SlideShare a Scribd company logo
1 of 7
Download to read offline
Office Redevelopment




        Tustin
                           Commons    A TIRED ASSET COMES OF AGE

           By Lawrence R. Armstrong

        With the recent credit crunch and economic downturn, ground up development is
        rare these days. Tenants are re-shuffling, re-organizing and re-prioritizing. This shift
        offers an opportunity for some of the less-than-stellar properties on today’s market to
        shine beneath their 1970s paint scheme.



  DEVELOPMENT   WINTER | 2009
www.naiop.org
                                                             Renovations included a new corner entry plaza, landscape
                                                             material and a renewal of the parking area.




Potential tenants are willing to       There are many viable ways to             recently designed for Stonewood
consider an “old relic” if the loca-   transform an existing property            Properties and their partner,
tion is right, the proposed re-image   to make it more compelling and            Broachreach Capital Partners.
is right and, of course, the price     relevant in the current marketplace.
is right. All it takes is a vision,    Especially with today’s economic          Tustin Commons is located in
collaboration and a great team of      challenges, commercial real estate        the city of Tustin, California. The
commercial real estate profession-     investment dollars need to be             existing Class C industrial campus
als to reinvent an asset with the      strategically utilized. An illustrative   included three 1970s concrete
right fundamentals.                    case study is “Tustin Commons,” a         tilt up buildings totaling 209,486
                                       renovation project Ware Malcomb           square feet on 14.2 acres. Two of



                                                                                          WINTER | 2009        DEVELOPMENT
Office Redevelopment                                        BEFORE




        the three buildings were vacant
        flex/R&D buildings and the third
        was an occupied industrial build-
        ing. The existing property was
        zoned for industrial use. The two
        vacant buildings had previously
                                                     Before the renovation, the two-story 1970s R&D buildings totaling 119,000
        been occupied by a single user and
                                                     square feet looked tired and dated despite their A+ location.
        were empty for over a year before
        being purchased.

                                                                                         completed, as well as the design of
        Timing is Everything                    Repositioning                            the building renovations for the two
        The property is located in close        for Highest and                          flex buildings, along with tenant
                                                                                         improvements in the lobbies. Some
        proximity to Interstate 5, and a        Best Use                                 of Stonewood Properties’ specific
        short distance from the Tustin
                                                The existing buildings presented         goals for the project included the
        Marketplace, a well-known retail
                                                several design challenges, some          following:
        development in Orange County.
        This area, once ripe for indus-         of which included:
                                                                                         • Convert buildings from flex to
        trial and R&D users, was being                                                     office
        squeezed by retail and office           • Dated building entries
        development. This dynamic was           • Very narrow vertical windows           • Convert buildings from single
        driving up rents and land prices,                                                  user to multi-user flexibility
                                                • Heavy exposed aggregate on the
        while driving out the pure industrial                                            • Re-image the building aesthetics
                                                  concrete panels
        user. Timing, an important factor
                                                • Outdated, ineffective HVAC and         • Update the exterior facade,
        for this type of re-development,
                                                  building systems                         without demolishing the concrete
        was right. There was very little new
                                                                                           panel
        office development in the immedi-       • Tired, inflexible lobbies, common
        ate area, creating an opening in the      areas                                  • Demolish and redesign the build-
        market for quality, larger floorplate                                              ing entries
                                                • Floorplans designed for a single
        office product. The City of Tustin                                               • Update the project landscape,
                                                  user
        desired a higher/better use for this                                               hardscape, site lighting and
        area, so they were in full support of   • 1970s style landscaping, site            signage
        the use change. There was only one        lighting and signage
                                                                                         • Create an alternative site plan for
        major drawback: the buildings were
                                                Stonewood Properties hired Ware            small building users
        antiquated, both aesthetically and
        functionally.                           Malcomb to provide architectural         • Update the building core and
                                                and interior design services for           lobbies
                                                the project, with the overall goal
                                                of repositioning the project to          • Maximize the budget through
                                                realize its highest and best use.          creative, economical solutions
                                                Several studies of the site were
                                                                                         Based on Stonewood’s vision,
                                                                                         the building was re-skinned with
                                                                                         a smooth, modern finish, which
         “There was very little new office development in the immedi-                    re-oriented the window line while
                                                                                         utilizing the existing window open-
         ate area, creating an opening in the market for quality, larger                 ings, and created a new contempo-
         floorplate office product. ”                                                    rary entry statement. It was through
                                                                                         the collaborative design process
                                                                                         that the final re-image was realized.



