Sarah Hartman
Fossil Hydro Operations
Engineering Co-op Program
December 2015
About Me
■ University of Cincinnati
– Chemical Engineering
– Expected Graduation, May 2017
■ 4th Session with Duke Energy
Gibson Technical Team
– Manager, Clint Fuhs
– Mentors, Sarah Hamman and
Josh Estep
2
Previous Co-ops
■ 1st and 2nd Sessions – Air Emissions Management
– Midwest Emissions Compliance Monthly Call Report
■ 3rd Session – Water / Waste
– EPA Regulations and Permits
3
Co-op Development Opportunities
■ United Way Day of Caring
Helped paint parking spots
and buildings, along with
Jana Jochim (pictured) and
Mike Hobson.
■ Attended:
― Reverse Osmosis Seminar
― Confined Space Training,
Entrant and Air Monitor
― Enable training, New item
request/change
4
Overview & Rotation Responsibilities
■ Presentation Overview:
– Ammonia Vapor Equalization Header
– Equipment Inspections
■ Rotation Responsibilities:
– Participating in Daily Pre-Job Briefs
– Ordering Materials for the Header Project
– Creating Purge & Repair Plans
5
Ammonia Vapor Equalization Header Project
■ Business Case: The current tank equalization header has a drop leg
in the lines, where liquid can get trapped and build up pressure. The
replacement line has the header spanning overtop the tanks, which
will provide better equalization and safer operation.
■ Project Scope: Participating in daily pre-job briefs, ordering materials,
and creating Purge & Repair plans.
■ Lessons Learned: Being Flexible
Communication
Decision Making Process
LOTO Requirements
Enterprise Asset Management (EAM) system
6
Ammonia Vapor Equalization Header Project
7
 PSM – Process Safety Management. An OSHA program designed to
promote safe use and storage of Highly Hazardous Chemicals.
Current Design New Design
Ammonia Vapor Eq. Header Project
Daily Pre-Job Briefs
■ For each pre-job I would introduce a daily PSM / safety topic, as
well as any new information on the project.
8
Example of information for morning meetings
Ammonia Vapor Eq. Header Project
Purge and Repair Plans
■ Header is to be implemented in 3 Stages,
– Stage 1 – Spade Flange (pancake) on each tank where header attaches.
– Stage 2 – Put a high-point vent on 2A and 2B Tank Truck unloading lines.
– Stage 3 – Tie Header into system.
9
Ammonia Vapor Eq. Header Project
Purge and Repair Plans
■ Driving Safety through Procedures:
10
Driving Safety through Procedures
Stage 1 P&IDs
Stage 1 Pancakes
Before After
Pancake
Handle
Stage 2 P&IDs
Stage 3 P&IDs
Ammonia Vapor Eq. Header
Project
Challenges
■ Coordinating Materials
■ Constantly evolving Plans
16
Equipment Inspections
17
■ SCR Absorber
■ FGD Surge Tank
■ Boiler Penthouse
■ Condenser & Water Box – Mapped Tube Plugs
■ DC Heater, Induct Heat Exchanger (Not Inspections)
Surge Tank Boiler Penthouse
Looking Ahead
Next Work Rotation
■ My next work rotation will by my 5th and final co-op before
graduation.
■ I will be working at the Cincinnati Office with Ashley Norton in the
Water Cycle Chemistry Group.
18
Questions?
19

More Related Content

Similar to Sarah Hartman ROP - Gibson Tech Team

End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL
End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNALEnd of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL
End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNALCorey Harpe
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Sergio A. Guerra
 
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building DimensionsEvaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building DimensionsSergio A. Guerra
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...irvan septyan mulyana
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
2017 - 1017 Portsmouth EHS Breakfast slides_compiled
2017 - 1017 Portsmouth EHS Breakfast slides_compiled2017 - 1017 Portsmouth EHS Breakfast slides_compiled
2017 - 1017 Portsmouth EHS Breakfast slides_compiledWayne Bates
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014San Diego County Water Authority
 
LYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetLYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetSean Street
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael Najarian
 
Duke Energy Intern Overview
Duke Energy Intern OverviewDuke Energy Intern Overview
Duke Energy Intern OverviewShane Mathew
 

Similar to Sarah Hartman ROP - Gibson Tech Team (20)

gibson
gibsongibson
gibson
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL
End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNALEnd of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL
End of Session 2 Presentation 11-29-16 Corey Harpe EXTERNAL
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
 
