DAR Specific Guidelines:
Criteria for assessing technical capablity of LGUs:
- track record/experience in implementing similar projects
- no. & competency of technical staff involved in:
project supervision/mgt
project monitoring
report preparation
funds management

Transfer of Funds:

DBM – DARCO – DARRO – DARPO/LGU
DBM – DTI/NIA/DENR - LGU

Monitoring of project implementation: As a regular subproject (per WFP)
LPRAT /MARO- DARPO/DTI/DENR/NIA - DARRO – DARCO/NAPC/DILG
GPB Project Implementation:
LGUs which are eligible to implement a GPB project must submit the
documents required by the concerned participating agency as basis
for fund release which may include:






Project Proposal
Work and Financial Plan
Terms of Reference
Detailed Estimates
Deed of Donations or Certificate of Land Availability (for
infrastructure)

If the LGU is ineligible to implement a GPB project, the project will
be implemented by the participating agency concerned.
Proposed Projects shall be validated considering the
following:
1.) Location: Barangay and Municipality (whether in an ARC, ARC
Cluster, non-ARC)
2.) No. of farmers (ARBs & Non-ARBs) to be benefitted
3.) Recipients-POs (no. of ARB-members)
3.) If in an ARC, is the Project included in the ARCDP?
4.) Physical targets/Scope of work (for infrastructure)
5.) Breakdown of Costs
6.) Plan of Implementation (Implementing Agency/Unit,
duration, target date, etc)
7.) Other relevant data/information

More Related Content

What's hot

Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018 Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018 Stephen Morris Ec.D.
 
SLOPE intro we have a new project!
SLOPE intro we have a new project!SLOPE intro we have a new project!
SLOPE intro we have a new project!SLOPE Project
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar BeheraTarun Behera
 
Slope wp9, task 9.1, project reporting by Graphitech
Slope wp9, task 9.1, project reporting by GraphitechSlope wp9, task 9.1, project reporting by Graphitech
Slope wp9, task 9.1, project reporting by GraphitechSLOPE Project
 
Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...gabriel_nistorescu
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareRajiva Gupta
 
Cascade eu reporting - erik van den elsen v.1.0.rh
Cascade   eu reporting - erik van den elsen v.1.0.rhCascade   eu reporting - erik van den elsen v.1.0.rh
Cascade eu reporting - erik van den elsen v.1.0.rhErik van den Elsen
 

What's hot (13)

RED Program Application Tips
RED Program Application TipsRED Program Application Tips
RED Program Application Tips
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Maaden Exp.
Maaden Exp.Maaden Exp.
Maaden Exp.
 
ESSP support to LPV implementation
ESSP support to LPV implementationESSP support to LPV implementation
ESSP support to LPV implementation
 
Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018 Rural Economic Development Program Application Tips 2018
Rural Economic Development Program Application Tips 2018
 
SLOPE intro we have a new project!
SLOPE intro we have a new project!SLOPE intro we have a new project!
SLOPE intro we have a new project!
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Slope wp9, task 9.1, project reporting by Graphitech
Slope wp9, task 9.1, project reporting by GraphitechSlope wp9, task 9.1, project reporting by Graphitech
Slope wp9, task 9.1, project reporting by Graphitech
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...Project Management & Technical Consultancy Services [Transportation, Rail...
Project Management & Technical Consultancy Services [Transportation, Rail...
 
Tpqma r5 to upload in slide share
Tpqma r5 to upload in slide shareTpqma r5 to upload in slide share
Tpqma r5 to upload in slide share
 
Cascade eu reporting - erik van den elsen v.1.0.rh
Cascade   eu reporting - erik van den elsen v.1.0.rhCascade   eu reporting - erik van den elsen v.1.0.rh
Cascade eu reporting - erik van den elsen v.1.0.rh
 
SHASHANK Intern PPT
SHASHANK Intern PPTSHASHANK Intern PPT
SHASHANK Intern PPT
 

Similar to Dar specific guidelines

Methodology for DPR & PMC Road works.pdf
Methodology  for DPR & PMC Road works.pdfMethodology  for DPR & PMC Road works.pdf
Methodology for DPR & PMC Road works.pdfWapcosLimited3
 
Decc discussion slides investor simulation workshop breakout_offshore_v 1 0
Decc discussion slides investor simulation workshop breakout_offshore_v 1 0Decc discussion slides investor simulation workshop breakout_offshore_v 1 0
Decc discussion slides investor simulation workshop breakout_offshore_v 1 0Department of Energy and Climate Change
 
Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...Department of Energy and Climate Change
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)malapatansarangani
 
Decc discussion slides investor simulation workshop breakout_marine and tidal...
Decc discussion slides investor simulation workshop breakout_marine and tidal...Decc discussion slides investor simulation workshop breakout_marine and tidal...
Decc discussion slides investor simulation workshop breakout_marine and tidal...Department of Energy and Climate Change
 
Decc discussion slides investor simulation workshop breakout_onshore large-sc...
Decc discussion slides investor simulation workshop breakout_onshore large-sc...Decc discussion slides investor simulation workshop breakout_onshore large-sc...
Decc discussion slides investor simulation workshop breakout_onshore large-sc...Department of Energy and Climate Change
 
Creation of PAMANA Provincial TWG
Creation of PAMANA Provincial TWGCreation of PAMANA Provincial TWG
Creation of PAMANA Provincial TWGGlendale Abao
 
Davao changes in gpb jmc for 2016 and succeeding years usep
Davao changes in gpb jmc for 2016 and succeeding years  usepDavao changes in gpb jmc for 2016 and succeeding years  usep
Davao changes in gpb jmc for 2016 and succeeding years usepWBKDC
 
Bottom up Budgeting
Bottom up BudgetingBottom up Budgeting
Bottom up BudgetingAlvin Almo
 
Project in punjab
Project in punjabProject in punjab
Project in punjabHuma Ilyas
 
Decc discussion slides investor simulation workshop breakout_biomass conversi...
Decc discussion slides investor simulation workshop breakout_biomass conversi...Decc discussion slides investor simulation workshop breakout_biomass conversi...
Decc discussion slides investor simulation workshop breakout_biomass conversi...Department of Energy and Climate Change
 
Responses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxResponses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxPANKITPATEL12
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmDNVGLEnergy
 
THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...
THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...
THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...zubeditufail
 
Project Management Methodology for Site Launches
Project Management Methodology for Site LaunchesProject Management Methodology for Site Launches
Project Management Methodology for Site LaunchesMichael Eydman
 
Aviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingAviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingThe European GNSS Agency (GSA)
 

Similar to Dar specific guidelines (20)

Methodology for DPR & PMC Road works.pdf
Methodology  for DPR & PMC Road works.pdfMethodology  for DPR & PMC Road works.pdf
Methodology for DPR & PMC Road works.pdf
 
Decc discussion slides investor simulation workshop breakout_offshore_v 1 0
Decc discussion slides investor simulation workshop breakout_offshore_v 1 0Decc discussion slides investor simulation workshop breakout_offshore_v 1 0
Decc discussion slides investor simulation workshop breakout_offshore_v 1 0
 
Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...Decc discussion slides investor simulation workshop breakout_onshore small-sc...
Decc discussion slides investor simulation workshop breakout_onshore small-sc...
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)
 
Decc discussion slides investor simulation workshop breakout_marine and tidal...
Decc discussion slides investor simulation workshop breakout_marine and tidal...Decc discussion slides investor simulation workshop breakout_marine and tidal...
Decc discussion slides investor simulation workshop breakout_marine and tidal...
 
Decc discussion slides investor simulation workshop breakout_onshore large-sc...
Decc discussion slides investor simulation workshop breakout_onshore large-sc...Decc discussion slides investor simulation workshop breakout_onshore large-sc...
Decc discussion slides investor simulation workshop breakout_onshore large-sc...
 
Creation of PAMANA Provincial TWG
Creation of PAMANA Provincial TWGCreation of PAMANA Provincial TWG
Creation of PAMANA Provincial TWG
 
Davao changes in gpb jmc for 2016 and succeeding years usep
Davao changes in gpb jmc for 2016 and succeeding years  usepDavao changes in gpb jmc for 2016 and succeeding years  usep
Davao changes in gpb jmc for 2016 and succeeding years usep
 
Bottom up Budgeting
Bottom up BudgetingBottom up Budgeting
Bottom up Budgeting
 
Project in punjab
Project in punjabProject in punjab
Project in punjab
 
Decc discussion slides investor simulation workshop breakout_biomass conversi...
Decc discussion slides investor simulation workshop breakout_biomass conversi...Decc discussion slides investor simulation workshop breakout_biomass conversi...
Decc discussion slides investor simulation workshop breakout_biomass conversi...
 