  DEVELOPMENT     WINTER | 2009
www.naiop.org
AFTER




                                            Tustin Commons’ new skin of EIFS, herculite glass and doors provide
  Collaboration was fundamental to          a connection between the re-designed lobby and the outside plaza.
  the success of this project. Ware
  Malcomb worked closely with
  the project team in the design/
  cost/buildability review process.     cations and determine which might        • Add new landscaping, hardscape,
  The team participants included        be the best fit for the project. In        exterior lighting and signage.
  Stonewood Properties; Broadreach      the end, the EIFS system won out
                                                                                 • Select a new project name to
  Capital Partners; Ware Malcomb        with the following effective design
                                                                                   rebrand the property.
  (Architects, Interior Designers);     solutions:
  Gordon & Williams (General Con-
  tractor); Ed Monroe from NuWays
                                        • Create a new façade by covering        Taking a Closer Look
                                          the existing aggregate tilt-up exte-
  Unlimited (Construction Manager);                                              The Myford Building, one of the
                                          rior with a new EIFS system along
  and The Raymond Group (Exterior                                                two buildings renovated at Tustin
                                          with a combination reflective vi-
  EIFS System Contractor). Together                                              Commons, had several unique
                                          sion and spandrel glass assembly,
  the project team considered sev-                                               issues. The building entry was
                                          utilizing existing window open-
  eral options for each component,                                               tri-level with a lobby located at the
                                          ings.
  ultimately arriving at an effective                                            mid-level between the first and
  design and cost solution.             • Demolish existing glass cube
                                                                                 second floor. This element gave the
                                          entry elements and design a mod-
                                                                                 impression that the first floor was
  One significant aesthetic chal-         ern, new entry statement design
                                                                                 a subterranean basement, when
  lenge was the existing façade. Ware     utilizing existing openings.
                                                                                 in actuality, it was on grade. The
  Malcomb worked side-by-side with
                                        • Demolish existing lobby core           other significant challenge was a
  general contractor Gordon & Wil-
                                          which only accommodated a              diamond-shaped atrium opening in
  liams to determine the best system
                                          single user and redesign the           the middle of the second floor that
  for covering the exposed aggregate
                                          interiors with a central core, to      created an inefficient floorplan.
  walls. One proposal included trying
                                          accommodate multiple tenants
  to remove the heavy aggregate in                                               The design solution for the My-
                                          and greater flexibility.
  an attempt to create a smooth sur-                                             ford Building included re-grading
  face to apply a plaster skim coat.    • Replace HVAC systems in both
                                                                                 the site to allow for a traditional
  Raymond Group’s yard was visited        buildings.
                                                                                 entrance on the first floor and the
  to examine different mock-up appli-



                                                                                          WINTER | 2009           DEVELOPMENT
Office Redevelopment




        redesign of the lobby area. Thus,
        the basement feeling was eliminat-
        ed, and in its place an open grand
        entry plaza. Upgrades to the lobby
        and core included new restrooms, a
        new elevator, new staircase and up-
        grade to more current finishes. The
        new lobby is more open and brings
        in natural light. The atrium opening
        to the second floor was filled in to
        increase the square footage of the
        building by 2,449 square feet and
        to allow the building to be more
        effectively planned for multiple
        tenants.                                                                             Transforming two single-tenant
                                                 for a up-to-date and very attractive        buildings into a multi-tenant
        Prior to completion of the entire        building with less impact on the            structure required the design
        renovation, Rockwell Collins signed      environment.                                of a common lobby, restroom
        a 10-year lease for the entire site                                                  facilities and secondary building
        at Tustin Commons.
                                                 The Take Away                               entrances.

