DesignCoordinates Inc.
Company profile: Design Coordinates Inc. is an ISO certified Company that specializes in project
management.
Construction Project Engineer-ME
August 26, 2012 – present
Duties and Responsibilities:
 Provides technical expertise in Mechanical, Plumbing, Fire Protection and Sanitary works to
ensure that the project is delivered in a quality and timely manner though consistent monitoring
and control starting from the pre-construction, construction, up to post construction stage of the
project.
 Bidding processes. Issuance of invitation to bid, preparation of technical and commercial
evaluations up to the awarding of the MPFS contract packages.
 Constant coordination with the MPFS consultants/designers and contractors for the proper
execution of latest approved plans, specs and methodologies harmonized with other trades
involved in the construction of the building.
 Regularly monitors the progress/status of MPFS works if it is subsequent to the approved
schedule or timeline of the project.
 Conducts documented inspections/punch listing to ensure that quality of works of the MPFS
from installation up to testing and commissioning is done by the respective contractors.
 Immediately addresses any case of deviation from the latest approved plan, specification,
methodologies and standards through issuance of letters or non-compliance reports.
 Attends/presides technical meetings to formally discuss, resolve and monitor all issues or
conflicts that are related to MPFS works that hampers or might hamper the schedule of
completion of the project.
 Documentation. Preparation of Notice of Meeting and Agenda, minutes of meetings, Site
instructions, letters, reports, etc. Also includes review of the shop drawings or queries submitted
by contractors prior to comment/approval of the concerned consultants or designers.
Part Time Safety Officer
April 2013 – present
Duties and Responsibilities:
 Conducts/presides regular meetings to address concerns to safeguard that all workers and staffs
have a healthy and safe working environment in accordance with the construction safety and
health standards.
 Conducts regular safety inspection and audit at the project to verify any cases of non-compliance
with the construction safety and health standards.
 Immediately calls the attention of any contractor, personnel or worker to correct any non-
compliance with safety and health standards to avoid incident/accident that may cause injury or
fatality.
Current Project:
Discovery Primea - (68 floors, 12 floors hotel, 45 floors residential condominiums with 6 basements)
6749 Ayala Avenue, Makati City
Irvine Construction Corporation
Company Profile: Irvine Construction Corporation is a specialty contractor in Plumbing/Sanitary works
and Fire Protection works.
Project-in-Charge - Fire Protection Works
September 2011- August 25, 2012
Duties and Responsibilities:
 General control & supervision of the completion of Fire Protection System of the building in
accordance with the latest approved plans, fire protection code, building code and other related
standards starting from installation up to testing and commissioning.
 Prepares comprehensive monitoring on a daily basis to ensure that the construction of the fire
protection works of the building is moving in relation to the project timeline.
 Conducts regular inspection at site to ensure that quality of work is maintained.
 Attends regular project meetings to address or resolve any issue or conflicts related to fire
protection works that hampers or might hamper the completion of the project.
 Documentations. Prepares shop drawings and queries for consultant’s comment or approval. Also
includes preparation of schedule (S-Curve), monthly progress reports, billings, letters, etc.
Projects Handled:
1. Bay Garden Club And Residences (Banyan Tree and Royal Palm Towers) -18 storey residential
buildings
Metropolitan Park, Pasay City
September 2011- August 2012
2. Four Seasons Riviera – 30 Storey residential building
Binondo, Manila
March 2012 - April 2012
Quantity Surveyor
May 26, 2011 – August 2011
Duties and Responsibilities:
 Quantification of materials needed to complete the fire protection system of a building.
 Preparation of Bill of Quantities for bidding.
The Lift Company Philippines Inc.
Company Profile: The Lift Company Philippines Inc. is a company that provides quality works in
installation, testing and commissioning of elevators and escalators. It is also provides maintenance
services for elevators and escalators.
Testing and Commissioning Engineer Trainee
October 2010- April 2011
Duties and responsibilities:
 Preparation for testing and commissioning of escalator and elevator including wiring works,
terminations and major mechanical adjustments.
 Testing and commissioning of escalator and elevator from low speed to high speed testing
including general functionality testing of all equipment features, minor mechanical and
program adjustments.
 Maintenance, trouble shooting and repair of elevator or escalator.
Projects Handled:
1. Home Depot Magallanes
4 units escalator, 1 unit elevator
2. Santiago City Dry Market
2 units escalator
3. Golden Gate General Hospital
1 unit elevator
SKILLS
MS Office and Auto CADD literate.
TRAININGS AND SEMINARS
Operating Principle and Maintenance of Trane CVHF Chiller, CGAM Chiller, Air Handling Unit
and Fan Coil Units
Trane Philippines Inc.
Discovery Primea, GF JTKC Centre, 2155 Pasong Tamo, Makati City
March 14, 2014
40 hour Construction Occupational Safety and Health Training
Synerquest Safety Consultants Inc.
3-ECOM Building Jobsite Pasay City
February 9 - March 22, 2013
Automatic Computer Aided Design and Drafting
Microcadd Technologies Co., Inc.
517-518 SM City Manila, Arroceros Street, Ermita, Manila
June 2011 – August 2011
Air Compressor Technology
Eulogio “Amang” Rodriguez Institute of Science And Technology
Nagtahan, Sampaloc, Manila
September 2007
EDUCATIONAL ATTAINMENT
Tertiary: Bachelor of Science in Mechanical Engineering
Eulogio “Amang” Rodriguez Institute of Science And Technology
Nagtahan, Sampaloc, Manila
2005-2010
Vocational: Heating, Ventilating and Air Conditioning
Eulogio “Amang” Rodriguez Institute of Science And Technology
Nagtahan, Sampaloc, Manila
July 2008 - October 2008
Diesel/Gasoline Engine Repair
Eulogio “Amang” Rodriguez Institute of Science And Technology
Nagtahan, Sampaloc, Manila
November 2007 - March 2007
Secondary: Quezon- Roxas High School
Mogpog, Marinduque
Elementary: Lamesa Elementary School
Lamesa, Mogpog, Marinduque
CHARACTER REFERENCES
Engr. Amiel Corpuz
Innovair Air-conditioning Corporation
QA/QC Engineer
09228588432
Engr. Shear Jasub Mantua
Masterpiece Asia Properties Inc.
Site Engineer
09437254548
Arch. Cecilia Cruz
Senior Construction Project Architect
Design Coordinates Inc.
09329496068
PERSONAL DATA
Age : 26
Gender : Male
Date of Birth : February 25, 1988
Civil Status : Single
Citizenship : Filipino
Religion : Roman Catholic
Height : 5'6”
Weight : 120 lbs.
I hereby certify that the above information is true and correct in the best of my
knowledge.
__________________________________
Engr. Lemuel M. Fedelino
Applicant

