IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 30 
ANALYTICAL REVIEW OF LOSS REDUCTION TECHNIQUES IN INDIAN POWER DISTRIBUTION SECTOR – TECHNO MANAGERIAL APPROACH Isaac Ramalla1, Nithin Namburi2 1EEE Department, UPES, Dehradun, India 2EEE Department, UPES, Dehradun, India Abstract Electrical power is important for economic development and also to improve the quality of life. It will be key input to any activity related to economics in industrial, agricultural, trade, commercial or the service sector. A rapidly developing economy like India faces an ever increasing demand for electrical power. Power distribution is the last stage within the delivery (before retail) of electricity to end user. A distribution system carries power from the transmission system and delivers it to customers. Typically, the distribution system would come with medium voltage (<50 KV) power lines, pole mounted transformers and electrical substations, low voltage (<1000V) generally electricity meters and distribution wiring. Distribution is that the important section of electricity price chain because it completes the revenue cycle. Sadly, in India, it's conjointly the weakest ling troubled because it is by poor monetary health, poor assortment efficiencies, poor governance, poor social control practices and lack of responsibility. The distribution sector caters to rural and concrete areas. Post restructuring of the electricity sector, most of the states have engraved out multiple distribution firms with its monopoly space. Presently Republic of India has seven classes of distribution entities The AT&C losses is one of the major problems of the Indian power sector, we know that India is struggling with the demand-supply gap existing in power sector and trying to recover these gap with different steps, and the AT&C losses is one of the major milestones of reducing the demand supply gap in the country, also it obligates a burden on the consumers as the T&D losses are included in the tariff that they are paying. The AT&C losses has two components technical losses and the commercial losses, the AT&C losses are 28.44% (average 2009) in the country, out of them most of the losses are of commercial only. 
-------------------------------------------------------------------***------------------------------------------------------------------- 1. INTRODUCTION Due The electricity sector in Republic of India is on the coinciding list of the constitution and therefore both the Centre and also the States having important jurisdiction over the world. Until 1975, every state had a State Electricity Board that was a vertically integrated monopoly liable for generation, transmission and distribution of electricity therein specific state. In 1975, the central government established generation firms like NTPC, NHPC and NEEPCO below the central sector to enhance a lot of required capability addition within the country. Soon after, grid was started to produce interstate and inter-regional transmission connectivity and capacity leading to the event of a national network. However, the world continued to be stricken by demand-supply gaps, high technical and commercial losses notably within the distribution section further as poor monetary and operational performance. In 1991, the Government of India (GoI) initiated reforms of the facility sector as a part of the larger exercise liberalizing the Indian economy. So as to enhance the supply-demand gap, the GoI permissible the entry of the private sector in electricity generation. There was no law exclusion private sector in electricity distribution even if most of sector was presently below the state governments. 
In the mid-1990s, it had been recognized that the mere augmentation of capacity wouldn't be adequate and also the sector needed much more targeted interventions. By the command of the World Bank, govt. of India enacted the state Power Reforms Act in 1995 that entailed the restructuring of the state Electricity Board through a method of purposeful unbundling and also the putting in of the State Electricity Regulatory Commission (SERC) as associate degree freelance regulator for the sector. This model was reforms was derived (sometimes with minor variations) in many different states across the country like state, Karnataka, Uttar Pradesh, Haryana etc. In 1998, the GoI enacted the Electricity Regulative Commissions Act that enabled the states to line up regulative commissions however failed to give the legislative foundation for restructuring the sector. Each restructuring and putting in associate degree ERC continued to be a possibility that states may exercise however wasn't obligatory. It had been solely once the enactment of the EA 2003 was the putting in of a regulative commission in each state created mandatory. However, as way as unbundling was involved, the sole mandatory demand was the separation of the transmission wires from trading for the aim of facilitating open access as a precursor to competition. The distribution firms continued to be native space monopolies although one state-wide distribution company was split into many firms for the sake of up operational potency.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 31 
