P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
1
Impact of retrieval requirements on
repository design
− Results of R&D project funded by BMWi (PTKA) −
Philipp Herold, Sabine Dörr, Eric Kuate Simo,
Wilhelm Bollingerfehr, Wolfgang Filbert
DBE TECHNOLOGY GmbH
Washington, DC
September 7-9, 2016
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
2
1. Final Disposal in Germany – HLW program
2. Regulatory requirements related to retrievability
3. Retrieval strategy
4. Retrievability in drift disposal concept
5. Retrievability in borehole disposal concept
6. Summary
Contents
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
3
Final Disposal in Germany
• Disposal in deep rock salt formations was the preferred
option for the last decades
• Summer 2013: German parliament (Bundestag) passed
new law for restart of site selection process for HLW
repository and implemented commission “Storage of
HLW”
Exploration Mine Gorleben (DBE, 2016)
Final report commission “Storage of HLW”:
• Recommends disposal of HLW in deep geologic
formations with the possibility of retrieving waste
packages as preferred option in Germany
• Determined site selection criteria, considering salt, clay,
crystalline rock as potential host rocks
• Prepared a roadmap for site selection process, which
will start in 2017
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
4
Retrievability − Regulations
Safety Requirements Governing the Final
Disposal of Heat-Generating Radioactive Waste:
 Mandatory for the design, further exploration,
construction, emplacement operations and
decommissioning of HLW/SF repository
 Compliance has to be demonstrated (in a
verifiable way)
 Demonstration of technical feasibility before or
during licensing
 Stipulate retrievability as a design criterion
“Retrievability is the planned technical option for removing
emplaced radioactive waste containers from the repository mine.”
“During the operating phase up until sealing of the shafts or
ramps, retrieval of the waste containers must be possible.”
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
5
Safety Requirements
“Measures taken to
secure the options of
recovering or retrieval
must not impair the
passive safety barriers
and thus the long-term
safety.” based on (NEA 2011)
Retrievability Recovery
“The number of open emplacement zones should be kept to a minimum.
These should be promptly loaded, then backfilled and reliably sealed
from the mine building.”
→ Operations of emplacement, backfilling, and sealing take place in parallel
during complete operational period
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
6
Retrieval Strategy
• In the framework of R&D projects (funded by German Federal Ministry for
Economic Affairs and Energy), DBE TECHNOLOGY GmbH developed a
suitable strategy and technical solutions to retrieve waste packages
• Focus on underground operations
• Waste package management plan after retrieval does not exist
“Re-mining”-strategy:
• Emplacement of waste containers, backfilling and sealing as designed
• Conceptual adaptations to facilitate retrieval and improve conditions during
potential retrieval period without impacts on long-term safety
• In case of retrievability decision, excavation of new access drifts to the
emplacement areas and waste packages, exposal and removal of the waste
packages
 Transfer of the waste packages from the passive safety system
of the repository back into human care
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
7
Drift disposal – Emplacement concept
Emplacement Drift
Prototype Emplacement DevicePOLLUX® cask
Emplacement of
POLLUX® casks
in 250-m-long
blind-ending
drifts
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
8
• Removal of all internals before
backfilling of emplacement drifts
(especially the rails)
During retrieval:
• All emplacement drifts have to be
located between two crosscuts
• Additional access drift allows an
increase in airflow (first cooling
measure) and higher flexibility
• Re-activation of radiation protection
areas during re-excavation of main
drifts and cross-cuts or release from
controlled area before backfilling
Drift disposal – Layout modifications
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
9
• Removal of the remaining pillar
and exposure of the POLLUX®
cask by means of road header
and (remote controlled)
demolition robots
• Backfilling after complete retrieval
Drift disposal − Excavation
• Stepwise excavation of two sub
drifts by means of road header
 between two crosscuts
 parallel to emplaced waste
packages
 floor 0.6 m below POLLUX®
Final retrieval drift:Start of retrieval:
Step 2Step 1 Step 3
POLLUX®POLLUX®
600
600
former
emplacement drift
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
10
Prototype Emplacement Device
Drift disposal − Equipment modifications
• Retrieval without rebuilding of rails
 automotive drive necessary
• Usability of trunnions after emplacement not
guaranteed
 alternative bearing structure necessary
• POLLUX® casks lie on a salt base/socket
 reduces lifting height
Feasibility Study for Modified Emplacement Device
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
11
Drift disposal − Thermal input
40 Years after start of
emplacement (corresponds
with start of retrieval)
• 200°C design temperature at waste package surface, optimized to densest
disposal of waste packages
• Barely manageable conditions inside the access drifts, cross cuts
• Retrieval operation coincides with thermal maximum inside the emplacement
fields
• Excavation inside the emplacement fields hardly manageable because of
very high technical cooling effort, necessary cooling breaks and geo-
mechanics
1 year after emplacement 2 years after emplacement
11 years after emplacement6 years after emplacement
Temperature [°C]
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
12
Drift disposal − Geo-mechanics
• High temperature accelerates salt
creep and produces high geo-
mechanical stress
• Rise of former drift floor
• High convergence calls for drift re-
cutting
• Additional wall and roof stabilization
needed
Displacement, 30 days after complete excavationFailure criterion, at excavation of sub drifts 1, 2 and pillar
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
13
Drift disposal − Conclusions
• Retrieval process is designed for total exposure of the POLLUX®-10
casks
• Modified emplacement device with rail-less drive and with new
bearing structure
• Thermal input due to densest packaging of the POLLUX®-10 casks
produces high rock temperatures and high geo-mechanical stress
• Optimization of thermal repository design would improve conditions
during potential retrieval period but increase repository footprint
• Requirement of retrievability changes repository design significantly
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
14
Borehole disposal − Emplacement concept
BSK 3
Triple pack
Borehole
cellar
Test facility for borehole disposal of spent fuel canisters with one dummy
canister → Unintentional demonstration of canister retrieval
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
15
Conceptual adaptions from “Preliminary safety
analysis for Gorleben site“ (based on nse GmbH):
Borehole disposal − Design impacts
canister with
conical head
new backfill
(quartz sand)
steel liner
Retrieval concept:
• layout of retrieval drifts corresponds to emplacement drifts
• two parallel drifts in the south improve operation and
ventilation
• retrieval corresponds to reversal of emplacement process
• steel liner remains in borehole after retrieval
• removal of backfill (quartz sand) as major technical
challenge during retrieval
• development of a suction device
1 m
• new canister shape (BSK-R)
• steel liner designed for rock pressure
• non-compactable and incompressible backfill
• stepwise emplacement and backfilling
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
16
Borehole disposal − Design impacts
Feasibility study on suction device:
• Remove backfill to free head of the BSK-R
• Suction device with same outer dimensions as
BSK
• Integrated drive, fan and storage space
• Two suctions steps per BSK-R
• First pilot tests for air intake design
Grip
Drive
Fan
Deflection
dome
Transport
pipe clamp
Storage
space
Transport
pipe
Borehole liner
Air intake
Canister head
Cladding
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
17
Borehole disposal − Thermal input
Thermal conditions:
• Heat sources below mine level
• Temperatures above 100°C just next to the boreholes
• Steady increase of rock temperature during retrieval period
• Moderate total heat input inside the mine openings expected
• Third main drift improves ventilation conditions and allows higher flexibility
• Additional cooling equipment during excavation necessary
Drifts at emplacement field East 2
Drifts at emplacement field East 3
Time [a]
Temperature[°C]
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
18
Borehole disposal − Conclusions
• Retrieval process corresponds to reversal of emplacement process
• Unintentional demonstration of canister retrieval at existing test
facility
• New suction device for backfill removal, demonstration of technical
feasibility still open
• Steady increase of rock temperature but moderate total heat input
expected
• No layout modifications necessary
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
19
Summary
• Retrievability is required during complete operational period as
licensing permission
• Thermal input of the waste will influence retrieval concept and to a
certain extent repository design
• Requirement of retrievability could change repository design
significantly
• Retrievability is compatible to German safety concept for high-level
radioactive waste repository in salt formations
• Technical feasibility of all retrieval concepts and techniques has still
to be demonstrated
P. Herold – 08/2016
US/D Workshop
Washington, USA, Sept. 7-9, 2016
20
Thank you
for your attention.

