Investment projects eng 2017

  1. 1. CONTENT 1. Kyiv – capital of Ukraine 2. Kyiv is the most attractive region for investment. in Ukraine 2.1 Favorable economy of Kyiv 2.2 The budget of Kyiv - the biggest budget among the cities of Ukraine 2.3 Investment activities of Kyiv. 3. Investment projects. 3.1 Real estate projects • Projects for the construction of residential properties • Projects for the construction of commercial properties • Projects for the construction of educational institutions 3.2 Transport infrastructure projects 3.3 Energy and Energy Efficiency projects 3.4 Energy Projects
  2. 2. 1530 years Kyiv celebrated in 2012 10 districts Administrative and territorial division of Kyiv 84,000 ha Total area of Kyiv 3 million population 1 million foreign tourists visit Kyiv every year Kyiv – is the capital of Ukraine and the historic capital of Ancient Rus, one of the oldest and greatest cities in Europe, which was first mentioned in manuscripts of IX century. Throughout its long history Kyiv gained huge achievements in culture and art. St. Sophia Cathedral with surrounding buildings and monastery ensemble of Kyiv-Pechersk Lavra included in the UNESCO World Heritage List. Kiev has a special status that is fixed by the Law of Ukraine «capital of Ukraine - city - hero of Kyiv». 1222 historical monuments 1126 monuments of architecture and history The monument " Motherland" is one of the most highest monuments of the world. The height of it is 102 m. Main street of Kyiv - Kreschatik, it is the one of the shortest and the widest among the capitals of Europe. Its length is 1300 meters and width 75 meters. Kyiv - the city park. 52% of the city is covered with greenery. In the city there are 127 parks. 500 public gardens and 78 boulevards. 20 sq.m of green spaces per capita KYIV – IS THE CAPITAL OF UKRAINE
  3. 3. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE. 24% 106% 25% 22% Kyiv - one of the major importers and exporters of Ukraine Kyiv's economy is growing faster than the economy of Ukraine $4.065 billion USD $7.26 billion USD
  4. 4. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE The biggest budget receipts 100% (3 млрд грн) Capital transactions 12% and other revenues 9% share participat ion funds 12% Revenues of budgetary institutions 67% 28 billion UAH The budget revenues of Kyiv (for the period January-September 2016) 100% (25 млрд грн) Other taxes and fees 19,5% Income tax 35,5% personal income tax 45% The structure of revenues to the general budget Structure of revenues to the Special Fund 100% (3 billion UAH) 100% (25 billion UAH) 20% Revenue growth of Kyiv (compared to 2015)
  5. 5. $8,500 USD Investment per capita in Kyiv $24.2 billion USD Foreign direct investments made in 2016 54% of foreign direct investments of Ukraine In 3 times Increase of revenues of foreign investments in 2016 KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Investment activities Financial activities 45.7% Trade; Auto service 15.5% IT and telecommunications 9% Real Estate 8.4% Science 8.1% Industry 4.7% Construction 3.3% Cyprus 23.2% Netherlands 15.8% Russia 18.4% Austria 8.9% UnitedKingdom 4.1% Italy 3.6% VirginIslands 3.1% Major countries investors, % of the total foreign direct investment The most demanded areas of investment
  6. 6. 1 room 35% 2 rooms 32% 3 rooms 5% 4 rooms 5% 5 and more rooms 3% 1 room 49% 2 rooms 33% 3 rooms 16% 4 rooms 1% 5 and rooms 1% STRUCTURE APARTMENTS ACCEPTED FOR OPERATION IN KYIV BY THE NUMBER OF ROOMS,% STRUCTURE OF HOUSING ACCEPTED FOR OPERATION The structure of housing accepted for operation traditionally characterized by a proportion of 35-40% for the left bank of Kyiv and 60-65% for the right bank. In recent years there has been a tendency in reduce of the supply on the Left Bank of Kyiv compared for the right-bank due to the appearance on the right bank side more affordable and lower cost prices. In the structure of housing accepted for operation in two quarters of 2016 dominated Solomians'kyi (29.8% - 87,335 sq.m); Pecherskiy (16.6% - 48,797 sq.m); Holosiivskyi (16.5% - 48 506 sq.m) and Shevchenkivskiy (13.6% - 39,892 sq.m) districts of Kyiv. The smallest amount of offers characterized by districts of Kyiv: Dniprovskiy (0.3%); Obolonskiy (0.9%) and Desnyanskiy (2.0%). PRICING IN THE PRIMARY REAL ESTATE MARKET The average price of 1 sq.m of primary real estate in UAH was nominated at the beginning of October 2016 - UAH 23,265. Current year showed stability in the price level nominated in US dollars amounted to $898 per 1 sq.m. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Housing 2011 2016 15,6% 22,8% 10,1% 7,1% 5,7% 5,2% 83,7% 77,1% 89,1% 92,5% 94,2% 94,8% 0,7% 0,0% 0,8% 0,4% 0,2% 2011 2012 2013 2014 2015 2Q 2016 Private houses (Частный сектор) Multi-storey housing (Многоквартирные) Dormitories (Общежития)(Приватний сектор) (Багатоквартирні) STRUCTURE OF HOUSING ACCEPTED FOR OPERATION IN KYIV BY THE TYPE OF BUILDINGS, % (Гуртожитки) Obolonskiy Desnyanskiy Dniprovskiy Shevchenkivskiy Holosiivskyi PecherskiySolomians'kyi Svyatoshynskyi Podylskyi Darnytskyi THE AVERAGE PRICE OF 1 SQ.M OF REAL ESTATE IN KYIV DISTRICTS, 000 UAH