The EA 2003 provides for the grant of multiple distribution licensees within the same space through independent distribution systems, so as to facilitate competition within the distribution business. Section 62 (1)(d) specifies that just in case there are quite one distribution licensee within the same space, the SERC could confirm solely the ceiling on the retail tariff so as to push competition. With a read to produce advantages of promoting competition to any or all group of consumers, the second and next in line licensee for distribution within the same space shall have duty to provide to any or all consumers in correspondence with provisions of section 43 of the Indian Electricity Act 2003. The state regulatory commissions needed to control the tariff payable together with connection charges to be collected by a distribution licensee below the provisions in the Act. This can be expected to make sure that more than one distribution licensee doesn't resort to cherry selecting by hard unreasonable affiliation charges from consumers. 1.1 Electricity Distribution Network Configuration Electricity Distribution networks are usually of 2 types: 
o Radial distribution network 
o Interconnected distribution network 
A radial distribution network leaves the plant and passes through the network space with no traditional connections to the other supply. This can be usually a protracted rural line with isolated load areas. An interconnected or ring network is mostly found in additional urban or developed areas and can have multiple connections to different points of sources. These connections are commonly open however permit varied by the operational entity by closing and gap switches. Operations of those switches could also be from a device from far away center or by linemen. The good thing about the interconnected model is that within the event of fault or needed maintenance, a tiny low space of network is isolated and also the remaining will unbroken. 1.2 Market Structure of Distribution Electricity Distribution may be a network business that includes two separate and clearly different businesses 
(a) The hardware part comprising the wires and associated transformers meters etc. and 
(b) The package part comprising actual offer and also the client interface. In India, distribution firms across most of the states are {a local a space| neighborhood} area monopoly comprising each distribution. 
Much of the distribution business in Republic of India is in hand and managed by authorities. though in hand by the govt., these distribution firms are corporatized with the expectation that it would give them the desired autonomy and to include state-of-art social control practices at the same time as they need monopoly right of distribution in their space. However, sure long standing distribution licensees are operational within the personal sector since the introduction of electricity within the country. Examples are Tata Power, R below D (formerly BSES) in Bombay, CESC in urban center and Torrent in Ahmedabad and Surat in Gujarat. The Electricity Act 2003 however permits for the regulator to produce for multiple and parallel distribution licensees within the same space of operation as long as the second licensee constructs its own distribution network. 
This still doesn't give for client alternative except at the commencement of the link between the utility and customer nor will it give for switching.For historical reasons, it's solely the town of Bombay, wherever multiple distribution licensees have operated, in their client alternative. The residents of Bombay, the industrial capital of the country, relish 24X7 electricity offer and don't have inverters or voltage stabilizers that are the standard cope mechanisms for electricity shoppers in different components of the country. Later in 2008, below a Supreme Court judgment, TPC was recognized to be holding a license to provide electricity to even retail consumers in BEST and also the R Infra-D areas. Twenty five TPC began operational as a parallel distribution licensee in these areas. As consumers began to exercise alternative, it became indefensible for TPC to get its own lines and also the geographic area Electricity Regulatory Commission came out with associate degree order permitting the utilization of open access on the distribution network for a wheeling charge and a cross grant surcharge. On 30th November 2011, the Ministry of Power issued a circular stating {that consumers| that buyers that customers} with a capability of one MW and on top of were thought- about open access players and also the regulator had no jurisdiction on fixing variable or energy charges for them This notification was reiterated on 3rd August 2012 leading the CERC and also the Forum of Regulators to fits the notification. Presently none of the states have operationalized the notification although several of them have had public hearings on the matter and place it on hold. If this notification will become operationalized, the impact on the structure of electricity distribution would be important as they might not be native space monopolies a minimum of four big customers. A recent trend in distribution management has been the carving out of franchisee areas notably that comprising of urban areas or urban areas with a rural part associate degreed concern a competitive bid for an input-based franchisee. The target for revenue assortment and T&D loss reduction is decided through a bidding mechanism. Newly privatized distribution utilities that are joint ventures with the state governments have had mixed results. In state the four distribution firms covering each 2. POWER TRANSMISSION AND DISTRIBUTION SYSTEM OF INDIA 
Historically the electricity business is owned by public establishment however beginning within the 1970s country began the method of deregulation and privatization of power sector, resulting in electricity markets. A serious focus of