More Related Content

What's hot

31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 peleann_mays
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...Global CCS Institute
 
07 progress on inspection and evaluation of ciscc at canister of dry storage ...
07 progress on inspection and evaluation of ciscc at canister of dry storage ...07 progress on inspection and evaluation of ciscc at canister of dry storage ...
07 progress on inspection and evaluation of ciscc at canister of dry storage ...leann_mays
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...Society of Petroleum Engineers
 
Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes Society of Petroleum Engineers
 
25 decovalex 2019 geochemical and reactive transport evaluations with relevan...
25 decovalex 2019 geochemical and reactive transport evaluations with relevan...25 decovalex 2019 geochemical and reactive transport evaluations with relevan...
25 decovalex 2019 geochemical and reactive transport evaluations with relevan...leann_mays
 
Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalSociety of Petroleum Engineers
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsSociety of Petroleum Engineers
 
104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...
104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...
104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...leann_mays
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsM.T.H Group
 
Hapsite large plume slide
Hapsite large plume slide Hapsite large plume slide
Hapsite large plume slide Chris Lutes
 

What's hot (20)

31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe31 session  corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
31 session corrosion of spent nuclear fuel canisters bryan sand2017 5541 pe
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
 
07 progress on inspection and evaluation of ciscc at canister of dry storage ...
07 progress on inspection and evaluation of ciscc at canister of dry storage ...07 progress on inspection and evaluation of ciscc at canister of dry storage ...
07 progress on inspection and evaluation of ciscc at canister of dry storage ...
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
 
Disposal research activities bam sand2014 18482 pe
Disposal research activities bam sand2014 18482 peDisposal research activities bam sand2014 18482 pe
Disposal research activities bam sand2014 18482 pe
 
Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes
 
25 decovalex 2019 geochemical and reactive transport evaluations with relevan...
25 decovalex 2019 geochemical and reactive transport evaluations with relevan...25 decovalex 2019 geochemical and reactive transport evaluations with relevan...
25 decovalex 2019 geochemical and reactive transport evaluations with relevan...
 
