SlideShare a Scribd company logo
1 of 23
Download to read offline
SHEDULE M2
PREPARED BY – JAYESH YADAV (18BPH065 L.E) AND SHIV KISHAN
PAL(18BPH076 L.E)
SUBMITTED TO- DR. VIKAS
SAM HIGGINBOTOM UNIVERSITY OF AGRICULTURE TECHNOLOGY AND
SCIENCES
[ScheduleM-II]
[SeeRule 139]
Requirement OfFactoryPremisesForManufactureOf
Cosmetics
I. General
Requirements
(A) Locationandsurroundings
The factory shall be located in a sanitary
place and hygienic conditions shall be
maintained in the premises. Premises
shall not be used for residence or be
interconnected with residential area. It
shall be well ventilatedand clean.
• (B)
Buildings
The buildings used for the factory shall be
constructedso as to permit Production under
hygienic conditionsand not to permit entry of
insects, rodents, files, etc. The walls of the room in
which manufacturing operationsare carried out, shall
up to a height of six feet from the floor, be smooth,
waterproof and capable of being kept clean. The
flooring shall be smooth, even and washable and
shall be such as not to permit retentionor
accumulation of dust.
• (D) Disposal
of water
Suitable arrangements shall be made for disposal of
wastewater.
• (E) Health,
clothing and
sanitary
requirements
of the staff.
All workers shall be free from contagiousor infectious
diseases. They shall be provided with clean uniforms,
masks, headgears, and gloves wherever required.
Washing facilities shall also be provided
(F) Medical Services. - Adequate facilities for first aid
shall be provided
(G) Working benchesshall be provided for carrying
out operations such as filling, labeling, packing, etc.
such benches shall be fitted with smooth, impervious
tops capable of being washed
(H) Adequate facilities shall be provided for washing
and drying of glass containersif the same are to be
used for packing the product
• II.
Requirement
of Plant and
Equipment
The following equipment, area and other
requirementsare recommended for the manufacture
of: -
A. Powders.- Face powder, cake make-up, compacts,
face packs, masks and rouges, etc.
1. Equipment.
(a) Powder mixer of suitable type provided with a
dust collector.
(b) Perfume and colour blender.
(c) Sifter with sieves of suitable mesh size.
(d) Ball mill or suitable grinder.
(e) Trays and scoops (stainless steel).
• B. Creams,
lotions,
emulsions,
pastes, cleansing
milks, shampoos,
pomade,
brilliantine,shavin
gcreams and
hair-oils etc.
(a) Mixing and storage tanks of suitable materials.
(b) Heating kettle – steam, gas or electrically
heated.
(c) Suitable agitator.
(d) Colloidal mill or homogeniser (wherever
necessary)
(e) Triple roller mill (wherever necessary).
• C. Nail
Polishes
and Nail
lacquers.
1. Equipment:
(a) A suitable mixer.
(b) Storage tanks.
(c) Filling machine – hand operated or power driven.
(d) Weighing and Measuring devices.
An area of 15 square meters is recommended. The
section shall be provided with
flameproof exhaust system.
2. Premises:
- The following are the special requirements related
to Nail Polishes and Nail Lacquers: -
a. It shall be suited in an industrial area.
b. It shall be separate from other cosmetic-
manufacturing areas by metal/brick partition up to
ceiling
c. Floors, walls, ceiling and doors shall be fireproof.
d. Smoking, cooking and dwelling shall not be