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 32 
those was the elimination of the previous thus referred to as natural monopoly of the generation, transmission and distribution. As a consequence, electricity has become additional of trade goods. The separation has also led to the event of latest word to explain the business units e.g. line company, wire business and Network Company. In Republic of India the facility distribution has continuously been thought-about to be a traditional affair i.e. providing an affiliation, request and revenue realization. Outages or failures on the distribution system have an effect on the buyer straightaway. These systems are additional vulnerable and have less backup capability than bulk power offer system and generation. The matter is, any aggravated by losses, poor voltage rules etc. frequent cycle of power shortages impose restriction on the distribution system. 2.1 Losses in Electricity Distribution System Power generated in power plant goes through giant electrical equipment; advanced networks like Transformers, Overhead Lines, Cables & Lamps; different equipment’s and reaches at the end users. Its unavoidable fact that the Units of electrical energy generated by station don’t match with the units consumed to the customers. Some proportion of the power is lost within the Distribution network. This distinction within the generated & distributed units is understood as Transmission and Distribution loss. 
 Transmission and Distribution losses are the amounts that don't seem to be paid for by users. 
 T&D Losses= (Energy Input to feeder (Kwh)- Billed Energy to Consumer (Kwh)) / Energy Input kWh x100). 
 Distribution is thought of because the poorest link within the entire electricity sector. 
India power transmission and distribution network 
Types of Transmission and Distribution Losses 
1. Technical Losses 
2. Commercial Losses (Non-Technical Losses) 
2.1.1 Technical Losses 
 These losses are owing to energy evaporations within the conductors, instrumentality used for cable, electrical device, sub- cable and distribution Line losses and magnetic core losses in transformers. 
 Technical losses are 22.5%, and rely on the network characteristics and therefore the mode of operations. 
 The major quantity of losses in power system grid is in primary distribution and secondary distribution lines. So the first and secondary distribution systems should be correctly planned to confirm among limits. 
 The surprising load increase was reflected within the increase of technical losses on top of the conventional level 
 Losses are inherent to the distribution of electricity and can't be eliminated. 
There are the types of Technical Losses. 2.1.1.1 Permanent / Fixed Technical losses: Fixed losses don't change as per current. These losses are of heat and noise and occur as long as an electrical device is energized. Between 1/4 and 1/3 of technical losses on distribution networks are fixed losses. Fixed losses on a network are influenced within the ways set out below. 
 Corona Losses. 
 Leakage Current Losses. 
 Dielectric Losses. 
 Open-Circuit Losses. 
 Losses Caused By Continuous Load of Measure Components 
 Losses Caused By Continuous Load of Management Elements. 
2.1.1.2 Variable Technical losses 
 Variable losses vary with the number of Electricity distributed and square measure, a lot of exactly, proportional to the square of this. Consequently, a tenth increase in current results in a rise in losses of more than 125th. 
 By increasing the cross-sectional space of cables and conductors for a given load, losses can fall. This results in an immediate decrease between value of losses and price of capital expenditure. 
It’s been prompt that optimum average utilization rate on a distribution network that considers the price of losses in its style may be as low as thirty per cent. 
 Joule line losses in lines in every voltage level 
 Impedance Losses 
 Losses caused by resistance.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 33 
Major Reasons for Technical Losses: 
 Protracted Electric Distribution lines 
 Inadequate Conductors Size of Distribution lines 
 Installation of DT far from load centers 
 Low Power Issue Of Primary And Secondary Distribution System 
 Poor Workmanship 
 Feeder Current and Load Balancing In Feeder 
 Load factor effect on Losses 
 Sizing of Transformer and Selection of Transformer 
 Balancing Three Phase Loads 
 Switching Off the Transformers 
2.1.2 Commercial Losses Commercial losses are at 16.6%, and associated with meter reading losses, defective meter and error in meter reading, charge of client energy consumption, lack of administration, monetary constraints, and estimating unmetered provider of energy similarly as energy thefts. 2.1.2.1 Main Reasons for Non-Technical Losses 
 Power Theft 
 Metering Inaccuracies 
 Unmetered Losses for terribly little Load 
 Unmetered supply 
 Error in Meter Reading 
 Billing Problems 
2.1.2.2 Analysis of Loss Reduction Techniques in Distribution Sector Technical Losses 
 Converting lv Line to HV Line 
 Large commercial / Industrial consumer gets direct Line from Feeder 
 Adopting High Voltage Distribution Service (HVDS) for Agricultural Customer 
 Adopting Arial Bundle Conductor 
 Reduce number of Transformer 
 Utilize Feeder on its Average Capacity 
 Replacements of old Conductor/Cables 
 Feeder Renovation / Improvement Program 
 Industrial / Urban Focus Program 
 Strictly Follow Preventive Maintenance Program 
 Preventing Leakages at Insulators 
 Automatic Voltage booster 
