RIFT VALLEY UNIVERSITY
MBA
5 June 2021 project management 1
By
Chala Dechassa (PhD, Assistant
Professor)
Chapter One
Project management overview
Essence of Project Analysis and Evaluation
 All countries have national plans, which spell a range of
economic and social objectives and strategies meant to
enhance Growth and Development.
• In this regard, projects provide an important means by which
investment and other development expenditures foreseen
in the plans can be clarified, justified, and realized.
 Development plans and projects are closely interlinked since
sound development plans require good projects as just good
projects require sound planning.
2
5 June 2021 project management
Project Defined
• A project is defined as a complex set of activities where
resources are used in expectation of returns and which
lends itself to planning, financing, and implementing as a unit
( Gittinger, 1982), .
• A project usually has a specific starting point and a specific
ending point intending to achieve specific objectives.
• It usually has a well-defined sequence of investment and
production activities and a specific group of beneficiaries that
can be identified, quantified, and valued, either socially or
monetarily.
3
5 June 2021 project management
Cont’d
• project as “….a temporary endeavor undertaken to create a unique
product of service.
• Temporary means that every project has a defined end.
• Unique means that the product or service is different in some
distinguishing way from all similar products or services.”(A project
can be defined as a non-repetitive activity (HarveyMaylor ).
• It constitutes the whole complex of activities in the undertaking that
uses resources to gain benefits that exceed the costs of the
resources.
• It involve the commitment of scarce resources to a specific line of
action, which prevents the use of those resources elsewhere.
5 June 2021 project management 4
Project ……. Defined
A project is an activity that require resource,
time, objective, with fixed deliverables.
A project is accomplished by performing a set of
activities.
– For example, construction of a house is a project. It
consists of many activities like digging of foundation pits,
construction of foundations, construction of walls,
construction of roof, fixing of doors and windows, fixing of
sanitary fittings, wiring, etc.
5
5 June 2021 project management
Cont’d
• Projects are usually the subject of special arrangements and
procedures for their planning, appraisal, and so on.
• Involve special financial arrangements, including loans from
overseas, development banks, and other agencies.
• The pattern of resources commitment in projects is usually for
capital investments to be made to establish productive
capacity or physical works, which then have a long life of
operation or use.
• Therefore, a project can be considered to be any series of
activities and characterstics
6
5 June 2021 project management
project management
Project Characteristics
Major project characteristics are as below:
1. Specific Objectives (It is goal oriented)
– A project has a set of objectives or a mission. For
example, the objective of a project may be
construction of a highway connecting two cities “A”
and “B”, covering a distance of 200 km. Once the
construction of the highway is completed the project
comes to an end.
– The objective is specified in terms of cost, schedule,
and performance requirements.
5 June 2021 7
project management
.. …Cont’d
2. Life Cycle
 A project has a life cycle. The life cycle consists of the
following stages:
a) Project Initiation
b) Project Planning
c) Project Execution, and
d) Project Closure
 The task, people, organizations, and other resources
change as the project moves from one phase to the next.
5 June 2021 8
project management
a) Project Initiation
 It is the first phase in the project
 In this phase a business problem (or opportunity) is
identified and a business case which provides various
solution options is defined.
 A feasibility study is then conducted to investigate the
likelihood of each solution option addressing the
business problem and a final recommendation is put
forwarded
5 June 2021 9
Project Initiation… Cont’d
 Once the recommended solution is approved, a project is
initiated to deliver the approved solution
 A “Term of Reference” is completed, which outlines the vision,
objectives, scope, deliverables and structure of the new
project, and a Project Manager is appointed.
 Then the Project Manager begins recruiting a project team and
establishes a Project Office environment.
 Approval is then sought to move into the detail planning phase.
project management
5 June 2021 10
project management
b) Project Planning
• Once the scope of the project has been defined in the “Terms
of Reference”, the project enters the detailed planning phase.
This involves the creation of a:
 Project Plan (Outlining the activities, tasks, dependencies
and timeframes)
 Resource Plan (listing the labour, equipment and materials
required)
 Financial Plan (identifying the labour, equipment and
materials costs)
5 June 2021 11
Project Planning, Cont’d
 Quality Plan (providing quality targets, assurance and
control measures)
 Risk Plan (highlighting potential risks and actions taken to
mitigate them).
 Procurement Plan (identifying products to be acquired
from external suppliers).
 Communications Plan (listing the information needed to
inform stakeholders)
project management
5 June 2021 12
project management
c) Project Execution
• This phase involves the implementation of each activity and
tasks listed in the Project Plan.
• While executing the activities and tasks, a series of
management processes are undertaken to monitor and
control the deliverables being produced by the project.
• Once all the deliverables have been produced and the
customer has accepted the final solution, the project is ready
for closure.
5 June 2021 13
project management
d) Project Closure ( conclusion)
• Project closure involves:-
 releasing the final deliverables to the customers,
 Handing over project documentation,
 Terminating supplier contracts,
 Releasing project resources and communicating the closure of the
project to all stakeholders.
 The last remaining step is to undertake a Post Implementation Review to
quantify the overall success of the project and list any lessons learnt for
future project.
5 June 2021 14
project management
…Cont’d
3. Definite Time Limit (Temporary)
• Have defined start and end dates
– A project has a definite time limit. It cannot continue forever.
– Have funding limits (if applicable)
4. Uniqueness
– Every project is unique and no two projects are similar.
Constructing a highway connecting two cities A & B and
constructing another highway between cities C & D are
unique in themselves. In view of the differences existing in
the organization, infrastructure, location, technical
specifications and the people behind the projects.
5 June 2021 15
project management
…Cont’d
5. Teamwork
Any project calls for the services of experts from a host
of disciplines. Coordination among the diverse areas
call for teamwork. Hence, a project can be
implemented only with teamwork.
Perhaps more than any other human endeavor, project
work is teamwork.
5 June 2021 16
project management
…Cont’d
6. Complexity
A project is complex set of activities relating to diverse areas.
 Technology survey,
 choosing the appropriate technology,
 procuring the appropriate machinery and equipment,
 hiring the right kind of people,
 arranging for financial resources,
 execution of the project in time by proper scheduling of
the different activities, etc.
contribute to the complexity of the project.
5 June 2021 17
project management
…Cont’d
8. Risk and Uncertainty- a risk free project cannot be
thought of.
9. Sub-contracting- to give a contract to somebody else to
do part of the work.
10. The output of the project is measurable
– Something has changed through the project being carried
out
5 June 2021 18
project management
…Cont’d
 Four key considerations always are involved in a project:
(1) What will it cost?
(2) What time is required to complete the project?
(3) What technical performance capability will it provide?
(4) How will the project results fit into the design and
implementation of organizational strategies?
5 June 2021 19
…Cont’d
Typical Project Examples
(a) Construction projects
(b) Development projects
(c) Weddings, remodeling a home, and moving to another
house are certainly projects for the families involved
(d) Company audits, major litigations, corporate relocations,
and mergers are also projects.
project management
5 June 2021 20
…Cont’d
Project Goals
 Virtually every project has three overriding goals: to
accomplish work for a client or end-user in accordance with
budget, schedule, and performance requirements.
(i) Budget: the budget is the specified or allowable cost for
the project.
• It is the target cost of the work to be done.
project management
5 June 2021 21
…Cont’d
 The above goals can be met in two ways:
 By using project management disciplines and project
management tools, and
 By following project management processes.
project management
5 June 2021 22
…Cont’d
• (ii) Schedule: the schedule includes the time period over
which the work will be done and the target date for when it
will be completed.
(iii) Performance Requirements: Specify what is to be done
to reach the end- item or final result.
• Note: The three goals are interrelated and must be addressed
simultaneously; exclusive emphasis on any one goal is likely to
detract from the others.
project management
5 June 2021 23
project management
Project Management
 Project management is an organized venture for managing projects.
 It involves scientific application of modern tools and techniques in
planning, financing, implementing, monitoring, controlling and
coordinating unique activities or tasks or produce desirable outputs
in accordance with the pre-determined objectives within the
constraints of time and cost.
5 June 2021 24
Project Mgt. … Cont’d
• “Project management is the skills, tools and
management processes required to undertake a project
successfully”.
 Project management comprises:
A set of Skills. Specialist skills and experience are required
to reduce the level of risk within a project and thereby