  7. 7. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Transport infrastructure Kyiv underground One of the biggest of capital cities 56% citywide carriage 3 lines, with a total length of 67.6 km 52 stations City electric train 90 minutes ring traffic time 66 trains 50 km total length of routes 15 stations Motor ways Total length 2000 km 301km km² density of street road networks 5 bridges across the Dnipro river linking the two banks of Kyiv Funicular 1905 Year of opening 100 people Capacity of the wagon funicular transports 3 million people per year Trolleybuses and trams 21 tram routes 289 Trams on the routes every day 41 trolleybus routes 369 Trolleybuses on the routes every day Aviation 2 airports 5 terminals at Boryspil airport 6 thousand people /hour Boryspil airport capacity Railway 5 Main networks pass through Kyiv 20% passengers of Ukraine serving main railway station of Kyiv Kyiv river port The main Kyiv river port located on the right bank of the city and serves excursion and passenger transportation There is an increase in use of environmentally friendly types of public transport. The number of minibuses is gradually reducing and the number of environmentally friendly and more capacious types of public transport has dominated : trolley buses, trams, buses with the length of not less than 11.9 meters and buses with the length of 18.5 m. In the capital of Ukraine operates well developed network of public passenger transport. Passenger traffic is carried out by almost all of types of public transport: underground, trams, trolleybuses, buses and minibuses - route and passenger taxis. 0 50 100 150 200 250 152,7 55,6 81,2 236,2 145,8 56,7 83,9 231,31 half-year period 2015 1 half-year period 2016
  8. 8. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Education sector 510 Primary and secondary schools 41 Development centers 54 Youth Sport Academies 30 technical schools 166 higher education institutions 734 kindergartens Education sector 113,000 pupils in kindergartens of Kyiv 13,000 teachers in kindergartens of Kyiv 19,000 teachers in primary and secondary schools of Kyiv 260,000 pupils in primary and secondary schools of Kyiv 32 286 first-graders in 2016 17 387 babies Were born for the last 6 months 2016
  9. 9. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Education sector 646 different types institutions 539 kindergartens 512 Municipal 14 private 13 departmental 62 educational complexes 47 Municipal 15 private 47 Child Development Centers 2 Municipal 45 private 8 private schools 745 Institutions with nursing groups The secondary schools of Kyiv by type, number Lyceums: 29 Gymnasium s: 42 Scientific Educational Complexes: 40 school- kindergarte n: 18 Evening schools: 9 boarding schools: 25 Schools І-ІІІ level: 270 Others: 2 The kindergartens of Kyiv by type, number
  10. 10. KYIVENERGO fully meet the needs of consumers in electricity and 75% - of heat energy. Darnytska CHP (‘’Euro-reconstructsiya’’ LLC) provides 25% of heat energy. Kyivenergo is a joint stock company that provides Kyiv with a full cycle of power by combining the processes of generation, transmission and sale of heat and electricity, and incineration. Approximately 12,000 employees are working for the company, and its material and technical base consists of the following assets which are grouped according to the main areas of activity: Distribution and supply of electricity: 13000 km power grids 0.4-110 kV. Cogeneration or combined heat and power (CHP): two ( "CHP") with a total installed electrical capacity of 1200 MW and the total installed thermal capacity of 3,614HKal / h. Heat generation, boiler houses with an installed heat capacity of 5,096Hkal / h Transportation and distribution networks of heat: 2600 km in two-pipe dimension. Incineration of waste, the plant "Energy", with an annual capacity of 250,000 tons of waste incineration and heat power installed 25Hkal / year. KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Energy efficiency
  11. 11. Kyiv is the largest city of Ukraine. Every year it produces more than 1,1 million tons of solid waste. According to various sources the level of recycling and reuse of waste does not exceed 10% of the total amount, while the European Union recycles 60% of solid waste. Almost 70% of solid waste sent to landfills and dumps, about 30% of the waste incinerated at the plant "Energy". The main ground is a landfill №5, which operates by PJSC "Kievspetstrans." 44% 13% 11% 9% 5% 5% 2%1% 10% STRUCTURE OF SOLID WASTE Food waste Paper and cardboard Secondary polymers Glass Cloth Repairs waste Metal Wood other KYIV IS THE MOST ATTRACTIVE REGION FOR INVESTMENT IN UKRAINE Energy efficiency PROCESSING AND STORAGE OBJECTS OF SOLID WASTE
  12. 12. PUBLIC CENTER «NYZHNYA TELYCHKA» HOLOSIIVS'KYI DISTRICT, KYIV
  13. 13. PROJECT DESCRIPTION The project envisages development of the area «Nyzhnya Telychka». Telychka- the historic district, settlement, industrial zone in Kiev. Located in the Pearl of the River Lybid along the Dnieper river between Vydubychi, Zvirynets, Saperna slobidka and Korchuvate. PROJECT FEATURES The project idea is to construct a single center of government in Ukraine. All branches of power in Ukraine will situated on the territory. Today in Kiev, 80% of government buildings are located in unsuitable premises. After transferring the Administrative center to the «Nyzhnya Telychka» current government buildings can be used as a hotels, apartment houses, commercial buildings. Thus will get rid of the enormous flow of traffic in the city center. VOLUME OF INVESTMENT $0.5 billion USD There is an unfinished subway station: The cost of commissioning: 350-400 million UAH PUBLIC CENTER «NYZHNYA TELYCHKA» HOLOSIIVS'KYI DISTRICT, KYIV
