March 12, 2011 Via email: smgaggero@pcmcorp.net Pacific Coast Management P.O. Box
25070 Ventura, CA. 93002
SUBJECT: Land Surveying Services for Canada Larga Land & Livestock LLC Ranch and Sulpher
Mountain land &Livestock LLC Ranch (“Site” , or “parcels”, or “Ranches”) APN’s 035-0-220-025, 0075,
085, 095, 105,125, 035-0-250-025 & 035 We are propose to provide the following professional land
surveying services for the above referenced property.
ASSUMPTIONS
This proposal is based on the following assumptions and qualifications.  All agency fees (if any) will be
paid by others.
 If any other services are determined to be necessary, a separate authorization will be provided for those
services.
SCOPE OF WORK
I propose to perform the following services:
Comment [S1]: add in all APN’s for SMLLC and
CLLL
1. Research - Survey I will research available Ventura County survey records to obtain copies of recorded
survey maps, field notes and deeds as well as other available information necessary to establish control for
the survey effort and the scope of work herein.
2. Compilation Map I will compile the pertinent record information into sketch form for the field work
efforts. This map will assist me in locating existing monuments necessary to establish the control for the
survey tasks. This is expected to take several office days to fully complete it but can be done in chunks to
facilitate the priorities. This effort is needed for all field work that involves boundary locations including road
right of ways and existing property lines of the exterior boundary.
3. Field Survey I will perform a field survey to physically locate all existing monuments near or on the
subject Ranches that may be needed to establish the boundaries and other work herein. I will locate
Canada Larga Rd, the Right of Way, the gates and cattle guards crossing it, the creek, pastures and
pasture fencing, structures and buildings on both sides of Canada Larga Rd, and the locations of existing
features within the Equestrian Center, all of which will be reflected on two Topographic Maps and Surveys.
The Canada Larga Road portion will not have the Equestrian Center reflected on it and vice versa, they will
be two separate Topo/Surveys maps. The Topo maps will be based on a vertical control from a local
Benchmark. After the initial control is established for the Right of Way pipe fencing along Canada Larga
Rd, we will then focus on the rest of the work, including the Equestrian Center. I will set permanent corners
for the right of way and any necessary temporary staking and or markers for the fence builders. Next will
be the property lines of the westerly lines of APN 035-0-220-105 and the northerly line of APN 035-0-220-
095. In order to establish those two lines, it is expected that some of the rest of the boundaries would need
to be recovered first, namely portions of the Rancho Line, since the deeds were written from them.
Included in the field surveys would be establishing the entire exterior boundary of the subject Ranches and
setting missing corners. Also, setting of the new and existing corners of the lot line adjustments when they
are completed, or near completed. This portion of the project will be done as convenient and may not be
completed until completion of other tasks.
4. Boundary Analysis A boundary survey of the Ranches will be performed in accordance with the
Professional Land Surveyor’s Act requirements. I will analyze that data and establish the boundary location
of the Ranches and lots, existing and to be adjusted, relative to the recovered monumentation.
5. Record of Survey All the found and set corners will need to be shown on a Record of Survey as
required by the County and Professional Land Surveyors’ Act, for each Ranch and parcel (lot). I will
prepare a Record of Survey Map for each Ranch, indicating the property boundary and all the retained
existing and newly established lot lines. The maps will be submitted to the Ventura County Surveyor's
office for review and recordation. These maps will provide a permanent record of the boundary survey, the