enhance its likelihood of success.
A Suit of Tools. Various types of tools are used by project
managers to improve their chances of success. Examples
include registers, planning software, modelling software,
audit checklist and review forms.
project management
5 June 2021 25
project management
... Cont’d
A Series of Processes. Various management techniques and
processes are required to monitor and control time, cost,
quality and scope of projects.
Examples include time management, quality management,
change management, risk management, etc.
5 June 2021 26
project management
…Cont’d
Every person, every organization and every nation
is concerned with project management.
– An individual builds a house. It is a project to him.
– An organization sets up new factory. It is a project for
the organization.
– The government of a country builds high ways, dams,
thermal power plants, hydropower plants, airports, etc.
These are all projects that a country undertakes.
5 June 2021 27
Cont’d
• Successful project management can then be defined as having
achieved the project objectives:
– Within time
– Within cost
– At the desired performance/technology level
– While utilizing the assigned resources effectively and efficiently
– Accepted by the customer
5 June 2021 project management 28
CLASSIFICATION OF PROJECTS:
Based on
– ownership,
– source of finance, and
– forces behind the projects.
1. Based on ownership:
– Private sector- mostly projects undertaken by business enterprises.
– Public sector- projects undertaken by national and local government
bodies.
– NGOs- development projects are most often undertaken by non-
government and non-for profit organizations.
29
5 June 2021 project management
Cont’d
2. Based on the Sources of Finance:
• Government treasury- projects may be entirely financed by
government budget as per its priority. For instance,
construction of regional airport.
• Government treasury and external sources- most projects
are financed by the joint partnership of the government and
donor groups. For example, a road project may be financed
50% by the government and 50% by a foreign donor.
• External sources of Finance- projects may be financed totally
by parties other than the government but established for the
well being of the citizens and the ownership may be for the
government or the public.
30
5 June 2021 project management
Cont’d
3. Based on the forces Behind:
• Demand driven/need driven- based on identified
unsatisfied demand project can be created or on
unsatisfied basic needs like food, water and shelter.
• Donor driven- the force behind the financing
organization. Donors will have their own say and
influence the types of projects to be established.
• Political Driven- Projects may be established in
response to some political situation such as for example
because of national elections, projects by religious
organizations.
31
5 June 2021 project management
Cont’d
4. Based on their nature:
• Civil engineering, construction, petrochemical, mining, quarrying,
projects far away from the contractor’s home office, and involve
special risk as well as problems of organizational communication.
• Manufacturing projects- conducted in a factory or other home
based environment and enable exercising on the spot management.
• Research projects- established for pure research consuming large
sum of money and lasting over years resulting in dramatic profitable
discovery or proving waste of money.
• Management projects- projects that require the employment of an
external project manager or managing contractor for issues such as
relocating head quarters, developing and introducing a new
computer system, preparing for a trade exhibition, producing a
feasibility or other study report, restructuring the organization etc.
32
5 June 2021 project management
PROJECT PARAMETERS
• During a project’s life, management focuses on three basic
parameters:
– quality,
– cost, and
– time.
– deadline;
– the budget.
In addition, client satisfaction indicates success and possibility
for replication or sustainability.
– Each of the parameters is specified in detail during the planning phase
of the project.
– These specifications then form the basis for controlling the project
during the implementation phase
33
5 June 2021 project management
Project Parameters
Quality
cost, and time
Performance
Budget
Schedule
34
5 June 2021 project management
HIERARCHICAL RELATIONSHIPS
• Plans and Projects
• Planning can be defined as a “continuous process that involves
decisions or choices about alternative ways of using
available resources with the aim of achieving a particular
goal or set of goals at some time in the future.”
• The rationale for planning is that it serves as a tool that
enhances the effectiveness in mobilizing resources and
enables allocation of resources into priority areas of
development.
35
5 June 2021 project management
The hierarchy’s are
Development plans
Programs
Projects
Tasks
Work packages
36
5 June 2021 project management
Continued
• Development plans:
– Most forward looking (futuristic)
– Broad and require systematic thinking, preparation and appraisal
– Attempts to bring welfare in the society
• Programs:
– Derived from development plans
– Exceptionally large with long term objectives
– Explores specific area with broader scope
37
5 June 2021 project management
Cont’d
• Projects:
– Derived from a program
– Unique investigative tool
– A development activity with specific objectives
– Funded by a program
– An implementation element (entity)
• Tasks:
– Work elements under a project
– Specific approaches for doing things
– Set of activities comprising a project
• Work packages:
– Sub elements of a given task (or undertaking)
– Something accomplished stage by stage
– Collection of work packages defines a given task
38
5 June 2021 project management
Projects and programs
• Difference
PROJECTS PROGRAMS
specific objectives General objectives
Specific project areas No specific project areas
Specific beneficiaries group No Specific beneficiaries group
Clearly determined and allocated funds No clear and detailed financial resource
allocation
Specific lifetime No specific lifetime
39
5 June 2021 project management
SIMILARITIES:
• Projects and programs have similar characteristics in a way
that both are:
• Having objectives;
• Requiring financial, human, material, etc inputs (or
resources);
• Generating outputs, (goods/services), of value;
• Serving as instruments for the execution of development plans
in order to boost the national economy.
40
5 June 2021 project management
Strategic Project Management:
as a competitive advantage
• Why Project Managers Need to Understand Strategy:
• Changes in the organization’s mission and strategy
– Project managers must respond to changes with appropriate
decisions about future projects and adjustments to
current projects.
– Project managers who understand their organization’s
strategy can become effective advocates of projects
aligned with the firm’s mission.
5 June 2021 project management 41
Projects and Strategy
• Mistakes caused by not understanding the role of projects in
accomplishing strategy:
– Focusing on problems or solutions with low strategic priority.
– Focusing on the immediate customer rather than the whole market
place and value chain.
– Overemphasizing technology that results in projects that pursue
exotic technology that does not fit the strategy or customer need
– Trying to solve customer issues with a product or service rather than
focusing on the 20% with 80% of the value (Pareto’s Law).
2–42
3. The Strategic Management Process:
An Overview
• Strategic Management
– Requires every project to be clearly linked to strategy.
– Provides theme and focus of firm’s future direction.
• Responding to changes in the external environment—
environmental scanning
• Allocating scarce resources of the firm to improve its
competitive position—internal responses to new programs
– Requires strong links among mission, goals, objectives, strategy,
and implementation.
2–43
Strategic project management Framework
• Review and define the organizational mission.
• Set long-range goals and objectives.
• Analyze and formulate strategies to reach
objectives.
• Implement strategies through projects
2–44
Strategic
Management
Process
2–45
FIGURE 1.1
5 June 2021 project management 46
• Project life cycle
What is a project cycle and why?”
– To answer these basic questions, we need to see and
understand the general features of project planning and
the identifiable tasks therein.
– In this regards, there tends to be a natural sequence in the
way projects arte planned and carried out.
– Before any project is actually realized, it goes through
various planning phases.
– Therefore, the different phases through which a project
passes constitute what is often called “the project cycle”.
– The main features of this process are information
gathering, analysis and decision-making.
5 June 2021 project management 47
-
• The project cycle considers various stages in which each stage
not only is grown out of the proceeding one/those that are
under way/but also leads into the subsequent ones.
• Therefore, a project cycle is a self-renewing cycle in that new
projects may grow out of the old ones in a continuous process
and self-sustaining cycle of activity.
5 June 2021 project management 48
THREE BASIC MODELS OF PROJECT CYCLES
1. “The Baum Cycle (also called the World Bank Project
Cycle)”
2. “The UNIDO Project Cycle”.
3. In addition to these two, a third model developed by
Development projects Studies Authority in Ethiopia (called
“The DEPSAs Model”),
5 June 2021 project management 49
1. THE BAUM CYCLE (WORLD BANK PROJECT CYCLE)
• developed by Warren. C. Baum in 1970 was by then adopted by the
World Bank as a project cycle.
• Initially, this model had recognized only four main stages in the
project cycle, namely:
1. Identification
2. Preparation
3. Appraisal and Selection
4. Implementation
• Later in 1978, the author has added additional two stages called
“Negotiation” and “Evaluation”.
• This model, therefore, includes a total of six identifiable stages in
the project cycle.
5 June 2021 project management 50
.
Baum’s main stages
1.Identification :
• Based on
• Some may be “resource based” and stem from the opportunity to
make profitable use of available resources.