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building DimensionsEvaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
Evaluation of AERMOD and Wind Tunnel Derived Equivalent Building Dimensions
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
CV_sharaa
CV_sharaaCV_sharaa
CV_sharaa
 
2017 - 1017 Portsmouth EHS Breakfast slides_compiled
2017 - 1017 Portsmouth EHS Breakfast slides_compiled2017 - 1017 Portsmouth EHS Breakfast slides_compiled
2017 - 1017 Portsmouth EHS Breakfast slides_compiled
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
 
Jouney of process safety (2)
Jouney of  process safety (2)Jouney of  process safety (2)
Jouney of process safety (2)
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
LYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean StreetLYB End of Term Presentation Sean Street
LYB End of Term Presentation Sean Street
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016
 
Duke Energy Intern Overview
Duke Energy Intern OverviewDuke Energy Intern Overview
Duke Energy Intern Overview
 

Sarah Hartman ROP - Gibson Tech Team

  • 1. Sarah Hartman Fossil Hydro Operations Engineering Co-op Program December 2015
  • 2. About Me ■ University of Cincinnati – Chemical Engineering – Expected Graduation, May 2017 ■ 4th Session with Duke Energy Gibson Technical Team – Manager, Clint Fuhs – Mentors, Sarah Hamman and Josh Estep 2
  • 3. Previous Co-ops ■ 1st and 2nd Sessions – Air Emissions Management – Midwest Emissions Compliance Monthly Call Report ■ 3rd Session – Water / Waste – EPA Regulations and Permits 3
  • 4. Co-op Development Opportunities ■ United Way Day of Caring Helped paint parking spots and buildings, along with Jana Jochim (pictured) and Mike Hobson. ■ Attended: ― Reverse Osmosis Seminar ― Confined Space Training, Entrant and Air Monitor ― Enable training, New item request/change 4
  • 5. Overview & Rotation Responsibilities ■ Presentation Overview: – Ammonia Vapor Equalization Header – Equipment Inspections ■ Rotation Responsibilities: – Participating in Daily Pre-Job Briefs – Ordering Materials for the Header Project – Creating Purge & Repair Plans 5
  • 6. Ammonia Vapor Equalization Header Project ■ Business Case: The current tank equalization header has a drop leg in the lines, where liquid can get trapped and build up pressure. The replacement line has the header spanning overtop the tanks, which will provide better equalization and safer operation. ■ Project Scope: Participating in daily pre-job briefs, ordering materials, and creating Purge & Repair plans. ■ Lessons Learned: Being Flexible Communication Decision Making Process LOTO Requirements Enterprise Asset Management (EAM) system 6
  • 7. Ammonia Vapor Equalization Header Project 7  PSM – Process Safety Management. An OSHA program designed to promote safe use and storage of Highly Hazardous Chemicals. Current Design New Design
  • 8. Ammonia Vapor Eq. Header Project Daily Pre-Job Briefs ■ For each pre-job I would introduce a daily PSM / safety topic, as well as any new information on the project. 8 Example of information for morning meetings
  • 9. Ammonia Vapor Eq. Header Project Purge and Repair Plans ■ Header is to be implemented in 3 Stages, – Stage 1 – Spade Flange (pancake) on each tank where header attaches. – Stage 2 – Put a high-point vent on 2A and 2B Tank Truck unloading lines. – Stage 3 – Tie Header into system. 9
  • 10. Ammonia Vapor Eq. Header Project Purge and Repair Plans ■ Driving Safety through Procedures: 10
  • 13. Stage 1 Pancakes Before After Pancake Handle
  • 16. Ammonia Vapor Eq. Header Project Challenges ■ Coordinating Materials ■ Constantly evolving Plans 16
  • 17. Equipment Inspections 17 ■ SCR Absorber ■ FGD Surge Tank ■ Boiler Penthouse ■ Condenser & Water Box – Mapped Tube Plugs ■ DC Heater, Induct Heat Exchanger (Not Inspections) Surge Tank Boiler Penthouse
  • 18. Looking Ahead Next Work Rotation ■ My next work rotation will by my 5th and final co-op before graduation. ■ I will be working at the Cincinnati Office with Ashley Norton in the Water Cycle Chemistry Group. 18