        Project vision, innovative design
                                                 What are ideal property types
        solutions and an integrated col-
                                                 for renovation? There are several
        laborative team approach led to a
                                                 factors that existed in the Tustin     Establishing a collaborative process
        successful project. The final result
                                                 Commons project, that are paral-       with a project team is imperative
        was a totally revitalized piece of
                                                 leled in other successful renovation   for success. Team members typi-
        property with a higher use, con-
                                                 projects. These include the follow-    cally include a real estate broker,
        temporary image to compete in a
                                                 ing factors:                           architect, general contractor and
        tight market, flexible floor plate and
                                                                                        construction manager. To work
        long-term real estate value. There is    • Great location, visibility and       most effectively, the entire team
        great satisfaction in the completion       accessibility.                       must understand and work to meet
        of a renovation project which in-
                                                 • Obsolete buildings for the current   the project’s proforma from the
        volves recycling of the demolished
                                                   real estate market.                  onset. The solution must balance
        building materials and the opportu-
                                                                                        all of the key factors of marketabil-
        nity to utilize more energy-efficient    • Building and site design that
                                                                                        ity, increased value of the asset,
        building systems.  The end result          lend themselves to conversion
                                                                                        elevated design, practicality to
        of this collaborative effort provides      to higher and better use.
                                                                                        execute and cost effectiveness.
                                                 • Favorable planning and zoning.
                                                                                        Right now, there is a premium on
                                                                                        creatively approaching commercial
                                                                                        real estate. Don’t underestimate
        “Project vision, innovative design solutions and an integrated
                                                                                        the potential value of an existing
        collaborative team approach led to a successful project. The                    asset that has the right ingredients
        final result was a totally revitalized piece of property with a                 for reinvention. n

        higher use, contemporary image to compete in a tight market,
        flexible floor plate and long-term real estate value.”                          By Lawrence R. Armstrong,
                                                                                        CEO, Ware Malcomb




  DEVELOPMENT     WINTER | 2009
www.naiop.org




WINTER | 2009   DEVELOPMENT
Office Redevelopment




 We’ve added more
 power to our lineup.
 NorthMarq has acquired Opus Property Services
 to help you in more markets nationwide.
 With more than 60 million square feet of retail,
 industrial and office property now under management
 in 22 markets, northmarq has the ability to provide
 even more of the services you need, where you need
 them.

 When you want a confident real estate partner with the
 teamwork, strength and agility to “hit one out of the
 park” for you, look no further than northmarq.




 Commercial Real Estate Services
 Debt/equity • investment sales • brokerage
 corporate solutions • property management




                                                          northmarq.com

  DEVELOPMENT    WINTER | 2009

More Related Content

What's hot

Dwight Eitzen Cv Work
Dwight Eitzen Cv WorkDwight Eitzen Cv Work
Dwight Eitzen Cv Workde243
 
Michael Anonuevo Samples
Michael Anonuevo SamplesMichael Anonuevo Samples
Michael Anonuevo SamplesMichaelLDC
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Market Transformation for Green Building - Jeff Ranson
Market Transformation for Green Building - Jeff RansonMarket Transformation for Green Building - Jeff Ranson
Market Transformation for Green Building - Jeff RansonToronto 2030 District
 
Michelle Beauvais Portfolio 2010.1
Michelle Beauvais   Portfolio 2010.1Michelle Beauvais   Portfolio 2010.1
Michelle Beauvais Portfolio 2010.1mbeauvais7
 
