
 
Rankine Cycle
Rankine CycleRankine Cycle
Rankine Cycle
 
Minor losses valve
Minor losses  valveMinor losses  valve
Minor losses valve
 
analysis of compressor
analysis of compressoranalysis of compressor
analysis of compressor
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycle
 
Cy34605609
Cy34605609Cy34605609
Cy34605609
 
Unit7 nozzles
Unit7   nozzlesUnit7   nozzles
Unit7 nozzles
 
Design of transonic axial compressor
Design of transonic axial compressorDesign of transonic axial compressor
Design of transonic axial compressor
 
Nozzle
NozzleNozzle
Nozzle
 
Centrifugal compressor head - Impact of MW and other parameters
Centrifugal compressor head - Impact of MW and other parametersCentrifugal compressor head - Impact of MW and other parameters
Centrifugal compressor head - Impact of MW and other parameters
 
A compressor surge control system
A compressor surge control systemA compressor surge control system
A compressor surge control system
 
STEAM NOZZLE AND STEAM TURBINE
STEAM NOZZLE AND STEAM TURBINESTEAM NOZZLE AND STEAM TURBINE
STEAM NOZZLE AND STEAM TURBINE
 
Gun Tunnels
Gun TunnelsGun Tunnels
Gun Tunnels
 
Impact of water jet
Impact of water jet Impact of water jet
Impact of water jet
 
Brayton cycle
Brayton cycleBrayton cycle
Brayton cycle
 
Nozzles - Lecture A
Nozzles - Lecture ANozzles - Lecture A
Nozzles - Lecture A
 
Anti surge control
Anti surge controlAnti surge control
Anti surge control
 
Infinity rankine
Infinity rankineInfinity rankine
Infinity rankine
 

Similar to csk

Air brake system of railways
Air brake system of railwaysAir brake system of railways
Air brake system of railwaysShraddha Mahabare
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknowpradeep verma
 
WAGON-AIR-BRAKE-SYSTEM.powerpoint.pptx
WAGON-AIR-BRAKE-SYSTEM.powerpoint.pptxWAGON-AIR-BRAKE-SYSTEM.powerpoint.pptx
WAGON-AIR-BRAKE-SYSTEM.powerpoint.pptxRakesh Jainwal
 
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017Rishish Shukla
 
Reciprocating pump ppt
Reciprocating pump ppt Reciprocating pump ppt
Reciprocating pump ppt Sourav Jana
 
internship report by usama
internship report by usamainternship report by usama
internship report by usamamuhammad usama
 
Reciprocating pump(1) (2)
Reciprocating pump(1) (2)Reciprocating pump(1) (2)
Reciprocating pump(1) (2)Sanju Sanjay
 
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptxCNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptxRishabh Sirvaiya
 
Advanced Vapour Compression systems.ppt
Advanced Vapour Compression systems.pptAdvanced Vapour Compression systems.ppt
Advanced Vapour Compression systems.pptPurushottam Ingle
 
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training hisham munir
 
Presentation on pump Roll 132031-132040
Presentation on pump Roll 132031-132040Presentation on pump Roll 132031-132040
Presentation on pump Roll 132031-132040Tanjidbd
 
Draft Tube PPT.pptx
Draft Tube PPT.pptxDraft Tube PPT.pptx
Draft Tube PPT.pptxRohan624622
 
air evacuation system and lrpv (liquid ring vacuum pump)
air evacuation system and lrpv (liquid ring vacuum pump) air evacuation system and lrpv (liquid ring vacuum pump)
air evacuation system and lrpv (liquid ring vacuum pump) Rhitesh Gupta
 
PRESENTATION ON PUMP RUET
PRESENTATION ON PUMP RUETPRESENTATION ON PUMP RUET
PRESENTATION ON PUMP RUETTanjidbd
 
Northern railway
Northern railwayNorthern railway
Northern railwaysometech
 

Similar to csk (20)

AIR BRAKE SYSTEM
AIR BRAKE SYSTEMAIR BRAKE SYSTEM
AIR BRAKE SYSTEM
 
AIR BRAKE SYSTEM
AIR BRAKE SYSTEMAIR BRAKE SYSTEM
AIR BRAKE SYSTEM
 
Air brake system of railways
Air brake system of railwaysAir brake system of railways
Air brake system of railways
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
 
WAGON-AIR-BRAKE-SYSTEM.powerpoint.pptx
WAGON-AIR-BRAKE-SYSTEM.powerpoint.pptxWAGON-AIR-BRAKE-SYSTEM.powerpoint.pptx
WAGON-AIR-BRAKE-SYSTEM.powerpoint.pptx
 
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
 
Reciprocating pump ppt
Reciprocating pump ppt Reciprocating pump ppt
Reciprocating pump ppt
 
internship report by usama
internship report by usamainternship report by usama
internship report by usama
 
nozzle analysis
nozzle analysisnozzle analysis
nozzle analysis
 
Reciprocating pump(1) (2)
Reciprocating pump(1) (2)Reciprocating pump(1) (2)
Reciprocating pump(1) (2)
 
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptxCNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
 
Advanced Vapour Compression systems.ppt
Advanced Vapour Compression systems.pptAdvanced Vapour Compression systems.ppt
Advanced Vapour Compression systems.ppt
 
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training
 
6.pptx
6.pptx6.pptx
6.pptx
 
Presentation on pump Roll 132031-132040
Presentation on pump Roll 132031-132040Presentation on pump Roll 132031-132040
Presentation on pump Roll 132031-132040
 
