SlideShare a Scribd company logo
1 of 11
Krishna Veni Gurram e-Mail: veni2301@gmail.com
Mobile: +91-7893321000
Overview:
• Around 8.5 +years of IT experience in Development, Implementation and
Maintenance of EAI/SOA based solutions using TIBCO Product suite.
• TIBCO Certified Professional (TIBCOActiveMatrix Business Works 5) with strong
experience on SOA (Service Oriented Architecture) based solutions implementation.
• TIBCO SOA Products: TIBCO Business Works, TIBCO Designer, TIBCO EMS,TIBCO
Administrator, TIBCO Hawk, TIBCO TWM, TIBCO CLE2012, TIBCO Manage File Transfer,
TIBCO AFF(Active fulfillment framework).
• TIBCO BI: TIBCO Spotfire
• TIBCO Adapters: TIBCO Database Adapter 5.x
• BW Plugins: RestAPI, Json
• Web services: Soap - HTTP, Soap – JMS
• Databases: SQL Server 2008 R2, Oracle 10g
• Technologies: XML Schema, Data format, Abstract WSDLS and Concrete WSDLS using TIBCO
Designer
• Applications Tested :
 Billing Systems: Intec Singl.e.View, CRM : Chordiant,
Front-Ends(Online, PIE), Web applications (Online,
PIE), Payments, Provisioning and Order
Management(TIBCO), business services (Web services
developed using web logic, Business works) being build
using SOA framework
• Phases of Software testing :
 Integration Testing, System Integration Testing, System
Testing, Interface Testing, Regression Testing,
Functional Testing, End to End Testing, Build
verification Testing, User Acceptance Testing,
Production Testing, Black box Testing, Static Testing
and Stability Testing.
• Testing Tools : MercuryQualityCenter 9.0, SOAP UI, EMM, xFIT
• Other Tools : Clearcase, SVN, IVR(Redwood), Alfresco, Dollar Universe, Toad
Employment summary
Bartronics Global services. LTD March 2015 to Till date
Senior Consultant
TIBCO Software India Pvt. LTD Sep 2011 to June 2014
Consultant
Hastraa Consulting Services Sdn Bhd May 2011 to Aug 2011
Consultant
HCL Technologies Ltd Aug-2010 to Mar-2011
Consultant
Keane India Pvt Ltd June-2010 to July-2010
Test Analyst
Patni Computers Systems (UK) Ltd Nov-2006 to Jan-2009
Test Analyst
Shri Comtech Software Solutions May-2005 to Feb- 2006
Software Tester
Bharat Heavy Electrical Ltd Nov-2004 to April- 2005
Project trainee Engineer
Experience summary
• Around 8.5 +years of IT experience in Development, Implementation and Maintenance
of EAI/SOA based solutions using TIBCO Product suite.
• About 5 + years of experience in Software Testing with hands on experience in integrated
environment with Front-Ends, Web applications, Billing Systems, CRM (Customer
Relationship management), TIBCO, Payments, Provisioning and Order Management
Applications.
• Extensive skills in Defect tracking, analyzing Test results, creating reports, Identified and
2
Documented errors and defects.
• Worked independently and unsupervised and delivered high quality software to the
customer.
• Worked in a multi technology Integration environments and performed Integration
Testing.
Work History
Bartronics Global services Ltd. Mar 2015 to Till date
World Vision International – World Vision Mar 2015 to Till date
Single Step:
World Vision International (WVI) uses software from TIBCO Software Inc. to enable their new
systems strategy, which allows desktop or mobile applications to operate remotely and
communicate with the production systems using an Enterprise Service Bus (ESB)
based on TIBCO Enterprise Message Service (EMS) and TIBCO Business Works (BW).
The first two applications created for this are SingleSTEP across 54 countries (and expanding).
The SingleSTEP application gathers Child and Reference (project, country, zone, etc.)
information produced by field workers and support around the world and aggregates it into a
central Child database(Singlestep database).Then the data is distributed back to all field workers
to use for continued operations.
S2P(Source To Pay):
The Source to Pay project integrates accounts payable related source of record (SOR)
items between the cloud-based procurement service COUPA with the World Vision in-house
ERP (Oracle EBS and Infor Sun6) systems for both the World Vision International and U.S.
organizations. It utilizes the TIBCO enterprise service bus (ESB) platform comprising of TIBCO
Business Works (BW) straddling TIBCO Enterprise Messaging System (EMS). It uses
COUPA’s flat file integration API’s via SFTP connections for reading invoice data from
COUPA and writing payments and master data items from the ERP systems. It uses SFTP flat
file (CSV and Pipe-delimited) drops to interface to the Oracle eBusiness suite for DonorVision.
For the Infor Sun6 systems it communicates over HTTP(S) using the SOAP protocol. For both
data routes to and from COUPA, Oracle EBS and Infor Sun6 it uses a Publish-Subscribe pattern
within the TIBCO BW platform using a SOA(Service oriented architecture) transport over Tibco
EMS.
SingleStep and Perceptive MFT:
3
The TIBCO MFT is used to transfer files between different locations. In World Vision we
implemented MFT to transfer files to their respective destination countries.
There are approx. 53 countries/locations where files from SSDA have to be delivered. TIBCO
MFT out of box does not support dynamic routing of files to different locations. There must be
one transfer template defined for every transfer location. The templates have to be maintained in
TIBCO MFT Command Center and also have to be configured at remote machines. This
approach is not feasible for a real-time production support, which is why a dynamic routing logic
was implemented in TIBCO Business Works.
RMT (Rich Media Transfer) MFT:
MFT Platforms server acts as client sends Child Photos and Videos to the Amazon MFT Internet
server. Videos will be transmitted to the Amazon S3 cloud by calling the Web service from
TIBCO BW upon arrival of the Video/Photo.
Every Transaction will be logged in TIBCO Lightweight CLE specifically designed for
FIP/RMT Projects. Spitfire is used to report RMT CLE information to the designated support
technical users.
Responsibilities:
• Involved in preparation TIBCO Business Works, MFT and HAWK project templates and data
mapping documents.
• Involved in preparation and execution of unit test cases of TIBCO interfaces.
• Worked closely with business analyst team to understand business logic and defining technical
design for solutions to functional use cases.
• Involved in Developing Business Works (BW) processes as per technical design specifications.
• Implemented Hawk monitoring successfully in all the environments
• Administrate Business Works Services using TIBCO Administrator. It includes configuration of
groups, users, BW services and Adapters.
• Administrate the MFT server like adding users in Command center, monitoring Internet servers
and file transfers
• Monitor the TWM in all the environments
• Administrate the Spotfire Server like adding the users and generating the report as per the
Customer requirement
• Enhancement of CLE2012 for the WVI S2P(Source To Pay) and RMT(Rich Media Transfer)
project as per the customer requirement
• Responsible to Monitor all the Tibco components in all the environments(Production and Staging)
• Responsible for preparing and delivering the deployment documents.
• Administrate Enterprise Message Service (EMS) using TIBCO EMS 8.2. It includes configuration
of EMS servers in different environments as per the Application requirement. Other tasks which
include EMS are creation/deletion of queues, topics, bridges & durables. As well as purging the
file store data.
• The migration of TIBCO projects across different lifecycle environments using TIBCO
Administrator GUI and script deployment.
4
• Solving incidents in a production/lower environments using Service now tool.