• Some projects may be “market based” arising from an identified
demand in home or overseas markets.
• Others may be “need-based” where the purpose is to try to make
available to all people in an area of minimal amounts of certain
basic material requirements and services.
• Well-informed “technical specialists” and “local leaders” are also
common sources of projects.
• Ideas for new projects also come from “proposals to extend and/or
expand existing programs and projects” as well as from
identifying technological alternatives.
5 June 2021 project management 51
2. Preparation:
– Once projects have been identified, there begins a process
of progressively more detailed preparation and analysis of
project plans. At this stage, the project is being seriously
considered as a definite investment action.
– Project preparation,(also called project formulation),
involves pre-feasibility and feasibility studies and covers
the establishment of commercial, technical, institutional,
financial, and socio-economic feasibility.
– Resource based investigations are undertaken and
alternative forms of projects are explored.
5 June 2021 project management 52
3. Appraisal and Selection:
• project preparation phase:
• Technical: here the appraisers concentrate in verifying
whether what is proposed will work in the way suggested or
not.
• Financial : the appraisers try to see if the requirements of
money needed by the project have been calculated properly,
their sources are all identified, and reasonable plans for their
repayment are made where necessary.
• Commercial: the way the necessary inputs for the project are
conceived to be supplied is examined and the arrangements for
the disposal of the products are verified.
5 June 2021 project management 53
-
• Incentive: the appraisers see to it whether things are arranged in such a
way that all those whose participation is required will find it in their
interest to take part in the project, at least to the extent envisaged in the
plan.
• Economic: the appraisers here try to see whether what is proposed is good
from the viewpoint of the national economic development interest, all
project effects (positive as well as negative) are taken into account, and
check if all are correctly valued.
• Managerial: this aspect of the appraisal examines if the capacity exists for
operating the project and see if those responsible ones can operate it
satisfactorily. Moreover, it tries to see if the responsible are given sufficient
power and scope to do what is required.
• Organizational: the appraisers examine the project it is organized
internally and externally into units, contract, policy, institution, etc so as to
allow the proposals to be carried out properly and to allow for change as
the project develops.
5 June 2021 project management 54
4. Negotiation and Financing :
• Once the project to be implemented is agreed on, for donor
funded projects, discussions are held on funding and
associated aspects of funding such as conditions for grants,
repayment period, interest rates on loans, flow of funds,
contributions from stakeholders, and whether there is co-
financing or not.
• This culminates into an “Agreement Document” for the
project, which binds all the parties involved during
implementation of the project.
5 June 2021 project management 55
5. Implementation:
• Some of the aspects of implementation that are of particular
relevance to project planning and analysis are the following:
• The first is that, the better and more realistic a project plan is,
the more likely it is that the plan can be carried out and the
expected benefits realized.
– The second is that, project implementation must be flexible.
– But there are factors that alter the ways in which projects should be
implemented.
The common ones are:
– technical changes (soils, water logging, and nitrogen application);
– price changes;
– economic policy and environmental changes;
– political changes, etc. and these all will
5 June 2021 project management 56
6. Evaluation
• The final phase in the project cycle is evaluation. Once a project has been
carried out, it is often useful, (though not always done), to look back over
what took place, to compare actual progress with the plans,
•
• The extent to which the objectives of a project are being realized provides
the primary criterion for an evaluation.
• The analyst looks systematically at the elements of success and failure in
the project experience to learn how better to plan for the future.
• Evaluation is not limited only to completed projects. It is a most important
managerial tool in on-going projects and rather, formalized evaluation may
take place at several times in the life of a project.
5 June 2021 project management 57
-
• Different groups or units may do the evaluation of projects.
Among others,
• Project’s management unit often continuously evaluates its
experience as implementation proceeds.
• The sponsoring agency, perhaps, the operating ministry, the
planning agency, or an external assistance agency may
undertake evaluation.
5 June 2021 project management 58
2. THE UNIDO PROJECT CYCLE
• The UNIDO has established a project cycle comprising the
following three distinct phases:
1. The pre-investment phase
2. The investment phase, and
3. The operating phase.
• Each of these three phases is divided into stages, some of
which constitute important consultancy, engineering, and
industrial (manufacturing) activities.
5 June 2021 project management 59
1. The pre-investment phase:
• According to the UNIDO manual, the pre-investment phase
comprises several stages:
• opportunity studies)
• pre-feasibility and feasibility studies, and
• Project appraisal and investment decision specialized
appraisal reports
• Support or functional studies are also part of the project
preparation stage and are usually conducted separately, for
later incorporation in a pre-feasibility study or feasibility study
as appropriate.
5 June 2021 project management 60
-
A. Opportunity Studies
• The main instrument used to quantify the parameters,
information, and data required to develop a project idea into a
proposal is the opportunity study, which should analyze:
– Natural resources
– The existing agricultural base (it may be the basis for agro-industries)
– Future demand for consumer goods
– Imports substitution and export possibilities
– Environmental impacts (mandatory or non-revenue producing projects)
– Expansions of existing capacity
– Manufacturing sectors (successful in other countries)
– Diversification
5 June 2021 project management 61
B. Pre-Feasibility Studies
– The project idea must be elaborated in a more detailed
study.
a further assessment of the project idea might be made in a
pre-feasibility study. This is to see if:
– All possible project alternatives are examined,
– The project concept justifies detail study,
– All aspects are critical and need in-depth investigation, and
– The project idea is viable and attractive or not.
5 June 2021 project management 62
C. Support/Functional/Studies
– This may include:
– Market studies of products
– Raw material and factory supply studies
– Laboratory and pilot plant tests
– Location studies
– Environmental impact assessment.
– Economies of scale studies
– Equipment selection studies
5 June 2021 project management 63
D. Feasibility Studies
• A feasibility study should provide all data necessary for an
investment decision.
• The commercial, technical, financial, economic, and
environment prerequisites for an investment project should,
therefore, be defined, refined and critically examined based
on alternative solutions already reviewed in the pre-feasibility
study
5 June 2021 project management 64
(E)Appraisal Report
• When a feasibility study is completed, the various parties will
carry out their own evaluation of expected risks, costs, and
gains.
• Large investment and development finance institutions have a
formalized project appraisal procedure and usually prepare
appraisal reports.
• The appraisal report will prove whether the pre-production
expenditures spent since the initiation of the project idea were
well spent or not.
5 June 2021 project management 65
2. The Investment/implementation Phase
investment phase can be divided into the following stages:
• Establishing the legal, financial, and organizational framework
• Tendering, evaluation of bids, and negotiations
• Technology acquisition and transfer
• Detailed engineering design and contract, including tendering,
evaluation of bids and negotiations
• Acquisition of land, construction work and installation
• Pre-production marketing, including the securing of supplies and
suppliers and setting up the administration of the firm.
• Recruitment and training of personnel
• Plant commissioning and start-up
5 June 2021 project management 66
3. The Operating Phase
The problem of the operating phase needs to be considered
from both a short and a long-term view point.
• The short-term view relates to the initial after
commencement of production when a number of problems
may arise concerning such matters as the applications of
production techniques, operation of equipment, or
inadequate labor productivity owing to lack of qualified
staff and labor. Most of these problems have their origin in
the implementation phase.
• The long-term view relates to chosen strategies and the
associated production and marketing costs as well as sales
revenues
5 June 2021 project management 67
3. The DEPSAs Project Cycle
• According to the Guidelines to project planning in Ethiopia (1990)
of Development Project Studies Authority (DEPSA), the project
cycle comprises three major phases,
– Pre-investment
– Investment, and
– Operating phase.
• Each of these three phases may be divided into stages. The
Guidelines has divided the Project cycle into six stages as follows:
– Identification
– Preparation
– Appraisal/decision
– Implementation
– Operation
– Ex-post evaluation.
5 June 2021 project management 68
-
• The pre-investment phase consists of the first three stages, the
investment phase includes the fourth stage, and the operation
phase covers the last two stages.
• The project cycle means the various stages of information
gathering and decision-making, which take place between a
project’s inception and completion.
5 June 2021 project management 69
-
Thank you!!!
70
5 June 2021 project management

