Article Info ABSTRACT
Article history:
Received Apr 8, 2020
Revised Jun 16, 2020
Accepted Jul 25, 2020
Software engineering is a discipline that is little understood by people.
It defines how software is developed and maintained to meet the clients’
requirements. Software engineers follow certain systems and standards in
their work to meet the clients’ desires. It is on this background that engineers
follow specific models in coming up with the final product. One of the
models highly used is scrum, which is one of the agile methodologies.
However, despite being highly used, it has inherent flaws that need to be
corrected. Those flaws are product owner continues changing; do not accept
changes in working scrum, sprint’s release time limitation, finally wasting
team time within each sprint. This paper presents a new framework, which is
an updated version of the current Scrum, to overcome the scum models
mentioned issues. In this study, a new framework is presented in a way that
is understandable and needed by software developer’s team upon the
collected qualitative and quantitative data. The implementation was by making
some changes to the current scrum model leading to the “Scrumbear”, certain
flaws can be corrected. One of the presented changes involve adding the
control master rule to ensure controlling the requirements changing.
Keywords:
Agile
Framework
Scrum
Software development
Software engineering
This is an open access article under the CC BY-SA license.
Corresponding Author:
Leanah Alsaber,
College of Computer and Information Sciences,
Prince Sultan University,
66833 Rafha Street, Riyadh 11586 Saudi Arabia.
Email: Leanah.Alsaber@gmail.com
1. INTRODUCTION
Technology rapidly changing and the customers start to have the instant needs of the products with
no patient for waiting for a long process, which may take months and could end up with different
requirements. According to [1], the customers testing on the provided version is to provide their inputs for
enhancement and requirements accuracy. From here, the customer is permitted to demonstrate and reveal
their actual needs. Therefore, it could be said that users and customers’ needs become more craving to change
than before. SE is an approach of engineering the process of system development life cycle (SDLC) [2]. SD has
continued to improve the process for years and presented different methods to decrease the difficulties and
problems [3]. As a result, to cover the needs of the customers continuous changes, SE start to adapt the
concept of agility by having shorter development period and continuous new versions to fulfill the customer
satisfactions [4]. There are many methods have been used by SE to carry out the products to customers. One
of these methods is Agile, which is consisting of three main models Kanban, Extreme Programing, and
Scrum. Scrum is an agile model that maintain rapid and continues implementation of requirement [5].
Moreover, upon practices and discussed statistics, scrum is more suitable for medium to small products
business. Scrum team have some challenges to face as the continues requirements change by the product
owner, no changes are accepted while the sprints is under development, sprints and release time limitations,
 ISSN: 2302-9285
Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326
320
and finally the unproductive time period spent by the team. In the interest of these issues, as software
engineers in this paper we introduce a new proposed framework to overcome these issues by covering them
by adding a new role as a control master, besides having number of sprints working at the same time to have
on release for them at each time. This framework was implemented after analyzing the data from
the qualitative and quantitative conducted techniques.
2. LITERATURE REVIEW
Software engineering SE is a methodical discipline/approach that is applied in the management
of software lifecycle processes in addressing the issues of the low-quality software projects to produce
high-quality software and software solutions. It is more about engineering in terms of analysis, design,
development, and maintenance processes. Besides, SE helps in ensuring that the projects meet all prerequisite
standards within the projected budgets and time plans. According to IEEE, SE defined as the process of
applying a methodical, disciplined, and quantifiable approach in developing, operating, and maintaining
software-the interplay between engineering and software. Computer systems need to be reliable and efficient;
which is met through systematic software processes. SE has played a role in the creation of large, extensive
and dynamic software systems that operate in a vast range of fields [6]. Because of SE, the software that is
developed has grown tremendously since the time of introducing the process.
2.1. SE layers
To be able to understand SE, one needs to view and comprehend that it is a layered technology
where each layer seeks the fulfillment of its predecessor show in Figure 1.
Figure 1. Software engineering layers
‒ Quality focus
The last layer is the quality layer; which is used as the stone base of all layers in SE. It is about
the correctness of the requirement and how it is connected to the functionality, and how the software should
be performed eventually. In addition, it is about the maintainability of the software and its integrity from
the perspective of security amongst other features. Finally, it is about the usability and what it
the necessitated effort to run the software.
‒ Process
After the quality layer, the process layer comes next, and it is considered as the foundation of SE.
This layer defines the key processes that one has to focus critically on to ensure the effective delivery
of the software, where it works as a glue to keep all the layers together. This layer enables the development
of software in the designated time; it also has the definition of the SE framework as explained in
the following sections.
‒ Methods
The Method layer mainly answers the questions of “How-to” do the processes, and it includes
the SDLC that covers such tasks in the SDLC as in requirements, designing, implementation, testing and
support. SDLC offers technical knowledge behind the development of software. It is considered crucial as it
covers broad tasks such as in the SDLC [7].
‒ Tools
Finally, the last layer is a tool, which provides fully-/semi-automated support for its predecessors -
the methods and the process layers. In this layer, the tools integrated in the need of passing the information,
like when information is created by one, it could be used others. In the design position, the “Microsoft
publisher” is counted as a tool in SE for the web designing.
Bulletin of Electr Eng & Inf ISSN: 2302-9285 
“Scrumbear” framework for solving traditional scrum model problems (Leanah Alsaber)
321
2.2. Software process
This forms a sequence of functions that should be followed to develop software. There are numerous
models of software, each of which consists of these following main activities:
‒ Requirements engineering
This is where all the business and system requirements are elicited, analyzed, evaluated and
validated.
‒ Design
This is where the system components are designed along with the design of the system’s logical
structure.
‒ Implementation
It is the process where system programming and construction are performed to present the software.
‒ Testing
As any software should be reliable and works without failure in the intended requirements to
consider it a successful software [8]. The testing where it is a verification & validation process to test and
ensure that the implementation is done correctly and that the system is performing in the right manner.
‒ Maintenance
It is about enhancing and modifying the system to meet requirements changes. Furthermore,
the software process has a collection of actions and tasks to be performed. In fact, the software process is
adaptable to allow software engineers to select the appropriate set of tasks as well as the work actions.
Some of the software process models support this adaptation [9].
2.3. Process framework
This constructs the foundation of the software engineering processes by fronting several framework
operations. These framework activities are suitable for any software project regardless of complexity or size.
The generic process framework for software engineering includes five activities, namely:
‒ Communication
It is the first activity and involves requirements gathering, where the software engineers
communicate with customers and other relevant stakeholders. The need of the communication between
the stakeholders is a fact, which needs management through the software process [10].
‒ Planning
It involves describing technical tasks to be conducted, the required resources, the required work
products to be produced, the possible risks, and the work schedule [9].
‒ Modeling
It involves creating models that assist the client/developer to understand the requirements needed for
the software [11].
‒ Construction
This is where the actual software is built, and it involves generating codes and eventually testing
the software to determine the presence of any errors and bugs.
‒ Deployment
Which is the final activity of the software process. It involves delivering the product to the client
who will evaluate it and give their feedback [9].
Generally, the software process details differ from one software project to another, whereas
the framework activities remain the same for all software projects. Moreover, the framework activities are
applied in an iterative manner in some software projects. Then again, other software projects have applied
the activities in a sequence manner [12].
2.4. Agile
Agile means the ability to move quickly, and easily, and in SE it is a SD method where the software
is implemented in an iterative software process. Agile has been the lead method of all process in software
project due to its ability, flexibility, and tolerance in accepting the requirement changes. The continuous
communication with customers helps to get the actual need from them in addition with getting
the requirements based on previous cases [13]. Here where agile considering this and where the product
could be implemented in iterations, where the customer provides their recommendations and the quick
implementation will be processed in the Agile. Here in the agility process, the team can work in divide
the software delivery process in N iterations depending on the business needs and plan [14]. Agile is about
teamwork and personal interaction over tools, in order to deliver a running and usable software product over
documentations as in linear software processes, and about negotiation over contracts. One of the agile models
is the Scrum model, which is the most process model being used in delivering software products.
 ISSN: 2302-9285
Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326
322
2.5. Scrum
Scrum is a framework that could be described as a lightweight framework that defines a set of steps
to manage and control the SD process. In SE scrum is a mash-up of iterative and incremental SD agile model
and it mainly focuses on team collaboration and self-organization. The objective of designing Scrum was to
increase development speed, define a culture to focus on performance, support stakeholder value creation
and improve individual development and quality of life [15-17].
2.6. Scrum roles
Scrum has three core roles, namely, the product owner, scrum master, plus scrum team, each of
which has a set of tasks and responsibilities [18].
‒ Product owner
It is supposed to understand the business and customer needs. In addition, the product owner
accounts for the requirements prioritization, and ensures that the scrum team delivers the best value to the
enterprise.
‒ Scrum master
It is an accounting for elimination and removal of impediments from the scrum team to enhance
the deliverables. In fact, they coach the scrum team and motivates them to focus on the tasks, ensures
following and applying the process as supposed.
‒ Team
This team is responsible for delivering the increments, and it consists of three to nine members; each
member has cross-functional skills. The team members are accountable for developing the software and their
main tasks include analyzing the requirements, designing the software, developing and testing the software [19].
2.7. Scrum flow
First, Scrum has a basic unit of development, which called sprint. Sprint’s duration ranges from one-
four weeks where each sprint increment is ready for release to the customer. As can be seen in Figure 2
Scrum consists of three artifacts; product backlog, spring backlog and in increment. The product backlog is
a selected list of requests/topographies which created by the product owner. Once a feature is added to the
backlog, it is called a user story; thus, a sprint buildup is a list of user stories that will be developed in the
current sprint. The last artifact is the increment, which is a set of items of product backlog completed during
a sprint. Releasing the increment is a decision by the product owner. In addition, Scrum has a set of key
meetings; planning for sprints, daily scrum, review of sprint plus sprint retrospective. The scrum master
enables all of these consultations and those in attendance include the owner and the scrum team.
In the planning summit, the client clarifies the utmost priority user stories and the sprint backlog is initiated
after the agreement with the scrum team. The second meeting is the daily scrum to follow up with the scrum
team and ensure that there are no blockers or issues that could affect the progress. The third consultation is
a sprint review for the progress review. And, the fourth meeting is sprint retrospective where the lessons
learned from the current sprint are identified to be applied next sprint to improve the process [18-20].
Figure 2. Scrum model process
Bulletin of Electr Eng & Inf ISSN: 2302-9285 
“Scrumbear” framework for solving traditional scrum model problems (Leanah Alsaber)
323
2.8. Scrum issues
Though Scrum is considered as one of the great models of agile, yet it has some issues [21, 22].
As the continuous incrementing changes by the client in addition of a critical changes must be done to
the production which could be avoided if was changes are accepted directly before going to the production [23].
3. RESEARCH METHOD
A questionnaire distributed online among employees who worked in the development of different