• Involved in preparing many of the Project related documentation such as (SOP, EMS Best
practice, HAWK installation and monitoring, Daily activities check list, Environment Sheet, Code
review Checklist).
• Involved in Installation of Hotfixes in order to auto grown-up of Logs for different environments
(such as DEV, TST, STG, and PROD).
• Having good analytical skills for troubleshooting interface related issues.
TIBCO Products used: TIBCO BW, Administrator, EMS, MFT (Manage File Transfer), Spotfire, HAWK,
CLE2012
Other Products used: Microsoft SQL, SVN,
TIBCO Software India Pvt. Ltd. Sep-2011 to June 2014
South East Water - Australia May 2012 to May 2015
It was a CRM agile based implementation project divided into many quick sprints; each sprint
was of five weeks. As part of it cloud based Salesforce.com was to be integrated with client’s
legacy application like CIS (customer information system) and ECM (corporate document
management system). There were various synchronous /asynchronous and batch process
developed as part of the project, some typical interface like payment is interacting with four
different systems as part of one transaction request meeting different requirements and
maintaining integrity yet remaining stateless.
Responsibilities:
• Involved in preparation TIBCO Business Works project templates and data mapping documents.
• Involved in preparation and execution of unit test cases of TIBCO interfaces.
• Worked closely with business analyst team to understand business logic and defining technical
design for solutions to functional use cases.
• Developed typical technical adapter interfaces for various systems.
• Planned and created as many re-usable processes and interfaces as possible and then adhere to
as per plan during development for quick turnaround.
• Developed various business services.
• Resolved technical challenges while interacting with HiAffinity application (Legacy CIS) and
Livelink document management system (Open Text ECM product) with salesforce.
• Created reusable interface by using Salesforce BW plugin provided by TIBCO to carry out various
operation like upsert/update/query and listening to salesforce outbound notifications.
KPN SNI_2 Upgrade – KPN, Netherlands Sep 2011 to April 2012
The main goal of the SNI Upgrade project is to realize an SNI that can handle a large number of
orders. The W&O business plan 2011 - 2013 for processes and IT forecasts 50,000 customer
5
orders per week by the end of 2011. SNI needs to handle this. Therefore, scalability is an
essential requirement for SNI. SNI currently has two bottlenecks that hinder reaching these order
levels.
Another important goal is to improve the development process for SNI. This will reduce the
time-to-market for new services, and will also lead to reduced project costs for future SNI
projects. This in large part will be made possible by leveraging the out-of-the-box product driven
fulfillment functionality provided by the TIBCO Active Fulfillment Suite (AFS) set of products.
Other out-of-the-box functionality will be leveraged to support other objectives such as
streamlining maintenance and assurance processes.
Responsibilities:
• Involved in the full Life cycle of this project where my main responsibilities included developing
Customer Order interfaces using TIBCO Product suite.
• Involved in preparation and execution of unit test cases to test the SNI_2 Project Deliverables.
• Worked closely with business analyst team to understand business logic and defining technical
design for solutions to functional use cases.
• System Test support to ensure the bugs are fixed and re tested.
• Integration testing of Software releases to ensure the project deliverables are of high quality
and function as per the Solution Design.
• Involved in Defect fixing & status update and coordinating with Testing teams.
• Involved in preparation of detailed design documents and Build & Release documentation.
TIBCO Products used: TIBCO BW, Administrator, EMS, BE
Other Products used: Oracle DB, LISA
Hastraa Consulting Services Sdn Bhd . May-2011 to Aug-2011
CIMB Standardization - CIMB Bank, Malaysia
Standardization of Singapore and Malaysia Core Banking Systems improving the Banking
capabilities for both Singapore and Malaysia.
Standardization is being done based on Singapore and Malaysia CBS using Singapore version as
base. OCBC Support the delivery of ‘One Bank’ vision of availing common customer
experience, unified process and product offering across Singapore and Malaysia
Support the increasingly integrated operating model of GCFS and GCB. Facilitate quicker
rollout of global products. Avail lower unit costs through common platform and resource
synergy.
Responsibilities:
• Involved in preparation TIBCO Business Works project templates and data mapping documents.
• Involved in preparation and execution of unit test cases of TIBCO interfaces.
• Worked closely with business analyst team to understand business logic and defining technical
design for solutions to functional use cases.
6
• Integration testing of Software releases to ensure the project deliverables are of high quality
and function as per the Solution Design.
• Involved in Defect fixing & status update and coordinating with other teams.
• Involved in preparation of project, test suite with test cases in SOAP UI using Data Source for
VIT(Vendor Integration Testing) and also testing of Remittance functionality as a part of SIT.
• Involved in preparing the Schema, Data format, Abstract WSDLS and Concrete WSDLS.
TIBCO Products Used : TIBCO BW, TIBCO Administrator, EMS, Java/JDK, dB2, SOAP UI
HCL Technologies Ltd. Aug-2010 to March-2011
OCBC-SIBS Standardization - OCBC Bank, Malaysia
OCBC SIBS is a Standardization of Singapore and Malaysia Core Banking Systems and adding
Silver Lake Version 8 Islamic Banking capabilities for both Singapore and Malaysia.
Standardization is being done based on Singapore and Malaysia CBS using Singapore version as
base. OCBC Support the delivery of ‘One Bank’ vision of availing common customer
experience, unified process and product offering across Singapore and Malaysia
Support the increasingly integrated operating model of GCFS and GCB. Facilitate quicker
rollout of global products. Avail lower unit costs through common platform and resource
synergy.
Responsibilities:
• Involved in preparation TIBCO BusinessWorks project templates and data mapping documents.
• Involved in preparation and execution of unit test cases of TIBCO interfaces.
• Worked closely with business analyst team to understand business logic and defining technical
design for solutions to functional use cases.
• Integration testing of Software releases to ensure the project deliverables are of high quality
and function as per the Solution Design.
• Involved in Defect fixing & status update and coordinating with other teams.
• Involved in preparation of project, test suite with test cases in SOAP UI using Data Source for
VIT(Vendor Integration Testing).
• Involved in preparing the Schema, Data format, Abstract WSDLS and Concrete WSDLS.
TIBCO Products Used : TIBCO ActveMatrix ServiceBus, BW, Administrator, EMS, Java/JDK, dB2,
SOAP UI, xFIT
Keane India Pvt Ltd. June-2010 to July-2010
IRP(Integration Replacement Program) Orange, UK
Recently Orange has decided to implement SOA (Service Oriented Architecture) by replacing
the existing integration between the system business layer(i.e., front end) and the backend
Databases. The existing legacy system uses Encina software in order to communicate between
7
the business layers (I.e., Just Talk front end) with the database with the help of services. Whereas
IRP (Integration Replacement Programme) would replace the Encina with Soap based Web
