SlideShare a Scribd company logo
1 of 40
www.principalityconsulting.com
www.principalityconsulting.com
An Introduction to the Lean
Business Model
www.principalityconsulting.com
Overview
• Lean Model
• What is Lean?
• Lean Business Journey, Timing & Themes
– Standardisation & Reducing Variation
– Identifying & Eliminating Waste
– Inventory Management
– Stuck in First Gear
Health and Safety
Environment
Ethics and Compliance
Employee engagement- Reward&
Recognition
Employee engagement- Talent
Development
Employee engagement-
Communication
Disaster Planning
Business Planning
Key Account Management
New Product Introduction
Customer Service
Sales and Operations Planning
Lean Tools
Lean Tools Training
Lean Improvement
Product Quality
Research and Development
Technology Transfer
IT Infrastructure
Branding
Act Plan
DoCheck
The Lean Business and
Operational Excellence
Order
Fulfilment
Lean
Business
What is lean?
A quick reminder…
Lean and Flow aren’t new
Any colour as
long as it’s
black!
Manufacturing at Highland Park in
1913
When did it all become so
complex?
We want
variety!
Variety means...
•Colour changes
•Body and shape changes
Which, in turn, means...
• Increased skill requirement
• More parts and part numbers
Which, in turn, means…
•Process islands
•More complex scheduling
Which, in turn, means…
Spaghetti World!
Assembly Components Piece Parts Process Material Information
What is Lean Thinking?
Inputs Your Process Outputs
1st Step - ID your Value Streams and
create flow with what resources you have
Inputs Your Process Outputs
MRP, Shared Resource, unbalanced
shifts and long C/O times
Value Stream 1
Value Stream 3
Value Stream 2
Value Stream 4
2nd Step eliminate the “knots and remaining tangles”
by dedicating resources to value streams - commit
yourself to single piece flow!
Input s Your Process Outputs
Value Stream 1
Value Stream 2
Value Stream 3
Value Stream 4
Lean Business Model
•Focussed on maximising profitability and
generating cash
•Links seamlessly with OE deployment and
Sales and operations planning
•Supports a plant-specific roadmap
•Drives local involvement and competition
•Combines all current best practice
Lean Business Journey
Time
Performance
Standardisation of
new system and
methods
Understand the
waste in the
current system
Reduce
variation
Previous
performance
Month on month
performance
improvement
Lean Business Journey – 5 Phases
Time
Consistency Continuous
Improvement
Habitual
Behaviour
Performance
Gaining
Control
Getting
Ready
Lean Business Journey
Lean Business Journey - Timing
Time
Consistency Continuous
Improvement
Habitual
Behaviour
Performance
Gaining
Control
Getting
Ready
12 – 18 Months 18– 24 Months 24 – 36 Months3 – 12 Months0 – 3 Months
Lean Business - Themes
1
Getting Ready
Gaining
Control
Consistency
Continuous
Improvement
Habitual
Behaviour
1
Getting Ready
Gaining
Control
Consistency
Continuous
Improvement
Habitual
Behaviour
Standardisation and
Reducing Variation
Guaranteeing Output is a Manufacturing
Plant’s Number 1 Priority
QUALITYQUALITYPPEOPLEEOPLE
PPARTSARTS
PPLANTLANT
COSTCOSTPPROCESSROCESS
HOWINPUT OUTPUT
DELIVERYDELIVERY
QUALITYQUALITYPPEOPLEEOPLE
PPARTSARTS
PPLANTLANT
COSTCOSTPPROCESSROCESS
HOWINPUT OUTPUT
DELIVERYDELIVERY
Leaders add value by successfully controlling the
inputs – the 4 P’s
If the inputs are right the output is guaranteed
Why is there so much firefighting in a
typical day?
QUALITYQUALITYPPEOPLEEOPLE
PPARTSARTS
PPLANTLANT
COSTCOSTPPROCESSROCESS
HOWINPUT OUTPUT
DELIVERYDELIVERY
QUALITYQUALITYPPEOPLEEOPLE
PPARTSARTS
PPLANTLANT
COSTCOSTPPROCESSROCESS
HOWINPUT OUTPUT
DELIVERYDELIVERY
If the inputs aren’t standardised then there could be:
10 People variables x 10 Parts variables x 10 Plant
variables x 10 Process variables
10 x 10 x 10 x 10
How can you manage 10,000 possible outcomes?
?
Standards:
Effect on Variation and Quality
10x10x10x10
= 10,000
Possible