Integration From Multiple Disciplines in Horizontal Well Evaluations to Incre...
Integration From Multiple Disciplines in Horizontal Well Evaluations to Incre...Integration From Multiple Disciplines in Horizontal Well Evaluations to Incre...
Integration From Multiple Disciplines in Horizontal Well Evaluations to Incre...
 
Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem Lawal
 
The Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir SimulationsThe Value and the Danger of Complex Reservoir Simulations
The Value and the Danger of Complex Reservoir Simulations
 
Srikanta Mishra
Srikanta MishraSrikanta Mishra
Srikanta Mishra
 
2016 resume
2016 resume2016 resume
2016 resume
 
The Role of Natural Fractures in Shale Gas Production: What does Production D...
The Role of Natural Fractures in Shale Gas Production: What does Production D...The Role of Natural Fractures in Shale Gas Production: What does Production D...
The Role of Natural Fractures in Shale Gas Production: What does Production D...
 
104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...
104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...
104 105. june 9 overview ebs task force-and_ufd r&d activites related to ...
 
Does Heavy Oil Recovery Need Steam?
Does Heavy Oil Recovery Need Steam?Does Heavy Oil Recovery Need Steam?
Does Heavy Oil Recovery Need Steam?
 
Sand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lacSand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lac
 
CO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to StorageCO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to Storage
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
Frank resume 20150707
Frank resume 20150707Frank resume 20150707
Frank resume 20150707
 
Hapsite large plume slide
Hapsite large plume slide Hapsite large plume slide
Hapsite large plume slide
 

Viewers also liked

17 if g popp teutschenthal v4
17 if g popp teutschenthal v417 if g popp teutschenthal v4
17 if g popp teutschenthal v4leann_mays
 
21 herrick parameter selections associated with wipp's sand2016 86
21 herrick parameter selections associated with wipp's sand2016 8621 herrick parameter selections associated with wipp's sand2016 86
21 herrick parameter selections associated with wipp's sand2016 86leann_mays
 
19 herold 20160830 elsa final
19 herold 20160830 elsa final19 herold 20160830 elsa final
19 herold 20160830 elsa finalleann_mays
 
24a kuhlman percolation discussion
24a kuhlman percolation discussion24a kuhlman percolation discussion
24a kuhlman percolation discussionleann_mays
 
27 kuhlman basin scale density-dependent groundwate sand2016-9236 a
27 kuhlman basin scale density-dependent groundwate sand2016-9236 a27 kuhlman basin scale density-dependent groundwate sand2016-9236 a
27 kuhlman basin scale density-dependent groundwate sand2016-9236 aleann_mays
 
22 hesse capillary controls
22 hesse capillary controls22 hesse capillary controls
22 hesse capillary controlsleann_mays
 
18 wieczorek dopas
18 wieczorek dopas18 wieczorek dopas
18 wieczorek dopasleann_mays
 
08 bollingerfehr nea and iaea workshop
08 bollingerfehr nea and iaea workshop08 bollingerfehr nea and iaea workshop
08 bollingerfehr nea and iaea workshopleann_mays
 
01 bräuer germany`s new approach
01 bräuer germany`s new approach01 bräuer germany`s new approach
01 bräuer germany`s new approachleann_mays
 
02 orrell international perspectives
02 orrell international perspectives02 orrell international perspectives
02 orrell international perspectivesleann_mays
 
20 mohlfeld retreiving vs emergency_preparadness
20 mohlfeld retreiving vs emergency_preparadness20 mohlfeld retreiving vs emergency_preparadness
20 mohlfeld retreiving vs emergency_preparadnessleann_mays
 
25 herold impact of retrieval requirements
25 herold impact of retrieval requirements 25 herold impact of retrieval requirements
25 herold impact of retrieval requirements leann_mays
 
18 wieczorek us de-workshop-dopas
18 wieczorek us de-workshop-dopas18 wieczorek us de-workshop-dopas
18 wieczorek us de-workshop-dopasleann_mays
 
26 gunter deep borehole disposal
26 gunter deep borehole disposal26 gunter deep borehole disposal
26 gunter deep borehole disposalleann_mays
 
15 sobolik comparison sand2016 7825 c
15 sobolik comparison sand2016 7825 c15 sobolik comparison sand2016 7825 c
15 sobolik comparison sand2016 7825 cleann_mays
 
12 reedlunn reinvestigation into closure
12 reedlunn reinvestigation into closure12 reedlunn reinvestigation into closure
12 reedlunn reinvestigation into closureleann_mays
 
14 van sambeek multi segmented creep law
14 van sambeek multi segmented creep law14 van sambeek multi segmented creep law
14 van sambeek multi segmented creep lawleann_mays
 