services. These Services are developed based on SOA framework, and to meet the business
requirements of distribution, effective re-usability, scalability, consistency and interface
flexibility.
Responsibilities:
• Involved in the full Life cycle of this project where my main responsibilities included preparation of
test data, test scenarios, test cases for PAT (Preliminary Acceptance Testing) and executing the
test cases. Uploading the test cases into Mercury Quality Centre.
• Involved in preparation and execution of test cases to test the IRP Project Deliverables.
• Worked closely with business analyst team to understand business logic and defining technical
design for solutions to functional use cases.
• PAT (Preliminary Acceptance Testing) to ensure the Project deliverables are of highest quality.
• Functional testing of Software releases to ensure the project deliverables are of high quality and
function as per the Solution Design.
• Involved in Defect Creation & status update and coordinating and re-test it once the defect is
fixed.
• Involved in preparation of project, test suite with test cases in SOAP UI using Data Source for
PAT (Preliminary Acceptance Testing).
Products Used : Java/JDK, Web Logic, Oracle10g, Data Power, SOAP UI, EA(Enterprise
Architecture),CRT5.1
Patni Computer Systems (UK) Ltd. Nov-2006 to Feb-2009
COBAL (Control Over Billing At Last), Carphone Warehouse, UK
Recent regulatory changes have given rise to opportunities for CPW to offer new services based
on Wholesale Line Rental (WLR) and Local Loop Unbundling (LLU) to existing and new
customers. The key drivers for doing so are to reduce churn and to increase revenues through
additional services. The business has determined that, in order to take full advantage of this
opportunity, it must be able to launch WLR and LLU as part of its portfolio of fixed line service
offerings such as CPS and broadband, as soon as possible. However, to launch WLR and LLU
significant changes to a number of existing CPW systems as well as the implementation of new
functionality is necessary. The gaps in the current system with regard to the WLR and LLU
requirements are in the areas of Billing, Customer Management and Order Management &
Provisioning.
As part of the strategic direction to address these limitations, CPW has made a key decision to
put in place a top tier Billing, CRM and Business Process Management system which will
ultimately replace the current CBS system. CPW has procured Singl.eView as the group-billing
platform following a strategic decision to consolidate European billing systems, provide
customers with a single bill and provide a convergent billing platform. Chordiant has been
8
selected as the CRM solution to be deployed across all CPW Contact Centres Tibco has been
selected as the process engine that will provide Order Management and Provisioning solution.
COBAL is the name of the project to launch Fixed Line voice (CPS, WLR) and data (BB) with
Singl.eView, Chordiant, and TIBCO.
Responsibilities:
• Involved in development of TIBCO interfaces using BusinessWorks and EMS products.
• Involved in integration testing of TIBCO Services along with Front-Ends, Web Applications,
IVR(Redwood), Chordiant(CRM), Telecom Billing Intec Singl.eView Billing System
Testing(Billing /Rating/Configuration/Testing), TIBCO, Payments, Provisioning and Order
Management Applications.
• Involved in preparation and execution of unit test cases to test the COBAL Project Deliverables.
• Installation and configuration of TIBCO Softwares on windows and UNIX Platforms.
• SIT (System Integration Testing) support to analyze and fix the defects.
• Involved in Regression Testing, Build Verification Testing, Production Testing and Stability
Testing
• Involved in preparation of System process flows by referring HLSDs for the testers and
developers to refer it.
• Performed Static testing by referring all the use cases and system processes to identify any
functional gaps and feasibility of the Test scenarios.
Products Used : Singl.e.view, TIBCO Business Works, TIBCO SmartMapper, TIBCO Business Events,
TIBCO IProcess, TIBCO EMS, TIBCO Administrator, EMM, Chordiant, Payment
Applications, Alfresco, IVR(Redwood),Mercury quality Center
Shri Comtech Software Solutions. May-2005 to Feb- 2006
Real Estate Management System, Shri Comtech Software Solutions
The main objective of the application is to facilitate the real estate companies effectively manage
the Project and site related information, Customer details, scheduling & viewings, payments and
instalments tracking.
My role is to evaluate the application for any visible/subliminal errors. Verify the functionality.
Test the integrity of database of the application. Validate login/authentication procedures as per
the plan. Generate test cases. Report/Coordinate with developers in notifying or resolving the
bugs.
Responsibilities:
Responsibilities:
• Performed Functional, User Interface, Regression tests manually.
• Prepared Test scenarios, Test cases and Executed Test cases.
• Defect Creation & status update and coordinating and re-test it once the defect is fixed.
• Interaction with Developers to address and to resolve technical problems.
9
Bharat Heavy Electrical Limited. Nov-2004 to April- 2005
Design of Two-Lobe Journal Bearing for TURBO Machine Bharat Heavy Electrical Limited.
We have designed a Two-Lobe Journal Bearing for a 120 MW TURBO Generator. Due to the
relative motion between the rotating shaft (Journal) and the stationary bearing generates
frictional losses, which are converted into heat energy, leading to the temperature rise of the
bearing.
The important objective of a bearing design is to reduce the frictional losses, insure stable
running of the rotor system in the extreme and the normal conditions ensuring long life of the
bearing and particularly no wear in the rotating. It is possible to reduce the weight of the
Machines, by increasing the speeds and it is not a common practice to go for a high speed
Machines. These High-speed machines naturally need suitable bearings to withstand high
dynamic forces and several operating loads like misalignment, axial thrust etc. We have
automated the design calculations by using C language because, generally manual calculations
are not as accurate as the automated calculations and also if we have done the calculations
manually they are time consuming so, we have prepared a C language program to save time
decrease manual interruption and to increase the accuracy of the calculations. PRO-E is used to
design the component practically in the system according to the design calculations and submit
the hard copy to the production department and ANSYS is used to analyze the designed
component.
Responsibilities:
• Prepared the design calculations in the design of Two-Lobe Journal Bearing for the 120-MW
Turbo Generator by taking the weight of the rotor as input.
• Compared the results obtained from the design calculations with the requirements of the
customer. Automation of the design calculations by using C language.
Products Used: PRO-E, ANSYS, C Language
Academic qualifications
B.Tech from JNTU University, Andhra Pradesh, India, during June-2001 to April-2005 with
69%.
Certifications:
• TIBCO Certified Professional in ActiveMatrix Business Works 5 - Nov 2011
Trainings Attended:
• TIBCO Business Works, CIM (Collaborative information Manager), Business
10
Events Training at TIBCO Software India Pvt Ltd
• TIBCO ActiveMatrix Training at HCL Technologies
• Tibco Business Events Training, Patni Computers, UK.
• Testing Tools - Win Runner, Load Runner, Test Director training from NICT,
India.
11