 Better Management of Distribution Transformers o Addition of Distribution Transformers 
o Relocation Of Power Distribution Transformers At Load Centers 
o Guarding Against Loss In Transformer 
 Load Equalization and Load Management 
 Capacitor Installation 
o Across Individual Customers 
o At Vantage Points on LT and Eleven Potential Unit Feeders 
o At Distribution Electrical Device (On The Secondary Side (LT Side)) 
o At 33/11 KV Substations 
o Improving Joints and Connections 
o ARTIFICIAL INTELLIGENCE 
 Artificial Neural Network 
 Simulated Algorithm 
 Ant Formula 
Non-Technical Losses: (Managerial Prospective) 
 Creating Mapping / Information of Distribution Line 
 Implementation of Energy Audits Schemes 
 Mitigating power stealing by Power stealing checking Drives 
 Replacement of Faulty/Sluggish Energy Meter 
 Bill collection facility 
 Reduce Debit areas of Sub Division 
 Watchdog effect on users. 
2.1.3 Countermeasures for Distribution Loss 
 Leveling distribution system masses by ‡Leveling distribution system masses by network reconfiguration (for MV, LV system) 
 Power issue correction by capacitance placement 
 Install new feeders 
 Install new transformers 
 Build a station 
 Re-conductoring (Replace with larger cross section conductors) 
2.1.3.1 Leveling of Distribution System Masses by Network Re-Configuration 
 Some masses within the significant loaded feeder shifted to a different gently loaded feeder 
 Sectionalizing switchgear allocation for load shift (new interconnection between feeders is also required) 
 Optimal switching allocation may be done by distribution system analysis software system 
2.1.3.2 Power Issue Correction by Capacitance Placement 
 Improvement of power issue reduces power flow in a very feeder. Thus, system loss reduction achieved 
 Power issue improved by compensating the reactive power. 
2.1.3.3 Install New Feeders /Transformers /Substations 
 significant loaded space to be equipped by new feeder so existing feeder provides less masses (for new feeder install, typically new HV/MV transformer needed) typically new HV/MV transformer needed)
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 
_______________________________________________________________________________________ 
Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 34 
 New station to be inbuilt the middle of high load density spaces different existing feeder provides less masses area so existing feeder provides less masses. 
3. CONCLUSIONS 
Distribution system takes for highest technical and non- technical losses in power sector. The endeavor of an influence distribution utility ought to cut back leakages by eliminating causes of non-technical losses and by minimizing technical losses. The main factors that contribute to high technical losses are low investments in distribution system, large-scale rural electrification, ad-hoc growth of the system, too several transformation stages, low power issue, caliber of excipient, poor construction and inadequate maintenance of apparatus, improper load management and Distribution Transformers not set at load centers. The factors that contributive to high industrial losses are theft/pilferage by existing client, black affiliation from distribution line by non-customers, incorrect estimation of energy consumption in respect of metered connections, defective metering, meter reading errors, belated request and poor revenue assortment and lack of answerableness. The measures to scale back the technical losses are network reconfiguration, network reconductoring, preventing discharge at insulators, using automatic voltage booster, load reconciliation and load management, capacitor installation etc. The measures to scale back the industrial losses are dominant direct sound by non-customers and customers, pre-paid metering; implementation of IT enabled tools, etc. Technical losses may be reduced to explicit acceptable levels. the suitable technical power loss levels are within the vary of 8.25% to 15.5% looking on configuration of the network, physical parameters of the network, level of loading and current in operation voltage of commercial losses. 
 Cut back request errors: As during this methodology the recharge coupons are issued to the customers for his or her power demand that they'd use for his or her consumption, as a result of this there's no got to generate and deliver the bills which might lead to the reduction of the industrial losses to a great extent. 
 Magnified collection Efficiency: As during this methodology the buyer would take the recharge coupons from the utilities that they need to pay ahead so there's no doubt of the gathering potency but 100%. All the payment would be received by the utilities ahead before the consumption of electricity. 
 Reduced Power Theft: Because the power felony is that the largest contributor of the industrial losses, with the installation of the paid meters the facility felony cases would additionally cut back because the person may solely use the electricity when recharging with the coupons. 
 Consumption as per the requirement: during this methodology it's showed unceasingly on the display of the meter that what's the consumption of the various gadgets and devices employed by the 
buyer, additionally it displays that what's the number remained to be consumed and when minimum limit the meter can begin creating beeping sound, at now of your time the buyer may manage the load as per the necessity which might lead to the effective use of electricity and an oversized quantity of power is also saved.