08 kuhnlenz first results of the kosina project
08 kuhnlenz first results of the kosina project08 kuhnlenz first results of the kosina project
08 kuhnlenz first results of the kosina projectleann_mays
 

Viewers also liked (20)

17 if g popp teutschenthal v4
17 if g popp teutschenthal v417 if g popp teutschenthal v4
17 if g popp teutschenthal v4
 
21 herrick parameter selections associated with wipp's sand2016 86
21 herrick parameter selections associated with wipp's sand2016 8621 herrick parameter selections associated with wipp's sand2016 86
21 herrick parameter selections associated with wipp's sand2016 86
 
7th us german workshop photos sand2016 9820 w
7th us german workshop photos sand2016 9820 w7th us german workshop photos sand2016 9820 w
7th us german workshop photos sand2016 9820 w
 
19 herold 20160830 elsa final
19 herold 20160830 elsa final19 herold 20160830 elsa final
19 herold 20160830 elsa final
 
24a kuhlman percolation discussion
24a kuhlman percolation discussion24a kuhlman percolation discussion
24a kuhlman percolation discussion
 
27 kuhlman basin scale density-dependent groundwate sand2016-9236 a
27 kuhlman basin scale density-dependent groundwate sand2016-9236 a27 kuhlman basin scale density-dependent groundwate sand2016-9236 a
27 kuhlman basin scale density-dependent groundwate sand2016-9236 a
 
22 hesse capillary controls
22 hesse capillary controls22 hesse capillary controls
22 hesse capillary controls
 
24 hammer zulauf us german_2016
24 hammer zulauf us german_201624 hammer zulauf us german_2016
24 hammer zulauf us german_2016
 
18 wieczorek dopas
18 wieczorek dopas18 wieczorek dopas
18 wieczorek dopas
 
08 bollingerfehr nea and iaea workshop
08 bollingerfehr nea and iaea workshop08 bollingerfehr nea and iaea workshop
08 bollingerfehr nea and iaea workshop
 
01 bräuer germany`s new approach
01 bräuer germany`s new approach01 bräuer germany`s new approach
01 bräuer germany`s new approach
 
02 orrell international perspectives
02 orrell international perspectives02 orrell international perspectives
02 orrell international perspectives
 
20 mohlfeld retreiving vs emergency_preparadness
20 mohlfeld retreiving vs emergency_preparadness20 mohlfeld retreiving vs emergency_preparadness
20 mohlfeld retreiving vs emergency_preparadness
 
25 herold impact of retrieval requirements
25 herold impact of retrieval requirements 25 herold impact of retrieval requirements
25 herold impact of retrieval requirements
 
18 wieczorek us de-workshop-dopas
18 wieczorek us de-workshop-dopas18 wieczorek us de-workshop-dopas
18 wieczorek us de-workshop-dopas
 
26 gunter deep borehole disposal
26 gunter deep borehole disposal26 gunter deep borehole disposal
26 gunter deep borehole disposal
 
15 sobolik comparison sand2016 7825 c
15 sobolik comparison sand2016 7825 c15 sobolik comparison sand2016 7825 c
15 sobolik comparison sand2016 7825 c
 
12 reedlunn reinvestigation into closure
12 reedlunn reinvestigation into closure12 reedlunn reinvestigation into closure
12 reedlunn reinvestigation into closure
 
14 van sambeek multi segmented creep law
14 van sambeek multi segmented creep law14 van sambeek multi segmented creep law
14 van sambeek multi segmented creep law
 
08 kuhnlenz first results of the kosina project
08 kuhnlenz first results of the kosina project08 kuhnlenz first results of the kosina project
08 kuhnlenz first results of the kosina project
 

Similar to 25 herold 20160830 retrieval final

CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processGlobal CCS Institute
 
The design evolution of replacement motorway bridge approach embankments
The design evolution of replacement motorway bridge approach embankmentsThe design evolution of replacement motorway bridge approach embankments
The design evolution of replacement motorway bridge approach embankmentsChris Bridges
 
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nick Vukovich
 
Parabolic trough collectors comparison
Parabolic trough collectors comparisonParabolic trough collectors comparison
Parabolic trough collectors comparisonSolarReference
 
Hangar 1 RAB Presentation, Jan. 10, 2008
Hangar 1 RAB Presentation, Jan. 10, 2008Hangar 1 RAB Presentation, Jan. 10, 2008
Hangar 1 RAB Presentation, Jan. 10, 2008Steve Williams
 
Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014David Chato
 
Sarah Hartman ROP - Gibson Tech Team
Sarah Hartman ROP - Gibson Tech TeamSarah Hartman ROP - Gibson Tech Team
Sarah Hartman ROP - Gibson Tech TeamSarah Hartman
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraProSIM R & D Pvt. Ltd.
 