Design Guidelines, North Island Hospitals
Design Guidelines, North Island HospitalsDesign Guidelines, North Island Hospitals
Design Guidelines, North Island HospitalsIsland Health
 
Riverside Avondale Zoning Overlay report
Riverside Avondale Zoning Overlay reportRiverside Avondale Zoning Overlay report
Riverside Avondale Zoning Overlay reportRiverside Avondale
 
Summer training project by surendra
Summer training project by surendraSummer training project by surendra
Summer training project by surendraSurendra Sah
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resumeRenee Thomas
 
David W. Jackson - Background
David W. Jackson - BackgroundDavid W. Jackson - Background
David W. Jackson - Backgrounddwj279
 
Shipping Container Architecture Research
Shipping Container Architecture ResearchShipping Container Architecture Research
Shipping Container Architecture ResearchPB4000XL
 

What's hot (15)

Dwight Eitzen Cv Work
Dwight Eitzen Cv WorkDwight Eitzen Cv Work
Dwight Eitzen Cv Work
 
Michael Anonuevo Samples
Michael Anonuevo SamplesMichael Anonuevo Samples
Michael Anonuevo Samples
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Market Transformation for Green Building - Jeff Ranson
Market Transformation for Green Building - Jeff RansonMarket Transformation for Green Building - Jeff Ranson
Market Transformation for Green Building - Jeff Ranson
 
Michelle Beauvais Portfolio 2010.1
Michelle Beauvais   Portfolio 2010.1Michelle Beauvais   Portfolio 2010.1
Michelle Beauvais Portfolio 2010.1
 
Design Guidelines, North Island Hospitals
Design Guidelines, North Island HospitalsDesign Guidelines, North Island Hospitals
Design Guidelines, North Island Hospitals
 
Riverside Avondale Zoning Overlay report
Riverside Avondale Zoning Overlay reportRiverside Avondale Zoning Overlay report
Riverside Avondale Zoning Overlay report
 
Surface reporter march 2013
Surface reporter march 2013Surface reporter march 2013
Surface reporter march 2013
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
 
Summer training project by surendra
Summer training project by surendraSummer training project by surendra
Summer training project by surendra
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
 
Work Samples
Work SamplesWork Samples
Work Samples
 
David W. Jackson - Background
David W. Jackson - BackgroundDavid W. Jackson - Background
David W. Jackson - Background
 
Shipping Container Architecture Research
Shipping Container Architecture ResearchShipping Container Architecture Research
Shipping Container Architecture Research
 

Similar to Office Redevelopment Project Transforms Tired 1970s Buildings

Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfoliotonytso
 
Novelis kemira 1950 vaughn rd - 1000 parkwood 2011
Novelis   kemira 1950 vaughn rd - 1000 parkwood 2011Novelis   kemira 1950 vaughn rd - 1000 parkwood 2011
Novelis kemira 1950 vaughn rd - 1000 parkwood 2011Gregg Metcalf
 
7 Storehouse Row Summary
7 Storehouse Row Summary7 Storehouse Row Summary
7 Storehouse Row Summarysocialmonkey
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conferencecassie111
 
Energy Efficiency Refurbishment Case Study
Energy Efficiency Refurbishment Case StudyEnergy Efficiency Refurbishment Case Study
Energy Efficiency Refurbishment Case StudyGlennMassey
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professionalchrisrohn
 
STW Commercial Profile
STW Commercial ProfileSTW Commercial Profile
STW Commercial ProfileSheila Carney
 
AOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATE
AOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATEAOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATE
AOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATEJUAN MOSQUERA
 
Recent Work Samples of Peng Wang
Recent Work Samples of Peng WangRecent Work Samples of Peng Wang
Recent Work Samples of Peng Wangwangpengtju
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012Colin Harrop
 
05 13 09 Complete Portfolio
05 13 09 Complete Portfolio05 13 09 Complete Portfolio
05 13 09 Complete Portfolioggs1918
 