solutions for different sectors; such as Educational sector, Health sector, and governmental sector. This
online questionnaire implemented to evaluate and see the existence of the issues, and to be able to provide
a solution to overcome them. Moreover, the companies’ size where the questionnaire took a place goes
between 5000 employees to +20,000 employees.
The questionnaire results show that 56.66% of the scrum team works in 2 and more sprints at the
same time. Yet the team who works on these sprints, 70% of them do accept changes and 50% do apply it
within the current sprint working sprints and 50% do not have a change control process to control the sprints.
Moreover, 83.33% of the teams said that the product owner does make changes to the working sprints.
In addition, because of these issues and more of them 62.07% has said that this adds extra pressure to
the team work, which is against the concept of scrum that clarifies scrum team are a team who works in
harmony and having a happy member. The SE’s has analyzed the questionnaire results and summarized
the main critical issues that affect the scrum process.
A list of issues resulted from the questionnaire and from the perspective and experience of the scrum
team, which have been working with scrum for years, and with different business domains. The collected
data represent flaws, which this paper has checked to for discussion to have a solution for them. The flaws
summarized in points:
‒ Product owner continuous changing
One of the flaws is when the product owner keeps asking for changes for the sake of business urges
and customer needs. Moreover, this is affecting the sprint planning, team focus, and team harmony at work.
‒ No changing accepted in working sprints
Not accepting the changes is more suitable for medium to small businesses. However, for huge and
critical business domains as health and governmental solutions, continues requirement changes are
predictable. In addition, for those changes, scrum team will be always under pressure because of the added
work and scrum will suffer from the uncontrolled changes that the product owner keeps requesting as
explained in the previous point. Which these changes will affect the actual plan and schedule for a project
estimation, leading to providing inaccurate plan which will cause a delay on the actual delivery date. Having
such this negative impact can cause critical risks [24].
‒ Sprints and release time limitations
Here, the concept that the sprint has a duration of two-to-four weeks, which is not enough time to
have a release with much crucial functionality; especially in the big domain business. Which lead to
the dissatisfaction of the customer in the way of not satisfying the business with these small releases.
‒ Wasting time
In the current scrum, each team will go in the phase of “not-doing-anything” and waiting for others.
As the QA team of the sprint waiting for the developers to finish their work to so they can start do testing,
and this is done in the beginning of each sprint. The same as the developer who either waits for the QA
feedback so they can be released from the sprint or wait to receive the QA finding bugs in which to be
solved. Imagining how this is happening into many sprints for big projects, how many hours will be the left
resulting of this time, and where the team could use it doing some actual work.
3.1. Proposed model
In the proposed model show in Figure 3, we have tried to put more attention in the gaps caused by
the previously summarized problems, which affect the current business to control them by adding one more
rule and regression test for an N+1 sprint before each release. The basic concept is to add a “Control Master”
rule, to control the slipping and the uncontrolled requirements that occur in the sprint while it is under
process. Neither the developers nor the quality assurance QA team can control those added changes by
the product owner because of the urgent cases. The added changes are explained as:
‒ Control master
It is a new rule that is responsible for controlling the requirement changes in the scrum lifespan; by
studying those changes before adding them to the sprint and disturbing unnecessarily. Instead, let the team
focus on the implementation of current sprint backlog for the control master to attend the daily meeting
and evaluate changes and their effectiveness.
 ISSN: 2302-9285
Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326
324
‒ N-sprint
Here is the actual concept of the sprint; however, instead of having one release for one sprint, it will
involve one release for several sprints at once. This process suite the big business that needs the production
releases to have as much functionality as it could for the urge of the business needs. Explaining the concept
involves having the resources working in the first sprint each in their rule, and when the developer finishes
their first sprints and hand the work over to the QA to start, the developer here can directly start working on
the backlog of the second sprint. When they finish from the second sprint, the developer might go back to
the first sprint to solve any finding bugs, or they can move to N number of sprints. The same applies for
the QA; but for clarifications, each sprint will still have its own planned backlog. Eventually, after finishing
the N sprints, the QA will do a regression test before the release.
‒ Regression test
Here the QA team will test the N-Sprints that will be combined into one increment in order to ensure
the stability of the increment-the changes or bug fixes do not affect the previous functionalities, and they are
not introducing any new errors [25]. Moreover, regression tests ensure that all the requirements have been
implemented and the increment is ready to be released to the customer. In the proposed model, the regression
test will be applied at the end of N-Sprints to ensure that all sprints have been implemented, no defects exist,
and that the N-Sprints are ready to be released. Eventually, the naming is based on the model that has
the concept of the scrum model and the added changes shape from the first eye site it looks like a bear, which
leads to name this model to be “Scrumbear”.
Figure 3. Scrumbear proposed model
4. RESULTS AND DISCUSSION
The findings of the questionnaire indicate that 56.66% of the scrum team operates concurrently in 2
and more sprints. However, the team that works on these sprints, 70% support improvements and 50%
implement it to the existing sprint work sprints and 50% have no change management mechanism to
management the sprints. In addition, 83.33% of the teams said the owner of the company is making
improvements to the working sprints. In addition, 62.07% said this brings additional strain to the team
because of these problems and more of them, which are against the scrum idea that clarifies scrum team, are
a team that operates in a good environment and has a satisfied member. The SE's evaluated the results of
the questionnaire and outlined the principal critical issues affecting the scrum process.
As in the comparison, in Table 1 the new model will help in resolving some of the flaws that already
exist and discussed in the current scrum. Through the adoption of Scrumbear, the scrum team will be able to
work in the scrum environment, which has a requirement of changing the management process to control and
manage the entire process. Due to this change, the team will start working in the new changes and by having
the control master with the collaboration of the scrum master it ensures that there is no pressure in
completing the sprints while other sprints are working, at the same time, the team time will be fully used
without affecting each sprint time.
Bulletin of Electr Eng & Inf ISSN: 2302-9285 
“Scrumbear” framework for solving traditional scrum model problems (Leanah Alsaber)
325
Table 1. Comparison between traditional Scrum and Scrumbear
Discussion Description Traditional Scrum Scrumbear
Control Changes Where the rule played by the control master to control the changes NO YES
Accept Changes To allow changes within the current working sprint NO YES
Team time wasting The time where a team member does not do anything and waiting the
result from another team member.
YES NO
5. CONCLUSION
In conclusion, software engineering is an important subject especially now that the world
of technology is growing at a very fast pace. It is on this background that the paper “Scrumbear” framework
to overcome the traditional Scrum model problems, has deliberated on how teams can improve their output.
After discussing the summarized collected problems, the product owner continuous changing, no accepted
changes in the active sprints, the time limitation of sprints and release, and wasting time that could be used in
other active sprints to fast-moving the production releases delivery. By using the new proposed Scrumbear
framework, those problems would be tackled and solved. It shown that traditional Scrum model is not
support the control of changes and not even accept the changes since the full authorized changes are in
business owner/software owner decisions. Furthermore, based on evaluation results of the Traditional Scrum,
it also proved that the wasting of the team member’s time where a team member does not do anything and
wait for the result from other team member in order to proceed for the next Sprint. All the problems arise
from traditional Scrum are solved by implementation of the Scrumbear framework.
ACKNOWLEDGEMENTS
This work was partially supported by the Artificial Intelligence Data Analytics Lab (AIDA), Prince
Sultan University, Riyadh, Saudi Arabia.
REFERENCES
[1] Fachrurrazi, “The end user requirement for project management software accuracy,” International Journal of
Electrical and Computer Engineering, vol. 8, no. 2, pp. 1112-1121, 2018.
[2] A. Verma and S. Kaur, “Design and development of an agorithm for prioritizing the test cases using neural network
as classifier,” IAES International Journal of Artificial Intelligence, vol. 4, no. 1, pp. 14-19, 2015.
[3] M. Ahmadi, B. B. Rad, and M. O. Thomas, “Tailoring software development methodologies for reliability,”
Journal of Telecommunication Electronic and Computer Engineering, vol. 10, no. 3, pp. 117-121, 2018.
[4] A. M. Dima and M. A. Maassen, “From waterfall to agile software: Development models in the IT sector, 2006 to
2018. Impacts on company management,” Journal of International Studies, vol. 11, no. 2, pp. 315-326, 2018.
[5] T. Linz, “Testing in scrum: A guide for software quality assurance in the agile world,” Rocky Nook, Inc., p. 224, 2014.
[6] R. Mall, “Fundamentals of software engineering-5th ed,” PHI Learning, pp. 612, 2018.
[7] J. Xiong, “Practical training of software engineering talent in one integration and four layers mode,” World
Transactions on Engineering and Technology Education, vol. 14, no. 1, pp. 146-150, 2016.
[8] D. Hema Latha and P. Premchand, “Estimating software reliability using ant colony optimization technique with
salesman problem for software process,” International Journal of Advanced Trends in Computer Science and
Engineering, vol. 7, no. 2, pp. 20-29, 2018.
[9] P. Clarke, R. V. O’Connor, B. Leavy, and M. Yilmaz, “Exploring the relationship between software process
adaptive capability and organisational performance,” IEEE Transactions on Software Engineering, vol. 41, no. 12,
pp. 1169-1183, Dec. 2015.
[10] P. Thakur and R. Shrivastava, “A review on text based emotion recognition system,” International Journal of
Advanced Trends in Computer Science and Engineering, vol. 7, no. 5, pp. 67-71, 2018.
[11] S. Aleem, L. F. Capretz, and F. Ahmed, “Critical success factors to improve the game development process from
a developer’s perspective,” Journal of Computer Science and Technology, vol. 31, no. 5, pp. 925-950, 2016.
[12] R. S. Pressman and B. Maxim, “Software engineering: A practitioner's approach-8th ed.,” McGraw-Hill Education,
p. 18, 2014.
[13] O. Oueslati, A. I. S. Khalil, and H. Ounelli, “Sentiment analysis for helpful reviews prediction,” International
Journal of Advanced Trends in Computer Science and Engineering, vol. 7, no. 3, pp. 34-40, 2018.
[14] P. Abrahamson, O. Salo, J. Ronkainen, and J. Warsta, “Agile software development methods: Review and
analysis,” VIT Publication, Finland, pp.1-107, 2002.
[15] F. ur Rehman, B. Maqbool, M. Q. Riaz, U. Qamar, and M. Abbas, “Scrum software maintenance model: Efficient
software maintenance in agile methodology,” 2018 21st Saudi Computer Society National Computer Conference
(NCC), pp. 1-5, 2018.
[16] R. Kumar, P. Maheshwary, and T. Malche, “Inside agile family software development methodologies,”
International Journal of Computer Sciences and Engineering, vol. 7, no. 6, pp. 650-660, 2019.
[17] A. Srivastava, S. Bhardwaj, and S. Saraswat, “SCRUM model for agile methodology,” 2017 International
Conference on Computing, Communication and Automation (ICCCA), pp. 864-869, 2017.
 ISSN: 2302-9285
Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326
326
[18] S. S. Samarawickrama and I. Perera, “Continuous scrum: A framework to enhance scrum with DevOps,” 2017
Seventeenth International Conference on Advances in ICT for Emerging Regions (ICTer), pp. 1-7, 2017.
[19] S. Hariharan, A. Rengarajan, and R. Prem Kumar, “Scrum based scaling using agile method to test software
projects and its future solutions using in artificial neural networks,” International Journal of Innovative Technology
and Exploring Engineering, vol. 8, no. 9, pp. 223-230, 2019.
[20] J. Sutherland, “Agile development: Lesson learned from the first scrum,” Cutter Agile Project Management
Advisory Service: Executive Update, vol. 5, no. 20, pp. 1-4, 2004.
[21] J. Cho, “Issues and challenges of agile software development with SCRUM”, Issues in Inoformation System, vol. 9,
no. 2, pp. 188-195, 2008.
[22] D. Maximin, “The scrum culture: Introducing agile methods in organizations,” Springer, 2018.
[23] J. Miler and K. Kaidy, “Problems and solutions of software design in scrum projects,” 2018 Federated Conference
on Computer Science and Information Systems (FedCSIS), pp. 975-978, 2018.
[24] A. Zakrani, M. Hain, and A. Idri, “Improving software development effort estimating using support vector
regression and feature selection,” International Journal of Artificial Intelligence, vol. 8, no. 4, pp. 399-410, 2019.
[25] B. Srisura and A. Lawanna, “False test case selection: Improvement of regression testing approach,” 2016 13th
International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information
Technology (ECTI-CON), pp. 1-6, 2016.

