1. TRINIDAD AND TOBAGO PPP PROJECT: CHURCHILL
ROOSEVELT/URIAH BUTLER HIGHWAY
INTERCHANGE.
PREPARED BY:
JULIANNA BAPTISTE FORTHE WORLD BANK GROUP PPP COURSE
INFORMATION SOURCES:
THETRINIDAD ANDTOBAGO MINISTRY OF WORKS AND INFRASTRUCTURE (MOWI)
and the NATIONAL INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED (NIDCO)
2. Churchill Roosevelt/Uriah Butler Highway Interchange.
Overall cost –TT $ 550 M
Schedule – Package A 6mths
Package B 18 mths
Package C 12 mths.
Completed to date : Package A and B.
Package C construction on going,
on schedule.
Engineer – Cansult.
Main Contractor –Vinci Grand Projects (Europe).
3. PROJECT DESCRIPTION
Churchill Roosevelt/Uriah Butler Highway Interchange.
Package A
Package A was completed adding an additional three (3) lane
bypass, around the right turn lanes and was undertaken
together with the construction of a bridge over the San Juan
River.
Package B
On May 1st 2009, Package B, an 18-metre high & 600-metre
long bridge over the CRH/UBH Intersection that runs from the
vicinity of the San Juan River Bridge to Grand Bazaar was
opened.The height of the bridge facilitates the separation of
the East-West and North-Bound sections of the Interchange.
4. PROJECT DESCRIPTION
Package B also included the construction of aWest to South
ramp, a New Diamond interchange and service roads at the
Bamboo intersection. All of which are contributing factors in
alleviating the traffic congestion East- West and North South
routes.
5. Package C
Package C consists of the construction of a North to South
Bridge that is located in the vicinity, south of the Churchill
Roosevelt Highway / Uriah Butler Highway (CRH/UBH)
Intersection.The design removes the major UBH north/south
link across CRH and continues to provide service by means of
an overpass.The design maintains access to Grand Bazaar Mall
by an exit ramp onto a service road off ofWestbound CRH and
a connection to the UBH overpass accessible for traffic
approaching from all directions.
PROJECT DESCRIPTION
Princess Town to Moruga ;Sangre Grande to Toco;Penal to Guayaguayare;Manzanilla to Mayaro
47km of 4 lane highway and 2.5km of 2 lane highway speed of 110km/h (70mph)