location of Canada Larga Rd and right of way, and the new lot lines. The maps will then be recorded with
the Ventura County Recorder’s Office reflecting the monumented boundaries after it goes through plan
checks. This portion of the work is long term and will not be finalized until the last lot line adjustment has
been approved or processed concurrently with the last Lot Line Adjustment application (LLA).
6. Final Monument I will set final boundary monuments and refer to the physical description of what was
set on the Record of Survey Map that we will create.
7. Lot Line Adjustments (LLA) I will work with you and make recommendations to determine the best
configuration, size and location for the lots to be created by the LLA applications. This includes field visits
and printing USGS and other publicly available Topographical and photographical material, at various
scales, to review, study and evaluate the existing and potential lots, house sites, access, views, water
availability, drainage topographic usability, and other issues and considerations germane to lot creation in
general and in the County of Ventura. I will prepare legal descriptions and exhibits for the proposed
configuration of new lot lines. I will prepare and process everything necessary through the County Planning
Department. The lot line adjustments can be accomplished with 2 LLA’s, provided we are dealing with 4 or
less lots per application. Depending on the configuration, we may be able to process them concurrently if
an existing interior line is to remain, otherwise it would be done one as soon as possible after the other.
This proposal includes 2 LLA applications within the cost.
DELIVERABLE PRODUCTS and WORK SCHEDULE
3 Copies of the Rancho Ex Mission map/survey from the 1800’s.
Topographic Survey/Map and temporary staking for fence construction and Monumentation of Canada
Larga Road, the creek, pastures, structures, iron pipe fencing, and pasture layout.
Topographic Survey/Map of the Equestrian Center
Two complete LLA applications and exhibits processed through Ventura County.
Survey and Monumentation of all exterior Ranch boundaries, newly created and existing parcels (lots).
Record of Survey Map showing new and existing parcels, Canada Larga Rd and the right of way, all
monumentation and process through Ventura County.
SCHEDULE OF WORK
Canada Larga Road survey, staking, topo map - ____ Days, commencing _____
Equestrian Center survey and topo map - ____Days, commencing ___________
LLA - ______Days, Commencing ___________
All monuments and staking, property lines, corners and lots - ____ Days, commencing __________
FEE
We will perform the work at $100/hr for field survey and $50/hr for office work, on a not to exceed basis..
We propose to provide the services described, including all materials on a hourly fee basis not to exceed
$20,000. We required a $1,000 retainer to proceed.
I will submit a detailed bill Monthly, reflecting the time spent and the exact work performed as the work
progresses. There will be a 30% retention on each billing. Final 30% will be paid upon final completion of
all services proposed herein.
Should any work be needed outside of the scope and project goals discussed above, a change order with
written authorization will be requested and obtained prior to starting the additional work. Any additional
services required to complete the scope and project goals set forth herein shall be included in this proposal.
Very truly yours,
Bruce D. Barton, P.L.S. - Land Surveying PLS 5555, expires 09/30/2011
AGREEMENT & AUTHORIZATION TO PROCEED THIS PROPOSAL IS ACCEPTED AND BRUCE D.
BARTON, CONSULTING LAND SURVEYOR, IS HEREBY AUTHORIZED TO PROCEED WITH THE
WORK DESCRIBED HEREIN FOR THE AMOUNT NOT TO EXCEED $22,540. AS REQUIRED UNDER
CCR TITLE 16, CHAPTER 5, SECTION 463.5, NOTICE OF LICENSURE, CLIENT IS HEREBY ADVISED
THAT BRUCE D. BARTON, CONSULTING LAND SURVEYOR, IS LICENSED BY THE STATE OF
CALIFORNIA TO PROVIDE LAND SURVEYING SERVICES. SPECIFIC PROJECT SERVICES WILL BE
PROVIDED UNDER THE DIRECTION OF A LICENSED LAND SURVEYOR, AS APPROPRIATE TO THE
SCOPE OF SERVICES ENVISIONED.
Signature Date