More Related Content

What's hot

INTRODUCTION TO SOFTWARE ENGINEERING
INTRODUCTION TO SOFTWARE ENGINEERINGINTRODUCTION TO SOFTWARE ENGINEERING
INTRODUCTION TO SOFTWARE ENGINEERINGProf Ansari
 
CSC426 - Software Engineering Lecture Note Cont'd
CSC426   - Software Engineering Lecture Note Cont'dCSC426   - Software Engineering Lecture Note Cont'd
CSC426 - Software Engineering Lecture Note Cont'dBro Shola Ajayi
 
Software Engineering Assignment
Software Engineering AssignmentSoftware Engineering Assignment
Software Engineering AssignmentSohaib Latif
 
Software engineering introduction
Software engineering introductionSoftware engineering introduction
Software engineering introductionVishal Singh
 
Lecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software EngineeringLecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software EngineeringAchmad Solichin
 
Engineering Software Products: 2. agile software engineering
Engineering Software Products: 2. agile software engineeringEngineering Software Products: 2. agile software engineering
Engineering Software Products: 2. agile software engineeringsoftware-engineering-book
 
Software Engineering- Crisis and Process Models
Software Engineering- Crisis and Process ModelsSoftware Engineering- Crisis and Process Models
Software Engineering- Crisis and Process ModelsNishu Rastogi
 