  14. 14. NEW BUSINESS AND COMMERCIAL DISTRICT Kyiv Hippodrome Facade Territory, Holosiivskyi district, Kyiv
  15. 15. NEW BUSINESS AND COMMERCIAL DISTRICT Kyiv Hippodrome Facade Territory, Holosiivskyi district, Kyiv INVESTMENT CONDITIONS : • PPP (public-private partnership), under the terms of bid process • Community fee for infrastructure development * • Renovation of utility networks PARTNERSHIP : • Ensuring competitive and transparent bid process • Project development and management support • Post-signing patronage & municipal support in deal execution etc. PROJECT DESCRIPTION • 1st stage of construction:  Business city (complex of several business centers) • 2nd stage of construction:  Innovative hotel complex  Additional objects construction optionally (shopping malls etc.) TOTAL AREA • More than 38 hectares • Estimated area that could be developed : 1.42 ha LOCATION • In the territory of relocated Kiev Hippodrome • Holoseevsky district • Developed nearby infrastructure • Subway station in close proximity ECONOMIC & SOCIAL EFFECT: • $20 million out of $100 million. USD will be spent on improvement of the Hippodrome accordance with international standards • Efficient use of an area of the city • The decentralization of business activity
  16. 16. CONSTRUCTION OF MULTIFUNCTIONAL COMPLEX 22 Vasylkivska street, Holosiivskyi District, Kyiv
  17. 17. CONSTRUCTION OF MULTIFUNCTIONAL COMPLEX 22 Vasylkivska street, Holosiivskyi District, Kyiv PROJECT FEATURES: The project provides for construction of a residential complex where a quarter of surrounding area is a pedestrian zone (a concept known as “a town park"). Land plot is located in residential area bordering the Holosiivskyi National Nature Park PROJECT PARAMETERS: Land plot : 6.7 hа (16.5 acres) Gross Floor Area of the complex : 106,514 sq.m Apartments : 74,560 sq.m Underground parking: 10,300 sq.m Kindergarten (150 places): 1,800 sq.m Secondary school (660 places): 7,260 sq.m Estimated Cost Of Construction : 1.6 Billion UAH Estimated Payback Period : 2 Years Internal Rate Of Return (IRR): 50%
  18. 18. CONSTRUCTION OF RETAIL AND INDUSTRIAL COMPLEX Holosiivskyi District, Kyiv
  19. 19. CONSTRUCTION OF RETAIL AND INDUSTRIAL COMPLEX, Holosiivskyi District, Kyiv PROJECT DESCRIPTION The project provides for construction of commercial and industrial complex in Holosiivskyi District in Kyiv PROJECT PARAMETERS Estimated land plot: 52 ha Volume of investment: $ 50 million USD Recultivated dump unfinished trolleybus line S=52 ha S=29 ha
  20. 20. CONSTRUCTION OF RESIDENTIAL QUARTERS WITH FULL COMPLEX OF SERVICE 37-41 Bakynska street, Shevchenkivskyi district, Kyiv
  21. 21. CONSTRUCTION OF RESIDENTIAL QUARTERS WITH FULL COMPLEX OF SERVICE 37-41 Bakynska street, Shevchenkivskyi district, Kyiv PROJECT FEATURES: The project provides for the transfer of production base of Municipal Enterprise «Kyyivkomunservis» which is situated at 37-41 Bakynska street to 94 Chervonopraporna street. Buildings which are on the balance sheet of ME «Kyivkomunservis» will be demolished. PROJECT PARAMETERS: Land plot: 7.56 hа (18.68 acres) Residential quarters consists of: - Kindergarten for 200 children - Primary and secondary school for 600 children - Shopping center : 0,14 hа - Three twenty-stories residential buildings Estimated Cost Of Construction : 1 billion UAH
  22. 22. CONSTRUCTION OF MULTIFUNCTIONAL RESIDENTIAL COMPLEX 25 Krasnova street, Svyatoshyns’kyi district, Kyiv
  23. 23. CONSTRUCTION OF MULTIFUNCTIONAL RESIDENTIAL COMPLEX 25 Krasnova street, Svyatoshyns’kyi district, Kyiv PROJECT FEATURES: Municipal property real estate will be written off and residential complex will be built on a land plot. PROJECT BENEFITS: Optimization of municipal property management Improving the economic situation in Municipal Enterprise «Kyivpastrans». PROJECT PARAMETERS: Land plot : 3.3 hа (8.15 acres) The current real estate (buildings of AP №4): 12,846.3 sq.m (will be written off and demolished) GBA : 64,445 sq.m including : Apartments : 38,472 sq.m Parking for 465 cars : 10,340 sq.m Public purpose space: 3,086 sq.m Estimated cost of construction: 758 million UAH Estimated payback period: 2 years
  24. 24. RECONSTRUCTION OF TRANSPORTATION HUB Metro station «Livoberezhna», Kyiv
  25. 25. RECONSTRUCTION OF TRANSPORTATION HUB Metro station «Livoberezhna», Kyiv PROJECT FEATURES: According to the project, the metro station pass way will be reconstructed and a shopping center will be built inside. The project will give an opportunity to combine four units of traffic in a single one. PROJECT BENEFITS: Passenger traffic is 54 thousand people a day (one of the highest in the city). Land plot is located in the commercial and residential area that borders with International Exhibition Centre. PROJECT PARAMETERS Land plot : 2.17 hа Gross floor area: 22 781 sq.m Number of floor : 3 Estimated cost of construction: 500 mln UAH Payback Period : 5 years .