permitted and no naked flame shall be brought in the
premises
e. All electrical writing and connections shall be
concealed and main electric switch shall be outside
the manufacturing area
3. Storage
. -All explosive solvents and ingredientsshall be
stored in metal cupboardsor in a separate enclosed
area.
• 4.
Manufacture:
(a) Manufacture of lacquer shall not be
undertaken unless the above conditions
are complied with.
(b) Workers shall be asked to wear shoes with
rubber soles in the section.
5. Other requirements: -No objection certificate
from the local Fire Brigade Authoritiesshall be
furnished.
•D.
Lipsticks
and Lip-
gloss, etc.
1. Equipment
a. Vertical mixer
b. Jackettedkettle – steam, gas or electrically
heated.
c. Mixing vessel (stainless steel)
d. Triple roller mill/Ball mill.
e. Moulds with refrigerationfacility.
f. Weighing and measuring devices.
2. An area of 15 square meters is
recommended.
•E.
Depilatories.
1. Equipment:
a. Mixing tanks.
b. Mixer
c. Triple roller mill or homogeniser (where
necessary).
d. Filling and sealing equipment
e. Weighing and measuring devices.
f. Moulds (where necessary)
2. An area of 10 square meters is
recommended.
• F. Preparations
used for Eyes: -
• Such preparations
shall be
manufactured
under strict
hygienic conditions
toensure that
these are safe for
use
I. Eyebrows, Eyelashes, Eyeliners, etc.
1. Equipment:
a. Mixing tanks.
b. A suitable mixer.
c. Homogeniser (where necessary)
d. Filling and sealing equipment.
e. Weighing and measuring devices.
An area of 10 square meters is recommended.
G. Aerosol
.
1. Equipment:-
a. Air-compressor (wherever necessary).
b. Mixing tanks.
c. Suitable propellant filling and crimping
equipments.
d. Liquid filling unit.
e. Leak testing equipment.
II.Kajaland
Surma
1.Equipment:
a. Base sterilizer
b. Powder sterilizer (dry heat oven).
c. Stainless steel tanks.
d. A suitable Mixer
e. Stainless steel sieves
f. Filling and sealing arrangements.
g. Weighing and measuring devices.
h. Homogeniser (where necessary)
i. Pestle and Mortar (for Surma)
H. Alcoholic
Fragrance
Solutions.
1. Equipment:-
a. Mixing tanks with stirrer
b. Filtering equipment.
c. Filling and sealing equipment.
d. Weighing and measuring devices.
An area of 15 square meters is recommended.
I. Hair Dyes.
1. Equipment:
a. Stainless steel tanks.
b. Mixer.
c. Filling Unit
d. Weighing and measuring devices.
e. Masks, gloves and goggles.
An area of 15 square meters with proper exhaust is
recommended.
I.Tooth-
powder
1. Equipment:
a. Weighing and measuring devices.
b. Dry mixer (powder blender)
c. Stainless steel sieves
d. Powder filling and sealing equipments.
An area of 15 square meters with proper exhaust is
recommended.
II.Toothpastes.
1. Equipment:
a. Weighing and measuring devices.
b. Kettle – steam, gas or electrically heated (where
necessary)
c. Planetory mixer with de-aerator system.
d. Stainless steel tanks.
e. Tube filling equipment.
f. Crimping machine.
An additional area of 15 square meters with proper
exhaust is recommended.
K.ToiletSoaps.
1. Equipment:-
(a) Kettles/pans for saponification.
(b) Boiler or any other suitable heating arrangement.
(c) Suitable stirring arrangement.
(d) Storage tanks or trays
(e) Driers.
Thankyou
SHUATS
SHIV KISHAN PAL (18BPH076L.E)
Prepared by JAYESH YADAV
(18BPH065L.E)