Introduction to Software Engineering & Information Technology
Introduction to Software Engineering & Information TechnologyIntroduction to Software Engineering & Information Technology
Introduction to Software Engineering & Information TechnologyGaditek
 
962 sech04
962 sech04962 sech04
962 sech04aldwal
 
Software engineering principles in system software design
Software engineering principles in system software designSoftware engineering principles in system software design
Software engineering principles in system software designTech_MX
 
Ian Sommerville, Software Engineering, 9th Edition Ch 4
Ian Sommerville,  Software Engineering, 9th Edition Ch 4Ian Sommerville,  Software Engineering, 9th Edition Ch 4
Ian Sommerville, Software Engineering, 9th Edition Ch 4Mohammed Romi
 
Notes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNotes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNANDINI SHARMA
 

What's hot (20)

INTRODUCTION TO SOFTWARE ENGINEERING
INTRODUCTION TO SOFTWARE ENGINEERINGINTRODUCTION TO SOFTWARE ENGINEERING
INTRODUCTION TO SOFTWARE ENGINEERING
 
Software engineering unit 1
Software engineering unit 1Software engineering unit 1
Software engineering unit 1
 
software engineering ch-1
software engineering ch-1software engineering ch-1
software engineering ch-1
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
CSC426 - Software Engineering Lecture Note Cont'd
CSC426   - Software Engineering Lecture Note Cont'dCSC426   - Software Engineering Lecture Note Cont'd
CSC426 - Software Engineering Lecture Note Cont'd
 
Software Engineering Assignment
Software Engineering AssignmentSoftware Engineering Assignment
Software Engineering Assignment
 
Ch19 systems engineering
Ch19 systems engineeringCh19 systems engineering
Ch19 systems engineering
 
Software engineering introduction
Software engineering introductionSoftware engineering introduction
Software engineering introduction
 
Lecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software EngineeringLecture 01 Introduction to Software Engineering
Lecture 01 Introduction to Software Engineering
 
Engineering Software Products: 2. agile software engineering
Engineering Software Products: 2. agile software engineeringEngineering Software Products: 2. agile software engineering
Engineering Software Products: 2. agile software engineering
 
Chapter1
Chapter1Chapter1
Chapter1
 
Software Engineering- Crisis and Process Models
Software Engineering- Crisis and Process ModelsSoftware Engineering- Crisis and Process Models
Software Engineering- Crisis and Process Models
 
Introduction to Software Engineering & Information Technology
Introduction to Software Engineering & Information TechnologyIntroduction to Software Engineering & Information Technology
Introduction to Software Engineering & Information Technology
 
962 sech04
962 sech04962 sech04
962 sech04
 
Software engineering principles in system software design
Software engineering principles in system software designSoftware engineering principles in system software design
Software engineering principles in system software design
 
Ian Sommerville, Software Engineering, 9th Edition Ch 4
Ian Sommerville,  Software Engineering, 9th Edition Ch 4Ian Sommerville,  Software Engineering, 9th Edition Ch 4
Ian Sommerville, Software Engineering, 9th Edition Ch 4
 
Notes of Software engineering and Project Management
Notes of Software engineering and Project ManagementNotes of Software engineering and Project Management
Notes of Software engineering and Project Management
 
Ch3. agile sw dev
Ch3. agile sw devCh3. agile sw dev
Ch3. agile sw dev
 
Ch22 project management
Ch22 project managementCh22 project management
Ch22 project management
 
Software engineering
Software engineering Software engineering
Software engineering
 

Similar to “Scrumbear” framework for solving traditional scrum model problems

Elementary Probability theory Chapter 2.pptx
Elementary Probability theory Chapter 2.pptxElementary Probability theory Chapter 2.pptx
Elementary Probability theory Chapter 2.pptxethiouniverse
 
Introduction Software and Software Engineering
Introduction Software and Software EngineeringIntroduction Software and Software Engineering
Introduction Software and Software Engineeringinfinitetechnology20
 
Soft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptxSoft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptxKalpna Saharan
 
Software Engineering Overview
Software Engineering OverviewSoftware Engineering Overview
Software Engineering OverviewPrachi Sasankar
 
Understanding the Software Development Lifecycle [SDLC] | A Comprehensive Guide
Understanding the Software Development Lifecycle [SDLC] | A Comprehensive GuideUnderstanding the Software Development Lifecycle [SDLC] | A Comprehensive Guide
Understanding the Software Development Lifecycle [SDLC] | A Comprehensive GuideGeorgeStanley21
 
Perspectives on the adherance to scrum rules in software project management
Perspectives on the adherance to scrum rules in software project managementPerspectives on the adherance to scrum rules in software project management
Perspectives on the adherance to scrum rules in software project managementnooriasukmaningtyas
 
Software Engineering in a Quick and Easy way - v1.pdf
Software Engineering in a Quick and Easy way - v1.pdfSoftware Engineering in a Quick and Easy way - v1.pdf
Software Engineering in a Quick and Easy way - v1.pdfKAJAL MANDAL
 
Software lifecycle model report
Software lifecycle model reportSoftware lifecycle model report
Software lifecycle model reportAshutosh Singh
 
Pm soln9416141129710
Pm soln9416141129710Pm soln9416141129710
Pm soln9416141129710Nikhil Todkar
 
DESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance FrameworkDESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance FrameworkIJERA Editor
 
OS Password-Manager-Report.docx
OS Password-Manager-Report.docxOS Password-Manager-Report.docx
OS Password-Manager-Report.docxrinim85726
 
construction management system final year report
construction management system final year reportconstruction management system final year report
construction management system final year reportchiragbarasiya
 
ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
 ppt on sOFTWARE DEVELOPMENT LIFE CYCLE ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
ppt on sOFTWARE DEVELOPMENT LIFE CYCLESwarnima Tiwari
 

Similar to “Scrumbear” framework for solving traditional scrum model problems (20)

Unit1
Unit1Unit1
Unit1
 
SE-Lecture-2.pptx
SE-Lecture-2.pptxSE-Lecture-2.pptx
SE-Lecture-2.pptx
 
Elementary Probability theory Chapter 2.pptx
Elementary Probability theory Chapter 2.pptxElementary Probability theory Chapter 2.pptx
Elementary Probability theory Chapter 2.pptx
 
Introduction Software and Software Engineering
Introduction Software and Software EngineeringIntroduction Software and Software Engineering
Introduction Software and Software Engineering
 
Soft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptxSoft.Engg. UNIT 1.pptx
Soft.Engg. UNIT 1.pptx
 
Software engineering the process
Software engineering the processSoftware engineering the process
Software engineering the process
 
Software Engineering Overview
Software Engineering OverviewSoftware Engineering Overview
Software Engineering Overview
 
Understanding the Software Development Lifecycle [SDLC] | A Comprehensive Guide
Understanding the Software Development Lifecycle [SDLC] | A Comprehensive GuideUnderstanding the Software Development Lifecycle [SDLC] | A Comprehensive Guide
Understanding the Software Development Lifecycle [SDLC] | A Comprehensive Guide
 
Perspectives on the adherance to scrum rules in software project management
Perspectives on the adherance to scrum rules in software project managementPerspectives on the adherance to scrum rules in software project management
Perspectives on the adherance to scrum rules in software project management
 
Software Engineering in a Quick and Easy way - v1.pdf
Software Engineering in a Quick and Easy way - v1.pdfSoftware Engineering in a Quick and Easy way - v1.pdf
Software Engineering in a Quick and Easy way - v1.pdf
 
The process
The processThe process
The process
 
Software lifecycle model report
Software lifecycle model reportSoftware lifecycle model report
Software lifecycle model report
 
Pm soln9416141129710
Pm soln9416141129710Pm soln9416141129710
Pm soln9416141129710
 
DESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance FrameworkDESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance Framework
 
OS Password-Manager-Report.docx
OS Password-Manager-Report.docxOS Password-Manager-Report.docx
OS Password-Manager-Report.docx
 
Sdpl1
Sdpl1Sdpl1
Sdpl1
 
construction management system final year report
construction management system final year reportconstruction management system final year report
construction management system final year report
 
Ijetcas14 545
Ijetcas14 545Ijetcas14 545
Ijetcas14 545
 
ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
 ppt on sOFTWARE DEVELOPMENT LIFE CYCLE ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 