More Related Content

What's hot

Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Cash Flow and Fund Flow Statements - Importance and Limitations, Distinction
Cash Flow and Fund Flow Statements - Importance and Limitations, DistinctionCash Flow and Fund Flow Statements - Importance and Limitations, Distinction
Cash Flow and Fund Flow Statements - Importance and Limitations, DistinctionAnila Titus
 
Payback timevalue of money and iir
Payback timevalue of money and iirPayback timevalue of money and iir
Payback timevalue of money and iirSubhash Rohit
 
Capital Structure Theories
Capital Structure TheoriesCapital Structure Theories
Capital Structure TheoriesJithin Thomas
 
9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio methodAli Juma Albahrani
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysisSumit Malhotra
 
Budgetary control final ppt
Budgetary control  final pptBudgetary control  final ppt
Budgetary control final pptAnkita yewle
 
Capital budgeting cash flow estimation
Capital budgeting cash flow estimationCapital budgeting cash flow estimation
Capital budgeting cash flow estimationPrafulla Tekriwal
 
Project identification
Project  identificationProject  identification
Project identificationVasanth Rvk
 

What's hot (20)

Contract costing
Contract costingContract costing
Contract costing
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Cash Flow and Fund Flow Statements - Importance and Limitations, Distinction
Cash Flow and Fund Flow Statements - Importance and Limitations, DistinctionCash Flow and Fund Flow Statements - Importance and Limitations, Distinction
Cash Flow and Fund Flow Statements - Importance and Limitations, Distinction
 
Payback timevalue of money and iir
Payback timevalue of money and iirPayback timevalue of money and iir
Payback timevalue of money and iir
 
Cost management
Cost managementCost management
Cost management
 
Capital Investment Analysis
Capital Investment AnalysisCapital Investment Analysis
Capital Investment Analysis
 
Capital Structure Theories
Capital Structure TheoriesCapital Structure Theories
Capital Structure Theories
 
Cost Management
Cost ManagementCost Management
Cost Management
 
Standard costing PPT
Standard costing PPTStandard costing PPT
Standard costing PPT
 
Budgetary control
Budgetary controlBudgetary control
Budgetary control
 
9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio method
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
 
Irr
IrrIrr
Irr
 
Budgetary control final ppt
Budgetary control  final pptBudgetary control  final ppt
Budgetary control final ppt
 
Capital budgeting cash flow estimation
Capital budgeting cash flow estimationCapital budgeting cash flow estimation
Capital budgeting cash flow estimation
 
Internal Rate of Return
Internal Rate of ReturnInternal Rate of Return
Internal Rate of Return
 
Project identification
Project  identificationProject  identification
Project identification
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Shadow pricing
Shadow pricingShadow pricing
Shadow pricing
 

Similar to chapter 1 edited.pdf

Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revisedFiker Love
 
Project 27663255255255781771777166162666
Project 27663255255255781771777166162666Project 27663255255255781771777166162666
Project 27663255255255781771777166162666MilkiasMuse
 
Project evaluation and implementation notes and questions
Project evaluation and implementation   notes and questionsProject evaluation and implementation   notes and questions
Project evaluation and implementation notes and questionsAnirban Chakraborty
 
Project management material from chapter one up to chapter four
Project management material from chapter one up to chapter fourProject management material from chapter one up to chapter four
Project management material from chapter one up to chapter fourGetachewAbera3
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdfTanzeelShahid5
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)Regmi Milan
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTAbraham Ncunge
 