Outcomes
5x5x5x5
= 625
Possible
Outcomes
Current:
• Variation
• Errors
•Little control
• Reactive
Future
• Control
• Improved quality
• Predictability
• Prevention
From control into continuous
improvement
• The systems, people, equipment, product and all need to go from
control to habitual improvement
• Areas from clutter to clean
• Engineering from breakdown panic to predictive calm
• Process from fickle to dependable
• Product from changeable to consistent
• Shift management from reactive to proactive
• Continuous improvement from special effort to daily habit
10,000
Outcomes
5,000
Outcomes
1,000
Outcomes
250
Outcomes
Control Consistency Continuous
Improvement
Chaos
10,000
Outcomes
5,000
Outcomes
1,000
Outcomes
250
Outcomes
Control Consistency Continuous
Improvement
ChaosGaining
Control
Consistency
Continuous
Improvement
Habitual
Behaviour
The Golden Triangle
Creating Standards for
Operational Excellence
Standard Work
Standard description of a task or
process, which if followed
consistently, ensures the same output
Standard Management
Standard process to ensure
standards are being met
Visual Management
Make problems visible and
bring them to the attention
of the user.
Status within 10 seconds.
The Golden Triangle
Basis for daily error avoidance and
control
Standard Work
Visual ManagementStandard
Management
5SReject
Control
Daily
Maintenance
Identifying and
Eliminating Waste
In Manufacturing there are 7
Traditional Types of NVA or Waste
•Waste of T ransport
•Waste of I nventory
•Waste of M ovement
•Waste of W aiting
•Waste of O verprocessing
•Waste of O verproduction
•Waste of D efects and Rework
4 weeks
HOURS 1000 2000
AVERAGE
INVENTORY
INVENTORY
High Inventory Manufacturing
HOURS 1000
1.5 weeks
INVENTORY
Low Inventory Manufacturing
Has a positive impact on;
• Quality and scrap
• Engineering change introduction
• Margin
• Overtime & resources at month-end
• Capital investment
• Due date performance
• Improved forecast reliability
• Leadtime-
• Leadtime is proportional to inventory
1
Getting Ready
Gaining
Control
Consistency
Continuous
Improvement
Habitual
Behaviour
1
Getting Ready
Gaining
Control
Consistency
Continuous
Improvement
Habitual
Behaviour
1
Getting Ready
Gaining
Control
Consistency
Continuous
Improvement
Habitual
Behaviour
Lean Business Journey - Timing
Time
Consistency Continuous
Improvement
Habitual
Behaviour
Performance
Gaining
Control
Getting
Ready
12 – 18 Months 18– 24 Months 24 – 36 Months3 – 12 Months0 – 3 Months
Stuck in first gear and can’t get
traction!
“Lean production has dramatically lifted the
competitiveness of many manufacturing companies and the
value they deliver to customers.
Despite these triumphs, many firms I visit are stuck in first
gear on their initial lean efforts. They are trying to create
flow but can’t somehow get traction.
An overlooked and recurring pitfall that I’m seeing more
often is a lack of “basic stability” in operations.”
Art Smalley Lean Enterprise Institute
A poor business will get stuck in
first gear…
Time
Consistency Continuous
Improvement
Habitual
Behaviour
Performance
Gaining
Control
Getting
Ready
Stuck in first gear
Lean Business
Journey
Time
Performance
www.principalityconsulting.com
Journey Summary
• Get Ready - To understand the current state and implement actions to get
started
• Gain Control – To reduce surprises and firefighting in order to focus on future
improvement strategy
• Consistency - To deliver some quick wins, align by value streams, develop
the improvement infrastructure and up-skill middle management
• Continuous Improvement - To engage the majority in focused improvement,
achieve a revolutionary change, extend the scope to the supply chain and
develop a growth strategy
• Habitual Behaviour - To feedback all the positive improvement experience
into the re-design of equipment, systems and suppliers
www.principalityconsulting.com