More Related Content

What's hot (20)

Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)
 
CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016CURRICULAM VITAE for Jomy@25-04-2016
CURRICULAM VITAE for Jomy@25-04-2016
 
aravind ..
aravind ..aravind ..
aravind ..
 
Safety Manager CV
Safety Manager CVSafety Manager CV
Safety Manager CV
 
Ralph george hse manager
Ralph george   hse managerRalph george   hse manager
Ralph george hse manager
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15
 
Praveen sadula cv 9th may 2015
Praveen sadula cv  9th may 2015Praveen sadula cv  9th may 2015
Praveen sadula cv 9th may 2015
 
CV SHAHROL AMIN
CV SHAHROL AMINCV SHAHROL AMIN
CV SHAHROL AMIN
 
FIELD SUPERVISOR
FIELD SUPERVISORFIELD SUPERVISOR
FIELD SUPERVISOR
 
HSE Manager CV Abdeslem Dahmani Rev12 2016
HSE Manager CV Abdeslem Dahmani Rev12 2016HSE Manager CV Abdeslem Dahmani Rev12 2016
HSE Manager CV Abdeslem Dahmani Rev12 2016
 
Shaik Abdul Khader Updated C.V. New
Shaik Abdul Khader Updated C.V. NewShaik Abdul Khader Updated C.V. New
Shaik Abdul Khader Updated C.V. New
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
RESUME
RESUMERESUME
RESUME
 
Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016
 
Mansur HSE Manager - cv
Mansur HSE Manager - cvMansur HSE Manager - cv
Mansur HSE Manager - cv
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE Manager
 
my cv
my cvmy cv
my cv
 
resume azhari bin rahim (1) (2)
resume azhari bin rahim (1) (2)resume azhari bin rahim (1) (2)
resume azhari bin rahim (1) (2)
 