  26. 26. CONSTRUCTION OF A MULTIFUNCTIONAL COMPLEX WITH UNDERGROUND PARKING 7-9 Vasylya Poryka Avenue , Podil's'kyi district, Kyiv
  27. 27. PROJECT FEATURES : The project provides for construction of a multifunctional complex with underground parking and landscaping the surrounding construction area. Investor compensate uncompleted cost of construction. PROJECT BENEFITS : • Land plot is located in the established residential area within walking distance to public transport – 5 minutes walk to trolley bus stop; • Construction of metro in the nearest future; • Construction provided in two stages; • The proximity of recreational areas; • Social effect due to development of the city infrastructure. PROJECT PARAMETERS: Land plot : 1.1 hа (2.71 acres) 2 stages of the construction Gross Floor Area : 30 136 sq.m Total area of apartments: 1 stage: 3,971 sq.m 2 stage: 14,053 sq.m Fitness center (1 stage): 609 sq.m Kindergarten (97 places)(2 stage): 582 sq.m Retail space (2 stage): 302 sq.m Undergroung parking with 215 parking lots: 6,781 sq.m Estimated cost of construction : 450 million UAH Estimated payback period : 2 years Internal rate of return (IRR): 47% CONSTRUCTION OF A MULTIFUNCTIONAL COMPLEX WITH UNDERGROUND PARKING 7-9 Vasylya Poryka Avenue , Podil's'kyi district, Kyiv General Plan. The current cituationGeneral Plan. The proposal
  28. 28. BOILER STATION LIQUIDATION AND CONSTRUCTION ON ITS PLACE MULTISTOREY RESIDENTIAL HOUSE WITH PUBLIC PREMISES 25 Chornobylska street, Svyatoshyns’kyi district, Kyiv
  29. 29. BOILER STATION LIQUIDATION AND CONSTRUCTION ON ITS PLACE MULTISTOREY RESIDENTIAL HOUSE WITH PUBLIC PREMISES 25 Chornobylska street, Svyatoshyns’kyi district, Kyiv PROJECT DESCPRIPTION In 2014, JSC «Kyivenergo» made a number of steps to reconnect consumers from boiler house «Svyatoshyno» to the zone of heating ST «Bilychi». Therefore the boiler house was commissioned and its equipment mothballed. For the construction of residential house and final liquidation of a boiler house «Svyatoshyno» a certain number of actions needs to be done: a section of heating network needs to be relayed (2 DN 300 up to 280 m), valve installation (4 DN 300), increase a number of shunt pipes (2 DN 300) and equipment of a Central Heating Unit needs to be upgraded. The project will be implemented in two stages : 1. Execution of activities for final liquidation of a boiler house, its write-off with compensation to the city budget and demolition of it. 2. Construction of a residential house. PROJECT BENEFITS Improving the environmental and engineering infrastructure in the neighbourhood PROJECT PARAMETERS Land plot : 0.45 hа (1.11 acres) Existing real estate(boiler house): 547,8 sq.m (will be written off and demolished) Gross floor area: 13,732 sq.m Apartments: 8,268 sq.m Parking with 101 parking lots: 2,780 sq.m Expenditures connected with engineering infrastructure (specification and liquidation of a boiler house): 15 million UAH (preliminary) Estimated Cost Of Construction : 160 million UAH
  30. 30. INDUSTRIAL PARK «KYIV BUSINESS – HARBOR» Puhivska street, Desnyanskiy District, Kyiv
  31. 31. Center Projected zoning * Transport scheme of land plot Prospective metro line Potential territory for project development Tram line ≈ 300 hа ≈ 106 ha Troyeshchyna Pogreby Kyiv limits Power statio n 6 Land plot ≈ 106 ha PROJECT DESCRIPTION IP "KBH" – is a large-scale project of the industrial park, with aim to create industrial facilities, wholesale and retail complex, consolidating production and trade capacity for local production in the city of Kyiv. The structure of the park will consist of the companies that operate in the areas of: furniture and decorations, pharmaceuticals, spare parts and components for the automotive industry and so on. European and Asian manufacturers, logistics companies as well as retail and wholesale trade companies will serve as an anchor tenants. PROJECT PARAMETERS Land plot area:: ~106 ha GBA: 326 000 sq.m GLA: 230 000 sq.m Parking: 13 000 parking lots Volume of investment : $440million USD Public buildings Industrial and R&D Warehouses and engineering equipment Protection green zone Metro territory Housing (more than 9 floors) Land plot in this concept INDUSTRIAL PARK «KYIV BUSINESS – HARBOR» Puhivska street, Desnyanskiy District, Kyiv"
  32. 32. RECONSTRUCTION OF THE BUILDING OF CITY CENTRE OF THERMAL LESIONS, RECONSTRUCTIVE AND PLASTIC SURGERY OF KYIV CITY CLINICAL HOSPITAL №2 ON 13 KRAKIVSKA STREET IN THE DNIPROVSKYI DISTRICT, KYIV RECONSTRUCTION OF THE BUILDING OF CITY CENTRE OF THERMAL LESIONS, RECONSTRUCTIVE AND PLASTIC SURGERY OF KYIV CITY CLINICAL HOSPITAL №2 ON 13 KRAKIVSKA STREET IN THE DNIPROVSKYI DISTRICT