More from journalBEEI

Square transposition: an approach to the transposition process in block cipher
Square transposition: an approach to the transposition process in block cipherSquare transposition: an approach to the transposition process in block cipher
Square transposition: an approach to the transposition process in block cipherjournalBEEI
 
Hyper-parameter optimization of convolutional neural network based on particl...
Hyper-parameter optimization of convolutional neural network based on particl...Hyper-parameter optimization of convolutional neural network based on particl...
Hyper-parameter optimization of convolutional neural network based on particl...journalBEEI
 
Supervised machine learning based liver disease prediction approach with LASS...
Supervised machine learning based liver disease prediction approach with LASS...Supervised machine learning based liver disease prediction approach with LASS...
Supervised machine learning based liver disease prediction approach with LASS...journalBEEI
 
A secure and energy saving protocol for wireless sensor networks
A secure and energy saving protocol for wireless sensor networksA secure and energy saving protocol for wireless sensor networks
A secure and energy saving protocol for wireless sensor networksjournalBEEI
 
Plant leaf identification system using convolutional neural network
Plant leaf identification system using convolutional neural networkPlant leaf identification system using convolutional neural network
Plant leaf identification system using convolutional neural networkjournalBEEI
 
Customized moodle-based learning management system for socially disadvantaged...
Customized moodle-based learning management system for socially disadvantaged...Customized moodle-based learning management system for socially disadvantaged...
Customized moodle-based learning management system for socially disadvantaged...journalBEEI
 
Understanding the role of individual learner in adaptive and personalized e-l...
Understanding the role of individual learner in adaptive and personalized e-l...Understanding the role of individual learner in adaptive and personalized e-l...
Understanding the role of individual learner in adaptive and personalized e-l...journalBEEI
 
Prototype mobile contactless transaction system in traditional markets to sup...
Prototype mobile contactless transaction system in traditional markets to sup...Prototype mobile contactless transaction system in traditional markets to sup...
Prototype mobile contactless transaction system in traditional markets to sup...journalBEEI
 
Wireless HART stack using multiprocessor technique with laxity algorithm
Wireless HART stack using multiprocessor technique with laxity algorithmWireless HART stack using multiprocessor technique with laxity algorithm
Wireless HART stack using multiprocessor technique with laxity algorithmjournalBEEI
 
Implementation of double-layer loaded on octagon microstrip yagi antenna
Implementation of double-layer loaded on octagon microstrip yagi antennaImplementation of double-layer loaded on octagon microstrip yagi antenna
Implementation of double-layer loaded on octagon microstrip yagi antennajournalBEEI
 
The calculation of the field of an antenna located near the human head
The calculation of the field of an antenna located near the human headThe calculation of the field of an antenna located near the human head
The calculation of the field of an antenna located near the human headjournalBEEI
 
Exact secure outage probability performance of uplinkdownlink multiple access...
Exact secure outage probability performance of uplinkdownlink multiple access...Exact secure outage probability performance of uplinkdownlink multiple access...
Exact secure outage probability performance of uplinkdownlink multiple access...journalBEEI
 
Design of a dual-band antenna for energy harvesting application
Design of a dual-band antenna for energy harvesting applicationDesign of a dual-band antenna for energy harvesting application
Design of a dual-band antenna for energy harvesting applicationjournalBEEI
 
Transforming data-centric eXtensible markup language into relational database...
Transforming data-centric eXtensible markup language into relational database...Transforming data-centric eXtensible markup language into relational database...
Transforming data-centric eXtensible markup language into relational database...journalBEEI
 
Key performance requirement of future next wireless networks (6G)
Key performance requirement of future next wireless networks (6G)Key performance requirement of future next wireless networks (6G)
Key performance requirement of future next wireless networks (6G)journalBEEI
 
Noise resistance territorial intensity-based optical flow using inverse confi...
Noise resistance territorial intensity-based optical flow using inverse confi...Noise resistance territorial intensity-based optical flow using inverse confi...
Noise resistance territorial intensity-based optical flow using inverse confi...journalBEEI
 
Modeling climate phenomenon with software grids analysis and display system i...
Modeling climate phenomenon with software grids analysis and display system i...Modeling climate phenomenon with software grids analysis and display system i...
Modeling climate phenomenon with software grids analysis and display system i...journalBEEI
 
An approach of re-organizing input dataset to enhance the quality of emotion ...
An approach of re-organizing input dataset to enhance the quality of emotion ...An approach of re-organizing input dataset to enhance the quality of emotion ...
An approach of re-organizing input dataset to enhance the quality of emotion ...journalBEEI
 
Parking detection system using background subtraction and HSV color segmentation
Parking detection system using background subtraction and HSV color segmentationParking detection system using background subtraction and HSV color segmentation
Parking detection system using background subtraction and HSV color segmentationjournalBEEI
 
Quality of service performances of video and voice transmission in universal ...
Quality of service performances of video and voice transmission in universal ...Quality of service performances of video and voice transmission in universal ...
Quality of service performances of video and voice transmission in universal ...journalBEEI
 

More from journalBEEI (20)

Square transposition: an approach to the transposition process in block cipher
Square transposition: an approach to the transposition process in block cipherSquare transposition: an approach to the transposition process in block cipher
Square transposition: an approach to the transposition process in block cipher
 
Hyper-parameter optimization of convolutional neural network based on particl...
Hyper-parameter optimization of convolutional neural network based on particl...Hyper-parameter optimization of convolutional neural network based on particl...
Hyper-parameter optimization of convolutional neural network based on particl...
 
Supervised machine learning based liver disease prediction approach with LASS...
Supervised machine learning based liver disease prediction approach with LASS...Supervised machine learning based liver disease prediction approach with LASS...
Supervised machine learning based liver disease prediction approach with LASS...
 
A secure and energy saving protocol for wireless sensor networks
A secure and energy saving protocol for wireless sensor networksA secure and energy saving protocol for wireless sensor networks
A secure and energy saving protocol for wireless sensor networks
 
Plant leaf identification system using convolutional neural network
Plant leaf identification system using convolutional neural networkPlant leaf identification system using convolutional neural network
Plant leaf identification system using convolutional neural network
 
Customized moodle-based learning management system for socially disadvantaged...
Customized moodle-based learning management system for socially disadvantaged...Customized moodle-based learning management system for socially disadvantaged...
Customized moodle-based learning management system for socially disadvantaged...
 
Understanding the role of individual learner in adaptive and personalized e-l...
Understanding the role of individual learner in adaptive and personalized e-l...Understanding the role of individual learner in adaptive and personalized e-l...
Understanding the role of individual learner in adaptive and personalized e-l...
 
Prototype mobile contactless transaction system in traditional markets to sup...
Prototype mobile contactless transaction system in traditional markets to sup...Prototype mobile contactless transaction system in traditional markets to sup...
Prototype mobile contactless transaction system in traditional markets to sup...
 
Wireless HART stack using multiprocessor technique with laxity algorithm
Wireless HART stack using multiprocessor technique with laxity algorithmWireless HART stack using multiprocessor technique with laxity algorithm
Wireless HART stack using multiprocessor technique with laxity algorithm
 
Implementation of double-layer loaded on octagon microstrip yagi antenna
Implementation of double-layer loaded on octagon microstrip yagi antennaImplementation of double-layer loaded on octagon microstrip yagi antenna
Implementation of double-layer loaded on octagon microstrip yagi antenna
 
The calculation of the field of an antenna located near the human head
The calculation of the field of an antenna located near the human headThe calculation of the field of an antenna located near the human head
The calculation of the field of an antenna located near the human head
 
Exact secure outage probability performance of uplinkdownlink multiple access...
Exact secure outage probability performance of uplinkdownlink multiple access...Exact secure outage probability performance of uplinkdownlink multiple access...
Exact secure outage probability performance of uplinkdownlink multiple access...
 
Design of a dual-band antenna for energy harvesting application
Design of a dual-band antenna for energy harvesting applicationDesign of a dual-band antenna for energy harvesting application
Design of a dual-band antenna for energy harvesting application
 
Transforming data-centric eXtensible markup language into relational database...
Transforming data-centric eXtensible markup language into relational database...Transforming data-centric eXtensible markup language into relational database...
Transforming data-centric eXtensible markup language into relational database...
 