Draft Tube PPT.pptx
Draft Tube PPT.pptxDraft Tube PPT.pptx
Draft Tube PPT.pptx
 
air evacuation system and lrpv (liquid ring vacuum pump)
air evacuation system and lrpv (liquid ring vacuum pump) air evacuation system and lrpv (liquid ring vacuum pump)
air evacuation system and lrpv (liquid ring vacuum pump)
 
exp.9 flow meter demonstration
exp.9 flow meter demonstrationexp.9 flow meter demonstration
exp.9 flow meter demonstration
 
PRESENTATION ON PUMP RUET
PRESENTATION ON PUMP RUETPRESENTATION ON PUMP RUET
PRESENTATION ON PUMP RUET
 
Northern railway
Northern railwayNorthern railway
Northern railway
 

csk

  • 1. CENTRAL RAILWAY WORKSHOP,KURDUWADI A Project Work On “ Distributor Valve.” Submitted in the partial fulfillment of the requirement for the award of Final Year,Mechanical Engineering By 1).Mr. Kshirsagar Mangesh Ankush. 2).Mr. Kulkarni Chaitanya Shashank. Under the Guidance of Prof. Ghogare R.N. DEPARTMENT OF MECHANICAL ENGINEERING SKN SINHGAD COLLEGE OF ENGINEERING, KORTI, PANDHARPUR ACADEMIC YEAR 2016-17
  • 2. Savitribai Phule Shikshan Prasarak Mandal’s SKN SINHGAD COLLEGE OF ENGINEERING, KORTI, PANDHARPUR CERTIFICATE This is to certify that the project entitled “DISTRIBUTOR VALVE”has been submitted by Mr.Kshirsagar M.A And Mr.Kulkarni C.S. In Final Year Of Mechanical Engineering as per curriculum laid by the Solapur University, Solapur during the academic year 2016-2017.
  • 3. ACKNOWLEDGEMENT:- It is my pleasure to get this opportunity to thank my beloved and respected Guide Prof. who imparted valuable knowledge of Project “Distributor Valve .” I am grateful to Works Manager Mr. Shobhit Pratap Singh for his encouragement and guidance throughout the training period. I express my sincere thanks to all the staff, faculties and All Department , who have helped me directly or indirectly in completing this Training Report. I also like to grateful my parents for wishes and moral support during the preparation and all concerned for helping and encouraging me. I am grateful for the many useful comments and suggestions provided by reviewers, which have resulted significant improvements in the dissertation.
  • 4. Introduction:- Distributer Valve is The Brain Of The Air Brake System. It's main function is to charging the air into the cylinder & Apply The Brake In The 18 to 30 Sec. Also It another Most Important Function is to Release The Brake After 45 to 60 sec. Principle:- To Give the Sufficient Amount Of Air To Charge The cylinder & This Air Is Supplied To Every Part For Applying The Brake As well as Release the brake in the accurate time.
  • 5. Working:- It is used to charge the cylinder i.e. control reservior Also charge Sub reservior. To apply the brake in the brake cylinder by supplying sufficient amount of air about 3.8 Kg/Cm^2. To apply the brake as early as possible as well as release brake. It can remove air the air from cyclinder & It can charge cylinder by hand to push the relese lever. It can control the the timing of applying the brake & releasing the brake as per Bougie & Coach.
  • 6. Working Of Brake cylinder: To charge the air into brake system into the brake cylinder .In The brake cylinder only atmospheric air is present also there is no another any pressure in that cylinder. In timing of the brake apply the brake pipe pressure (B.P) of air is about 5 Kg/cm^2 . To release the brake charging of the air into the cylinder is important so that after that three pressure valve of D.V to get Oringinal position & exhaust the air to get the joint. the whole air is goes inside the D.V. & return spring piston to get it's original position. The following pressure are required for testing of the distributer valve:- 1) M.R (main master reserviour):- when braking pressure is 7.6 kg/cm^2 the main master reserviour pressure is 6.5 kg/cm^2. 2) B.P (brake pipe pressure):- the brake pipe pressure is about 5kg/cm^2. chmber timing is 160 to 210 sec. 3) C.R(control reservior):- its pressure is about 5 kg/cm^2. 4) A.R(auxiliary reserviour):- the 5kg/cm^2 pressure is present into this reserviour. 5) B.C(brake cylinder):- in this the pressure is 3.8 kg/cm^2.
  • 7. TEST FOR DISTRIBUTER VALVE:- 1).Single Test:- To find out leakages to charging the D.V then use soap solution. 2).Charging Time:- A.R pressure is o - 4.8 kg.cm^2. brake timing is 160 to 210 sec C.R is also charge. 3).Full Service Application:- release the brake cylinder in 18-30 sec & pressure is about 0 - 3.8 kg/cm^2. 4).Emergency Application:- feeding time is 18 to 30 sec for B.C 3.6 kg/cm^2 & releasing time is 45-60 sec. 5).Sensitivity Application:- To sense upto 6 sec to apply the brake in that CR-AR-BP is 5kg/cm^2 & close the FP & open the sense the valve. in that time is 0.6 sec to apply the brake minimize the AR. 6).Insensitivity:- when we open the valve B.P is 0.3 kg/cm^2 in the below 60 sec . to apply the brake BP pressure 0.3 to get minimize BP is apply is not apply in 60 sec.
  • 8. Application:- 1). Wide range of the different vehicle. 2).All sizes of the brake cylinder. 3).Single & Twin pipes of the brake system. 4). Used in the rail way as per application.