  33. 33. RECONSTRUCTION OF THE BUILDING OF CITY CENTRE OF THERMAL LESIONS, RECONSTRUCTIVE AND PLASTIC SURGERY OF KYIV CITY CLINICAL HOSPITAL №2 ON 13 KRAKIVSKA STREET IN THE DNIPROVSKYI DISTRICT The buildings of Kyiv City Clinical Hospital № 2 are located in 2 areas: - 36, Popudrenka Street - 0.98 ha - 13, Krakivska Street - 2,44 ha - Total area - 3.42 ha Burn Center operates since 2000 in areas of building construction in 1962. The total area of the Center - 5.5 thousand square meters. Total area of the building (main building) - 8,7 thousand square meters.Volume of Investment: 1 launch complex burn center: 975.7 millon UAH Total area of a complex: 40,000 sq.m Capacity: 325 beds The composition of future medical complex will include: 1 launch complex – the new building of Centre of thermal lesions with 80 beds (area - 16.0 square meters); 2 launch complex - reconstruction of existing buildings (general and gynecological) to accommodate 210 beds (area - 16.0 square meters); The total capacity of the future complex - 325 beds. The total area - 40.0 square meters The power of Kyiv City Clinical Hospital № 2 - 300 beds, including burn center - 80 beds. To investors: the parts of new areas of the complex (30%) for the introduction of private medical services or 0.4 hectares of land for using on its own needs (not necessarily medical institution). 1. The possibility of cooperation with investors on the basis of public-private partnerships. 2. The joint implementation of new technologies in the process of growing cells and tissues (provision of 3%). 3. Profiting investor through the introduction of new technologies in areas of the hospital:high-tech diagnostic tests (55% availability); reconstructive and plastic surgery (52% availability). The main advantages of the project
  34. 34. PRIVATE MEDICAL CENTER CONSTRUCTION 3 Zoologichna street, Shevchenkivskyi District, Kyiv
  35. 35. PRIVATE MEDICAL CENTER CONSTRUCTION 3 Zoologichna street, Shevchenkivskyi District, Kyiv PROJECT PARAMETERS Estimated land plot : 2.0 ha Estimated GBA: 13 000 sq.m Estimated cost of construction: 175 million UAH Estimated payback period: 7years PROJECT FEATURES: Municipal property real estate will be written off and private medical center will constructed on a land plot PROJECT BENEFITS: Optimization of municipal property management Improving the economic situation in Kyiv City Clinical Hospital #14. LOCATION The project`s land plot is located in the recreation area in the territory of Kyiv City Clinical Hospital #14. The proximity to the public transport – 5 minutes walk to the bus stop, 15 minutes walk to the metro
  36. 36. KYIV CENTER OF REHABILITATIVE MEDICINE 17 Solomenskaya street, Solomenskiy district, Kyiv
  37. 37. KYIV CENTER OF REHABILITATIVE MEDICINE 17 Solomenskaya street, Solomenskiy district, Kyiv Creating a specialized medical institution for the rehabilitation of patients with disorders of the nervous system and the musculoskeletal system through the expansion of reconstruction and completion of five floors: • 0 floor - balneological department • 1st floor - admission diagnostic department • 2nd floor - Department of Mechanical (kinezo) therapy is including rooms for gymnastic trainers (series "motomed '), rooms for therapeutic massage and physical therapy department with cabinets for electrotherapy and mud treatments. • 3rd floor - Sclerosis in-patients hospitals (40 beds) • 4th floor - Renewable orthopedics department (20-30 beds) • 5th floor - Neurological department (40 beds). The estimated capacity of the object: the total number of beds - 110-120, 100 outpatient visits per shift, 5000 treated patients per year Approximate area of 8500 m2 The estimated cost of the project - eq. 80 mln. UAH. Payback period (years, months): 10 years Location of the project: Kyiv City Clinical Hospital №4 17, Solomenskaya Street, Kyiv Offers for investors The investor will have area of the new complex for the introduction of private medical services
  38. 38. PRIVATE SCHOOL CONSTRUCTION 10 Heroiv Stalinhradu avenue, Obolonskyi district, Kyiv
  39. 39. PRIVATE SCHOOL CONSTRUCTION 10 Heroiv Stalinhradu avenue, Obolonskyi district, Kyiv PROJECT DESCRIPTION Land for the project has a unique location and it is situated near the business class residential complex "Oasis“, golf club "Obolon" and Obolonska Quay, providing excellent view characteristics. In walking distance to metro «Minska» – 10 minutes and public transport stop – 5 minutes. PROJECT PARAMETERS Land plot : 2.2 ha (5.43 acres) Gross floor area : 8,853 sq.m Number of floors : 4 Estimated capacity : 660 places Provides the presence of the sport playground Availability of parking space Volume Of Investment : 140 Million Uah Estimated Payback Period : 8,7 Years Internal Rate Of Return (IRR) : 22.60%
  40. 40. CONSTRUCTION OF SECONDARY PUBLIC SCHOOL 10 Suzdalska street, Solom’yans’kyi district, Kyiv
  41. 41. CONSTRUCTION OF SECONDARY PUBLIC SCHOOL 10 Suzdalska street, Solom’yans’kyi district, Kyiv PROJECT DESCRIPTION Planning to built a 4 storey secondary public school; Non functioning building is located on the land plot; The project will have a positive impact on the quality of educational services and it will be an example of social responsibility of private business. PROJECT PARAMETERS: Estimated land plot : 1 hа Estimated capacity : 400 places Number of floors : 4 Estimated Cost Of Construction : 117 million UAH
  42. 42. CONSTRUCTION OF PRIVATE KINDERGARTEN Land plot №38 in 8th Poznyaki microdistrict, Darnytskyi district, Kyiv
  43. 43. CONSTRUCTION OF PRIVATE KINDERGARTEN Land plot №38 in 8th Poznyaki microdistrict, Darnytskyi district, Kyiv PROJECT FEATURES AND BENEFITS : The project provides for construction of a private kindergarten. Land plot is located in a residential area in the centre of the quarter. In proximity to public transport - 5 minutes walk to trolleybus stop, 10 minutes walk to a metro. Poznyaki - one of the youngest districts with the highest number of young families. Approximate term to fill the 100% of the facility is less than 2 years. It was found large number of operators interested in construction of kindergartens. PROJECT PARAMETERS Land plot – 1,1 hа (2,7 acres) Gross floor area - 2830 sq.m Number of floors – 2 Estimated capacity : 240 places Estimated Cost Of Construction : 46 Million UAH (With Vat) Estimated Payback Period : 5 Years Internal Rate Of Return (Irr) : 23%