More Related Content

What's hot

Smart Grids & smart grid technologies in India
Smart Grids & smart grid technologies in IndiaSmart Grids & smart grid technologies in India
Smart Grids & smart grid technologies in IndiaIRJET Journal
 
Power Distribution
Power Distribution Power Distribution
Power Distribution UGL Limited
 
bsnl project report
 bsnl project report bsnl project report
bsnl project reportTara Saini
 
BSNL: A STRATEGIC ANALYSIS
BSNL: A STRATEGIC ANALYSISBSNL: A STRATEGIC ANALYSIS
BSNL: A STRATEGIC ANALYSISANOOPA NARAYANAN
 
Connecting Rural India
Connecting Rural IndiaConnecting Rural India
Connecting Rural IndiaDeepak Pareek
 
Electrum - a project on innovative service
Electrum - a project on innovative service Electrum - a project on innovative service
Electrum - a project on innovative service Debashish Sarkar
 
IRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power SystemIRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power SystemIRJET Journal
 
Unification Requirements of Electric Vehicle Charging Infrastructure
Unification Requirements of Electric Vehicle Charging InfrastructureUnification Requirements of Electric Vehicle Charging Infrastructure
Unification Requirements of Electric Vehicle Charging InfrastructureIAES-IJPEDS
 
Strategy Analysis on BSNL
Strategy Analysis on BSNLStrategy Analysis on BSNL
Strategy Analysis on BSNLSharath Murali
 
Power scenario and approach in india
Power scenario and approach in indiaPower scenario and approach in india
Power scenario and approach in indiaCol Mukteshwar Prasad
 
Training report on telecom exchange2
Training report on telecom exchange2Training report on telecom exchange2
Training report on telecom exchange2raghav aggarwal
 
Priank mathur-north-delhi-power-limited-a-consumer-centric-organization
Priank mathur-north-delhi-power-limited-a-consumer-centric-organizationPriank mathur-north-delhi-power-limited-a-consumer-centric-organization
Priank mathur-north-delhi-power-limited-a-consumer-centric-organizationcloneseeyom
 

What's hot (19)

Smart Grids & smart grid technologies in India
Smart Grids & smart grid technologies in IndiaSmart Grids & smart grid technologies in India
Smart Grids & smart grid technologies in India
 
Powergridppt
PowergridpptPowergridppt
Powergridppt
 
Telecom ppt
Telecom pptTelecom ppt
Telecom ppt
 
Fuel Cells- A Potential Solution for Telecommunications Backup Power
Fuel Cells- A Potential Solution for Telecommunications Backup PowerFuel Cells- A Potential Solution for Telecommunications Backup Power
Fuel Cells- A Potential Solution for Telecommunications Backup Power
 
Power Distribution
Power Distribution Power Distribution
Power Distribution
 
Beama ev guide
Beama ev guideBeama ev guide
Beama ev guide
 
Power plus distribution high res
Power plus distribution high resPower plus distribution high res
Power plus distribution high res
 
bsnl project report
 bsnl project report bsnl project report
bsnl project report
 
BSNL: A STRATEGIC ANALYSIS
BSNL: A STRATEGIC ANALYSISBSNL: A STRATEGIC ANALYSIS
BSNL: A STRATEGIC ANALYSIS
 
Connecting Rural India
Connecting Rural IndiaConnecting Rural India
Connecting Rural India
 
Power sector mis
Power sector misPower sector mis
Power sector mis
 
Electrum - a project on innovative service
Electrum - a project on innovative service Electrum - a project on innovative service
Electrum - a project on innovative service
 
IRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power SystemIRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power System
 
Unification Requirements of Electric Vehicle Charging Infrastructure
Unification Requirements of Electric Vehicle Charging InfrastructureUnification Requirements of Electric Vehicle Charging Infrastructure
Unification Requirements of Electric Vehicle Charging Infrastructure
 