Key performance requirement of future next wireless networks (6G)
Key performance requirement of future next wireless networks (6G)Key performance requirement of future next wireless networks (6G)
Key performance requirement of future next wireless networks (6G)
 
Noise resistance territorial intensity-based optical flow using inverse confi...
Noise resistance territorial intensity-based optical flow using inverse confi...Noise resistance territorial intensity-based optical flow using inverse confi...
Noise resistance territorial intensity-based optical flow using inverse confi...
 
Modeling climate phenomenon with software grids analysis and display system i...
Modeling climate phenomenon with software grids analysis and display system i...Modeling climate phenomenon with software grids analysis and display system i...
Modeling climate phenomenon with software grids analysis and display system i...
 
An approach of re-organizing input dataset to enhance the quality of emotion ...
An approach of re-organizing input dataset to enhance the quality of emotion ...An approach of re-organizing input dataset to enhance the quality of emotion ...
An approach of re-organizing input dataset to enhance the quality of emotion ...
 
Parking detection system using background subtraction and HSV color segmentation
Parking detection system using background subtraction and HSV color segmentationParking detection system using background subtraction and HSV color segmentation
Parking detection system using background subtraction and HSV color segmentation
 
Quality of service performances of video and voice transmission in universal ...
Quality of service performances of video and voice transmission in universal ...Quality of service performances of video and voice transmission in universal ...
Quality of service performances of video and voice transmission in universal ...
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