  44. 44. CONSTRUCTION OF PRIVATE KINDERGARTEN 7-A Kudryashova street, Solomyanskyi district, Kyiv
  45. 45. CONSTRUCTION OF PRIVATE KINDERGARTEN 7-A Kudryashova street, Solomyanskyi district, Kyiv PROJECT FEATURES AND BENEFITS: Land plot is located in a residential area in the centre of the quarter, which borders with recreational area – «Solomyanskyi park». In proximity to public transport - 10 minutes walk to trolleybus stop, 15 minutes walk to a metro. Building which is not in working condition is situated on the land plot and it will be written off and demolished. Investor will compensate the value of the property to the special fund budget of Kyiv as a proceeds from the sale of property. PROJECT PARAMETERS Land plot - 0.59 ha Gross floor area : 1870 sq.m Estimated capacity : 160 places Estimated Cost Of Construction : 31 Million UAH Estimated Payback Period : 5 Years Internal Rate Of Return (IRR) : 25%
  46. 46. CONSTRUCTION OF KINDERGATEN 155-А Antonovycha street, Holosiivs'kyi district, Kyiv
  47. 47. CONSTRUCTION OF KINDERGATEN 155-А Antonovycha street, Holosiivs'kyi district, Kyiv PROJECT FEATURES AND BENEFITS: Current investment project provides for construction of kindergarten at 155-A Antonovycha street with an estimated capacity of 120 places. Land plot is located in the city center with a developed transport infrastructure : • Lybidska metro - 450 m • Bus station – 1 000 m PROJECT PARAMETERS: Land plot : 0.53 hа Gross Floor Area : 1,645 sq.m Number of floors : 2 Number of children's groups : 7 Estimated capacity : 130 places Estimated Cost Of Construction : 27 million UAH
  48. 48. CONSTRUCTION OF PRIVATE KINDERGARTEN 7 Oleksandra Popova street, Obolonskyi district, Kyiv
  49. 49. CONSTRUCTION OF PRIVATE KINDERGARTEN 7 Oleksandra Popova street, Obolonskyi district, Kyiv PROJECT FEATURES AND BENEFITS : Existed building is out of order and it is in a critical condition. It will be written off and demolished. Investor acquires a property rights of the built kindergarten, provide a set of actions on beautification of surrounded area and has additional investment obligations; Current project will have a positive impact on the quality of educational services and it will be a good example of social responsibility of private business. PROJECT PARAMETERS: Estimated area of a land plot : 0.3 ha Estimated capacity : 75 places Number of floors : 2 Estimated Cost Of Construction : 20 million UAH
  50. 50. CONSTRUCTION OF PRIVATE KINDERGARTEN 66 Dmitrivska street, Shevchenkivskyi District, Kyiv
  51. 51. PROJECT FEATURES AND BENEFITS: The project provides for construction of private kindergarten. Land plot is located near Kyiv National Circus in the housing and commercial area in the center of the quarter. In proximity to public transport - 5 minutes walk to trolleybus stop, 10 minutes walk to a metro. Not functioning building is situated on the land plot and it will be written off and demolished. Investor will compensate the value of the property to the special fund budget of Kyiv as a proceeds from the sale of property. PROJECT PARAMETERS Land plot : 0,198 hа Gross floor area : 1029 sq.m Estimated capacity : 70 places Number of floors : 2 Estimated Cost Of Construction : 14 million UAH CONSTRUCTION OF PRIVATE KINDERGARTEN 66 Dmitrivska street, Shevchenkivskyi District, Kyiv
  52. 52. CONSTRUCTION OF AN AMUSEMENT PARK ON THE TERRITORY OF «HYDROPARK»
  53. 53. PROJECT DESCRIPTION The concept of the project will provide for construction of the Amusement park on the territory of «Hydropark» PROJECT PARAMETERS Estimated land plot: 70 ha ESTIMATED VOLUME OF INVESTMENT $300-420 million USD PROJECT STAGE The concept of the development of «Hydropark» will be presented soon. CONSTRUCTION OF AN AMUSEMENT PARK ON THE TERRITORY OF «HYDROPARK»
  54. 54. CONSTRUCTION OF SPORT COMPLEX Henerala Vatutina avenue, Desnyans’kyi district, Kyiv
  55. 55. CONSTRUCTION OF SPORT COMPLEX Henerala Vatutina avenue, Desnyans’kyi district, Kyiv PROJECT FEATURES AND BENEFITS : The project provides for construction of sport complex. Currently , on a land plot there are no permanent structures. Land is in constant use of the Department of Education and Science, Youth and Sport. Land plot is located near the bank of Dnieper river. Proximity to public transport – 2 minutes walk to the bus stop. PROJECT PARAMETERS Total land area: 1.53 ha Sport complex include: Arena with 4,400 seats Common areas, lobby, cloakroom, shops, cafes, fast food outlets, toilets Administrative buildings Premises for athletes Technical facilities Estimated construction cost: 273 mln. UAH. Payback period: 10 years IRR: 8% Arena seats for 4400 represents a functional space transformer, which can be increased to 7900 seats General Plan. Current situationGeneral Plan. The proposal
  56. 56. DEVELOPMENT OF RECREATIONAL INFRASTRUCTURE Truhaniv island, Dniprovskyi district, Kyiv