More Related Content

What's hot

Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primaveragjmstleonards
 
205410 primavera and sap
205410 primavera and sap205410 primavera and sap
205410 primavera and sapp6academy
 
Primavera Integrations with special emphasis on the Cloud
Primavera Integrations with special emphasis on the CloudPrimavera Integrations with special emphasis on the Cloud
Primavera Integrations with special emphasis on the Cloudp6academy
 
Vandana Sathish Maller
Vandana Sathish MallerVandana Sathish Maller
Vandana Sathish MallerVandana Maller
 
Vinoth_Perumal_Datawarehousing
Vinoth_Perumal_DatawarehousingVinoth_Perumal_Datawarehousing
Vinoth_Perumal_Datawarehousingvinoth perumal
 
SAP BusinessObjects 4.x Upgrade / Migration to 4.x
SAP BusinessObjects 4.x Upgrade / Migration to 4.xSAP BusinessObjects 4.x Upgrade / Migration to 4.x
SAP BusinessObjects 4.x Upgrade / Migration to 4.xDMIMarketing
 
Unlock The Value Of Your Microsoft and SAP Investments
Unlock The Value Of Your Microsoft and SAP InvestmentsUnlock The Value Of Your Microsoft and SAP Investments
Unlock The Value Of Your Microsoft and SAP InvestmentsSAP Technology
 
Learn about Tibco Designer
Learn about Tibco Designer Learn about Tibco Designer
Learn about Tibco Designer Cblsolutions.com
 
Integrating Oracle BI, BPM and BAM 11g: The complete cycle of information
Integrating Oracle BI, BPM and BAM 11g: The complete cycle of informationIntegrating Oracle BI, BPM and BAM 11g: The complete cycle of information
Integrating Oracle BI, BPM and BAM 11g: The complete cycle of informationEdelweiss Kammermann
 
Contractors Network - Developing Oracle Bi (Xml) Publisher
Contractors Network - Developing Oracle Bi (Xml) PublisherContractors Network - Developing Oracle Bi (Xml) Publisher
Contractors Network - Developing Oracle Bi (Xml) Publisherbraggy
 

What's hot (20)

EXPERIENCE
EXPERIENCEEXPERIENCE
EXPERIENCE
 
Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primavera
 
PatriceGenest-en
PatriceGenest-enPatriceGenest-en
PatriceGenest-en
 
205410 primavera and sap
205410 primavera and sap205410 primavera and sap
205410 primavera and sap
 
Sanjeev kumar
Sanjeev kumarSanjeev kumar
Sanjeev kumar
 
PRASAD_KARUTURI_RES
PRASAD_KARUTURI_RESPRASAD_KARUTURI_RES
PRASAD_KARUTURI_RES
 
Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
Primavera Integrations with special emphasis on the Cloud
Primavera Integrations with special emphasis on the CloudPrimavera Integrations with special emphasis on the Cloud
Primavera Integrations with special emphasis on the Cloud
 
Vandana Sathish Maller
Vandana Sathish MallerVandana Sathish Maller
Vandana Sathish Maller
 
Vinoth_Perumal_Datawarehousing
Vinoth_Perumal_DatawarehousingVinoth_Perumal_Datawarehousing
Vinoth_Perumal_Datawarehousing
 
Resume_Bhabani_Prasad_Mohanty
Resume_Bhabani_Prasad_MohantyResume_Bhabani_Prasad_Mohanty
Resume_Bhabani_Prasad_Mohanty
 
SAP BusinessObjects 4.x Upgrade / Migration to 4.x
SAP BusinessObjects 4.x Upgrade / Migration to 4.xSAP BusinessObjects 4.x Upgrade / Migration to 4.x
SAP BusinessObjects 4.x Upgrade / Migration to 4.x
 
Mahuya_Chowdhury
Mahuya_ChowdhuryMahuya_Chowdhury
Mahuya_Chowdhury
 
Unlock The Value Of Your Microsoft and SAP Investments
Unlock The Value Of Your Microsoft and SAP InvestmentsUnlock The Value Of Your Microsoft and SAP Investments
Unlock The Value Of Your Microsoft and SAP Investments
 
Learn about Tibco Designer
Learn about Tibco Designer Learn about Tibco Designer
Learn about Tibco Designer
 
Integrating Oracle BI, BPM and BAM 11g: The complete cycle of information
Integrating Oracle BI, BPM and BAM 11g: The complete cycle of informationIntegrating Oracle BI, BPM and BAM 11g: The complete cycle of information
Integrating Oracle BI, BPM and BAM 11g: The complete cycle of information
 
Veerapradeep_Apps_profile
Veerapradeep_Apps_profileVeerapradeep_Apps_profile
Veerapradeep_Apps_profile
 
CV_ANTONY_JOSEPH1
CV_ANTONY_JOSEPH1CV_ANTONY_JOSEPH1
CV_ANTONY_JOSEPH1
 
SAP BusinessObjects Security
SAP BusinessObjects SecuritySAP BusinessObjects Security
SAP BusinessObjects Security
 
Contractors Network - Developing Oracle Bi (Xml) Publisher
Contractors Network - Developing Oracle Bi (Xml) PublisherContractors Network - Developing Oracle Bi (Xml) Publisher
Contractors Network - Developing Oracle Bi (Xml) Publisher
 

Viewers also liked

Edit decision list
Edit decision listEdit decision list
Edit decision listNathanR10
 