More Related Content

What's hot

Assistant production manager perfomance appraisal 2
Assistant production manager perfomance appraisal 2Assistant production manager perfomance appraisal 2
Assistant production manager perfomance appraisal 2
tonychoper3104
 

What's hot (6)

Pr executive performance appraisal
Pr executive performance appraisalPr executive performance appraisal
Pr executive performance appraisal
 
Customer Centricity Score
Customer Centricity ScoreCustomer Centricity Score
Customer Centricity Score
 
Assistant production manager perfomance appraisal 2
Assistant production manager perfomance appraisal 2Assistant production manager perfomance appraisal 2
Assistant production manager perfomance appraisal 2
 
Associate architect performance appraisal
Associate architect performance appraisalAssociate architect performance appraisal
Associate architect performance appraisal
 
Senior network engineer performance appraisal
Senior network engineer performance appraisalSenior network engineer performance appraisal
Senior network engineer performance appraisal
 
Operational Excellence Metrics PowerPoint Presentation Slides
Operational Excellence Metrics PowerPoint Presentation SlidesOperational Excellence Metrics PowerPoint Presentation Slides
Operational Excellence Metrics PowerPoint Presentation Slides
 

Similar to An Introduction to the Lean Business Model

Lean presentation tier1 v2 053113
Lean presentation tier1 v2 053113Lean presentation tier1 v2 053113
Lean presentation tier1 v2 053113
OMCMEXICO
 
AustraLEAN presentation Edition
AustraLEAN presentation EditionAustraLEAN presentation Edition
AustraLEAN presentation Edition
Andrew Manic
 
The impact of a company's culture on Lean intiatives - SME
The impact of a company's culture on Lean intiatives - SMEThe impact of a company's culture on Lean intiatives - SME
The impact of a company's culture on Lean intiatives - SME
Kirk Hazen, P.E.
 
An introduction-to-quality
An introduction-to-qualityAn introduction-to-quality
An introduction-to-quality
slenois
 
Engagement_Driven to Sustain Positive Change _ SME kirk 092110
Engagement_Driven to Sustain Positive Change _ SME kirk 092110Engagement_Driven to Sustain Positive Change _ SME kirk 092110
Engagement_Driven to Sustain Positive Change _ SME kirk 092110
Kirk Hazen, P.E.
 

Similar to An Introduction to the Lean Business Model (20)

Lean presentation tier1 v2 053113
Lean presentation tier1 v2 053113Lean presentation tier1 v2 053113
Lean presentation tier1 v2 053113
 
AustraLEAN presentation Edition
AustraLEAN presentation EditionAustraLEAN presentation Edition
AustraLEAN presentation Edition
 
Finding and Mining Value Hidden in Operations - The ProAction Group
Finding and Mining Value Hidden in Operations - The ProAction GroupFinding and Mining Value Hidden in Operations - The ProAction Group
Finding and Mining Value Hidden in Operations - The ProAction Group
 
The impact of a company's culture on Lean intiatives - SME
The impact of a company's culture on Lean intiatives - SMEThe impact of a company's culture on Lean intiatives - SME
The impact of a company's culture on Lean intiatives - SME
 
Returns Management: Where are you on the Maturity Curve?
Returns Management: Where are you on the Maturity Curve?Returns Management: Where are you on the Maturity Curve?
Returns Management: Where are you on the Maturity Curve?
 
An introduction-to-quality
An introduction-to-qualityAn introduction-to-quality
An introduction-to-quality
 
Engagement_Driven to Sustain Positive Change _ SME kirk 092110
Engagement_Driven to Sustain Positive Change _ SME kirk 092110Engagement_Driven to Sustain Positive Change _ SME kirk 092110
Engagement_Driven to Sustain Positive Change _ SME kirk 092110
 
Chapter1 introduction
Chapter1 introductionChapter1 introduction
Chapter1 introduction
 
ISO 9001:2015 Interpretation and Implementation (10/22/16)
ISO 9001:2015 Interpretation and Implementation (10/22/16)ISO 9001:2015 Interpretation and Implementation (10/22/16)
ISO 9001:2015 Interpretation and Implementation (10/22/16)
 
Quality Management .pptx
Quality Management .pptxQuality Management .pptx
Quality Management .pptx
 