More Related Content

Viewers also liked

Https _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696
Https  _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696Https  _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696
Https _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696jamesmaredmond
 
Appellant.opening brief 20111115164215850
Appellant.opening brief 20111115164215850Appellant.opening brief 20111115164215850
Appellant.opening brief 20111115164215850jamesmaredmond
 
Sulphur mountainsrespondentsbrief
Sulphur mountainsrespondentsbriefSulphur mountainsrespondentsbrief
Sulphur mountainsrespondentsbriefjamesmaredmond
 
09.06.12 motion appointment receiver [conformed]
09.06.12   motion appointment receiver [conformed]09.06.12   motion appointment receiver [conformed]
09.06.12 motion appointment receiver [conformed]jamesmaredmond
 
B168314 dis sulphur_mountain
B168314 dis sulphur_mountainB168314 dis sulphur_mountain
B168314 dis sulphur_mountainjamesmaredmond
 
2010-11 Presentazione Nuovo Hospital Younde
2010-11 Presentazione Nuovo Hospital Younde2010-11 Presentazione Nuovo Hospital Younde
2010-11 Presentazione Nuovo Hospital YoundeElena Re
 
Бяззлучнікавыя складаныя сказы
Бяззлучнікавыя складаныя сказыБяззлучнікавыя складаныя сказы
Бяззлучнікавыя складаныя сказыSergey Miranovich
 

Viewers also liked (10)

Https _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696
Https  _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696Https  _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696
Https _ecf.cacb.uscourts.gov_cgi-bin_show_temp.pl_file=file0.0704430361251696
 
Appellant.opening brief 20111115164215850
Appellant.opening brief 20111115164215850Appellant.opening brief 20111115164215850
Appellant.opening brief 20111115164215850
 
Sulphur mountainsrespondentsbrief
Sulphur mountainsrespondentsbriefSulphur mountainsrespondentsbrief
Sulphur mountainsrespondentsbrief
 
09.06.12 motion appointment receiver [conformed]
09.06.12   motion appointment receiver [conformed]09.06.12   motion appointment receiver [conformed]
09.06.12 motion appointment receiver [conformed]
 
B168314 dis sulphur_mountain
B168314 dis sulphur_mountainB168314 dis sulphur_mountain
B168314 dis sulphur_mountain
 
Redes informáticas
Redes informáticasRedes informáticas
Redes informáticas
 
2010-11 Presentazione Nuovo Hospital Younde
2010-11 Presentazione Nuovo Hospital Younde2010-11 Presentazione Nuovo Hospital Younde
2010-11 Presentazione Nuovo Hospital Younde
 
latest Resume
latest Resumelatest Resume
latest Resume
 
Network topology
Network topologyNetwork topology
Network topology
 
Бяззлучнікавыя складаныя сказы
Бяззлучнікавыя складаныя сказыБяззлучнікавыя складаныя сказы
Бяззлучнікавыя складаныя сказы
 

Similar to Barton proposal draft 31311

land Development
land Developmentland Development
land DevelopmentIan Wave
 
Item # 6 - Freese & Nichols Normandy Storm Drain
Item # 6 - Freese & Nichols Normandy Storm DrainItem # 6 - Freese & Nichols Normandy Storm Drain
Item # 6 - Freese & Nichols Normandy Storm Drainahcitycouncil
 
Reston Transit Station Areas Development and Transportation Projects
Reston Transit Station Areas Development and Transportation Projects Reston Transit Station Areas Development and Transportation Projects
Reston Transit Station Areas Development and Transportation Projects Fairfax County
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Prescriptive ease 01 09
Prescriptive ease 01 09Prescriptive ease 01 09
Prescriptive ease 01 09louieb
 
SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9Andrew Ackerman
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsFairfax County
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingFairfax County
 
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxMTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxgilpinleeanna
 
I need someone to paraphrase these words just change it to dif.docx
I need someone to paraphrase these words  just change it to dif.docxI need someone to paraphrase these words  just change it to dif.docx
I need someone to paraphrase these words just change it to dif.docxwilcockiris
 
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Adam Cohen
 
CV Resume Dejan Mladenovski 1 Jan 15 2014
CV Resume Dejan Mladenovski 1 Jan 15 2014CV Resume Dejan Mladenovski 1 Jan 15 2014
CV Resume Dejan Mladenovski 1 Jan 15 2014Dejan Mladenovski
 
