2. Site Location
Prague - 850 km
Vienna - 720 km
Minsk - 580 km
Kyiv -
575 km
Kishinev -
560 km
Budapest - 650 km
Krakow - 300 km
Warsaw
- 400 km
City Center
A4 highway along the site
8 km
11 km
4,5 km
2 km
Public Trasport
Lviv International Airport
Airport Cargo Terminal
Major Rail Cargo Terminal
Catchment area
(50k inhabitants)
10 intercity and municipal bus routes
Networks and Connection Points
point ofconnectionto the gas supplypoint of connectionto the electricity networkpoint of connectionto sewage treatment networkspoint of connectionto the water supply25 ha150 ha Shevchenka Str. A4 highway
25 ha land
150 ha land
road
railway
electricity
gas supply
water supply
sewage supply
border
of the city
up to 25 hectares on Shevchenko St. in Ryasne II area
circa 150 hectares
Stage:
Stage:
1
2
3. Site Development Plan
Option 1
Option 2
Two land plots of
3,3 hectares, each for administrative and production buildings, engineering and transport infrastructure
Two land plots, divided into eight plots of 2 hectares each for administrative and production buildings, engineering and transport infrastructure.
Plot 3,3 hectares for administrative and production buildings, engineering and transport infrastructure – 2 plots
Plot 3,2 hectares — 2 plots
Plot 2,4 hectares — 2 plots
Plot 1,2 hectares — 2 plots
Plot 1,2 hа — 2 plots
Water
D = 500
€ 0.45/m3
Gas
D = 89
€ 0.374/m3
Electricity
€ 0.076/kWh
Target Industries
Expected Efficiency
Planning of Utilities’ Capacity Requirements (option 1)
• At least 5 companies attracted for 1, 2 and 3 hectares of the Park
• The companies may engage in the following business areas:
— Manufacture of wood and wood products
— Pulp and paper industry, publishing industry
— Manufacture of electrical, electronic and optical equipment
— Manufacture of rubber and plastic products
- Apparel and footwear industry, food industry
- Other low-pollution industries
• At least 12,000 new jobs inside the Park and similar number of indirect jobs in supply and service industry
• At least 38 million UAH of additional income tax revenue to the city budget per annum
• At least 2 million UAH in land lease per annum
• Regeneration of the industrial area and boost to residential development in Ryasne I.
Plot
Plot
2 plots 3,3 hectares each
8 plots 2 hectares each
All plots in total
Area, hectares
3,3
2,0
6,6 (2x3,3)
16 (8х2,0)
22,6
Water consumption,
cubic meters per day
400
270
800
2160
2960
Sewerage,
cubic meters per day
260
178
520
1424
1944
Heat supply, Gcal per hour
3,1
2,33
6,2
18,64
24,84
Gas supply,
cubic meters per hour
481,4
361,8
962,7
2894,4
3857,1
Electric supply, MW
2,5
1,5
5
12
17
4. Why Lviv?
Human Resources
Existing Investors
Support by Strategies
Support by Programs
Number of Students
Academic Major
128 000 students
364 $
average monthly salary
53 academies,
universities and colleges
86 % of students
speak English
751 000 inhabitants
Lvivska Politechnika National University among the largest and the most popular in Ukraine with over 30,000 students and 4th in nation-wide ranking.
38 %
8 %
5 %
2 %
3 %
6 %
6 %
12 %
10 %
10 %
Economics
Natural Studies
Architecture
& Design
Hospitality
Social Studies
Law
Health Care Science
Engineering
Informational
Technologies
Humanities
Krakow
170 000
128 000
Lviv
100 000
Bucharest
91 000
Budapest
80 000
Prague
63 000
Brno
56 000
Bratislava
• Lviv Complex Development Strategy 2025
• Lviv Economic Competitiveness Strategy 2015
• Lviv Strategic Plan of Investment Attraction 2020
• Simplified procedure of state registration of legal entities and individual entrepreneurs
• Simplified procedure for obtaining permit documents, and counseling services for economic entities
• Program of single social contribution (tax) compensation
Contact information
Serhiy Kiral
Head of Foreign Economic Relations
& Investment Office of Lviv City Council
+38 (032) 254 60 06
serhiy.kiral@city-adm.lviv.ua