Efficient Agricultural Buildings: An Overview
Efficient Agricultural Buildings: An OverviewEfficient Agricultural Buildings: An Overview
Efficient Agricultural Buildings: An OverviewElisaMendelsohn
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project PhasingAlexiaLevite
 
Leed Forum 2009
Leed Forum 2009Leed Forum 2009
Leed Forum 2009naoums
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010Virtual ULI
 
Managing Success Stories
Managing Success StoriesManaging Success Stories
Managing Success Storiesgosush
 
Tump Bew Hill- Steve Spencer, Glenn Howells Architects
Tump Bew Hill- Steve Spencer, Glenn Howells ArchitectsTump Bew Hill- Steve Spencer, Glenn Howells Architects
Tump Bew Hill- Steve Spencer, Glenn Howells ArchitectsDesign South East
 

Similar to Office Redevelopment Project Transforms Tired 1970s Buildings (20)

Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
 
Novelis kemira 1950 vaughn rd - 1000 parkwood 2011
Novelis   kemira 1950 vaughn rd - 1000 parkwood 2011Novelis   kemira 1950 vaughn rd - 1000 parkwood 2011
Novelis kemira 1950 vaughn rd - 1000 parkwood 2011
 
Ulx June09
Ulx June09Ulx June09
Ulx June09
 
7 Storehouse Row Summary
7 Storehouse Row Summary7 Storehouse Row Summary
7 Storehouse Row Summary
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conference
 
Energy Efficiency Refurbishment Case Study
Energy Efficiency Refurbishment Case StudyEnergy Efficiency Refurbishment Case Study
Energy Efficiency Refurbishment Case Study
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professional
 
STW Commercial Profile
STW Commercial ProfileSTW Commercial Profile
STW Commercial Profile
 
Evans investment inc
Evans investment incEvans investment inc
Evans investment inc
 
AOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATE
AOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATEAOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATE
AOS STUDLEY 7 KEYS TO COST REDUCTION IN REAL ESTATE
 
Resume
ResumeResume
Resume
 
Recent Work Samples of Peng Wang
Recent Work Samples of Peng WangRecent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012
 
05 13 09 Complete Portfolio
05 13 09 Complete Portfolio05 13 09 Complete Portfolio
05 13 09 Complete Portfolio
 
Efficient Agricultural Buildings: An Overview
Efficient Agricultural Buildings: An OverviewEfficient Agricultural Buildings: An Overview
Efficient Agricultural Buildings: An Overview
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project Phasing
 
Leed Forum 2009
Leed Forum 2009Leed Forum 2009
Leed Forum 2009
 
ULX Jan Feb 2010
ULX Jan Feb 2010ULX Jan Feb 2010
ULX Jan Feb 2010
 
Managing Success Stories
Managing Success StoriesManaging Success Stories
Managing Success Stories
 
Tump Bew Hill- Steve Spencer, Glenn Howells Architects
Tump Bew Hill- Steve Spencer, Glenn Howells ArchitectsTump Bew Hill- Steve Spencer, Glenn Howells Architects
Tump Bew Hill- Steve Spencer, Glenn Howells Architects
 