2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater ChargesAntea Group
 
195 Huntmar Drive - Fotenn planning rationale demonstration report
195 Huntmar Drive - Fotenn planning rationale demonstration report195 Huntmar Drive - Fotenn planning rationale demonstration report
195 Huntmar Drive - Fotenn planning rationale demonstration reportStittsvilleCentral.ca
 
Solar Power Analysis and Design Specifications Houston solar
Solar Power Analysis and  Design Specifications Houston solarSolar Power Analysis and  Design Specifications Houston solar
Solar Power Analysis and Design Specifications Houston solarHossam Zein
 
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove roadPublic Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove roadStittsvilleCentral.ca
 

Similar to Barton proposal draft 31311 (20)

land Development
land Developmentland Development
land Development
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
 
Dor
DorDor
Dor
 
Item # 6 - Freese & Nichols Normandy Storm Drain
Item # 6 - Freese & Nichols Normandy Storm DrainItem # 6 - Freese & Nichols Normandy Storm Drain
Item # 6 - Freese & Nichols Normandy Storm Drain
 
John_Giblin
John_GiblinJohn_Giblin
John_Giblin
 
Reston Transit Station Areas Development and Transportation Projects
Reston Transit Station Areas Development and Transportation Projects Reston Transit Station Areas Development and Transportation Projects
Reston Transit Station Areas Development and Transportation Projects
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Prescriptive ease 01 09
Prescriptive ease 01 09Prescriptive ease 01 09
Prescriptive ease 01 09
 
SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9SFPUC PEA_LandUseRec&AgPgs1-9
SFPUC PEA_LandUseRec&AgPgs1-9
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation Projects
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and Restriping
 
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxMTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
 
I need someone to paraphrase these words just change it to dif.docx
I need someone to paraphrase these words  just change it to dif.docxI need someone to paraphrase these words  just change it to dif.docx
I need someone to paraphrase these words just change it to dif.docx
 
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
 
CV Resume Dejan Mladenovski 1 Jan 15 2014
CV Resume Dejan Mladenovski 1 Jan 15 2014CV Resume Dejan Mladenovski 1 Jan 15 2014
CV Resume Dejan Mladenovski 1 Jan 15 2014
 
2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges
 
195 Huntmar Drive - Fotenn planning rationale demonstration report
195 Huntmar Drive - Fotenn planning rationale demonstration report195 Huntmar Drive - Fotenn planning rationale demonstration report
195 Huntmar Drive - Fotenn planning rationale demonstration report
 
Frank Del 0215
Frank Del 0215Frank Del 0215
Frank Del 0215
 
Solar Power Analysis and Design Specifications Houston solar
Solar Power Analysis and  Design Specifications Houston solarSolar Power Analysis and  Design Specifications Houston solar
Solar Power Analysis and Design Specifications Houston solar
 
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove roadPublic Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
 

Recently uploaded

ARTICLE 370 PDF about the indian constitution.
ARTICLE 370 PDF about the  indian constitution.ARTICLE 370 PDF about the  indian constitution.
ARTICLE 370 PDF about the indian constitution.tanughoshal0
 
5-6-24 David Kennedy Article Law 360.pdf
5-6-24 David Kennedy Article Law 360.pdf5-6-24 David Kennedy Article Law 360.pdf
5-6-24 David Kennedy Article Law 360.pdfTodd Spodek
 
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理F La
 
Performance of contract-1 law presentation
Performance of contract-1 law presentationPerformance of contract-1 law presentation
Performance of contract-1 law presentationKhushdeep Kaur
 
一比一原版(UWA毕业证书)西澳大学毕业证如何办理
一比一原版(UWA毕业证书)西澳大学毕业证如何办理一比一原版(UWA毕业证书)西澳大学毕业证如何办理
一比一原版(UWA毕业证书)西澳大学毕业证如何办理bd2c5966a56d
 