Similar to RESUME-FEDELINO, LEMUEL M

Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen
 
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...james espiritu
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Bernie Buenavent
 
Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEfren Eito
 
Daniel Matias Resume rev 1.1
Daniel Matias Resume rev 1.1Daniel Matias Resume rev 1.1
Daniel Matias Resume rev 1.1Daniel Matias
 
Ed McCarty Resume
Ed McCarty ResumeEd McCarty Resume
Ed McCarty ResumeEd McCarty
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelPaul Snyder
 

Similar to RESUME-FEDELINO, LEMUEL M (20)

Resume (Mohammed Sami Ahmed)
Resume (Mohammed Sami Ahmed)Resume (Mohammed Sami Ahmed)
Resume (Mohammed Sami Ahmed)
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
Update CV
Update CVUpdate CV
Update CV
 
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
 
CV updated 28.07.2016
CV updated 28.07.2016CV updated 28.07.2016
CV updated 28.07.2016
 
Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_Updated
 
Daniel Matias Resume rev 1.1
Daniel Matias Resume rev 1.1Daniel Matias Resume rev 1.1
Daniel Matias Resume rev 1.1
 
CVFTCabunoc
CVFTCabunocCVFTCabunoc
CVFTCabunoc
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Ed McCarty Resume
Ed McCarty ResumeEd McCarty Resume
Ed McCarty Resume
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
CV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABORCV-FRANCISCO L. ABOR
CV-FRANCISCO L. ABOR
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Siva Sankaran Menon - Resume
Siva Sankaran Menon - ResumeSiva Sankaran Menon - Resume
Siva Sankaran Menon - Resume
 