“Scrumbear” framework for solving traditional scrum model problems

  • 1. Bulletin of Electrical Engineering and Informatics Vol. 10, No. 1, February 2021, pp. 319~326 ISSN: 2302-9285, DOI: 10.11591/eei.v10i1.2487  319 Journal homepage: http://beei.org “Scrumbear” framework for solving traditional scrum model problems Leanah Alsaber, Ebtesam Al Elsheikh, Sarah Aljumah, Nor Shahida Mohd Jamail College of Computer and Information Sciences, Prince Sultan University, Saudi Arabia Article Info ABSTRACT Article history: Received Apr 8, 2020 Revised Jun 16, 2020 Accepted Jul 25, 2020 Software engineering is a discipline that is little understood by people. It defines how software is developed and maintained to meet the clients’ requirements. Software engineers follow certain systems and standards in their work to meet the clients’ desires. It is on this background that engineers follow specific models in coming up with the final product. One of the models highly used is scrum, which is one of the agile methodologies. However, despite being highly used, it has inherent flaws that need to be corrected. Those flaws are product owner continues changing; do not accept changes in working scrum, sprint’s release time limitation, finally wasting team time within each sprint. This paper presents a new framework, which is an updated version of the current Scrum, to overcome the scum models mentioned issues. In this study, a new framework is presented in a way that is understandable and needed by software developer’s team upon the collected qualitative and quantitative data. The implementation was by making some changes to the current scrum model leading to the “Scrumbear”, certain flaws can be corrected. One of the presented changes involve adding the control master rule to ensure controlling the requirements changing. Keywords: Agile Framework Scrum Software development Software engineering This is an open access article under the CC BY-SA license. Corresponding Author: Leanah Alsaber, College of Computer and Information Sciences, Prince Sultan University, 66833 Rafha Street, Riyadh 11586 Saudi Arabia. Email: Leanah.Alsaber@gmail.com 1. INTRODUCTION Technology rapidly changing and the customers start to have the instant needs of the products with no patient for waiting for a long process, which may take months and could end up with different requirements. According to [1], the customers testing on the provided version is to provide their inputs for enhancement and requirements accuracy. From here, the customer is permitted to demonstrate and reveal their actual needs. Therefore, it could be said that users and customers’ needs become more craving to change than before. SE is an approach of engineering the process of system development life cycle (SDLC) [2]. SD has continued to improve the process for years and presented different methods to decrease the difficulties and problems [3]. As a result, to cover the needs of the customers continuous changes, SE start to adapt the concept of agility by having shorter development period and continuous new versions to fulfill the customer satisfactions [4]. There are many methods have been used by SE to carry out the products to customers. One of these methods is Agile, which is consisting of three main models Kanban, Extreme Programing, and Scrum. Scrum is an agile model that maintain rapid and continues implementation of requirement [5]. Moreover, upon practices and discussed statistics, scrum is more suitable for medium to small products business. Scrum team have some challenges to face as the continues requirements change by the product owner, no changes are accepted while the sprints is under development, sprints and release time limitations,
  • 2.  ISSN: 2302-9285 Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326 320 and finally the unproductive time period spent by the team. In the interest of these issues, as software engineers in this paper we introduce a new proposed framework to overcome these issues by covering them by adding a new role as a control master, besides having number of sprints working at the same time to have on release for them at each time. This framework was implemented after analyzing the data from the qualitative and quantitative conducted techniques. 2. LITERATURE REVIEW Software engineering SE is a methodical discipline/approach that is applied in the management of software lifecycle processes in addressing the issues of the low-quality software projects to produce high-quality software and software solutions. It is more about engineering in terms of analysis, design, development, and maintenance processes. Besides, SE helps in ensuring that the projects meet all prerequisite standards within the projected budgets and time plans. According to IEEE, SE defined as the process of applying a methodical, disciplined, and quantifiable approach in developing, operating, and maintaining software-the interplay between engineering and software. Computer systems need to be reliable and efficient; which is met through systematic software processes. SE has played a role in the creation of large, extensive and dynamic software systems that operate in a vast range of fields [6]. Because of SE, the software that is developed has grown tremendously since the time of introducing the process. 2.1. SE layers To be able to understand SE, one needs to view and comprehend that it is a layered technology where each layer seeks the fulfillment of its predecessor show in Figure 1. Figure 1. Software engineering layers ‒ Quality focus The last layer is the quality layer; which is used as the stone base of all layers in SE. It is about the correctness of the requirement and how it is connected to the functionality, and how the software should be performed eventually. In addition, it is about the maintainability of the software and its integrity from the perspective of security amongst other features. Finally, it is about the usability and what it the necessitated effort to run the software. ‒ Process After the quality layer, the process layer comes next, and it is considered as the foundation of SE. This layer defines the key processes that one has to focus critically on to ensure the effective delivery of the software, where it works as a glue to keep all the layers together. This layer enables the development of software in the designated time; it also has the definition of the SE framework as explained in the following sections. ‒ Methods The Method layer mainly answers the questions of “How-to” do the processes, and it includes the SDLC that covers such tasks in the SDLC as in requirements, designing, implementation, testing and support. SDLC offers technical knowledge behind the development of software. It is considered crucial as it covers broad tasks such as in the SDLC [7]. ‒ Tools Finally, the last layer is a tool, which provides fully-/semi-automated support for its predecessors - the methods and the process layers. In this layer, the tools integrated in the need of passing the information, like when information is created by one, it could be used others. In the design position, the “Microsoft publisher” is counted as a tool in SE for the web designing.
  • 3. Bulletin of Electr Eng & Inf ISSN: 2302-9285  “Scrumbear” framework for solving traditional scrum model problems (Leanah Alsaber) 321 2.2. Software process This forms a sequence of functions that should be followed to develop software. There are numerous models of software, each of which consists of these following main activities: ‒ Requirements engineering This is where all the business and system requirements are elicited, analyzed, evaluated and validated. ‒ Design This is where the system components are designed along with the design of the system’s logical structure. ‒ Implementation It is the process where system programming and construction are performed to present the software. ‒ Testing As any software should be reliable and works without failure in the intended requirements to consider it a successful software [8]. The testing where it is a verification & validation process to test and ensure that the implementation is done correctly and that the system is performing in the right manner. ‒ Maintenance It is about enhancing and modifying the system to meet requirements changes. Furthermore, the software process has a collection of actions and tasks to be performed. In fact, the software process is adaptable to allow software engineers to select the appropriate set of tasks as well as the work actions. Some of the software process models support this adaptation [9]. 2.3. Process framework This constructs the foundation of the software engineering processes by fronting several framework operations. These framework activities are suitable for any software project regardless of complexity or size. The generic process framework for software engineering includes five activities, namely: ‒ Communication It is the first activity and involves requirements gathering, where the software engineers communicate with customers and other relevant stakeholders. The need of the communication between the stakeholders is a fact, which needs management through the software process [10]. ‒ Planning It involves describing technical tasks to be conducted, the required resources, the required work products to be produced, the possible risks, and the work schedule [9]. ‒ Modeling It involves creating models that assist the client/developer to understand the requirements needed for the software [11]. ‒ Construction This is where the actual software is built, and it involves generating codes and eventually testing the software to determine the presence of any errors and bugs. ‒ Deployment Which is the final activity of the software process. It involves delivering the product to the client who will evaluate it and give their feedback [9]. Generally, the software process details differ from one software project to another, whereas the framework activities remain the same for all software projects. Moreover, the framework activities are applied in an iterative manner in some software projects. Then again, other software projects have applied the activities in a sequence manner [12]. 2.4. Agile Agile means the ability to move quickly, and easily, and in SE it is a SD method where the software is implemented in an iterative software process. Agile has been the lead method of all process in software project due to its ability, flexibility, and tolerance in accepting the requirement changes. The continuous communication with customers helps to get the actual need from them in addition with getting the requirements based on previous cases [13]. Here where agile considering this and where the product could be implemented in iterations, where the customer provides their recommendations and the quick implementation will be processed in the Agile. Here in the agility process, the team can work in divide the software delivery process in N iterations depending on the business needs and plan [14]. Agile is about teamwork and personal interaction over tools, in order to deliver a running and usable software product over documentations as in linear software processes, and about negotiation over contracts. One of the agile models is the Scrum model, which is the most process model being used in delivering software products.
  • 4.  ISSN: 2302-9285 Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326 322 2.5. Scrum Scrum is a framework that could be described as a lightweight framework that defines a set of steps to manage and control the SD process. In SE scrum is a mash-up of iterative and incremental SD agile model and it mainly focuses on team collaboration and self-organization. The objective of designing Scrum was to increase development speed, define a culture to focus on performance, support stakeholder value creation and improve individual development and quality of life [15-17]. 2.6. Scrum roles Scrum has three core roles, namely, the product owner, scrum master, plus scrum team, each of which has a set of tasks and responsibilities [18]. ‒ Product owner It is supposed to understand the business and customer needs. In addition, the product owner accounts for the requirements prioritization, and ensures that the scrum team delivers the best value to the enterprise. ‒ Scrum master It is an accounting for elimination and removal of impediments from the scrum team to enhance the deliverables. In fact, they coach the scrum team and motivates them to focus on the tasks, ensures following and applying the process as supposed. ‒ Team This team is responsible for delivering the increments, and it consists of three to nine members; each member has cross-functional skills. The team members are accountable for developing the software and their main tasks include analyzing the requirements, designing the software, developing and testing the software [19]. 2.7. Scrum flow First, Scrum has a basic unit of development, which called sprint. Sprint’s duration ranges from one- four weeks where each sprint increment is ready for release to the customer. As can be seen in Figure 2 Scrum consists of three artifacts; product backlog, spring backlog and in increment. The product backlog is a selected list of requests/topographies which created by the product owner. Once a feature is added to the backlog, it is called a user story; thus, a sprint buildup is a list of user stories that will be developed in the current sprint. The last artifact is the increment, which is a set of items of product backlog completed during a sprint. Releasing the increment is a decision by the product owner. In addition, Scrum has a set of key meetings; planning for sprints, daily scrum, review of sprint plus sprint retrospective. The scrum master enables all of these consultations and those in attendance include the owner and the scrum team. In the planning summit, the client clarifies the utmost priority user stories and the sprint backlog is initiated after the agreement with the scrum team. The second meeting is the daily scrum to follow up with the scrum team and ensure that there are no blockers or issues that could affect the progress. The third consultation is a sprint review for the progress review. And, the fourth meeting is sprint retrospective where the lessons learned from the current sprint are identified to be applied next sprint to improve the process [18-20]. Figure 2. Scrum model process