Offshore production technology summit 2014
Offshore production technology summit 2014Offshore production technology summit 2014
Offshore production technology summit 2014BRONSWERK
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
Final_Final_Paper_mod1.docx (1)
Final_Final_Paper_mod1.docx (1)Final_Final_Paper_mod1.docx (1)
Final_Final_Paper_mod1.docx (1)William Bodensieck
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasAshwin Gadgil
 
2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind 2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind MEC Intelligence
 
Ctws ocean energy hurley
Ctws ocean energy hurleyCtws ocean energy hurley
Ctws ocean energy hurleyblemon
 
2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...
2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...
2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...Haskel International
 

Similar to 25 herold 20160830 retrieval final (20)

CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 
The design evolution of replacement motorway bridge approach embankments
The design evolution of replacement motorway bridge approach embankmentsThe design evolution of replacement motorway bridge approach embankments
The design evolution of replacement motorway bridge approach embankments
 
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
 
Parabolic trough collectors comparison
Parabolic trough collectors comparisonParabolic trough collectors comparison
Parabolic trough collectors comparison
 
Rear Ventilated Rain Screen OBEC Mar 2016
Rear Ventilated Rain Screen OBEC Mar 2016Rear Ventilated Rain Screen OBEC Mar 2016
Rear Ventilated Rain Screen OBEC Mar 2016
 
Hangar 1 RAB Presentation, Jan. 10, 2008
Hangar 1 RAB Presentation, Jan. 10, 2008Hangar 1 RAB Presentation, Jan. 10, 2008
Hangar 1 RAB Presentation, Jan. 10, 2008
 
Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014
 
Sarah Hartman ROP - Gibson Tech Team
Sarah Hartman ROP - Gibson Tech TeamSarah Hartman ROP - Gibson Tech Team
Sarah Hartman ROP - Gibson Tech Team
 
Used fuel andrew sowder - epri
Used fuel   andrew sowder - epriUsed fuel   andrew sowder - epri
Used fuel andrew sowder - epri
 
Rice mars nov99
Rice mars nov99Rice mars nov99
Rice mars nov99
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
Offshore production technology summit 2014
Offshore production technology summit 2014Offshore production technology summit 2014
Offshore production technology summit 2014
 
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
Final_Final_Paper_mod1.docx (1)
Final_Final_Paper_mod1.docx (1)Final_Final_Paper_mod1.docx (1)
Final_Final_Paper_mod1.docx (1)
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
 
2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind 2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind
 
Ctws ocean energy hurley
Ctws ocean energy hurleyCtws ocean energy hurley
Ctws ocean energy hurley
 
2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...
2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...
2018 Hydrogen & Fuel Cells Energy Summit - Haskel Unveils New Hydrogen Techno...
 

More from leann_mays

43 international collaboration skb ebs task force overview jove-colon sand2...
43 international collaboration skb ebs task force   overview jove-colon sand2...43 international collaboration skb ebs task force   overview jove-colon sand2...
43 international collaboration skb ebs task force overview jove-colon sand2...leann_mays
 
27 task f fluid inclusion and movement in tight rocks wang sand2017-4132 pe...
27 task f   fluid inclusion and movement in tight rocks wang sand2017-4132 pe...27 task f   fluid inclusion and movement in tight rocks wang sand2017-4132 pe...
27 task f fluid inclusion and movement in tight rocks wang sand2017-4132 pe...leann_mays
 
13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...
13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...
13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...leann_mays
 
03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c
03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c
03 dry cask simulator experiments for cfd validation durbin sand2017 4330 cleann_mays
 
17 laboratory testing approach for intermediate scale borehole heater test mi...
17 laboratory testing approach for intermediate scale borehole heater test mi...17 laboratory testing approach for intermediate scale borehole heater test mi...
17 laboratory testing approach for intermediate scale borehole heater test mi...leann_mays
 
10 sfwst – disposal in argillite r&d barrier material degradation and int...
10 sfwst – disposal in argillite r&d barrier material degradation and int...10 sfwst – disposal in argillite r&d barrier material degradation and int...
10 sfwst – disposal in argillite r&d barrier material degradation and int...leann_mays
 
07 international collaboration activities in disposal r and d relevance to r ...
07 international collaboration activities in disposal r and d relevance to r ...07 international collaboration activities in disposal r and d relevance to r ...
07 international collaboration activities in disposal r and d relevance to r ...leann_mays
 
59 an example of a regional geologic evaluation of argillite for disposal of ...
59 an example of a regional geologic evaluation of argillite for disposal of ...59 an example of a regional geologic evaluation of argillite for disposal of ...
59 an example of a regional geologic evaluation of argillite for disposal of ...leann_mays
 
51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...leann_mays
 
49 collaboration with swedish deep drilling project dobson lbnl
49 collaboration with swedish deep drilling project dobson lbnl49 collaboration with swedish deep drilling project dobson lbnl
49 collaboration with swedish deep drilling project dobson lbnlleann_mays
 
46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl
46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl
46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnlleann_mays
 
34 ciscc susceptibility and cgr testing sindelar srnl sti-2017-00323
34 ciscc susceptibility and cgr testing sindelar srnl sti-2017-0032334 ciscc susceptibility and cgr testing sindelar srnl sti-2017-00323
34 ciscc susceptibility and cgr testing sindelar srnl sti-2017-00323leann_mays
 