一比一原版(UM毕业证书)密苏里大学毕业证如何办理
一比一原版(UM毕业证书)密苏里大学毕业证如何办理一比一原版(UM毕业证书)密苏里大学毕业证如何办理
一比一原版(UM毕业证书)密苏里大学毕业证如何办理F La
 
Elective Course on Forensic Science in Law
Elective Course on Forensic Science  in LawElective Course on Forensic Science  in Law
Elective Course on Forensic Science in LawNilendra Kumar
 
Smarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation Strategy
Smarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation StrategySmarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation Strategy
Smarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation StrategyJong Hyuk Choi
 
一比一原版悉尼科技大学毕业证如何办理
一比一原版悉尼科技大学毕业证如何办理一比一原版悉尼科技大学毕业证如何办理
一比一原版悉尼科技大学毕业证如何办理e9733fc35af6
 
一比一原版(Warwick毕业证书)华威大学毕业证如何办理
一比一原版(Warwick毕业证书)华威大学毕业证如何办理一比一原版(Warwick毕业证书)华威大学毕业证如何办理
一比一原版(Warwick毕业证书)华威大学毕业证如何办理Fir La
 
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理Airst S
 
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理ss
 
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理Airst S
 
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersPhilippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersJillianAsdala
 
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURYA SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURYJulian Scutts
 
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理e9733fc35af6
 
judicial remedies against administrative actions.pptx
judicial remedies against administrative actions.pptxjudicial remedies against administrative actions.pptx
judicial remedies against administrative actions.pptxIshikaChauhan30
 
一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理
一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理
一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理e9733fc35af6
 
一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理Airst S
 

Recently uploaded (20)

ARTICLE 370 PDF about the indian constitution.
ARTICLE 370 PDF about the  indian constitution.ARTICLE 370 PDF about the  indian constitution.
ARTICLE 370 PDF about the indian constitution.
 
5-6-24 David Kennedy Article Law 360.pdf
5-6-24 David Kennedy Article Law 360.pdf5-6-24 David Kennedy Article Law 360.pdf
5-6-24 David Kennedy Article Law 360.pdf
 
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
 
Performance of contract-1 law presentation
Performance of contract-1 law presentationPerformance of contract-1 law presentation
Performance of contract-1 law presentation
 
Chambers Global Practice Guide - Canada M&A
Chambers Global Practice Guide - Canada M&AChambers Global Practice Guide - Canada M&A
Chambers Global Practice Guide - Canada M&A
 
一比一原版(UWA毕业证书)西澳大学毕业证如何办理
一比一原版(UWA毕业证书)西澳大学毕业证如何办理一比一原版(UWA毕业证书)西澳大学毕业证如何办理
一比一原版(UWA毕业证书)西澳大学毕业证如何办理
 
一比一原版(UM毕业证书)密苏里大学毕业证如何办理
一比一原版(UM毕业证书)密苏里大学毕业证如何办理一比一原版(UM毕业证书)密苏里大学毕业证如何办理
一比一原版(UM毕业证书)密苏里大学毕业证如何办理
 
Elective Course on Forensic Science in Law
Elective Course on Forensic Science  in LawElective Course on Forensic Science  in Law
Elective Course on Forensic Science in Law
 
Smarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation Strategy
Smarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation StrategySmarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation Strategy
Smarp Snapshot 210 -- Google's Social Media Ad Fraud & Disinformation Strategy
 
一比一原版悉尼科技大学毕业证如何办理
一比一原版悉尼科技大学毕业证如何办理一比一原版悉尼科技大学毕业证如何办理
一比一原版悉尼科技大学毕业证如何办理
 
一比一原版(Warwick毕业证书)华威大学毕业证如何办理
一比一原版(Warwick毕业证书)华威大学毕业证如何办理一比一原版(Warwick毕业证书)华威大学毕业证如何办理
一比一原版(Warwick毕业证书)华威大学毕业证如何办理
 
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
 
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
 
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
一比一原版(JCU毕业证书)詹姆斯库克大学毕业证如何办理
 
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersPhilippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
 