серпнева презентація 25.08.2016 поправлено
серпнева презентація 25.08.2016 поправленосерпнева презентація 25.08.2016 поправлено
серпнева презентація 25.08.2016 поправленоMARO51
 
How to Test the New Fashioned Way
How to Test the New Fashioned WayHow to Test the New Fashioned Way
How to Test the New Fashioned WayCA Technologies
 
Lap. diklatpim IV 2015 Kab. Pangandaran
Lap. diklatpim IV 2015 Kab. PangandaranLap. diklatpim IV 2015 Kab. Pangandaran
Lap. diklatpim IV 2015 Kab. PangandaranDani Setiawan
 
Designing for Culture Change
Designing for Culture ChangeDesigning for Culture Change
Designing for Culture ChangeGuido Stevens
 
10만 라인, 26280시간의 이야기
10만 라인, 26280시간의 이야기10만 라인, 26280시간의 이야기
10만 라인, 26280시간의 이야기Minyoung Jeong
 
Surat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten Pangandaran
Surat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten PangandaranSurat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten Pangandaran
Surat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten PangandaranDani Setiawan
 
Codal analysis film trailers 3
Codal analysis film trailers 3Codal analysis film trailers 3
Codal analysis film trailers 3NathanR10
 
Celery의 빛과 그림자
Celery의 빛과 그림자Celery의 빛과 그림자
Celery의 빛과 그림자Minyoung Jeong
 
Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...
Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...
Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...indra wiryantaka
 

Viewers also liked (12)

Edit decision list
Edit decision listEdit decision list
Edit decision list
 
серпнева презентація 25.08.2016 поправлено
серпнева презентація 25.08.2016 поправленосерпнева презентація 25.08.2016 поправлено
серпнева презентація 25.08.2016 поправлено
 
The rogues
The roguesThe rogues
The rogues
 
How to Test the New Fashioned Way
How to Test the New Fashioned WayHow to Test the New Fashioned Way
How to Test the New Fashioned Way
 
Lap. diklatpim IV 2015 Kab. Pangandaran
Lap. diklatpim IV 2015 Kab. PangandaranLap. diklatpim IV 2015 Kab. Pangandaran
Lap. diklatpim IV 2015 Kab. Pangandaran
 
Designing for Culture Change
Designing for Culture ChangeDesigning for Culture Change
Designing for Culture Change
 
FaceControllMovie
FaceControllMovieFaceControllMovie
FaceControllMovie
 
10만 라인, 26280시간의 이야기
10만 라인, 26280시간의 이야기10만 라인, 26280시간의 이야기
10만 라인, 26280시간의 이야기
 
Surat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten Pangandaran
Surat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten PangandaranSurat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten Pangandaran
Surat Edaran Pakain Dinas di Lingkungan Pemerintah Kabupaten Pangandaran
 
Codal analysis film trailers 3
Codal analysis film trailers 3Codal analysis film trailers 3
Codal analysis film trailers 3
 
Celery의 빛과 그림자
Celery의 빛과 그림자Celery의 빛과 그림자
Celery의 빛과 그림자
 
Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...
Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...
Proyek Perubahan Diklat Pim IV penanganan pengaduan masyarakat UPT Puskesmas ...
 

Similar to TIBCO Professional with 8.5+ years of IT and testing experience

Similar to TIBCO Professional with 8.5+ years of IT and testing experience (20)

suresh.TIBCO1
suresh.TIBCO1suresh.TIBCO1
suresh.TIBCO1
 
VEERAREDDY_TIBCO_MULESOFT_CONSULTANT
VEERAREDDY_TIBCO_MULESOFT_CONSULTANTVEERAREDDY_TIBCO_MULESOFT_CONSULTANT
VEERAREDDY_TIBCO_MULESOFT_CONSULTANT
 
Resume
ResumeResume
Resume
 
Profile - Deepak Kumar
Profile - Deepak KumarProfile - Deepak Kumar
Profile - Deepak Kumar
 
Subhoshree resume
Subhoshree resumeSubhoshree resume
Subhoshree resume
 
Subhoshree_ETLDeveloper
Subhoshree_ETLDeveloperSubhoshree_ETLDeveloper
Subhoshree_ETLDeveloper
 
Reddi rani 3yrs bangalore
Reddi rani 3yrs bangaloreReddi rani 3yrs bangalore
Reddi rani 3yrs bangalore
 
Reddi Rani_3yrs_Bangalore
Reddi Rani_3yrs_BangaloreReddi Rani_3yrs_Bangalore
Reddi Rani_3yrs_Bangalore
 
Rakshatha_Resume
Rakshatha_ResumeRakshatha_Resume
Rakshatha_Resume
 
Varun Rajasekaran-TIBCO
Varun Rajasekaran-TIBCOVarun Rajasekaran-TIBCO
Varun Rajasekaran-TIBCO
 
Arunprakash Alagesan
Arunprakash AlagesanArunprakash Alagesan
Arunprakash Alagesan
 
Resume
ResumeResume
Resume
 
Damodar_TIBCO
Damodar_TIBCODamodar_TIBCO
Damodar_TIBCO
 
Vitaly gritsenko
Vitaly gritsenkoVitaly gritsenko
Vitaly gritsenko
 
Updated_Resume
Updated_ResumeUpdated_Resume
Updated_Resume
 
Vu Ho (.Net )
Vu Ho (.Net )Vu Ho (.Net )
Vu Ho (.Net )
 
Bayapa_Tibco_Mule_Resume
Bayapa_Tibco_Mule_ResumeBayapa_Tibco_Mule_Resume
Bayapa_Tibco_Mule_Resume
 
Vamsi_Obiee_Admin
Vamsi_Obiee_AdminVamsi_Obiee_Admin
Vamsi_Obiee_Admin
 
Harish Srivastava -Resume
Harish Srivastava -ResumeHarish Srivastava -Resume
Harish Srivastava -Resume
 
Introduction to BizTalk for Beginners
Introduction to BizTalk for BeginnersIntroduction to BizTalk for Beginners
Introduction to BizTalk for Beginners
 