CONTENT 2.doc
CONTENT 2.docCONTENT 2.doc
CONTENT 2.docselam49
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01Amy Roman
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementexemplar2401
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementchaithanya1025
 
project_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdfproject_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdfBigyaptiBashyal1
 
Project Implementation
Project ImplementationProject Implementation
Project ImplementationShidin Divakar
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introductionAditi Garg
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementDerbewBirhanu2
 
Presentation of project management synopsis 1
Presentation of project management synopsis 1Presentation of project management synopsis 1
Presentation of project management synopsis 1ferozpatowary
 
Ppt project mgt. syllabus
Ppt project mgt.  syllabusPpt project mgt.  syllabus
Ppt project mgt. syllabusDrneetu2
 

Similar to chapter 1 edited.pdf (20)

Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revised
 
Project 27663255255255781771777166162666
Project 27663255255255781771777166162666Project 27663255255255781771777166162666
Project 27663255255255781771777166162666
 
Project evaluation and implementation notes and questions
Project evaluation and implementation   notes and questionsProject evaluation and implementation   notes and questions
Project evaluation and implementation notes and questions
 
Project management material from chapter one up to chapter four
Project management material from chapter one up to chapter fourProject management material from chapter one up to chapter four
Project management material from chapter one up to chapter four
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdf
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
CONTENT 2.doc
CONTENT 2.docCONTENT 2.doc
CONTENT 2.doc
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
project_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdfproject_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdf
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project management
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
Presentation of project management synopsis 1
Presentation of project management synopsis 1Presentation of project management synopsis 1
Presentation of project management synopsis 1
 
Ppt project mgt. syllabus
Ppt project mgt.  syllabusPpt project mgt.  syllabus
Ppt project mgt. syllabus
 

More from kena6

CHAPTER 4.pdf
CHAPTER 4.pdfCHAPTER 4.pdf
CHAPTER 4.pdfkena6
 
Addis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdfAddis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdfkena6
 
Ahmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfAhmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfkena6
 
Ahmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfAhmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfkena6
 
Addis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdfAddis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdfkena6
 
achwashp1.pdf
achwashp1.pdfachwashp1.pdf
achwashp1.pdfkena6
 
Abiy Girma Abebe Final Dissertation Amended.pdf
Abiy Girma Abebe Final Dissertation Amended.pdfAbiy Girma Abebe Final Dissertation Amended.pdf
Abiy Girma Abebe Final Dissertation Amended.pdfkena6
 
A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...
A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...
A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...kena6
 
Ahmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfAhmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfkena6
 
Acceptedpaper_Delay.pdf
Acceptedpaper_Delay.pdfAcceptedpaper_Delay.pdf
Acceptedpaper_Delay.pdfkena6
 

More from kena6 (10)

CHAPTER 4.pdf
CHAPTER 4.pdfCHAPTER 4.pdf
CHAPTER 4.pdf
 
Addis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdfAddis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdf
 
Ahmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfAhmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdf
 
Ahmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfAhmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdf
 
Addis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdfAddis_Ababa_Resilient_cities_program.pdf
Addis_Ababa_Resilient_cities_program.pdf
 
achwashp1.pdf
achwashp1.pdfachwashp1.pdf
achwashp1.pdf
 
Abiy Girma Abebe Final Dissertation Amended.pdf
Abiy Girma Abebe Final Dissertation Amended.pdfAbiy Girma Abebe Final Dissertation Amended.pdf
Abiy Girma Abebe Final Dissertation Amended.pdf
 
A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...
A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...
A-guide-for-Municipalities-Inclusive-and-Sustainable-Urban-Development-Planni...
 
Ahmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdfAhmed Motuma Assen proposal.pdf
Ahmed Motuma Assen proposal.pdf
 
Acceptedpaper_Delay.pdf
Acceptedpaper_Delay.pdfAcceptedpaper_Delay.pdf
Acceptedpaper_Delay.pdf
 