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURYA SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
A SHORT HISTORY OF LIBERTY'S PROGREE THROUGH HE EIGHTEENTH CENTURY
 
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
 
judicial remedies against administrative actions.pptx
judicial remedies against administrative actions.pptxjudicial remedies against administrative actions.pptx
judicial remedies against administrative actions.pptx
 
一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理
一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理
一比一原版(OhioStateU毕业证书)美国俄亥俄州立大学毕业证如何办理
 
一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证书)埃迪斯科文大学毕业证如何办理
 

Barton proposal draft 31311

  • 1. March 12, 2011 Via email: smgaggero@pcmcorp.net Pacific Coast Management P.O. Box 25070 Ventura, CA. 93002 SUBJECT: Land Surveying Services for Canada Larga Land & Livestock LLC Ranch and Sulpher Mountain land &Livestock LLC Ranch (“Site” , or “parcels”, or “Ranches”) APN’s 035-0-220-025, 0075, 085, 095, 105,125, 035-0-250-025 & 035 We are propose to provide the following professional land surveying services for the above referenced property. ASSUMPTIONS This proposal is based on the following assumptions and qualifications.  All agency fees (if any) will be paid by others.  If any other services are determined to be necessary, a separate authorization will be provided for those services. SCOPE OF WORK I propose to perform the following services: Comment [S1]: add in all APN’s for SMLLC and CLLL
  • 2. 1. Research - Survey I will research available Ventura County survey records to obtain copies of recorded survey maps, field notes and deeds as well as other available information necessary to establish control for the survey effort and the scope of work herein.
  • 3. 2. Compilation Map I will compile the pertinent record information into sketch form for the field work efforts. This map will assist me in locating existing monuments necessary to establish the control for the survey tasks. This is expected to take several office days to fully complete it but can be done in chunks to facilitate the priorities. This effort is needed for all field work that involves boundary locations including road right of ways and existing property lines of the exterior boundary.
  • 4. 3. Field Survey I will perform a field survey to physically locate all existing monuments near or on the subject Ranches that may be needed to establish the boundaries and other work herein. I will locate Canada Larga Rd, the Right of Way, the gates and cattle guards crossing it, the creek, pastures and pasture fencing, structures and buildings on both sides of Canada Larga Rd, and the locations of existing features within the Equestrian Center, all of which will be reflected on two Topographic Maps and Surveys. The Canada Larga Road portion will not have the Equestrian Center reflected on it and vice versa, they will be two separate Topo/Surveys maps. The Topo maps will be based on a vertical control from a local Benchmark. After the initial control is established for the Right of Way pipe fencing along Canada Larga Rd, we will then focus on the rest of the work, including the Equestrian Center. I will set permanent corners for the right of way and any necessary temporary staking and or markers for the fence builders. Next will be the property lines of the westerly lines of APN 035-0-220-105 and the northerly line of APN 035-0-220- 095. In order to establish those two lines, it is expected that some of the rest of the boundaries would need to be recovered first, namely portions of the Rancho Line, since the deeds were written from them. Included in the field surveys would be establishing the entire exterior boundary of the subject Ranches and setting missing corners. Also, setting of the new and existing corners of the lot line adjustments when they are completed, or near completed. This portion of the project will be done as convenient and may not be completed until completion of other tasks.
  • 5. 4. Boundary Analysis A boundary survey of the Ranches will be performed in accordance with the Professional Land Surveyor’s Act requirements. I will analyze that data and establish the boundary location of the Ranches and lots, existing and to be adjusted, relative to the recovered monumentation.