TIBCO Professional with 8.5+ years of IT and testing experience

  • 1. Krishna Veni Gurram e-Mail: veni2301@gmail.com Mobile: +91-7893321000 Overview: • Around 8.5 +years of IT experience in Development, Implementation and Maintenance of EAI/SOA based solutions using TIBCO Product suite. • TIBCO Certified Professional (TIBCOActiveMatrix Business Works 5) with strong experience on SOA (Service Oriented Architecture) based solutions implementation. • TIBCO SOA Products: TIBCO Business Works, TIBCO Designer, TIBCO EMS,TIBCO Administrator, TIBCO Hawk, TIBCO TWM, TIBCO CLE2012, TIBCO Manage File Transfer, TIBCO AFF(Active fulfillment framework). • TIBCO BI: TIBCO Spotfire • TIBCO Adapters: TIBCO Database Adapter 5.x • BW Plugins: RestAPI, Json • Web services: Soap - HTTP, Soap – JMS • Databases: SQL Server 2008 R2, Oracle 10g • Technologies: XML Schema, Data format, Abstract WSDLS and Concrete WSDLS using TIBCO Designer • Applications Tested :  Billing Systems: Intec Singl.e.View, CRM : Chordiant, Front-Ends(Online, PIE), Web applications (Online, PIE), Payments, Provisioning and Order Management(TIBCO), business services (Web services developed using web logic, Business works) being build using SOA framework • Phases of Software testing :  Integration Testing, System Integration Testing, System Testing, Interface Testing, Regression Testing, Functional Testing, End to End Testing, Build verification Testing, User Acceptance Testing, Production Testing, Black box Testing, Static Testing and Stability Testing. • Testing Tools : MercuryQualityCenter 9.0, SOAP UI, EMM, xFIT • Other Tools : Clearcase, SVN, IVR(Redwood), Alfresco, Dollar Universe, Toad
  • 2. Employment summary Bartronics Global services. LTD March 2015 to Till date Senior Consultant TIBCO Software India Pvt. LTD Sep 2011 to June 2014 Consultant Hastraa Consulting Services Sdn Bhd May 2011 to Aug 2011 Consultant HCL Technologies Ltd Aug-2010 to Mar-2011 Consultant Keane India Pvt Ltd June-2010 to July-2010 Test Analyst Patni Computers Systems (UK) Ltd Nov-2006 to Jan-2009 Test Analyst Shri Comtech Software Solutions May-2005 to Feb- 2006 Software Tester Bharat Heavy Electrical Ltd Nov-2004 to April- 2005 Project trainee Engineer Experience summary • Around 8.5 +years of IT experience in Development, Implementation and Maintenance of EAI/SOA based solutions using TIBCO Product suite. • About 5 + years of experience in Software Testing with hands on experience in integrated environment with Front-Ends, Web applications, Billing Systems, CRM (Customer Relationship management), TIBCO, Payments, Provisioning and Order Management Applications. • Extensive skills in Defect tracking, analyzing Test results, creating reports, Identified and 2
  • 3. Documented errors and defects. • Worked independently and unsupervised and delivered high quality software to the customer. • Worked in a multi technology Integration environments and performed Integration Testing. Work History Bartronics Global services Ltd. Mar 2015 to Till date World Vision International – World Vision Mar 2015 to Till date Single Step: World Vision International (WVI) uses software from TIBCO Software Inc. to enable their new systems strategy, which allows desktop or mobile applications to operate remotely and communicate with the production systems using an Enterprise Service Bus (ESB) based on TIBCO Enterprise Message Service (EMS) and TIBCO Business Works (BW). The first two applications created for this are SingleSTEP across 54 countries (and expanding). The SingleSTEP application gathers Child and Reference (project, country, zone, etc.) information produced by field workers and support around the world and aggregates it into a central Child database(Singlestep database).Then the data is distributed back to all field workers to use for continued operations. S2P(Source To Pay): The Source to Pay project integrates accounts payable related source of record (SOR) items between the cloud-based procurement service COUPA with the World Vision in-house ERP (Oracle EBS and Infor Sun6) systems for both the World Vision International and U.S. organizations. It utilizes the TIBCO enterprise service bus (ESB) platform comprising of TIBCO Business Works (BW) straddling TIBCO Enterprise Messaging System (EMS). It uses COUPA’s flat file integration API’s via SFTP connections for reading invoice data from COUPA and writing payments and master data items from the ERP systems. It uses SFTP flat file (CSV and Pipe-delimited) drops to interface to the Oracle eBusiness suite for DonorVision. For the Infor Sun6 systems it communicates over HTTP(S) using the SOAP protocol. For both data routes to and from COUPA, Oracle EBS and Infor Sun6 it uses a Publish-Subscribe pattern within the TIBCO BW platform using a SOA(Service oriented architecture) transport over Tibco EMS. SingleStep and Perceptive MFT: 3
  • 4. The TIBCO MFT is used to transfer files between different locations. In World Vision we implemented MFT to transfer files to their respective destination countries. There are approx. 53 countries/locations where files from SSDA have to be delivered. TIBCO MFT out of box does not support dynamic routing of files to different locations. There must be one transfer template defined for every transfer location. The templates have to be maintained in TIBCO MFT Command Center and also have to be configured at remote machines. This approach is not feasible for a real-time production support, which is why a dynamic routing logic was implemented in TIBCO Business Works. RMT (Rich Media Transfer) MFT: MFT Platforms server acts as client sends Child Photos and Videos to the Amazon MFT Internet server. Videos will be transmitted to the Amazon S3 cloud by calling the Web service from TIBCO BW upon arrival of the Video/Photo. Every Transaction will be logged in TIBCO Lightweight CLE specifically designed for FIP/RMT Projects. Spitfire is used to report RMT CLE information to the designated support technical users. Responsibilities: • Involved in preparation TIBCO Business Works, MFT and HAWK project templates and data mapping documents. • Involved in preparation and execution of unit test cases of TIBCO interfaces. • Worked closely with business analyst team to understand business logic and defining technical design for solutions to functional use cases. • Involved in Developing Business Works (BW) processes as per technical design specifications. • Implemented Hawk monitoring successfully in all the environments • Administrate Business Works Services using TIBCO Administrator. It includes configuration of groups, users, BW services and Adapters. • Administrate the MFT server like adding users in Command center, monitoring Internet servers and file transfers • Monitor the TWM in all the environments • Administrate the Spotfire Server like adding the users and generating the report as per the Customer requirement • Enhancement of CLE2012 for the WVI S2P(Source To Pay) and RMT(Rich Media Transfer) project as per the customer requirement • Responsible to Monitor all the Tibco components in all the environments(Production and Staging) • Responsible for preparing and delivering the deployment documents. • Administrate Enterprise Message Service (EMS) using TIBCO EMS 8.2. It includes configuration of EMS servers in different environments as per the Application requirement. Other tasks which include EMS are creation/deletion of queues, topics, bridges & durables. As well as purging the file store data. • The migration of TIBCO projects across different lifecycle environments using TIBCO Administrator GUI and script deployment. 4