Recently uploaded

High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

chapter 1 edited.pdf

  • 1. RIFT VALLEY UNIVERSITY MBA 5 June 2021 project management 1 By Chala Dechassa (PhD, Assistant Professor) Chapter One Project management overview
  • 2. Essence of Project Analysis and Evaluation  All countries have national plans, which spell a range of economic and social objectives and strategies meant to enhance Growth and Development. • In this regard, projects provide an important means by which investment and other development expenditures foreseen in the plans can be clarified, justified, and realized.  Development plans and projects are closely interlinked since sound development plans require good projects as just good projects require sound planning. 2 5 June 2021 project management
  • 3. Project Defined • A project is defined as a complex set of activities where resources are used in expectation of returns and which lends itself to planning, financing, and implementing as a unit ( Gittinger, 1982), . • A project usually has a specific starting point and a specific ending point intending to achieve specific objectives. • It usually has a well-defined sequence of investment and production activities and a specific group of beneficiaries that can be identified, quantified, and valued, either socially or monetarily. 3 5 June 2021 project management
  • 4. Cont’d • project as “….a temporary endeavor undertaken to create a unique product of service. • Temporary means that every project has a defined end. • Unique means that the product or service is different in some distinguishing way from all similar products or services.”(A project can be defined as a non-repetitive activity (HarveyMaylor ). • It constitutes the whole complex of activities in the undertaking that uses resources to gain benefits that exceed the costs of the resources. • It involve the commitment of scarce resources to a specific line of action, which prevents the use of those resources elsewhere. 5 June 2021 project management 4
  • 5. Project ……. Defined A project is an activity that require resource, time, objective, with fixed deliverables. A project is accomplished by performing a set of activities. – For example, construction of a house is a project. It consists of many activities like digging of foundation pits, construction of foundations, construction of walls, construction of roof, fixing of doors and windows, fixing of sanitary fittings, wiring, etc. 5 5 June 2021 project management
  • 6. Cont’d • Projects are usually the subject of special arrangements and procedures for their planning, appraisal, and so on. • Involve special financial arrangements, including loans from overseas, development banks, and other agencies. • The pattern of resources commitment in projects is usually for capital investments to be made to establish productive capacity or physical works, which then have a long life of operation or use. • Therefore, a project can be considered to be any series of activities and characterstics 6 5 June 2021 project management
  • 7. project management Project Characteristics Major project characteristics are as below: 1. Specific Objectives (It is goal oriented) – A project has a set of objectives or a mission. For example, the objective of a project may be construction of a highway connecting two cities “A” and “B”, covering a distance of 200 km. Once the construction of the highway is completed the project comes to an end. – The objective is specified in terms of cost, schedule, and performance requirements. 5 June 2021 7
  • 8. project management .. …Cont’d 2. Life Cycle  A project has a life cycle. The life cycle consists of the following stages: a) Project Initiation b) Project Planning c) Project Execution, and d) Project Closure  The task, people, organizations, and other resources change as the project moves from one phase to the next. 5 June 2021 8
  • 9. project management a) Project Initiation  It is the first phase in the project  In this phase a business problem (or opportunity) is identified and a business case which provides various solution options is defined.  A feasibility study is then conducted to investigate the likelihood of each solution option addressing the business problem and a final recommendation is put forwarded 5 June 2021 9
  • 10. Project Initiation… Cont’d  Once the recommended solution is approved, a project is initiated to deliver the approved solution  A “Term of Reference” is completed, which outlines the vision, objectives, scope, deliverables and structure of the new project, and a Project Manager is appointed.  Then the Project Manager begins recruiting a project team and establishes a Project Office environment.  Approval is then sought to move into the detail planning phase. project management 5 June 2021 10
  • 11. project management b) Project Planning • Once the scope of the project has been defined in the “Terms of Reference”, the project enters the detailed planning phase. This involves the creation of a:  Project Plan (Outlining the activities, tasks, dependencies and timeframes)  Resource Plan (listing the labour, equipment and materials required)  Financial Plan (identifying the labour, equipment and materials costs) 5 June 2021 11
  • 12. Project Planning, Cont’d  Quality Plan (providing quality targets, assurance and control measures)  Risk Plan (highlighting potential risks and actions taken to mitigate them).  Procurement Plan (identifying products to be acquired from external suppliers).  Communications Plan (listing the information needed to inform stakeholders) project management 5 June 2021 12
  • 13. project management c) Project Execution • This phase involves the implementation of each activity and tasks listed in the Project Plan. • While executing the activities and tasks, a series of management processes are undertaken to monitor and control the deliverables being produced by the project. • Once all the deliverables have been produced and the customer has accepted the final solution, the project is ready for closure. 5 June 2021 13
  • 14. project management d) Project Closure ( conclusion) • Project closure involves:-  releasing the final deliverables to the customers,  Handing over project documentation,  Terminating supplier contracts,  Releasing project resources and communicating the closure of the project to all stakeholders.  The last remaining step is to undertake a Post Implementation Review to quantify the overall success of the project and list any lessons learnt for future project. 5 June 2021 14
  • 15. project management …Cont’d 3. Definite Time Limit (Temporary) • Have defined start and end dates – A project has a definite time limit. It cannot continue forever. – Have funding limits (if applicable) 4. Uniqueness – Every project is unique and no two projects are similar. Constructing a highway connecting two cities A & B and constructing another highway between cities C & D are unique in themselves. In view of the differences existing in the organization, infrastructure, location, technical specifications and the people behind the projects. 5 June 2021 15
  • 16. project management …Cont’d 5. Teamwork Any project calls for the services of experts from a host of disciplines. Coordination among the diverse areas call for teamwork. Hence, a project can be implemented only with teamwork. Perhaps more than any other human endeavor, project work is teamwork. 5 June 2021 16
  • 17. project management …Cont’d 6. Complexity A project is complex set of activities relating to diverse areas.  Technology survey,  choosing the appropriate technology,  procuring the appropriate machinery and equipment,  hiring the right kind of people,  arranging for financial resources,  execution of the project in time by proper scheduling of the different activities, etc. contribute to the complexity of the project. 5 June 2021 17
  • 18. project management …Cont’d 8. Risk and Uncertainty- a risk free project cannot be thought of. 9. Sub-contracting- to give a contract to somebody else to do part of the work. 10. The output of the project is measurable – Something has changed through the project being carried out 5 June 2021 18
  • 19. project management …Cont’d  Four key considerations always are involved in a project: (1) What will it cost? (2) What time is required to complete the project? (3) What technical performance capability will it provide? (4) How will the project results fit into the design and implementation of organizational strategies? 5 June 2021 19
  • 20. …Cont’d Typical Project Examples (a) Construction projects (b) Development projects (c) Weddings, remodeling a home, and moving to another house are certainly projects for the families involved (d) Company audits, major litigations, corporate relocations, and mergers are also projects. project management 5 June 2021 20
  • 21. …Cont’d Project Goals  Virtually every project has three overriding goals: to accomplish work for a client or end-user in accordance with budget, schedule, and performance requirements. (i) Budget: the budget is the specified or allowable cost for the project. • It is the target cost of the work to be done. project management 5 June 2021 21
  • 22. …Cont’d  The above goals can be met in two ways:  By using project management disciplines and project management tools, and  By following project management processes. project management 5 June 2021 22
  • 23. …Cont’d • (ii) Schedule: the schedule includes the time period over which the work will be done and the target date for when it will be completed. (iii) Performance Requirements: Specify what is to be done to reach the end- item or final result. • Note: The three goals are interrelated and must be addressed simultaneously; exclusive emphasis on any one goal is likely to detract from the others. project management 5 June 2021 23
  • 24. project management Project Management  Project management is an organized venture for managing projects.  It involves scientific application of modern tools and techniques in planning, financing, implementing, monitoring, controlling and coordinating unique activities or tasks or produce desirable outputs in accordance with the pre-determined objectives within the constraints of time and cost. 5 June 2021 24