  • 5. Bulletin of Electr Eng & Inf ISSN: 2302-9285  “Scrumbear” framework for solving traditional scrum model problems (Leanah Alsaber) 323 2.8. Scrum issues Though Scrum is considered as one of the great models of agile, yet it has some issues [21, 22]. As the continuous incrementing changes by the client in addition of a critical changes must be done to the production which could be avoided if was changes are accepted directly before going to the production [23]. 3. RESEARCH METHOD A questionnaire distributed online among employees who worked in the development of different solutions for different sectors; such as Educational sector, Health sector, and governmental sector. This online questionnaire implemented to evaluate and see the existence of the issues, and to be able to provide a solution to overcome them. Moreover, the companies’ size where the questionnaire took a place goes between 5000 employees to +20,000 employees. The questionnaire results show that 56.66% of the scrum team works in 2 and more sprints at the same time. Yet the team who works on these sprints, 70% of them do accept changes and 50% do apply it within the current sprint working sprints and 50% do not have a change control process to control the sprints. Moreover, 83.33% of the teams said that the product owner does make changes to the working sprints. In addition, because of these issues and more of them 62.07% has said that this adds extra pressure to the team work, which is against the concept of scrum that clarifies scrum team are a team who works in harmony and having a happy member. The SE’s has analyzed the questionnaire results and summarized the main critical issues that affect the scrum process. A list of issues resulted from the questionnaire and from the perspective and experience of the scrum team, which have been working with scrum for years, and with different business domains. The collected data represent flaws, which this paper has checked to for discussion to have a solution for them. The flaws summarized in points: ‒ Product owner continuous changing One of the flaws is when the product owner keeps asking for changes for the sake of business urges and customer needs. Moreover, this is affecting the sprint planning, team focus, and team harmony at work. ‒ No changing accepted in working sprints Not accepting the changes is more suitable for medium to small businesses. However, for huge and critical business domains as health and governmental solutions, continues requirement changes are predictable. In addition, for those changes, scrum team will be always under pressure because of the added work and scrum will suffer from the uncontrolled changes that the product owner keeps requesting as explained in the previous point. Which these changes will affect the actual plan and schedule for a project estimation, leading to providing inaccurate plan which will cause a delay on the actual delivery date. Having such this negative impact can cause critical risks [24]. ‒ Sprints and release time limitations Here, the concept that the sprint has a duration of two-to-four weeks, which is not enough time to have a release with much crucial functionality; especially in the big domain business. Which lead to the dissatisfaction of the customer in the way of not satisfying the business with these small releases. ‒ Wasting time In the current scrum, each team will go in the phase of “not-doing-anything” and waiting for others. As the QA team of the sprint waiting for the developers to finish their work to so they can start do testing, and this is done in the beginning of each sprint. The same as the developer who either waits for the QA feedback so they can be released from the sprint or wait to receive the QA finding bugs in which to be solved. Imagining how this is happening into many sprints for big projects, how many hours will be the left resulting of this time, and where the team could use it doing some actual work. 3.1. Proposed model In the proposed model show in Figure 3, we have tried to put more attention in the gaps caused by the previously summarized problems, which affect the current business to control them by adding one more rule and regression test for an N+1 sprint before each release. The basic concept is to add a “Control Master” rule, to control the slipping and the uncontrolled requirements that occur in the sprint while it is under process. Neither the developers nor the quality assurance QA team can control those added changes by the product owner because of the urgent cases. The added changes are explained as: ‒ Control master It is a new rule that is responsible for controlling the requirement changes in the scrum lifespan; by studying those changes before adding them to the sprint and disturbing unnecessarily. Instead, let the team focus on the implementation of current sprint backlog for the control master to attend the daily meeting and evaluate changes and their effectiveness.
  • 6.  ISSN: 2302-9285 Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326 324 ‒ N-sprint Here is the actual concept of the sprint; however, instead of having one release for one sprint, it will involve one release for several sprints at once. This process suite the big business that needs the production releases to have as much functionality as it could for the urge of the business needs. Explaining the concept involves having the resources working in the first sprint each in their rule, and when the developer finishes their first sprints and hand the work over to the QA to start, the developer here can directly start working on the backlog of the second sprint. When they finish from the second sprint, the developer might go back to the first sprint to solve any finding bugs, or they can move to N number of sprints. The same applies for the QA; but for clarifications, each sprint will still have its own planned backlog. Eventually, after finishing the N sprints, the QA will do a regression test before the release. ‒ Regression test Here the QA team will test the N-Sprints that will be combined into one increment in order to ensure the stability of the increment-the changes or bug fixes do not affect the previous functionalities, and they are not introducing any new errors [25]. Moreover, regression tests ensure that all the requirements have been implemented and the increment is ready to be released to the customer. In the proposed model, the regression test will be applied at the end of N-Sprints to ensure that all sprints have been implemented, no defects exist, and that the N-Sprints are ready to be released. Eventually, the naming is based on the model that has the concept of the scrum model and the added changes shape from the first eye site it looks like a bear, which leads to name this model to be “Scrumbear”. Figure 3. Scrumbear proposed model 4. RESULTS AND DISCUSSION The findings of the questionnaire indicate that 56.66% of the scrum team operates concurrently in 2 and more sprints. However, the team that works on these sprints, 70% support improvements and 50% implement it to the existing sprint work sprints and 50% have no change management mechanism to management the sprints. In addition, 83.33% of the teams said the owner of the company is making improvements to the working sprints. In addition, 62.07% said this brings additional strain to the team because of these problems and more of them, which are against the scrum idea that clarifies scrum team, are a team that operates in a good environment and has a satisfied member. The SE's evaluated the results of the questionnaire and outlined the principal critical issues affecting the scrum process. As in the comparison, in Table 1 the new model will help in resolving some of the flaws that already exist and discussed in the current scrum. Through the adoption of Scrumbear, the scrum team will be able to work in the scrum environment, which has a requirement of changing the management process to control and manage the entire process. Due to this change, the team will start working in the new changes and by having the control master with the collaboration of the scrum master it ensures that there is no pressure in completing the sprints while other sprints are working, at the same time, the team time will be fully used without affecting each sprint time.
  • 7. Bulletin of Electr Eng & Inf ISSN: 2302-9285  “Scrumbear” framework for solving traditional scrum model problems (Leanah Alsaber) 325 Table 1. Comparison between traditional Scrum and Scrumbear Discussion Description Traditional Scrum Scrumbear Control Changes Where the rule played by the control master to control the changes NO YES Accept Changes To allow changes within the current working sprint NO YES Team time wasting The time where a team member does not do anything and waiting the result from another team member. YES NO 5. CONCLUSION In conclusion, software engineering is an important subject especially now that the world of technology is growing at a very fast pace. It is on this background that the paper “Scrumbear” framework to overcome the traditional Scrum model problems, has deliberated on how teams can improve their output. After discussing the summarized collected problems, the product owner continuous changing, no accepted changes in the active sprints, the time limitation of sprints and release, and wasting time that could be used in other active sprints to fast-moving the production releases delivery. By using the new proposed Scrumbear framework, those problems would be tackled and solved. It shown that traditional Scrum model is not support the control of changes and not even accept the changes since the full authorized changes are in business owner/software owner decisions. Furthermore, based on evaluation results of the Traditional Scrum, it also proved that the wasting of the team member’s time where a team member does not do anything and wait for the result from other team member in order to proceed for the next Sprint. All the problems arise from traditional Scrum are solved by implementation of the Scrumbear framework. ACKNOWLEDGEMENTS This work was partially supported by the Artificial Intelligence Data Analytics Lab (AIDA), Prince Sultan University, Riyadh, Saudi Arabia. REFERENCES [1] Fachrurrazi, “The end user requirement for project management software accuracy,” International Journal of Electrical and Computer Engineering, vol. 8, no. 2, pp. 1112-1121, 2018. [2] A. Verma and S. Kaur, “Design and development of an agorithm for prioritizing the test cases using neural network as classifier,” IAES International Journal of Artificial Intelligence, vol. 4, no. 1, pp. 14-19, 2015. [3] M. Ahmadi, B. B. Rad, and M. O. Thomas, “Tailoring software development methodologies for reliability,” Journal of Telecommunication Electronic and Computer Engineering, vol. 10, no. 3, pp. 117-121, 2018. [4] A. M. Dima and M. A. Maassen, “From waterfall to agile software: Development models in the IT sector, 2006 to 2018. Impacts on company management,” Journal of International Studies, vol. 11, no. 2, pp. 315-326, 2018. [5] T. Linz, “Testing in scrum: A guide for software quality assurance in the agile world,” Rocky Nook, Inc., p. 224, 2014. [6] R. Mall, “Fundamentals of software engineering-5th ed,” PHI Learning, pp. 612, 2018. [7] J. Xiong, “Practical training of software engineering talent in one integration and four layers mode,” World Transactions on Engineering and Technology Education, vol. 14, no. 1, pp. 146-150, 2016. [8] D. Hema Latha and P. Premchand, “Estimating software reliability using ant colony optimization technique with salesman problem for software process,” International Journal of Advanced Trends in Computer Science and Engineering, vol. 7, no. 2, pp. 20-29, 2018. [9] P. Clarke, R. V. O’Connor, B. Leavy, and M. Yilmaz, “Exploring the relationship between software process adaptive capability and organisational performance,” IEEE Transactions on Software Engineering, vol. 41, no. 12, pp. 1169-1183, Dec. 2015. [10] P. Thakur and R. Shrivastava, “A review on text based emotion recognition system,” International Journal of Advanced Trends in Computer Science and Engineering, vol. 7, no. 5, pp. 67-71, 2018. [11] S. Aleem, L. F. Capretz, and F. Ahmed, “Critical success factors to improve the game development process from a developer’s perspective,” Journal of Computer Science and Technology, vol. 31, no. 5, pp. 925-950, 2016. [12] R. S. Pressman and B. Maxim, “Software engineering: A practitioner's approach-8th ed.,” McGraw-Hill Education, p. 18, 2014. [13] O. Oueslati, A. I. S. Khalil, and H. Ounelli, “Sentiment analysis for helpful reviews prediction,” International Journal of Advanced Trends in Computer Science and Engineering, vol. 7, no. 3, pp. 34-40, 2018. [14] P. Abrahamson, O. Salo, J. Ronkainen, and J. Warsta, “Agile software development methods: Review and analysis,” VIT Publication, Finland, pp.1-107, 2002. [15] F. ur Rehman, B. Maqbool, M. Q. Riaz, U. Qamar, and M. Abbas, “Scrum software maintenance model: Efficient software maintenance in agile methodology,” 2018 21st Saudi Computer Society National Computer Conference (NCC), pp. 1-5, 2018. [16] R. Kumar, P. Maheshwary, and T. Malche, “Inside agile family software development methodologies,” International Journal of Computer Sciences and Engineering, vol. 7, no. 6, pp. 650-660, 2019. [17] A. Srivastava, S. Bhardwaj, and S. Saraswat, “SCRUM model for agile methodology,” 2017 International Conference on Computing, Communication and Automation (ICCCA), pp. 864-869, 2017.
  • 8.  ISSN: 2302-9285 Bulletin of Electr Eng & Inf, Vol. 10, No. 1, February 2021 : 319 – 326 326 [18] S. S. Samarawickrama and I. Perera, “Continuous scrum: A framework to enhance scrum with DevOps,” 2017 Seventeenth International Conference on Advances in ICT for Emerging Regions (ICTer), pp. 1-7, 2017. [19] S. Hariharan, A. Rengarajan, and R. Prem Kumar, “Scrum based scaling using agile method to test software projects and its future solutions using in artificial neural networks,” International Journal of Innovative Technology and Exploring Engineering, vol. 8, no. 9, pp. 223-230, 2019. [20] J. Sutherland, “Agile development: Lesson learned from the first scrum,” Cutter Agile Project Management Advisory Service: Executive Update, vol. 5, no. 20, pp. 1-4, 2004. [21] J. Cho, “Issues and challenges of agile software development with SCRUM”, Issues in Inoformation System, vol. 9, no. 2, pp. 188-195, 2008. [22] D. Maximin, “The scrum culture: Introducing agile methods in organizations,” Springer, 2018. [23] J. Miler and K. Kaidy, “Problems and solutions of software design in scrum projects,” 2018 Federated Conference on Computer Science and Information Systems (FedCSIS), pp. 975-978, 2018. [24] A. Zakrani, M. Hain, and A. Idri, “Improving software development effort estimating using support vector regression and feature selection,” International Journal of Artificial Intelligence, vol. 8, no. 4, pp. 399-410, 2019. [25] B. Srisura and A. Lawanna, “False test case selection: Improvement of regression testing approach,” 2016 13th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON), pp. 1-6, 2016.