  • 5. • Solving incidents in a production/lower environments using Service now tool. • Involved in preparing many of the Project related documentation such as (SOP, EMS Best practice, HAWK installation and monitoring, Daily activities check list, Environment Sheet, Code review Checklist). • Involved in Installation of Hotfixes in order to auto grown-up of Logs for different environments (such as DEV, TST, STG, and PROD). • Having good analytical skills for troubleshooting interface related issues. TIBCO Products used: TIBCO BW, Administrator, EMS, MFT (Manage File Transfer), Spotfire, HAWK, CLE2012 Other Products used: Microsoft SQL, SVN, TIBCO Software India Pvt. Ltd. Sep-2011 to June 2014 South East Water - Australia May 2012 to May 2015 It was a CRM agile based implementation project divided into many quick sprints; each sprint was of five weeks. As part of it cloud based Salesforce.com was to be integrated with client’s legacy application like CIS (customer information system) and ECM (corporate document management system). There were various synchronous /asynchronous and batch process developed as part of the project, some typical interface like payment is interacting with four different systems as part of one transaction request meeting different requirements and maintaining integrity yet remaining stateless. Responsibilities: • Involved in preparation TIBCO Business Works project templates and data mapping documents. • Involved in preparation and execution of unit test cases of TIBCO interfaces. • Worked closely with business analyst team to understand business logic and defining technical design for solutions to functional use cases. • Developed typical technical adapter interfaces for various systems. • Planned and created as many re-usable processes and interfaces as possible and then adhere to as per plan during development for quick turnaround. • Developed various business services. • Resolved technical challenges while interacting with HiAffinity application (Legacy CIS) and Livelink document management system (Open Text ECM product) with salesforce. • Created reusable interface by using Salesforce BW plugin provided by TIBCO to carry out various operation like upsert/update/query and listening to salesforce outbound notifications. KPN SNI_2 Upgrade – KPN, Netherlands Sep 2011 to April 2012 The main goal of the SNI Upgrade project is to realize an SNI that can handle a large number of orders. The W&O business plan 2011 - 2013 for processes and IT forecasts 50,000 customer 5
  • 6. orders per week by the end of 2011. SNI needs to handle this. Therefore, scalability is an essential requirement for SNI. SNI currently has two bottlenecks that hinder reaching these order levels. Another important goal is to improve the development process for SNI. This will reduce the time-to-market for new services, and will also lead to reduced project costs for future SNI projects. This in large part will be made possible by leveraging the out-of-the-box product driven fulfillment functionality provided by the TIBCO Active Fulfillment Suite (AFS) set of products. Other out-of-the-box functionality will be leveraged to support other objectives such as streamlining maintenance and assurance processes. Responsibilities: • Involved in the full Life cycle of this project where my main responsibilities included developing Customer Order interfaces using TIBCO Product suite. • Involved in preparation and execution of unit test cases to test the SNI_2 Project Deliverables. • Worked closely with business analyst team to understand business logic and defining technical design for solutions to functional use cases. • System Test support to ensure the bugs are fixed and re tested. • Integration testing of Software releases to ensure the project deliverables are of high quality and function as per the Solution Design. • Involved in Defect fixing & status update and coordinating with Testing teams. • Involved in preparation of detailed design documents and Build & Release documentation. TIBCO Products used: TIBCO BW, Administrator, EMS, BE Other Products used: Oracle DB, LISA Hastraa Consulting Services Sdn Bhd . May-2011 to Aug-2011 CIMB Standardization - CIMB Bank, Malaysia Standardization of Singapore and Malaysia Core Banking Systems improving the Banking capabilities for both Singapore and Malaysia. Standardization is being done based on Singapore and Malaysia CBS using Singapore version as base. OCBC Support the delivery of ‘One Bank’ vision of availing common customer experience, unified process and product offering across Singapore and Malaysia Support the increasingly integrated operating model of GCFS and GCB. Facilitate quicker rollout of global products. Avail lower unit costs through common platform and resource synergy. Responsibilities: • Involved in preparation TIBCO Business Works project templates and data mapping documents. • Involved in preparation and execution of unit test cases of TIBCO interfaces. • Worked closely with business analyst team to understand business logic and defining technical design for solutions to functional use cases. 6
  • 7. • Integration testing of Software releases to ensure the project deliverables are of high quality and function as per the Solution Design. • Involved in Defect fixing & status update and coordinating with other teams. • Involved in preparation of project, test suite with test cases in SOAP UI using Data Source for VIT(Vendor Integration Testing) and also testing of Remittance functionality as a part of SIT. • Involved in preparing the Schema, Data format, Abstract WSDLS and Concrete WSDLS. TIBCO Products Used : TIBCO BW, TIBCO Administrator, EMS, Java/JDK, dB2, SOAP UI HCL Technologies Ltd. Aug-2010 to March-2011 OCBC-SIBS Standardization - OCBC Bank, Malaysia OCBC SIBS is a Standardization of Singapore and Malaysia Core Banking Systems and adding Silver Lake Version 8 Islamic Banking capabilities for both Singapore and Malaysia. Standardization is being done based on Singapore and Malaysia CBS using Singapore version as base. OCBC Support the delivery of ‘One Bank’ vision of availing common customer experience, unified process and product offering across Singapore and Malaysia Support the increasingly integrated operating model of GCFS and GCB. Facilitate quicker rollout of global products. Avail lower unit costs through common platform and resource synergy. Responsibilities: • Involved in preparation TIBCO BusinessWorks project templates and data mapping documents. • Involved in preparation and execution of unit test cases of TIBCO interfaces. • Worked closely with business analyst team to understand business logic and defining technical design for solutions to functional use cases. • Integration testing of Software releases to ensure the project deliverables are of high quality and function as per the Solution Design. • Involved in Defect fixing & status update and coordinating with other teams. • Involved in preparation of project, test suite with test cases in SOAP UI using Data Source for VIT(Vendor Integration Testing). • Involved in preparing the Schema, Data format, Abstract WSDLS and Concrete WSDLS. TIBCO Products Used : TIBCO ActveMatrix ServiceBus, BW, Administrator, EMS, Java/JDK, dB2, SOAP UI, xFIT Keane India Pvt Ltd. June-2010 to July-2010 IRP(Integration Replacement Program) Orange, UK Recently Orange has decided to implement SOA (Service Oriented Architecture) by replacing the existing integration between the system business layer(i.e., front end) and the backend Databases. The existing legacy system uses Encina software in order to communicate between 7