More Related Content

Similar to shedule m2

Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layout
Robin Gulati
 
Premises Design Construction And Plant
Premises Design Construction And PlantPremises Design Construction And Plant
Premises Design Construction And Plant
PrakashKumar721
 
Aac introduction
Aac introductionAac introduction
Aac introduction
Gary Li
 

Similar to shedule m2 (20)

Schedule m1,m2 & m3
Schedule m1,m2 & m3Schedule m1,m2 & m3
Schedule m1,m2 & m3
 
Plant Layout- Ajinkya Malpe.pptx
Plant Layout- Ajinkya Malpe.pptxPlant Layout- Ajinkya Malpe.pptx
Plant Layout- Ajinkya Malpe.pptx
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layout
 
Cosmetics-regulatory.pptx
Cosmetics-regulatory.pptxCosmetics-regulatory.pptx
Cosmetics-regulatory.pptx
 
SELECTION OF SITE & PRECAUTIONS FOR HYGIENIC CONDITIONS
SELECTION OF SITE & PRECAUTIONS FOR HYGIENIC CONDITIONS SELECTION OF SITE & PRECAUTIONS FOR HYGIENIC CONDITIONS
SELECTION OF SITE & PRECAUTIONS FOR HYGIENIC CONDITIONS
 
GMP Sub Part - C
GMP Sub Part - CGMP Sub Part - C
GMP Sub Part - C
 
Manufacturing facility of parentarals as per schedule m
Manufacturing facility of parentarals as per schedule mManufacturing facility of parentarals as per schedule m
Manufacturing facility of parentarals as per schedule m
 
mid sem report.pptx
mid sem report.pptxmid sem report.pptx
mid sem report.pptx
 
Maintainance of Facility & Equipment. pptx
Maintainance of Facility & Equipment. pptxMaintainance of Facility & Equipment. pptx
Maintainance of Facility & Equipment. pptx
 
Shedule m
Shedule mShedule m
Shedule m
 
opthalmics.pptx
opthalmics.pptxopthalmics.pptx
opthalmics.pptx
 
FPL - 03 DESIGN, CONSTRUCTION.ppt
FPL - 03 DESIGN, CONSTRUCTION.pptFPL - 03 DESIGN, CONSTRUCTION.ppt
FPL - 03 DESIGN, CONSTRUCTION.ppt
 
Designing of plant support services
Designing of plant support servicesDesigning of plant support services
Designing of plant support services
 
Textile1
Textile1Textile1
Textile1
 
Cgmp.pptx
Cgmp.pptxCgmp.pptx
Cgmp.pptx
 
Plant support service layouts
Plant support service layoutsPlant support service layouts
Plant support service layouts
 
Premises Design Construction And Plant
Premises Design Construction And PlantPremises Design Construction And Plant
Premises Design Construction And Plant
 
CSSD by Dr Zulfiquer Ahmed Amin
CSSD by Dr Zulfiquer Ahmed AminCSSD by Dr Zulfiquer Ahmed Amin
CSSD by Dr Zulfiquer Ahmed Amin
 
Drugs & Cosmetics Act 1940 Part V
Drugs & Cosmetics Act 1940 Part VDrugs & Cosmetics Act 1940 Part V
Drugs & Cosmetics Act 1940 Part V
 
Aac introduction
Aac introductionAac introduction
Aac introduction
 

Recently uploaded

Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
EADTU
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 

Recently uploaded (20)

TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptx
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 