Strategy Analysis on BSNL
Strategy Analysis on BSNLStrategy Analysis on BSNL
Strategy Analysis on BSNL
 
Power scenario and approach in india
Power scenario and approach in indiaPower scenario and approach in india
Power scenario and approach in india
 
Electric vehicle technology impacts on energy
Electric vehicle technology impacts on energyElectric vehicle technology impacts on energy
Electric vehicle technology impacts on energy
 
Training report on telecom exchange2
Training report on telecom exchange2Training report on telecom exchange2
Training report on telecom exchange2
 
Priank mathur-north-delhi-power-limited-a-consumer-centric-organization
Priank mathur-north-delhi-power-limited-a-consumer-centric-organizationPriank mathur-north-delhi-power-limited-a-consumer-centric-organization
Priank mathur-north-delhi-power-limited-a-consumer-centric-organization
 

Viewers also liked

Taguchi optimization for efficient extraction of a natural dye from bougainvi...
Taguchi optimization for efficient extraction of a natural dye from bougainvi...Taguchi optimization for efficient extraction of a natural dye from bougainvi...
Taguchi optimization for efficient extraction of a natural dye from bougainvi...eSAT Publishing House
 
Design and implementation of a fuzzy based tsunami warning system
Design and implementation of a fuzzy based tsunami warning systemDesign and implementation of a fuzzy based tsunami warning system
Design and implementation of a fuzzy based tsunami warning systemeSAT Publishing House
 
Mri image registration based segmentation framework for whole heart
Mri image registration based segmentation framework for whole heartMri image registration based segmentation framework for whole heart
Mri image registration based segmentation framework for whole hearteSAT Publishing House
 
Community detection in social networks an overview
Community detection in social networks an overviewCommunity detection in social networks an overview
Community detection in social networks an overvieweSAT Publishing House
 
Applications of layered theory for the analysis of flexible pavements
Applications of layered theory for the analysis of flexible pavementsApplications of layered theory for the analysis of flexible pavements
Applications of layered theory for the analysis of flexible pavementseSAT Publishing House
 
Influence of process parameters on depth of
Influence of process parameters on depth ofInfluence of process parameters on depth of
Influence of process parameters on depth ofeSAT Publishing House
 
Development of mobile surface water filtration system through simulation usin...
Development of mobile surface water filtration system through simulation usin...Development of mobile surface water filtration system through simulation usin...
Development of mobile surface water filtration system through simulation usin...eSAT Publishing House
 
Cmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensorCmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensoreSAT Publishing House
 
Studies on effect of mineral admixtures on durability
Studies on effect of mineral admixtures on durabilityStudies on effect of mineral admixtures on durability
Studies on effect of mineral admixtures on durabilityeSAT Publishing House
 
Implementation of content based image retrieval using the cfsd algorithm
Implementation of content based image retrieval using the cfsd algorithmImplementation of content based image retrieval using the cfsd algorithm
Implementation of content based image retrieval using the cfsd algorithmeSAT Publishing House
 
Fpga based low power and high performance address
Fpga based low power and high performance addressFpga based low power and high performance address
Fpga based low power and high performance addresseSAT Publishing House
 
Prediction of flow characteristics through a
Prediction of flow characteristics through aPrediction of flow characteristics through a
Prediction of flow characteristics through aeSAT Publishing House
 
Secure intrusion detection and countermeasure selection in virtual system usi...
Secure intrusion detection and countermeasure selection in virtual system usi...Secure intrusion detection and countermeasure selection in virtual system usi...
Secure intrusion detection and countermeasure selection in virtual system usi...eSAT Publishing House
 
Performance of lateritic concrete under
Performance of lateritic concrete underPerformance of lateritic concrete under
Performance of lateritic concrete undereSAT Publishing House
 
Effect of sb si addition on necking behaviour of mg alloys
Effect of sb si addition on necking behaviour of mg alloysEffect of sb si addition on necking behaviour of mg alloys
Effect of sb si addition on necking behaviour of mg alloyseSAT Publishing House
 
Load balancing in public cloud by division of cloud based on the geographical...
Load balancing in public cloud by division of cloud based on the geographical...Load balancing in public cloud by division of cloud based on the geographical...
Load balancing in public cloud by division of cloud based on the geographical...eSAT Publishing House
 
Overall increase in efficiency in raw meals
Overall increase in efficiency in raw mealsOverall increase in efficiency in raw meals
Overall increase in efficiency in raw mealseSAT Publishing House
 

Viewers also liked (20)

Taguchi optimization for efficient extraction of a natural dye from bougainvi...
Taguchi optimization for efficient extraction of a natural dye from bougainvi...Taguchi optimization for efficient extraction of a natural dye from bougainvi...
Taguchi optimization for efficient extraction of a natural dye from bougainvi...
 