  57. 57. DEVELOPMENT OF RECREATIONAL INFRASTRUCTURE Truhaniv island, Dniprovskyi district, Kyiv 2 4 8 1 CREATION OF SPORTS AND RECREATIONAL BEACH ZONE Land: 1.4 hectares Temporary buildings Area: 502 sq m The area includes the following facilities: • locker room • Administrative buildings • Cafe • Fields for beach volleyball ESTABLISHMENT OF THE WAKEBOARDING CENTER Land: 2.2 hectares The total area of temporary structures: 1027 sq m The area includes the following facilities: Admin. building Theoretical classes (2 pcs.) Indoor training room (2 pcs.) Locker rooms, showers Temporary buildings for leisure of athletes and visitors (20 pieces) Dry closets (2 pcs.) Sports trampolines Field for mini-football (25х15) Volleyball ground (25х15) Outdoor gym (25х10) Skate park CREATION OF INFORMATION BIKE HUB The area includes the following facilities: Sports grounds Velohab of bike parking Changing rooms with showers and restrooms The project also provides for landscaping of the adjacent territory INFRASTRUCTURE FOR FISHING AND BBQ ZONE The area includes the following facilities: Administrative building Vymostky for fishermen House for a guard Changing rooms with showers and restrooms Pavilions with barbecue Guest parking The project provides for landscaping of the adjacent territory
  58. 58. SKI COMPLEX WITH ENTERTAINMENT AND RECREATIONAL FACILITIES FOR ALL- SEASON ACTIVE LEISURE «PYROHOVO»
  59. 59. SKI COMPLEX WITH ENTERTAINMENT AND RECREATIONAL FACILITIES FOR ALL-SEASON ACTIVE LEISURE «PYROHOVO» SKI COMPLEX "PYROHOVO“ Explication: 1. Cafes 2. The hotel-restaurant complex (30 rooms) with facilities for seminars and conferences, sports center with swimming pool and sports halls 3. Technical pond (surface area - 33 275.0 sq.m) with equipment for training of Wakeboarding 4. Store and sports infrastructure, cafes, bathrooms, sport equipment rental, lockers 5. Car parking, cafe 6. Rope park 7. Information hub 8. Information hub 9. Information hub 10.Restaurant and premises for athletes (Equestrian Sports Facilities) 11.Playground for a game of mini football 12.Information hub 13.Information hub 14.Open platform for: Winter- zone “finish“ of skiers and snowboarders and carrying out mass sports and cultural events Summer- for placing ramps for rollers and skateborders
  60. 60. CONCEPT OF DEVELOPMENT OF THE KYIV ZOO LOCATION Nowadays the zoo is located in the center of the city and occupies the territory of 40 hectares. The landscape relief allows all the zoo inhabitants live in comfortable conditions. The collection of Kiev Zoo numbers over 2,000 fauna representatives from all over the world, including mammals, birds, snakes, fishes and insects. The zoo boasts a pair of elephants. Over 130 kinds of trees and bushes decorate the zoo lands. DISCRIPTION The Kyiv Zoo is one of the largest zoos in the former Soviet Union and the only zoo in Kiev, Ukraine. Situated on about 40 hectares (99 acres), the zoo is cared for by 378 staff members and receives about 450,000 visitors annually. ESTIMATED VOLUME OF INVESTMENT 300 million UAH
  61. 61. CREATION OF ENGINEERING AND TRANSPORT INFRASTRUCTURE CABLE CAR LINE WITH PUBLIC FACILITIES BY THE ROUTE: FRIENDSHIP OF NATIONS ARCH, VOLODYMYRSKA HILL PARK, POSHTOVA PLOSHCHA, TRUKHANIV ISLAND, HIDROPARK in Kyiv
  62. 62. CREATION OF ENGINEERING AND TRANSPORT INFRASTRUCTURE CABLE CAR LINE WITH PUBLIC FACILITIES BY THE ROUTE: FRIENDSHIP OF NATIONS ARCH, VOLODYMYRSKA HILL PARK, POSHTOVA PLOSHCHA, TRUKHANIV ISLAND, HIDROPARK in Kyiv PROJECT DESCRIPTION The project concept envisages the development of the cable car line and boarding stations with the implementation in several stages. • First stage route: Friendship of Nations Arch - Poshtova Ploshcha - Trukhaniv Island • Second stage route: Trukhaniv Island - Matviivs'ka gulf – Desenka River – Hidropark PROJECT PARAMETRES Total length: ~ 6,170 m • First stage: ~ 950 m • Second stage: ~ 5,220 m Number of boarding stations: 7 Volume of investment: $21 million USD 1 stage 2 stage Boarding stations FRIENDSHIP OF NATIONS ARCH BOARDING STATION POSHTOVA PLOSHCHA BOARDING STATION
  63. 63. PUBLIC TRANSPORT STOPS ARRANGEMENT IN KYIV CITY
  64. 64. PUBLIC TRANSPORT STOPS ARRANGEMENT IN KYIV CITY Creating a modern, safe and comfortable infrastructure on public transport stops in Kyiv PROJECT GOAL PROJECT OBJECTIVES • pavilions arrangement for maximum number of public transport stops; • bringing entire infrastructure of public transport stops to single architectural form; • proper technical and sanitary conditions maintenance for the stops • provision of lighting, setting of trash bins and electronic information board on each stop • providing comfortable conditions for disabled people PROJECT PARAMETERS • estimated cost of the project ~ UAH 250 mln. • PBP (payback period) - 5 years • DPBP (discounted payback period) - 9 years CURRENT PROJECT STATUS Project reason: Order of the KCSA dd. 14.07.2016 №541 «On holding an investment tenders to attract investors for realization of the projects «The set of actions for the improvement and arrangement of public transport stops in Kyiv» Customer of the project: Public utility company «Kyivpastrans» Customer of preparatory (pre-investment) works: Public utility company «Kyiv Investment Agency» SOURCE OF RETURN ON INVESTMENT • placing the trade pavilion • placing advertising • placing vending machines and payment terminals • provision of telecommunication services and other services
  65. 65. CREATING BICYCLE RENTAL SYSTEM «BIKE-SHARING» IN KYIV