Responses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptxResponses_D&D - Process Review.pptx
Responses_D&D - Process Review.pptx
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...
THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...
THIRD PARTY VALIDATION FOR RESETTLEMENT (SOCIAL SAFEGUARD) - MDTF- ERRP Pk...
 
Apel GEF GHG accounting methods requirements Nov 10 2014
Apel GEF GHG accounting methods requirements Nov 10 2014Apel GEF GHG accounting methods requirements Nov 10 2014
Apel GEF GHG accounting methods requirements Nov 10 2014
 
Project Management Methodology for Site Launches
Project Management Methodology for Site LaunchesProject Management Methodology for Site Launches
Project Management Methodology for Site Launches
 
Aviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management TrainingAviation grants GSA/EEX.0030/2015 - Project Management Training
Aviation grants GSA/EEX.0030/2015 - Project Management Training
 
Latest Resume
Latest ResumeLatest Resume
Latest Resume
 
PROJECT_STEPS
PROJECT_STEPSPROJECT_STEPS
PROJECT_STEPS
 

More from malapatansarangani

More from malapatansarangani (14)

Technology and vocational opportunities in the region
Technology and vocational opportunities in the regionTechnology and vocational opportunities in the region
Technology and vocational opportunities in the region
 
List of approved priority projects in sarangani
List of approved priority projects in saranganiList of approved priority projects in sarangani
List of approved priority projects in sarangani
 
2015 dti menu of program for gpb for lprat orientation
2015 dti menu of program for  gpb for lprat orientation2015 dti menu of program for  gpb for lprat orientation
2015 dti menu of program for gpb for lprat orientation
 
2013 bottoms up budgeting (bub) status
2013 bottoms up budgeting (bub) status2013 bottoms up budgeting (bub) status
2013 bottoms up budgeting (bub) status
 
Bub menu
Bub menuBub menu
Bub menu
 
2015 bub
2015 bub2015 bub
2015 bub
 
Dar xii status of bub 2013 presentation
Dar xii status of bub 2013 presentationDar xii status of bub 2013 presentation
Dar xii status of bub 2013 presentation
 
Dar apcp
Dar apcpDar apcp
Dar apcp
 
Dar cap pbd
Dar cap pbdDar cap pbd
Dar cap pbd
 
Dar menu of programs
Dar menu of programsDar menu of programs
Dar menu of programs
 
Dar arccess
Dar arccessDar arccess
Dar arccess
 
Tools in development lprap
Tools in development lprapTools in development lprap
Tools in development lprap
 
Role of cso in gbp
Role of cso in gbpRole of cso in gbp
Role of cso in gbp
 
2015 grassroots budgeting guidelines (scanned pdf)
2015 grassroots budgeting guidelines (scanned pdf)2015 grassroots budgeting guidelines (scanned pdf)
2015 grassroots budgeting guidelines (scanned pdf)
 

Dar specific guidelines

  • 1. DAR Specific Guidelines: Criteria for assessing technical capablity of LGUs: - track record/experience in implementing similar projects - no. & competency of technical staff involved in: project supervision/mgt project monitoring report preparation funds management Transfer of Funds: DBM – DARCO – DARRO – DARPO/LGU DBM – DTI/NIA/DENR - LGU Monitoring of project implementation: As a regular subproject (per WFP) LPRAT /MARO- DARPO/DTI/DENR/NIA - DARRO – DARCO/NAPC/DILG
  • 2. GPB Project Implementation: LGUs which are eligible to implement a GPB project must submit the documents required by the concerned participating agency as basis for fund release which may include:      Project Proposal Work and Financial Plan Terms of Reference Detailed Estimates Deed of Donations or Certificate of Land Availability (for infrastructure) If the LGU is ineligible to implement a GPB project, the project will be implemented by the participating agency concerned.
  • 3. Proposed Projects shall be validated considering the following: 1.) Location: Barangay and Municipality (whether in an ARC, ARC Cluster, non-ARC) 2.) No. of farmers (ARBs & Non-ARBs) to be benefitted 3.) Recipients-POs (no. of ARB-members) 3.) If in an ARC, is the Project included in the ARCDP? 4.) Physical targets/Scope of work (for infrastructure) 5.) Breakdown of Costs 6.) Plan of Implementation (Implementing Agency/Unit, duration, target date, etc) 7.) Other relevant data/information