33 residual stress simulation and experimental stress replication of mock up ...
33 residual stress simulation and experimental stress replication of mock up ...33 residual stress simulation and experimental stress replication of mock up ...
33 residual stress simulation and experimental stress replication of mock up ...leann_mays
 
32 field test at maine yankee independent spent fuel storage instillation gor...
32 field test at maine yankee independent spent fuel storage instillation gor...32 field test at maine yankee independent spent fuel storage instillation gor...
32 field test at maine yankee independent spent fuel storage instillation gor...leann_mays
 
30 fe heater test at mont terri rutqvist lbnl
30 fe heater test at mont terri rutqvist lbnl30 fe heater test at mont terri rutqvist lbnl
30 fe heater test at mont terri rutqvist lbnlleann_mays
 
29 international collaboration in disposal research fs experiment at mont ter...
29 international collaboration in disposal research fs experiment at mont ter...29 international collaboration in disposal research fs experiment at mont ter...
29 international collaboration in disposal research fs experiment at mont ter...leann_mays
 
28 international collaboration in disposal research mont terri project birkho...
28 international collaboration in disposal research mont terri project birkho...28 international collaboration in disposal research mont terri project birkho...
28 international collaboration in disposal research mont terri project birkho...leann_mays
 
27b potential hot bent collaboration zheng v0 lbnl
27b potential hot bent collaboration zheng v0 lbnl27b potential hot bent collaboration zheng v0 lbnl
27b potential hot bent collaboration zheng v0 lbnlleann_mays
 
27a febex dp collaboration overview and related sfwst r and d activities zhen...
27a febex dp collaboration overview and related sfwst r and d activities zhen...27a febex dp collaboration overview and related sfwst r and d activities zhen...
27a febex dp collaboration overview and related sfwst r and d activities zhen...leann_mays
 
24 upscaling of heater tests in bure rutqvist lbnl
24 upscaling of heater tests in bure rutqvist lbnl24 upscaling of heater tests in bure rutqvist lbnl
24 upscaling of heater tests in bure rutqvist lbnlleann_mays
 

More from leann_mays (20)

43 international collaboration skb ebs task force overview jove-colon sand2...
43 international collaboration skb ebs task force   overview jove-colon sand2...43 international collaboration skb ebs task force   overview jove-colon sand2...
43 international collaboration skb ebs task force overview jove-colon sand2...
 
27 task f fluid inclusion and movement in tight rocks wang sand2017-4132 pe...
27 task f   fluid inclusion and movement in tight rocks wang sand2017-4132 pe...27 task f   fluid inclusion and movement in tight rocks wang sand2017-4132 pe...
27 task f fluid inclusion and movement in tight rocks wang sand2017-4132 pe...
 
13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...
13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...
13 ensa enun 32 p rail cask transport tests start june 2017 mcconnell sand201...
 
03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c
03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c
03 dry cask simulator experiments for cfd validation durbin sand2017 4330 c
 
17 laboratory testing approach for intermediate scale borehole heater test mi...
17 laboratory testing approach for intermediate scale borehole heater test mi...17 laboratory testing approach for intermediate scale borehole heater test mi...
17 laboratory testing approach for intermediate scale borehole heater test mi...
 
10 sfwst – disposal in argillite r&d barrier material degradation and int...
10 sfwst – disposal in argillite r&d barrier material degradation and int...10 sfwst – disposal in argillite r&d barrier material degradation and int...
10 sfwst – disposal in argillite r&d barrier material degradation and int...
 
07 international collaboration activities in disposal r and d relevance to r ...
07 international collaboration activities in disposal r and d relevance to r ...07 international collaboration activities in disposal r and d relevance to r ...
07 international collaboration activities in disposal r and d relevance to r ...
 
59 an example of a regional geologic evaluation of argillite for disposal of ...
59 an example of a regional geologic evaluation of argillite for disposal of ...59 an example of a regional geologic evaluation of argillite for disposal of ...
59 an example of a regional geologic evaluation of argillite for disposal of ...
 
51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...51 update on the fifth worldwide review international approaches for nuclear ...
51 update on the fifth worldwide review international approaches for nuclear ...
 
49 collaboration with swedish deep drilling project dobson lbnl
49 collaboration with swedish deep drilling project dobson lbnl49 collaboration with swedish deep drilling project dobson lbnl
49 collaboration with swedish deep drilling project dobson lbnl
 
46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl
46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl
46 collaboration with clausthal germany on coupled thm modeling rutqvist lbnl
 
34 ciscc susceptibility and cgr testing sindelar srnl sti-2017-00323
34 ciscc susceptibility and cgr testing sindelar srnl sti-2017-0032334 ciscc susceptibility and cgr testing sindelar srnl sti-2017-00323
34 ciscc susceptibility and cgr testing sindelar srnl sti-2017-00323
 
33 residual stress simulation and experimental stress replication of mock up ...
33 residual stress simulation and experimental stress replication of mock up ...33 residual stress simulation and experimental stress replication of mock up ...
33 residual stress simulation and experimental stress replication of mock up ...
 