RESUME-FEDELINO, LEMUEL M

  • 1. Lemuel Marte Fedelino Registered Mechanical Engineer; Registered Master Plumber 443 Alvarez Bliss, Alvarez St., Sta. Cruz, Manila Mobile no. 09274101413 Email: el_fedelino@yahoo.com OBJECTIVE:  To be employed in a company where my skills and abilities can be utilized for future company advancement and to convey ideas and knowledge that I had learned from my past works, which could be useful for the company. WORKS EXPERIENCES DesignCoordinates Inc. Company profile: Design Coordinates Inc. is an ISO certified Company that specializes in project management. Construction Project Engineer-ME August 26, 2012 – present Duties and Responsibilities:  Provides technical expertise in Mechanical, Plumbing, Fire Protection and Sanitary works to ensure that the project is delivered in a quality and timely manner though consistent monitoring and control starting from the pre-construction, construction, up to post construction stage of the project.  Bidding processes. Issuance of invitation to bid, preparation of technical and commercial evaluations up to the awarding of the MPFS contract packages.  Constant coordination with the MPFS consultants/designers and contractors for the proper execution of latest approved plans, specs and methodologies harmonized with other trades involved in the construction of the building.  Regularly monitors the progress/status of MPFS works if it is subsequent to the approved schedule or timeline of the project.  Conducts documented inspections/punch listing to ensure that quality of works of the MPFS from installation up to testing and commissioning is done by the respective contractors.  Immediately addresses any case of deviation from the latest approved plan, specification, methodologies and standards through issuance of letters or non-compliance reports.  Attends/presides technical meetings to formally discuss, resolve and monitor all issues or conflicts that are related to MPFS works that hampers or might hamper the schedule of completion of the project.  Documentation. Preparation of Notice of Meeting and Agenda, minutes of meetings, Site instructions, letters, reports, etc. Also includes review of the shop drawings or queries submitted by contractors prior to comment/approval of the concerned consultants or designers.
  • 2. Part Time Safety Officer April 2013 – present Duties and Responsibilities:  Conducts/presides regular meetings to address concerns to safeguard that all workers and staffs have a healthy and safe working environment in accordance with the construction safety and health standards.  Conducts regular safety inspection and audit at the project to verify any cases of non-compliance with the construction safety and health standards.  Immediately calls the attention of any contractor, personnel or worker to correct any non- compliance with safety and health standards to avoid incident/accident that may cause injury or fatality. Current Project: Discovery Primea - (68 floors, 12 floors hotel, 45 floors residential condominiums with 6 basements) 6749 Ayala Avenue, Makati City Irvine Construction Corporation Company Profile: Irvine Construction Corporation is a specialty contractor in Plumbing/Sanitary works and Fire Protection works. Project-in-Charge - Fire Protection Works September 2011- August 25, 2012 Duties and Responsibilities:  General control & supervision of the completion of Fire Protection System of the building in accordance with the latest approved plans, fire protection code, building code and other related standards starting from installation up to testing and commissioning.  Prepares comprehensive monitoring on a daily basis to ensure that the construction of the fire protection works of the building is moving in relation to the project timeline.  Conducts regular inspection at site to ensure that quality of work is maintained.  Attends regular project meetings to address or resolve any issue or conflicts related to fire protection works that hampers or might hamper the completion of the project.  Documentations. Prepares shop drawings and queries for consultant’s comment or approval. Also includes preparation of schedule (S-Curve), monthly progress reports, billings, letters, etc. Projects Handled: 1. Bay Garden Club And Residences (Banyan Tree and Royal Palm Towers) -18 storey residential buildings Metropolitan Park, Pasay City September 2011- August 2012 2. Four Seasons Riviera – 30 Storey residential building Binondo, Manila March 2012 - April 2012
  • 3. Quantity Surveyor May 26, 2011 – August 2011 Duties and Responsibilities:  Quantification of materials needed to complete the fire protection system of a building.  Preparation of Bill of Quantities for bidding. The Lift Company Philippines Inc. Company Profile: The Lift Company Philippines Inc. is a company that provides quality works in installation, testing and commissioning of elevators and escalators. It is also provides maintenance services for elevators and escalators. Testing and Commissioning Engineer Trainee October 2010- April 2011 Duties and responsibilities:  Preparation for testing and commissioning of escalator and elevator including wiring works, terminations and major mechanical adjustments.  Testing and commissioning of escalator and elevator from low speed to high speed testing including general functionality testing of all equipment features, minor mechanical and program adjustments.  Maintenance, trouble shooting and repair of elevator or escalator. Projects Handled: 1. Home Depot Magallanes 4 units escalator, 1 unit elevator 2. Santiago City Dry Market 2 units escalator 3. Golden Gate General Hospital 1 unit elevator SKILLS MS Office and Auto CADD literate. TRAININGS AND SEMINARS Operating Principle and Maintenance of Trane CVHF Chiller, CGAM Chiller, Air Handling Unit and Fan Coil Units Trane Philippines Inc. Discovery Primea, GF JTKC Centre, 2155 Pasong Tamo, Makati City March 14, 2014
  • 4. 40 hour Construction Occupational Safety and Health Training Synerquest Safety Consultants Inc. 3-ECOM Building Jobsite Pasay City February 9 - March 22, 2013 Automatic Computer Aided Design and Drafting Microcadd Technologies Co., Inc. 517-518 SM City Manila, Arroceros Street, Ermita, Manila June 2011 – August 2011 Air Compressor Technology Eulogio “Amang” Rodriguez Institute of Science And Technology Nagtahan, Sampaloc, Manila September 2007 EDUCATIONAL ATTAINMENT Tertiary: Bachelor of Science in Mechanical Engineering Eulogio “Amang” Rodriguez Institute of Science And Technology Nagtahan, Sampaloc, Manila 2005-2010 Vocational: Heating, Ventilating and Air Conditioning Eulogio “Amang” Rodriguez Institute of Science And Technology Nagtahan, Sampaloc, Manila July 2008 - October 2008 Diesel/Gasoline Engine Repair Eulogio “Amang” Rodriguez Institute of Science And Technology Nagtahan, Sampaloc, Manila November 2007 - March 2007 Secondary: Quezon- Roxas High School Mogpog, Marinduque Elementary: Lamesa Elementary School Lamesa, Mogpog, Marinduque CHARACTER REFERENCES Engr. Amiel Corpuz Innovair Air-conditioning Corporation QA/QC Engineer 09228588432
  • 5. Engr. Shear Jasub Mantua Masterpiece Asia Properties Inc. Site Engineer 09437254548 Arch. Cecilia Cruz Senior Construction Project Architect Design Coordinates Inc. 09329496068 PERSONAL DATA Age : 26 Gender : Male Date of Birth : February 25, 1988 Civil Status : Single Citizenship : Filipino Religion : Roman Catholic Height : 5'6” Weight : 120 lbs. I hereby certify that the above information is true and correct in the best of my knowledge. __________________________________ Engr. Lemuel M. Fedelino Applicant