  • 25. Project Mgt. … Cont’d • “Project management is the skills, tools and management processes required to undertake a project successfully”.  Project management comprises: A set of Skills. Specialist skills and experience are required to reduce the level of risk within a project and thereby enhance its likelihood of success. A Suit of Tools. Various types of tools are used by project managers to improve their chances of success. Examples include registers, planning software, modelling software, audit checklist and review forms. project management 5 June 2021 25
  • 26. project management ... Cont’d A Series of Processes. Various management techniques and processes are required to monitor and control time, cost, quality and scope of projects. Examples include time management, quality management, change management, risk management, etc. 5 June 2021 26
  • 27. project management …Cont’d Every person, every organization and every nation is concerned with project management. – An individual builds a house. It is a project to him. – An organization sets up new factory. It is a project for the organization. – The government of a country builds high ways, dams, thermal power plants, hydropower plants, airports, etc. These are all projects that a country undertakes. 5 June 2021 27
  • 28. Cont’d • Successful project management can then be defined as having achieved the project objectives: – Within time – Within cost – At the desired performance/technology level – While utilizing the assigned resources effectively and efficiently – Accepted by the customer 5 June 2021 project management 28
  • 29. CLASSIFICATION OF PROJECTS: Based on – ownership, – source of finance, and – forces behind the projects. 1. Based on ownership: – Private sector- mostly projects undertaken by business enterprises. – Public sector- projects undertaken by national and local government bodies. – NGOs- development projects are most often undertaken by non- government and non-for profit organizations. 29 5 June 2021 project management
  • 30. Cont’d 2. Based on the Sources of Finance: • Government treasury- projects may be entirely financed by government budget as per its priority. For instance, construction of regional airport. • Government treasury and external sources- most projects are financed by the joint partnership of the government and donor groups. For example, a road project may be financed 50% by the government and 50% by a foreign donor. • External sources of Finance- projects may be financed totally by parties other than the government but established for the well being of the citizens and the ownership may be for the government or the public. 30 5 June 2021 project management
  • 31. Cont’d 3. Based on the forces Behind: • Demand driven/need driven- based on identified unsatisfied demand project can be created or on unsatisfied basic needs like food, water and shelter. • Donor driven- the force behind the financing organization. Donors will have their own say and influence the types of projects to be established. • Political Driven- Projects may be established in response to some political situation such as for example because of national elections, projects by religious organizations. 31 5 June 2021 project management
  • 32. Cont’d 4. Based on their nature: • Civil engineering, construction, petrochemical, mining, quarrying, projects far away from the contractor’s home office, and involve special risk as well as problems of organizational communication. • Manufacturing projects- conducted in a factory or other home based environment and enable exercising on the spot management. • Research projects- established for pure research consuming large sum of money and lasting over years resulting in dramatic profitable discovery or proving waste of money. • Management projects- projects that require the employment of an external project manager or managing contractor for issues such as relocating head quarters, developing and introducing a new computer system, preparing for a trade exhibition, producing a feasibility or other study report, restructuring the organization etc. 32 5 June 2021 project management
  • 33. PROJECT PARAMETERS • During a project’s life, management focuses on three basic parameters: – quality, – cost, and – time. – deadline; – the budget. In addition, client satisfaction indicates success and possibility for replication or sustainability. – Each of the parameters is specified in detail during the planning phase of the project. – These specifications then form the basis for controlling the project during the implementation phase 33 5 June 2021 project management
  • 34. Project Parameters Quality cost, and time Performance Budget Schedule 34 5 June 2021 project management
  • 35. HIERARCHICAL RELATIONSHIPS • Plans and Projects • Planning can be defined as a “continuous process that involves decisions or choices about alternative ways of using available resources with the aim of achieving a particular goal or set of goals at some time in the future.” • The rationale for planning is that it serves as a tool that enhances the effectiveness in mobilizing resources and enables allocation of resources into priority areas of development. 35 5 June 2021 project management
  • 36. The hierarchy’s are Development plans Programs Projects Tasks Work packages 36 5 June 2021 project management
  • 37. Continued • Development plans: – Most forward looking (futuristic) – Broad and require systematic thinking, preparation and appraisal – Attempts to bring welfare in the society • Programs: – Derived from development plans – Exceptionally large with long term objectives – Explores specific area with broader scope 37 5 June 2021 project management
  • 38. Cont’d • Projects: – Derived from a program – Unique investigative tool – A development activity with specific objectives – Funded by a program – An implementation element (entity) • Tasks: – Work elements under a project – Specific approaches for doing things – Set of activities comprising a project • Work packages: – Sub elements of a given task (or undertaking) – Something accomplished stage by stage – Collection of work packages defines a given task 38 5 June 2021 project management
  • 39. Projects and programs • Difference PROJECTS PROGRAMS specific objectives General objectives Specific project areas No specific project areas Specific beneficiaries group No Specific beneficiaries group Clearly determined and allocated funds No clear and detailed financial resource allocation Specific lifetime No specific lifetime 39 5 June 2021 project management
  • 40. SIMILARITIES: • Projects and programs have similar characteristics in a way that both are: • Having objectives; • Requiring financial, human, material, etc inputs (or resources); • Generating outputs, (goods/services), of value; • Serving as instruments for the execution of development plans in order to boost the national economy. 40 5 June 2021 project management
  • 41. Strategic Project Management: as a competitive advantage • Why Project Managers Need to Understand Strategy: • Changes in the organization’s mission and strategy – Project managers must respond to changes with appropriate decisions about future projects and adjustments to current projects. – Project managers who understand their organization’s strategy can become effective advocates of projects aligned with the firm’s mission. 5 June 2021 project management 41
  • 42. Projects and Strategy • Mistakes caused by not understanding the role of projects in accomplishing strategy: – Focusing on problems or solutions with low strategic priority. – Focusing on the immediate customer rather than the whole market place and value chain. – Overemphasizing technology that results in projects that pursue exotic technology that does not fit the strategy or customer need – Trying to solve customer issues with a product or service rather than focusing on the 20% with 80% of the value (Pareto’s Law). 2–42
  • 43. 3. The Strategic Management Process: An Overview • Strategic Management – Requires every project to be clearly linked to strategy. – Provides theme and focus of firm’s future direction. • Responding to changes in the external environment— environmental scanning • Allocating scarce resources of the firm to improve its competitive position—internal responses to new programs – Requires strong links among mission, goals, objectives, strategy, and implementation. 2–43
  • 44. Strategic project management Framework • Review and define the organizational mission. • Set long-range goals and objectives. • Analyze and formulate strategies to reach objectives. • Implement strategies through projects 2–44
  • 46. 5 June 2021 project management 46 • Project life cycle
  • 47. What is a project cycle and why?” – To answer these basic questions, we need to see and understand the general features of project planning and the identifiable tasks therein. – In this regards, there tends to be a natural sequence in the way projects arte planned and carried out. – Before any project is actually realized, it goes through various planning phases. – Therefore, the different phases through which a project passes constitute what is often called “the project cycle”. – The main features of this process are information gathering, analysis and decision-making. 5 June 2021 project management 47
  • 48. - • The project cycle considers various stages in which each stage not only is grown out of the proceeding one/those that are under way/but also leads into the subsequent ones. • Therefore, a project cycle is a self-renewing cycle in that new projects may grow out of the old ones in a continuous process and self-sustaining cycle of activity. 5 June 2021 project management 48
  • 49. THREE BASIC MODELS OF PROJECT CYCLES 1. “The Baum Cycle (also called the World Bank Project Cycle)” 2. “The UNIDO Project Cycle”. 3. In addition to these two, a third model developed by Development projects Studies Authority in Ethiopia (called “The DEPSAs Model”), 5 June 2021 project management 49
  • 50. 1. THE BAUM CYCLE (WORLD BANK PROJECT CYCLE) • developed by Warren. C. Baum in 1970 was by then adopted by the World Bank as a project cycle. • Initially, this model had recognized only four main stages in the project cycle, namely: 1. Identification 2. Preparation 3. Appraisal and Selection 4. Implementation • Later in 1978, the author has added additional two stages called “Negotiation” and “Evaluation”. • This model, therefore, includes a total of six identifiable stages in the project cycle. 5 June 2021 project management 50