Office Redevelopment Project Transforms Tired 1970s Buildings

  • 1. Office Redevelopment Tustin Commons A TIRED ASSET COMES OF AGE By Lawrence R. Armstrong With the recent credit crunch and economic downturn, ground up development is rare these days. Tenants are re-shuffling, re-organizing and re-prioritizing. This shift offers an opportunity for some of the less-than-stellar properties on today’s market to shine beneath their 1970s paint scheme. DEVELOPMENT WINTER | 2009
  • 2. www.naiop.org Renovations included a new corner entry plaza, landscape material and a renewal of the parking area. Potential tenants are willing to There are many viable ways to recently designed for Stonewood consider an “old relic” if the loca- transform an existing property Properties and their partner, tion is right, the proposed re-image to make it more compelling and Broachreach Capital Partners. is right and, of course, the price relevant in the current marketplace. is right. All it takes is a vision, Especially with today’s economic Tustin Commons is located in collaboration and a great team of challenges, commercial real estate the city of Tustin, California. The commercial real estate profession- investment dollars need to be existing Class C industrial campus als to reinvent an asset with the strategically utilized. An illustrative included three 1970s concrete right fundamentals. case study is “Tustin Commons,” a tilt up buildings totaling 209,486 renovation project Ware Malcomb square feet on 14.2 acres. Two of WINTER | 2009 DEVELOPMENT
  • 3. Office Redevelopment BEFORE the three buildings were vacant flex/R&D buildings and the third was an occupied industrial build- ing. The existing property was zoned for industrial use. The two vacant buildings had previously Before the renovation, the two-story 1970s R&D buildings totaling 119,000 been occupied by a single user and square feet looked tired and dated despite their A+ location. were empty for over a year before being purchased. completed, as well as the design of Timing is Everything Repositioning the building renovations for the two The property is located in close for Highest and flex buildings, along with tenant improvements in the lobbies. Some proximity to Interstate 5, and a Best Use of Stonewood Properties’ specific short distance from the Tustin The existing buildings presented goals for the project included the Marketplace, a well-known retail several design challenges, some following: development in Orange County. This area, once ripe for indus- of which included: • Convert buildings from flex to trial and R&D users, was being office squeezed by retail and office • Dated building entries development. This dynamic was • Very narrow vertical windows • Convert buildings from single driving up rents and land prices, user to multi-user flexibility • Heavy exposed aggregate on the while driving out the pure industrial • Re-image the building aesthetics concrete panels user. Timing, an important factor • Outdated, ineffective HVAC and • Update the exterior facade, for this type of re-development, building systems without demolishing the concrete was right. There was very little new panel office development in the immedi- • Tired, inflexible lobbies, common ate area, creating an opening in the areas • Demolish and redesign the build- market for quality, larger floorplate ing entries • Floorplans designed for a single office product. The City of Tustin • Update the project landscape, user desired a higher/better use for this hardscape, site lighting and area, so they were in full support of • 1970s style landscaping, site signage the use change. There was only one lighting and signage • Create an alternative site plan for major drawback: the buildings were Stonewood Properties hired Ware small building users antiquated, both aesthetically and functionally. Malcomb to provide architectural • Update the building core and and interior design services for lobbies the project, with the overall goal of repositioning the project to • Maximize the budget through realize its highest and best use. creative, economical solutions Several studies of the site were Based on Stonewood’s vision, the building was re-skinned with a smooth, modern finish, which “There was very little new office development in the immedi- re-oriented the window line while utilizing the existing window open- ate area, creating an opening in the market for quality, larger ings, and created a new contempo- floorplate office product. ” rary entry statement. It was through the collaborative design process that the final re-image was realized. DEVELOPMENT WINTER | 2009