32 field test at maine yankee independent spent fuel storage instillation gor...
32 field test at maine yankee independent spent fuel storage instillation gor...32 field test at maine yankee independent spent fuel storage instillation gor...
32 field test at maine yankee independent spent fuel storage instillation gor...
 
30 fe heater test at mont terri rutqvist lbnl
30 fe heater test at mont terri rutqvist lbnl30 fe heater test at mont terri rutqvist lbnl
30 fe heater test at mont terri rutqvist lbnl
 
29 international collaboration in disposal research fs experiment at mont ter...
29 international collaboration in disposal research fs experiment at mont ter...29 international collaboration in disposal research fs experiment at mont ter...
29 international collaboration in disposal research fs experiment at mont ter...
 
28 international collaboration in disposal research mont terri project birkho...
28 international collaboration in disposal research mont terri project birkho...28 international collaboration in disposal research mont terri project birkho...
28 international collaboration in disposal research mont terri project birkho...
 
27b potential hot bent collaboration zheng v0 lbnl
27b potential hot bent collaboration zheng v0 lbnl27b potential hot bent collaboration zheng v0 lbnl
27b potential hot bent collaboration zheng v0 lbnl
 
27a febex dp collaboration overview and related sfwst r and d activities zhen...
27a febex dp collaboration overview and related sfwst r and d activities zhen...27a febex dp collaboration overview and related sfwst r and d activities zhen...
27a febex dp collaboration overview and related sfwst r and d activities zhen...
 
24 upscaling of heater tests in bure rutqvist lbnl
24 upscaling of heater tests in bure rutqvist lbnl24 upscaling of heater tests in bure rutqvist lbnl
24 upscaling of heater tests in bure rutqvist lbnl
 

Recently uploaded

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 

Recently uploaded (20)