  • 51. . Baum’s main stages 1.Identification : • Based on • Some may be “resource based” and stem from the opportunity to make profitable use of available resources. • Some projects may be “market based” arising from an identified demand in home or overseas markets. • Others may be “need-based” where the purpose is to try to make available to all people in an area of minimal amounts of certain basic material requirements and services. • Well-informed “technical specialists” and “local leaders” are also common sources of projects. • Ideas for new projects also come from “proposals to extend and/or expand existing programs and projects” as well as from identifying technological alternatives. 5 June 2021 project management 51
  • 52. 2. Preparation: – Once projects have been identified, there begins a process of progressively more detailed preparation and analysis of project plans. At this stage, the project is being seriously considered as a definite investment action. – Project preparation,(also called project formulation), involves pre-feasibility and feasibility studies and covers the establishment of commercial, technical, institutional, financial, and socio-economic feasibility. – Resource based investigations are undertaken and alternative forms of projects are explored. 5 June 2021 project management 52
  • 53. 3. Appraisal and Selection: • project preparation phase: • Technical: here the appraisers concentrate in verifying whether what is proposed will work in the way suggested or not. • Financial : the appraisers try to see if the requirements of money needed by the project have been calculated properly, their sources are all identified, and reasonable plans for their repayment are made where necessary. • Commercial: the way the necessary inputs for the project are conceived to be supplied is examined and the arrangements for the disposal of the products are verified. 5 June 2021 project management 53
  • 54. - • Incentive: the appraisers see to it whether things are arranged in such a way that all those whose participation is required will find it in their interest to take part in the project, at least to the extent envisaged in the plan. • Economic: the appraisers here try to see whether what is proposed is good from the viewpoint of the national economic development interest, all project effects (positive as well as negative) are taken into account, and check if all are correctly valued. • Managerial: this aspect of the appraisal examines if the capacity exists for operating the project and see if those responsible ones can operate it satisfactorily. Moreover, it tries to see if the responsible are given sufficient power and scope to do what is required. • Organizational: the appraisers examine the project it is organized internally and externally into units, contract, policy, institution, etc so as to allow the proposals to be carried out properly and to allow for change as the project develops. 5 June 2021 project management 54
  • 55. 4. Negotiation and Financing : • Once the project to be implemented is agreed on, for donor funded projects, discussions are held on funding and associated aspects of funding such as conditions for grants, repayment period, interest rates on loans, flow of funds, contributions from stakeholders, and whether there is co- financing or not. • This culminates into an “Agreement Document” for the project, which binds all the parties involved during implementation of the project. 5 June 2021 project management 55
  • 56. 5. Implementation: • Some of the aspects of implementation that are of particular relevance to project planning and analysis are the following: • The first is that, the better and more realistic a project plan is, the more likely it is that the plan can be carried out and the expected benefits realized. – The second is that, project implementation must be flexible. – But there are factors that alter the ways in which projects should be implemented. The common ones are: – technical changes (soils, water logging, and nitrogen application); – price changes; – economic policy and environmental changes; – political changes, etc. and these all will 5 June 2021 project management 56
  • 57. 6. Evaluation • The final phase in the project cycle is evaluation. Once a project has been carried out, it is often useful, (though not always done), to look back over what took place, to compare actual progress with the plans, • • The extent to which the objectives of a project are being realized provides the primary criterion for an evaluation. • The analyst looks systematically at the elements of success and failure in the project experience to learn how better to plan for the future. • Evaluation is not limited only to completed projects. It is a most important managerial tool in on-going projects and rather, formalized evaluation may take place at several times in the life of a project. 5 June 2021 project management 57
  • 58. - • Different groups or units may do the evaluation of projects. Among others, • Project’s management unit often continuously evaluates its experience as implementation proceeds. • The sponsoring agency, perhaps, the operating ministry, the planning agency, or an external assistance agency may undertake evaluation. 5 June 2021 project management 58
  • 59. 2. THE UNIDO PROJECT CYCLE • The UNIDO has established a project cycle comprising the following three distinct phases: 1. The pre-investment phase 2. The investment phase, and 3. The operating phase. • Each of these three phases is divided into stages, some of which constitute important consultancy, engineering, and industrial (manufacturing) activities. 5 June 2021 project management 59
  • 60. 1. The pre-investment phase: • According to the UNIDO manual, the pre-investment phase comprises several stages: • opportunity studies) • pre-feasibility and feasibility studies, and • Project appraisal and investment decision specialized appraisal reports • Support or functional studies are also part of the project preparation stage and are usually conducted separately, for later incorporation in a pre-feasibility study or feasibility study as appropriate. 5 June 2021 project management 60
  • 61. - A. Opportunity Studies • The main instrument used to quantify the parameters, information, and data required to develop a project idea into a proposal is the opportunity study, which should analyze: – Natural resources – The existing agricultural base (it may be the basis for agro-industries) – Future demand for consumer goods – Imports substitution and export possibilities – Environmental impacts (mandatory or non-revenue producing projects) – Expansions of existing capacity – Manufacturing sectors (successful in other countries) – Diversification 5 June 2021 project management 61
  • 62. B. Pre-Feasibility Studies – The project idea must be elaborated in a more detailed study. a further assessment of the project idea might be made in a pre-feasibility study. This is to see if: – All possible project alternatives are examined, – The project concept justifies detail study, – All aspects are critical and need in-depth investigation, and – The project idea is viable and attractive or not. 5 June 2021 project management 62
  • 63. C. Support/Functional/Studies – This may include: – Market studies of products – Raw material and factory supply studies – Laboratory and pilot plant tests – Location studies – Environmental impact assessment. – Economies of scale studies – Equipment selection studies 5 June 2021 project management 63
  • 64. D. Feasibility Studies • A feasibility study should provide all data necessary for an investment decision. • The commercial, technical, financial, economic, and environment prerequisites for an investment project should, therefore, be defined, refined and critically examined based on alternative solutions already reviewed in the pre-feasibility study 5 June 2021 project management 64
  • 65. (E)Appraisal Report • When a feasibility study is completed, the various parties will carry out their own evaluation of expected risks, costs, and gains. • Large investment and development finance institutions have a formalized project appraisal procedure and usually prepare appraisal reports. • The appraisal report will prove whether the pre-production expenditures spent since the initiation of the project idea were well spent or not. 5 June 2021 project management 65
  • 66. 2. The Investment/implementation Phase investment phase can be divided into the following stages: • Establishing the legal, financial, and organizational framework • Tendering, evaluation of bids, and negotiations • Technology acquisition and transfer • Detailed engineering design and contract, including tendering, evaluation of bids and negotiations • Acquisition of land, construction work and installation • Pre-production marketing, including the securing of supplies and suppliers and setting up the administration of the firm. • Recruitment and training of personnel • Plant commissioning and start-up 5 June 2021 project management 66
  • 67. 3. The Operating Phase The problem of the operating phase needs to be considered from both a short and a long-term view point. • The short-term view relates to the initial after commencement of production when a number of problems may arise concerning such matters as the applications of production techniques, operation of equipment, or inadequate labor productivity owing to lack of qualified staff and labor. Most of these problems have their origin in the implementation phase. • The long-term view relates to chosen strategies and the associated production and marketing costs as well as sales revenues 5 June 2021 project management 67
  • 68. 3. The DEPSAs Project Cycle • According to the Guidelines to project planning in Ethiopia (1990) of Development Project Studies Authority (DEPSA), the project cycle comprises three major phases, – Pre-investment – Investment, and – Operating phase. • Each of these three phases may be divided into stages. The Guidelines has divided the Project cycle into six stages as follows: – Identification – Preparation – Appraisal/decision – Implementation – Operation – Ex-post evaluation. 5 June 2021 project management 68
  • 69. - • The pre-investment phase consists of the first three stages, the investment phase includes the fourth stage, and the operation phase covers the last two stages. • The project cycle means the various stages of information gathering and decision-making, which take place between a project’s inception and completion. 5 June 2021 project management 69
  • 70. - Thank you!!! 70 5 June 2021 project management