  • 4. www.naiop.org AFTER Tustin Commons’ new skin of EIFS, herculite glass and doors provide Collaboration was fundamental to a connection between the re-designed lobby and the outside plaza. the success of this project. Ware Malcomb worked closely with the project team in the design/ cost/buildability review process. cations and determine which might • Add new landscaping, hardscape, The team participants included be the best fit for the project. In exterior lighting and signage. Stonewood Properties; Broadreach the end, the EIFS system won out • Select a new project name to Capital Partners; Ware Malcomb with the following effective design rebrand the property. (Architects, Interior Designers); solutions: Gordon & Williams (General Con- tractor); Ed Monroe from NuWays • Create a new façade by covering Taking a Closer Look the existing aggregate tilt-up exte- Unlimited (Construction Manager); The Myford Building, one of the rior with a new EIFS system along and The Raymond Group (Exterior two buildings renovated at Tustin with a combination reflective vi- EIFS System Contractor). Together Commons, had several unique sion and spandrel glass assembly, the project team considered sev- issues. The building entry was utilizing existing window open- eral options for each component, tri-level with a lobby located at the ings. ultimately arriving at an effective mid-level between the first and design and cost solution. • Demolish existing glass cube second floor. This element gave the entry elements and design a mod- impression that the first floor was One significant aesthetic chal- ern, new entry statement design a subterranean basement, when lenge was the existing façade. Ware utilizing existing openings. in actuality, it was on grade. The Malcomb worked side-by-side with • Demolish existing lobby core other significant challenge was a general contractor Gordon & Wil- which only accommodated a diamond-shaped atrium opening in liams to determine the best system single user and redesign the the middle of the second floor that for covering the exposed aggregate interiors with a central core, to created an inefficient floorplan. walls. One proposal included trying accommodate multiple tenants to remove the heavy aggregate in The design solution for the My- and greater flexibility. an attempt to create a smooth sur- ford Building included re-grading face to apply a plaster skim coat. • Replace HVAC systems in both the site to allow for a traditional Raymond Group’s yard was visited buildings. entrance on the first floor and the to examine different mock-up appli- WINTER | 2009 DEVELOPMENT
  • 5. Office Redevelopment redesign of the lobby area. Thus, the basement feeling was eliminat- ed, and in its place an open grand entry plaza. Upgrades to the lobby and core included new restrooms, a new elevator, new staircase and up- grade to more current finishes. The new lobby is more open and brings in natural light. The atrium opening to the second floor was filled in to increase the square footage of the building by 2,449 square feet and to allow the building to be more effectively planned for multiple tenants. Transforming two single-tenant for a up-to-date and very attractive buildings into a multi-tenant Prior to completion of the entire building with less impact on the structure required the design renovation, Rockwell Collins signed environment. of a common lobby, restroom a 10-year lease for the entire site facilities and secondary building at Tustin Commons. The Take Away entrances. Project vision, innovative design What are ideal property types solutions and an integrated col- for renovation? There are several laborative team approach led to a factors that existed in the Tustin Establishing a collaborative process successful project. The final result Commons project, that are paral- with a project team is imperative was a totally revitalized piece of leled in other successful renovation for success. Team members typi- property with a higher use, con- projects. These include the follow- cally include a real estate broker, temporary image to compete in a ing factors: architect, general contractor and tight market, flexible floor plate and construction manager. To work long-term real estate value. There is • Great location, visibility and most effectively, the entire team great satisfaction in the completion accessibility. must understand and work to meet of a renovation project which in- • Obsolete buildings for the current the project’s proforma from the volves recycling of the demolished real estate market. onset. The solution must balance building materials and the opportu- all of the key factors of marketabil- nity to utilize more energy-efficient • Building and site design that ity, increased value of the asset, building systems.  The end result lend themselves to conversion elevated design, practicality to of this collaborative effort provides to higher and better use. execute and cost effectiveness. • Favorable planning and zoning. Right now, there is a premium on creatively approaching commercial real estate. Don’t underestimate “Project vision, innovative design solutions and an integrated the potential value of an existing collaborative team approach led to a successful project. The asset that has the right ingredients final result was a totally revitalized piece of property with a for reinvention. n higher use, contemporary image to compete in a tight market, flexible floor plate and long-term real estate value.” By Lawrence R. Armstrong, CEO, Ware Malcomb DEVELOPMENT WINTER | 2009
  • 7. Office Redevelopment We’ve added more power to our lineup. NorthMarq has acquired Opus Property Services to help you in more markets nationwide. With more than 60 million square feet of retail, industrial and office property now under management in 22 markets, northmarq has the ability to provide even more of the services you need, where you need them. When you want a confident real estate partner with the teamwork, strength and agility to “hit one out of the park” for you, look no further than northmarq. Commercial Real Estate Services Debt/equity • investment sales • brokerage corporate solutions • property management northmarq.com DEVELOPMENT WINTER | 2009