Services Marketing
Services MarketingServices Marketing
Services Marketing
 
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise ResiliencyCSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
 
Yagna wadhwani collaboration
Yagna wadhwani collaborationYagna wadhwani collaboration
Yagna wadhwani collaboration
 
A Guide to Operational Excellence
A Guide to Operational ExcellenceA Guide to Operational Excellence
A Guide to Operational Excellence
 
CFW Procurement Workshop October 2016
CFW Procurement Workshop October 2016CFW Procurement Workshop October 2016
CFW Procurement Workshop October 2016
 
Op Man1
Op Man1Op Man1
Op Man1
 
How Life Science organisations can achieve excellence through Quality Managem...
How Life Science organisations can achieve excellence through Quality Managem...How Life Science organisations can achieve excellence through Quality Managem...
How Life Science organisations can achieve excellence through Quality Managem...
 
00 Why Change 22 Pgs
00 Why Change 22  Pgs00 Why Change 22  Pgs
00 Why Change 22 Pgs
 
ResumeHoJY 290316
ResumeHoJY 290316ResumeHoJY 290316
ResumeHoJY 290316
 
Lean slides
Lean slidesLean slides
Lean slides
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

An Introduction to the Lean Business Model

  • 2. www.principalityconsulting.com Overview • Lean Model • What is Lean? • Lean Business Journey, Timing & Themes – Standardisation & Reducing Variation – Identifying & Eliminating Waste – Inventory Management – Stuck in First Gear
  • 3. Health and Safety Environment Ethics and Compliance Employee engagement- Reward& Recognition Employee engagement- Talent Development Employee engagement- Communication Disaster Planning Business Planning Key Account Management New Product Introduction Customer Service Sales and Operations Planning Lean Tools Lean Tools Training Lean Improvement Product Quality Research and Development Technology Transfer IT Infrastructure Branding Act Plan DoCheck The Lean Business and Operational Excellence Order Fulfilment Lean Business
  • 4. What is lean? A quick reminder…
  • 5. Lean and Flow aren’t new Any colour as long as it’s black! Manufacturing at Highland Park in 1913
  • 6. When did it all become so complex? We want variety!
  • 7. Variety means... •Colour changes •Body and shape changes Which, in turn, means... • Increased skill requirement • More parts and part numbers
  • 8. Which, in turn, means… •Process islands •More complex scheduling Which, in turn, means…
  • 9. Spaghetti World! Assembly Components Piece Parts Process Material Information
  • 10. What is Lean Thinking? Inputs Your Process Outputs
  • 11. 1st Step - ID your Value Streams and create flow with what resources you have Inputs Your Process Outputs MRP, Shared Resource, unbalanced shifts and long C/O times Value Stream 1 Value Stream 3 Value Stream 2 Value Stream 4
  • 12. 2nd Step eliminate the “knots and remaining tangles” by dedicating resources to value streams - commit yourself to single piece flow! Input s Your Process Outputs Value Stream 1 Value Stream 2 Value Stream 3 Value Stream 4
  • 13. Lean Business Model •Focussed on maximising profitability and generating cash •Links seamlessly with OE deployment and Sales and operations planning •Supports a plant-specific roadmap •Drives local involvement and competition •Combines all current best practice
  • 14. Lean Business Journey Time Performance Standardisation of new system and methods Understand the waste in the current system Reduce variation Previous performance Month on month performance improvement
  • 15. Lean Business Journey – 5 Phases Time Consistency Continuous Improvement Habitual Behaviour Performance Gaining Control Getting Ready
  • 17. Lean Business Journey - Timing Time Consistency Continuous Improvement Habitual Behaviour Performance Gaining Control Getting Ready 12 – 18 Months 18– 24 Months 24 – 36 Months3 – 12 Months0 – 3 Months
  • 18. Lean Business - Themes
  • 22. Guaranteeing Output is a Manufacturing Plant’s Number 1 Priority QUALITYQUALITYPPEOPLEEOPLE PPARTSARTS PPLANTLANT COSTCOSTPPROCESSROCESS HOWINPUT OUTPUT DELIVERYDELIVERY QUALITYQUALITYPPEOPLEEOPLE PPARTSARTS PPLANTLANT COSTCOSTPPROCESSROCESS HOWINPUT OUTPUT DELIVERYDELIVERY Leaders add value by successfully controlling the inputs – the 4 P’s If the inputs are right the output is guaranteed