shedule m2

  • 1. SHEDULE M2 PREPARED BY – JAYESH YADAV (18BPH065 L.E) AND SHIV KISHAN PAL(18BPH076 L.E) SUBMITTED TO- DR. VIKAS SAM HIGGINBOTOM UNIVERSITY OF AGRICULTURE TECHNOLOGY AND SCIENCES
  • 3. I. General Requirements (A) Locationandsurroundings The factory shall be located in a sanitary place and hygienic conditions shall be maintained in the premises. Premises shall not be used for residence or be interconnected with residential area. It shall be well ventilatedand clean.
  • 4. • (B) Buildings The buildings used for the factory shall be constructedso as to permit Production under hygienic conditionsand not to permit entry of insects, rodents, files, etc. The walls of the room in which manufacturing operationsare carried out, shall up to a height of six feet from the floor, be smooth, waterproof and capable of being kept clean. The flooring shall be smooth, even and washable and shall be such as not to permit retentionor accumulation of dust.
  • 5. • (D) Disposal of water Suitable arrangements shall be made for disposal of wastewater.
  • 6. • (E) Health, clothing and sanitary requirements of the staff. All workers shall be free from contagiousor infectious diseases. They shall be provided with clean uniforms, masks, headgears, and gloves wherever required. Washing facilities shall also be provided (F) Medical Services. - Adequate facilities for first aid shall be provided (G) Working benchesshall be provided for carrying out operations such as filling, labeling, packing, etc. such benches shall be fitted with smooth, impervious tops capable of being washed (H) Adequate facilities shall be provided for washing and drying of glass containersif the same are to be used for packing the product
  • 7. • II. Requirement of Plant and Equipment The following equipment, area and other requirementsare recommended for the manufacture of: - A. Powders.- Face powder, cake make-up, compacts, face packs, masks and rouges, etc. 1. Equipment. (a) Powder mixer of suitable type provided with a dust collector. (b) Perfume and colour blender. (c) Sifter with sieves of suitable mesh size. (d) Ball mill or suitable grinder. (e) Trays and scoops (stainless steel).
  • 8. • B. Creams, lotions, emulsions, pastes, cleansing milks, shampoos, pomade, brilliantine,shavin gcreams and hair-oils etc. (a) Mixing and storage tanks of suitable materials. (b) Heating kettle – steam, gas or electrically heated. (c) Suitable agitator. (d) Colloidal mill or homogeniser (wherever necessary) (e) Triple roller mill (wherever necessary).
  • 9. • C. Nail Polishes and Nail lacquers. 1. Equipment: (a) A suitable mixer. (b) Storage tanks. (c) Filling machine – hand operated or power driven. (d) Weighing and Measuring devices. An area of 15 square meters is recommended. The section shall be provided with flameproof exhaust system.
  • 10. 2. Premises: - The following are the special requirements related to Nail Polishes and Nail Lacquers: - a. It shall be suited in an industrial area. b. It shall be separate from other cosmetic- manufacturing areas by metal/brick partition up to ceiling c. Floors, walls, ceiling and doors shall be fireproof. d. Smoking, cooking and dwelling shall not be permitted and no naked flame shall be brought in the premises e. All electrical writing and connections shall be concealed and main electric switch shall be outside the manufacturing area
  • 11. 3. Storage . -All explosive solvents and ingredientsshall be stored in metal cupboardsor in a separate enclosed area.
  • 12. • 4. Manufacture: (a) Manufacture of lacquer shall not be undertaken unless the above conditions are complied with. (b) Workers shall be asked to wear shoes with rubber soles in the section. 5. Other requirements: -No objection certificate from the local Fire Brigade Authoritiesshall be furnished.
  • 13. •D. Lipsticks and Lip- gloss, etc. 1. Equipment a. Vertical mixer b. Jackettedkettle – steam, gas or electrically heated. c. Mixing vessel (stainless steel) d. Triple roller mill/Ball mill. e. Moulds with refrigerationfacility. f. Weighing and measuring devices. 2. An area of 15 square meters is recommended.
  • 14. •E. Depilatories. 1. Equipment: a. Mixing tanks. b. Mixer c. Triple roller mill or homogeniser (where necessary). d. Filling and sealing equipment e. Weighing and measuring devices. f. Moulds (where necessary) 2. An area of 10 square meters is recommended.
  • 15. • F. Preparations used for Eyes: - • Such preparations shall be manufactured under strict hygienic conditions toensure that these are safe for use I. Eyebrows, Eyelashes, Eyeliners, etc. 1. Equipment: a. Mixing tanks. b. A suitable mixer. c. Homogeniser (where necessary) d. Filling and sealing equipment. e. Weighing and measuring devices. An area of 10 square meters is recommended.
  • 16. G. Aerosol . 1. Equipment:- a. Air-compressor (wherever necessary). b. Mixing tanks. c. Suitable propellant filling and crimping equipments. d. Liquid filling unit. e. Leak testing equipment.
  • 17. II.Kajaland Surma 1.Equipment: a. Base sterilizer b. Powder sterilizer (dry heat oven). c. Stainless steel tanks. d. A suitable Mixer e. Stainless steel sieves f. Filling and sealing arrangements. g. Weighing and measuring devices. h. Homogeniser (where necessary) i. Pestle and Mortar (for Surma)
  • 18. H. Alcoholic Fragrance Solutions. 1. Equipment:- a. Mixing tanks with stirrer b. Filtering equipment. c. Filling and sealing equipment. d. Weighing and measuring devices. An area of 15 square meters is recommended.
  • 19. I. Hair Dyes. 1. Equipment: a. Stainless steel tanks. b. Mixer. c. Filling Unit d. Weighing and measuring devices. e. Masks, gloves and goggles. An area of 15 square meters with proper exhaust is recommended.
  • 20. I.Tooth- powder 1. Equipment: a. Weighing and measuring devices. b. Dry mixer (powder blender) c. Stainless steel sieves d. Powder filling and sealing equipments. An area of 15 square meters with proper exhaust is recommended.
  • 21. II.Toothpastes. 1. Equipment: a. Weighing and measuring devices. b. Kettle – steam, gas or electrically heated (where necessary) c. Planetory mixer with de-aerator system. d. Stainless steel tanks. e. Tube filling equipment. f. Crimping machine. An additional area of 15 square meters with proper exhaust is recommended.
  • 22. K.ToiletSoaps. 1. Equipment:- (a) Kettles/pans for saponification. (b) Boiler or any other suitable heating arrangement. (c) Suitable stirring arrangement. (d) Storage tanks or trays (e) Driers.
  • 23. Thankyou SHUATS SHIV KISHAN PAL (18BPH076L.E) Prepared by JAYESH YADAV (18BPH065L.E)