  • 8. the business layers (I.e., Just Talk front end) with the database with the help of services. Whereas IRP (Integration Replacement Programme) would replace the Encina with Soap based Web services. These Services are developed based on SOA framework, and to meet the business requirements of distribution, effective re-usability, scalability, consistency and interface flexibility. Responsibilities: • Involved in the full Life cycle of this project where my main responsibilities included preparation of test data, test scenarios, test cases for PAT (Preliminary Acceptance Testing) and executing the test cases. Uploading the test cases into Mercury Quality Centre. • Involved in preparation and execution of test cases to test the IRP Project Deliverables. • Worked closely with business analyst team to understand business logic and defining technical design for solutions to functional use cases. • PAT (Preliminary Acceptance Testing) to ensure the Project deliverables are of highest quality. • Functional testing of Software releases to ensure the project deliverables are of high quality and function as per the Solution Design. • Involved in Defect Creation & status update and coordinating and re-test it once the defect is fixed. • Involved in preparation of project, test suite with test cases in SOAP UI using Data Source for PAT (Preliminary Acceptance Testing). Products Used : Java/JDK, Web Logic, Oracle10g, Data Power, SOAP UI, EA(Enterprise Architecture),CRT5.1 Patni Computer Systems (UK) Ltd. Nov-2006 to Feb-2009 COBAL (Control Over Billing At Last), Carphone Warehouse, UK Recent regulatory changes have given rise to opportunities for CPW to offer new services based on Wholesale Line Rental (WLR) and Local Loop Unbundling (LLU) to existing and new customers. The key drivers for doing so are to reduce churn and to increase revenues through additional services. The business has determined that, in order to take full advantage of this opportunity, it must be able to launch WLR and LLU as part of its portfolio of fixed line service offerings such as CPS and broadband, as soon as possible. However, to launch WLR and LLU significant changes to a number of existing CPW systems as well as the implementation of new functionality is necessary. The gaps in the current system with regard to the WLR and LLU requirements are in the areas of Billing, Customer Management and Order Management & Provisioning. As part of the strategic direction to address these limitations, CPW has made a key decision to put in place a top tier Billing, CRM and Business Process Management system which will ultimately replace the current CBS system. CPW has procured Singl.eView as the group-billing platform following a strategic decision to consolidate European billing systems, provide customers with a single bill and provide a convergent billing platform. Chordiant has been 8
  • 9. selected as the CRM solution to be deployed across all CPW Contact Centres Tibco has been selected as the process engine that will provide Order Management and Provisioning solution. COBAL is the name of the project to launch Fixed Line voice (CPS, WLR) and data (BB) with Singl.eView, Chordiant, and TIBCO. Responsibilities: • Involved in development of TIBCO interfaces using BusinessWorks and EMS products. • Involved in integration testing of TIBCO Services along with Front-Ends, Web Applications, IVR(Redwood), Chordiant(CRM), Telecom Billing Intec Singl.eView Billing System Testing(Billing /Rating/Configuration/Testing), TIBCO, Payments, Provisioning and Order Management Applications. • Involved in preparation and execution of unit test cases to test the COBAL Project Deliverables. • Installation and configuration of TIBCO Softwares on windows and UNIX Platforms. • SIT (System Integration Testing) support to analyze and fix the defects. • Involved in Regression Testing, Build Verification Testing, Production Testing and Stability Testing • Involved in preparation of System process flows by referring HLSDs for the testers and developers to refer it. • Performed Static testing by referring all the use cases and system processes to identify any functional gaps and feasibility of the Test scenarios. Products Used : Singl.e.view, TIBCO Business Works, TIBCO SmartMapper, TIBCO Business Events, TIBCO IProcess, TIBCO EMS, TIBCO Administrator, EMM, Chordiant, Payment Applications, Alfresco, IVR(Redwood),Mercury quality Center Shri Comtech Software Solutions. May-2005 to Feb- 2006 Real Estate Management System, Shri Comtech Software Solutions The main objective of the application is to facilitate the real estate companies effectively manage the Project and site related information, Customer details, scheduling & viewings, payments and instalments tracking. My role is to evaluate the application for any visible/subliminal errors. Verify the functionality. Test the integrity of database of the application. Validate login/authentication procedures as per the plan. Generate test cases. Report/Coordinate with developers in notifying or resolving the bugs. Responsibilities: Responsibilities: • Performed Functional, User Interface, Regression tests manually. • Prepared Test scenarios, Test cases and Executed Test cases. • Defect Creation & status update and coordinating and re-test it once the defect is fixed. • Interaction with Developers to address and to resolve technical problems. 9
  • 10. Bharat Heavy Electrical Limited. Nov-2004 to April- 2005 Design of Two-Lobe Journal Bearing for TURBO Machine Bharat Heavy Electrical Limited. We have designed a Two-Lobe Journal Bearing for a 120 MW TURBO Generator. Due to the relative motion between the rotating shaft (Journal) and the stationary bearing generates frictional losses, which are converted into heat energy, leading to the temperature rise of the bearing. The important objective of a bearing design is to reduce the frictional losses, insure stable running of the rotor system in the extreme and the normal conditions ensuring long life of the bearing and particularly no wear in the rotating. It is possible to reduce the weight of the Machines, by increasing the speeds and it is not a common practice to go for a high speed Machines. These High-speed machines naturally need suitable bearings to withstand high dynamic forces and several operating loads like misalignment, axial thrust etc. We have automated the design calculations by using C language because, generally manual calculations are not as accurate as the automated calculations and also if we have done the calculations manually they are time consuming so, we have prepared a C language program to save time decrease manual interruption and to increase the accuracy of the calculations. PRO-E is used to design the component practically in the system according to the design calculations and submit the hard copy to the production department and ANSYS is used to analyze the designed component. Responsibilities: • Prepared the design calculations in the design of Two-Lobe Journal Bearing for the 120-MW Turbo Generator by taking the weight of the rotor as input. • Compared the results obtained from the design calculations with the requirements of the customer. Automation of the design calculations by using C language. Products Used: PRO-E, ANSYS, C Language Academic qualifications B.Tech from JNTU University, Andhra Pradesh, India, during June-2001 to April-2005 with 69%. Certifications: • TIBCO Certified Professional in ActiveMatrix Business Works 5 - Nov 2011 Trainings Attended: • TIBCO Business Works, CIM (Collaborative information Manager), Business 10
  • 11. Events Training at TIBCO Software India Pvt Ltd • TIBCO ActiveMatrix Training at HCL Technologies • Tibco Business Events Training, Patni Computers, UK. • Testing Tools - Win Runner, Load Runner, Test Director training from NICT, India. 11