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 

25 herold 20160830 retrieval final

  • 1. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 1 Impact of retrieval requirements on repository design − Results of R&D project funded by BMWi (PTKA) − Philipp Herold, Sabine Dörr, Eric Kuate Simo, Wilhelm Bollingerfehr, Wolfgang Filbert DBE TECHNOLOGY GmbH Washington, DC September 7-9, 2016
  • 2. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 2 1. Final Disposal in Germany – HLW program 2. Regulatory requirements related to retrievability 3. Retrieval strategy 4. Retrievability in drift disposal concept 5. Retrievability in borehole disposal concept 6. Summary Contents
  • 3. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 3 Final Disposal in Germany • Disposal in deep rock salt formations was the preferred option for the last decades • Summer 2013: German parliament (Bundestag) passed new law for restart of site selection process for HLW repository and implemented commission “Storage of HLW” Exploration Mine Gorleben (DBE, 2016) Final report commission “Storage of HLW”: • Recommends disposal of HLW in deep geologic formations with the possibility of retrieving waste packages as preferred option in Germany • Determined site selection criteria, considering salt, clay, crystalline rock as potential host rocks • Prepared a roadmap for site selection process, which will start in 2017
  • 4. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 4 Retrievability − Regulations Safety Requirements Governing the Final Disposal of Heat-Generating Radioactive Waste:  Mandatory for the design, further exploration, construction, emplacement operations and decommissioning of HLW/SF repository  Compliance has to be demonstrated (in a verifiable way)  Demonstration of technical feasibility before or during licensing  Stipulate retrievability as a design criterion “Retrievability is the planned technical option for removing emplaced radioactive waste containers from the repository mine.” “During the operating phase up until sealing of the shafts or ramps, retrieval of the waste containers must be possible.”
  • 5. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 5 Safety Requirements “Measures taken to secure the options of recovering or retrieval must not impair the passive safety barriers and thus the long-term safety.” based on (NEA 2011) Retrievability Recovery “The number of open emplacement zones should be kept to a minimum. These should be promptly loaded, then backfilled and reliably sealed from the mine building.” → Operations of emplacement, backfilling, and sealing take place in parallel during complete operational period
  • 6. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 6 Retrieval Strategy • In the framework of R&D projects (funded by German Federal Ministry for Economic Affairs and Energy), DBE TECHNOLOGY GmbH developed a suitable strategy and technical solutions to retrieve waste packages • Focus on underground operations • Waste package management plan after retrieval does not exist “Re-mining”-strategy: • Emplacement of waste containers, backfilling and sealing as designed • Conceptual adaptations to facilitate retrieval and improve conditions during potential retrieval period without impacts on long-term safety • In case of retrievability decision, excavation of new access drifts to the emplacement areas and waste packages, exposal and removal of the waste packages  Transfer of the waste packages from the passive safety system of the repository back into human care
  • 7. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 7 Drift disposal – Emplacement concept Emplacement Drift Prototype Emplacement DevicePOLLUX® cask Emplacement of POLLUX® casks in 250-m-long blind-ending drifts
  • 8. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 8 • Removal of all internals before backfilling of emplacement drifts (especially the rails) During retrieval: • All emplacement drifts have to be located between two crosscuts • Additional access drift allows an increase in airflow (first cooling measure) and higher flexibility • Re-activation of radiation protection areas during re-excavation of main drifts and cross-cuts or release from controlled area before backfilling Drift disposal – Layout modifications
  • 9. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 9 • Removal of the remaining pillar and exposure of the POLLUX® cask by means of road header and (remote controlled) demolition robots • Backfilling after complete retrieval Drift disposal − Excavation • Stepwise excavation of two sub drifts by means of road header  between two crosscuts  parallel to emplaced waste packages  floor 0.6 m below POLLUX® Final retrieval drift:Start of retrieval: Step 2Step 1 Step 3 POLLUX®POLLUX® 600 600 former emplacement drift
  • 10. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 10 Prototype Emplacement Device Drift disposal − Equipment modifications • Retrieval without rebuilding of rails  automotive drive necessary • Usability of trunnions after emplacement not guaranteed  alternative bearing structure necessary • POLLUX® casks lie on a salt base/socket  reduces lifting height Feasibility Study for Modified Emplacement Device
  • 11. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 11 Drift disposal − Thermal input 40 Years after start of emplacement (corresponds with start of retrieval) • 200°C design temperature at waste package surface, optimized to densest disposal of waste packages • Barely manageable conditions inside the access drifts, cross cuts • Retrieval operation coincides with thermal maximum inside the emplacement fields • Excavation inside the emplacement fields hardly manageable because of very high technical cooling effort, necessary cooling breaks and geo- mechanics 1 year after emplacement 2 years after emplacement 11 years after emplacement6 years after emplacement Temperature [°C]
  • 12. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 12 Drift disposal − Geo-mechanics • High temperature accelerates salt creep and produces high geo- mechanical stress • Rise of former drift floor • High convergence calls for drift re- cutting • Additional wall and roof stabilization needed Displacement, 30 days after complete excavationFailure criterion, at excavation of sub drifts 1, 2 and pillar
  • 13. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 13 Drift disposal − Conclusions • Retrieval process is designed for total exposure of the POLLUX®-10 casks • Modified emplacement device with rail-less drive and with new bearing structure • Thermal input due to densest packaging of the POLLUX®-10 casks produces high rock temperatures and high geo-mechanical stress • Optimization of thermal repository design would improve conditions during potential retrieval period but increase repository footprint • Requirement of retrievability changes repository design significantly
  • 14. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 14 Borehole disposal − Emplacement concept BSK 3 Triple pack Borehole cellar Test facility for borehole disposal of spent fuel canisters with one dummy canister → Unintentional demonstration of canister retrieval
  • 15. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 15 Conceptual adaptions from “Preliminary safety analysis for Gorleben site“ (based on nse GmbH): Borehole disposal − Design impacts canister with conical head new backfill (quartz sand) steel liner Retrieval concept: • layout of retrieval drifts corresponds to emplacement drifts • two parallel drifts in the south improve operation and ventilation • retrieval corresponds to reversal of emplacement process • steel liner remains in borehole after retrieval • removal of backfill (quartz sand) as major technical challenge during retrieval • development of a suction device 1 m • new canister shape (BSK-R) • steel liner designed for rock pressure • non-compactable and incompressible backfill • stepwise emplacement and backfilling
  • 16. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 16 Borehole disposal − Design impacts Feasibility study on suction device: • Remove backfill to free head of the BSK-R • Suction device with same outer dimensions as BSK • Integrated drive, fan and storage space • Two suctions steps per BSK-R • First pilot tests for air intake design Grip Drive Fan Deflection dome Transport pipe clamp Storage space Transport pipe Borehole liner Air intake Canister head Cladding
  • 17. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 17 Borehole disposal − Thermal input Thermal conditions: • Heat sources below mine level • Temperatures above 100°C just next to the boreholes • Steady increase of rock temperature during retrieval period • Moderate total heat input inside the mine openings expected • Third main drift improves ventilation conditions and allows higher flexibility • Additional cooling equipment during excavation necessary Drifts at emplacement field East 2 Drifts at emplacement field East 3 Time [a] Temperature[°C]
  • 18. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 18 Borehole disposal − Conclusions • Retrieval process corresponds to reversal of emplacement process • Unintentional demonstration of canister retrieval at existing test facility • New suction device for backfill removal, demonstration of technical feasibility still open • Steady increase of rock temperature but moderate total heat input expected • No layout modifications necessary
  • 19. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 19 Summary • Retrievability is required during complete operational period as licensing permission • Thermal input of the waste will influence retrieval concept and to a certain extent repository design • Requirement of retrievability could change repository design significantly • Retrievability is compatible to German safety concept for high-level radioactive waste repository in salt formations • Technical feasibility of all retrieval concepts and techniques has still to be demonstrated
  • 20. P. Herold – 08/2016 US/D Workshop Washington, USA, Sept. 7-9, 2016 20 Thank you for your attention.