  66. 66. CREATING BICYCLE RENTAL SYSTEM «BIKE-SHARING» IN KYIV PROJECT BENEFITS • increasing mobility of people • Load relief of public transport • reduce transport routes congestion • improvement of ecological situation • raising up general level of health PROJECT PARAMETERS • Quantity of bicycle stations: 100 • Number of bicycles: 1000 • estimated cost of the project: UAH 70 mln • PBP (payback period) - 7 years • DPBP (discounted payback period) - 9 years • The expected yield for the investor of the project (IRR,%) - 20% SOURCE OF RETURN ON INVESTMENT • Advertising on bicycles • Season prospective ticket payment system • Fee for rent PROJECT GOAL • provide citizens and tourists with bicycle for shot city rides as alternative to car • improvement of transport and ecological situation
  67. 67. IMPLEMENTATION OF AUTOMATED PARKING SPACE CONTROL SYSTEM
  68. 68. Project reason: Order of KCSA dd. 14.07.2016 №542 «On holding an investment tenders to attract investors for realization of the project «Development and implementation of automated parking space control system in Kyiv» On holding an investment tenders to attract investors for realization of the projects «The set of actions for the improvement and arrangement of public transport stops in Kyiv The customer of the project: Public utility company «Kyivtransparkservis» Customer of preparatory (pre-investment) works: Public utility company «Kyiv Investment Agency» CURRENT PROJECT STATUS implementation of an automated transparent payment system for city parking and minimization of human factor ‒ enhance compliance with the parking rules by drivers; ‒ reduce transport congestion on street and road network due to flexible pricing for parking places and on-line statistics on free parking places for drivers; ‒ promote usage of public transport; ‒ increase comfort of parking services usage for people and organizations in terms of payment and accounting costs for parking, including a convenient on- line statistics; ‒ reduce collecting payments costs for parking services. PROJECT BENEFITS number of parking slots: 7 000 estimated cost of the project: UAH 60 mln. PBP (payback period) - : 2-4 years DPBP (discounted payback period) - 5-7 years PROJECT PARAMETERS IMPLEMENTATION OF AUTOMATED PARKING SPACE CONTROL SYSTEM PROJECT GOAL inspector scanner Control for payment and compliance with parking roles Free registration Mobile phone website Smartphone, tablet Prospective account cash-in for parking services payment Bank card terminal or Payment for parking services Mobile phone website Smartphone, tablet Automated parking space control system
  69. 69. Експлікація нового об’єкту БУДІВНИЦТВО ТЕЦ У ДЕСНЯНСЬКОМУ РАЙОНІ CONSTRUCTION OF CHP , DESNYANSKYI DISTRICT, KYIV
  70. 70. PROJECT FEATURES The project of construction of heating power plant with new generation technology of co-firing coal, municipal solid waste as RDF and / or SRF and biomass in a circulating boiling layer on the territory of existed CHP-6 which is in municipal ownership of the community. According to the project, the main fuels are: biomass, RDFand coal. PROJECT BENEFITS Covering existing and prospective heat and electrical loads Disposal of waste and improve the environment Reducing emissions of pollutants PROJECT PARAMETERS Electric capacity : 2 X 300 MW Heating capacity : 700 Gcal / h Land : 27 ha Volume of investments: ~ $1.217 billion USA IRR: 14,5% 85 CONSTRUCTION OF CHP , DESNYANSKYI DISTRICT, KYIV
  71. 71. MODERNIZATION OF THE PLANT "ENERGIYA", KYIV
  72. 72. PROJECT OBJECTIVE: To grow the recycling sector and produce electricity from solid waste processing. PROJECT DESCRIPTION: Modernization of the incineration plant to begin producing electricity from solid waste processing ANNUAL CAPACITIES OF WASTE UTILIZATION 450 000 ton INVESTMENT MECHANISM: PPP(Public-private partnership EXPECTED FINANCIAL INDICATORS: Potential investment: USD 70 million SOURCES OF RETURN ON INVESTMENT : Alternative energy supply based on Green Tariff Sale of heat energy and recycled materials MODERNIZATION OF THE PLANT "ENERGIYA", KYIV
  73. 73. MODERNIZATION OF STREET LIGHTING IN KYIV
  74. 74. • Number of luminaries - 180 thousand. Pcs. • The length of networks - 4.2 thousand km. • Number of pillars - 71,5 thousand Pcs. • Energy power points - 1.4 thousand. Pcs. • Balance value of assets - 442 mln. UAH. • Number of employees - 379 people. • 90 units of special machinery • 17 operational and technical areas • 2 dispatching service MODERNIZATION OF STREET LIGHTING IN KYIV KEY FEATURES OF PUBLIC UTILITY COMPANY «KYIVMISKSVITLO» Number of luminaries to be replaced – 130 000 Term of concession agreement ~ 10 years Volume of investment – EUR 40-50 mln. PROJECT PARAMETERS • Increase the level of security on streets (decrease crime rate) • Decrease the number of road crashes, including running-down accident • Increase tourist and investment attractiveness of city • Improve visual comfort and psychic atmosphere which is indirectly positively influence on people’s health and people labor ability PROJECT BENEFITS Modernization of street lighting in Kyiv by way of transfer to concession of Public utility company “Kyivmisksvitlo” PROJECT GOAL
  75. 75. ME «KYIV INVESTMENT AGENCY» 01004, Kyiv, 11-A Tereschenkivska street, +38 (044) 289 53 51 e-mail:welcome@investinkyiv.org www.investinkyiv.gov.ua KYIV CITY STATE ADMINISTRATION 01044, Kyiv, 36 Khreschatyk street, +38 (044) 202 13 19 e-mail:welcome@investinkyiv.org www.investinkyiv.gov.ua

×