  • 6. 5. Record of Survey All the found and set corners will need to be shown on a Record of Survey as required by the County and Professional Land Surveyors’ Act, for each Ranch and parcel (lot). I will prepare a Record of Survey Map for each Ranch, indicating the property boundary and all the retained existing and newly established lot lines. The maps will be submitted to the Ventura County Surveyor's office for review and recordation. These maps will provide a permanent record of the boundary survey, the location of Canada Larga Rd and right of way, and the new lot lines. The maps will then be recorded with the Ventura County Recorder’s Office reflecting the monumented boundaries after it goes through plan checks. This portion of the work is long term and will not be finalized until the last lot line adjustment has been approved or processed concurrently with the last Lot Line Adjustment application (LLA).
  • 7. 6. Final Monument I will set final boundary monuments and refer to the physical description of what was set on the Record of Survey Map that we will create.
  • 8. 7. Lot Line Adjustments (LLA) I will work with you and make recommendations to determine the best configuration, size and location for the lots to be created by the LLA applications. This includes field visits and printing USGS and other publicly available Topographical and photographical material, at various scales, to review, study and evaluate the existing and potential lots, house sites, access, views, water availability, drainage topographic usability, and other issues and considerations germane to lot creation in general and in the County of Ventura. I will prepare legal descriptions and exhibits for the proposed configuration of new lot lines. I will prepare and process everything necessary through the County Planning Department. The lot line adjustments can be accomplished with 2 LLA’s, provided we are dealing with 4 or less lots per application. Depending on the configuration, we may be able to process them concurrently if an existing interior line is to remain, otherwise it would be done one as soon as possible after the other. This proposal includes 2 LLA applications within the cost. DELIVERABLE PRODUCTS and WORK SCHEDULE 3 Copies of the Rancho Ex Mission map/survey from the 1800’s. Topographic Survey/Map and temporary staking for fence construction and Monumentation of Canada Larga Road, the creek, pastures, structures, iron pipe fencing, and pasture layout. Topographic Survey/Map of the Equestrian Center Two complete LLA applications and exhibits processed through Ventura County. Survey and Monumentation of all exterior Ranch boundaries, newly created and existing parcels (lots). Record of Survey Map showing new and existing parcels, Canada Larga Rd and the right of way, all monumentation and process through Ventura County.
  • 9. SCHEDULE OF WORK Canada Larga Road survey, staking, topo map - ____ Days, commencing _____ Equestrian Center survey and topo map - ____Days, commencing ___________ LLA - ______Days, Commencing ___________ All monuments and staking, property lines, corners and lots - ____ Days, commencing __________
  • 10. FEE We will perform the work at $100/hr for field survey and $50/hr for office work, on a not to exceed basis.. We propose to provide the services described, including all materials on a hourly fee basis not to exceed $20,000. We required a $1,000 retainer to proceed. I will submit a detailed bill Monthly, reflecting the time spent and the exact work performed as the work progresses. There will be a 30% retention on each billing. Final 30% will be paid upon final completion of all services proposed herein. Should any work be needed outside of the scope and project goals discussed above, a change order with written authorization will be requested and obtained prior to starting the additional work. Any additional services required to complete the scope and project goals set forth herein shall be included in this proposal.
  • 11. Very truly yours, Bruce D. Barton, P.L.S. - Land Surveying PLS 5555, expires 09/30/2011
  • 12. AGREEMENT & AUTHORIZATION TO PROCEED THIS PROPOSAL IS ACCEPTED AND BRUCE D. BARTON, CONSULTING LAND SURVEYOR, IS HEREBY AUTHORIZED TO PROCEED WITH THE WORK DESCRIBED HEREIN FOR THE AMOUNT NOT TO EXCEED $22,540. AS REQUIRED UNDER CCR TITLE 16, CHAPTER 5, SECTION 463.5, NOTICE OF LICENSURE, CLIENT IS HEREBY ADVISED THAT BRUCE D. BARTON, CONSULTING LAND SURVEYOR, IS LICENSED BY THE STATE OF CALIFORNIA TO PROVIDE LAND SURVEYING SERVICES. SPECIFIC PROJECT SERVICES WILL BE PROVIDED UNDER THE DIRECTION OF A LICENSED LAND SURVEYOR, AS APPROPRIATE TO THE SCOPE OF SERVICES ENVISIONED. Signature Date