  • 23. Why is there so much firefighting in a typical day? QUALITYQUALITYPPEOPLEEOPLE PPARTSARTS PPLANTLANT COSTCOSTPPROCESSROCESS HOWINPUT OUTPUT DELIVERYDELIVERY QUALITYQUALITYPPEOPLEEOPLE PPARTSARTS PPLANTLANT COSTCOSTPPROCESSROCESS HOWINPUT OUTPUT DELIVERYDELIVERY If the inputs aren’t standardised then there could be: 10 People variables x 10 Parts variables x 10 Plant variables x 10 Process variables 10 x 10 x 10 x 10 How can you manage 10,000 possible outcomes? ?
  • 24. Standards: Effect on Variation and Quality 10x10x10x10 = 10,000 Possible Outcomes 5x5x5x5 = 625 Possible Outcomes Current: • Variation • Errors •Little control • Reactive Future • Control • Improved quality • Predictability • Prevention
  • 25. From control into continuous improvement • The systems, people, equipment, product and all need to go from control to habitual improvement • Areas from clutter to clean • Engineering from breakdown panic to predictive calm • Process from fickle to dependable • Product from changeable to consistent • Shift management from reactive to proactive • Continuous improvement from special effort to daily habit 10,000 Outcomes 5,000 Outcomes 1,000 Outcomes 250 Outcomes Control Consistency Continuous Improvement Chaos 10,000 Outcomes 5,000 Outcomes 1,000 Outcomes 250 Outcomes Control Consistency Continuous Improvement ChaosGaining Control Consistency Continuous Improvement Habitual Behaviour
  • 26. The Golden Triangle Creating Standards for Operational Excellence Standard Work Standard description of a task or process, which if followed consistently, ensures the same output Standard Management Standard process to ensure standards are being met Visual Management Make problems visible and bring them to the attention of the user. Status within 10 seconds.
  • 27. The Golden Triangle Basis for daily error avoidance and control Standard Work Visual ManagementStandard Management 5SReject Control Daily Maintenance
  • 29. In Manufacturing there are 7 Traditional Types of NVA or Waste •Waste of T ransport •Waste of I nventory •Waste of M ovement •Waste of W aiting •Waste of O verprocessing •Waste of O verproduction •Waste of D efects and Rework
  • 30. 4 weeks HOURS 1000 2000 AVERAGE INVENTORY INVENTORY High Inventory Manufacturing
  • 31. HOURS 1000 1.5 weeks INVENTORY Low Inventory Manufacturing Has a positive impact on; • Quality and scrap • Engineering change introduction • Margin • Overtime & resources at month-end • Capital investment • Due date performance • Improved forecast reliability • Leadtime- • Leadtime is proportional to inventory
  • 35. Lean Business Journey - Timing Time Consistency Continuous Improvement Habitual Behaviour Performance Gaining Control Getting Ready 12 – 18 Months 18– 24 Months 24 – 36 Months3 – 12 Months0 – 3 Months
  • 36. Stuck in first gear and can’t get traction! “Lean production has dramatically lifted the competitiveness of many manufacturing companies and the value they deliver to customers. Despite these triumphs, many firms I visit are stuck in first gear on their initial lean efforts. They are trying to create flow but can’t somehow get traction. An overlooked and recurring pitfall that I’m seeing more often is a lack of “basic stability” in operations.” Art Smalley Lean Enterprise Institute
  • 37. A poor business will get stuck in first gear… Time Consistency Continuous Improvement Habitual Behaviour Performance Gaining Control Getting Ready Stuck in first gear
  • 39. www.principalityconsulting.com Journey Summary • Get Ready - To understand the current state and implement actions to get started • Gain Control – To reduce surprises and firefighting in order to focus on future improvement strategy • Consistency - To deliver some quick wins, align by value streams, develop the improvement infrastructure and up-skill middle management • Continuous Improvement - To engage the majority in focused improvement, achieve a revolutionary change, extend the scope to the supply chain and develop a growth strategy • Habitual Behaviour - To feedback all the positive improvement experience into the re-design of equipment, systems and suppliers