Design and implementation of a fuzzy based tsunami warning system
Design and implementation of a fuzzy based tsunami warning systemDesign and implementation of a fuzzy based tsunami warning system
Design and implementation of a fuzzy based tsunami warning system
 
Mri image registration based segmentation framework for whole heart
Mri image registration based segmentation framework for whole heartMri image registration based segmentation framework for whole heart
Mri image registration based segmentation framework for whole heart
 
Community detection in social networks an overview
Community detection in social networks an overviewCommunity detection in social networks an overview
Community detection in social networks an overview
 
Applications of layered theory for the analysis of flexible pavements
Applications of layered theory for the analysis of flexible pavementsApplications of layered theory for the analysis of flexible pavements
Applications of layered theory for the analysis of flexible pavements
 
Influence of process parameters on depth of
Influence of process parameters on depth ofInfluence of process parameters on depth of
Influence of process parameters on depth of
 
Development of mobile surface water filtration system through simulation usin...
Development of mobile surface water filtration system through simulation usin...Development of mobile surface water filtration system through simulation usin...
Development of mobile surface water filtration system through simulation usin...
 
Cmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensorCmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensor
 
Studies on effect of mineral admixtures on durability
Studies on effect of mineral admixtures on durabilityStudies on effect of mineral admixtures on durability
Studies on effect of mineral admixtures on durability
 
Implementation of content based image retrieval using the cfsd algorithm
Implementation of content based image retrieval using the cfsd algorithmImplementation of content based image retrieval using the cfsd algorithm
Implementation of content based image retrieval using the cfsd algorithm
 
Fpga based low power and high performance address
Fpga based low power and high performance addressFpga based low power and high performance address
Fpga based low power and high performance address
 
Kinematic model of a car
Kinematic model of a carKinematic model of a car
Kinematic model of a car
 
Prediction of flow characteristics through a
Prediction of flow characteristics through aPrediction of flow characteristics through a
Prediction of flow characteristics through a
 
Secure intrusion detection and countermeasure selection in virtual system usi...
Secure intrusion detection and countermeasure selection in virtual system usi...Secure intrusion detection and countermeasure selection in virtual system usi...
Secure intrusion detection and countermeasure selection in virtual system usi...
 
Performance of lateritic concrete under
Performance of lateritic concrete underPerformance of lateritic concrete under
Performance of lateritic concrete under
 
Effect of sb si addition on necking behaviour of mg alloys
Effect of sb si addition on necking behaviour of mg alloysEffect of sb si addition on necking behaviour of mg alloys
Effect of sb si addition on necking behaviour of mg alloys
 
Load balancing in public cloud by division of cloud based on the geographical...
Load balancing in public cloud by division of cloud based on the geographical...Load balancing in public cloud by division of cloud based on the geographical...
Load balancing in public cloud by division of cloud based on the geographical...
 
A study on wind speed distributions
A study on wind speed distributionsA study on wind speed distributions
A study on wind speed distributions
 
Overall increase in efficiency in raw meals
Overall increase in efficiency in raw mealsOverall increase in efficiency in raw meals
Overall increase in efficiency in raw meals
 
Chemread – a chemical informant
Chemread – a chemical informantChemread – a chemical informant
Chemread – a chemical informant
 

Similar to Analytical review of loss reduction techniques in indian power distribution sector – techno managerial approach

International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
A Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in IndiaA Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in Indiaijiert bestjournal
 
An Investigative and Comprehensive Study about Deregulation (Restructuring) o...
An Investigative and Comprehensive Study about Deregulation (Restructuring) o...An Investigative and Comprehensive Study about Deregulation (Restructuring) o...
An Investigative and Comprehensive Study about Deregulation (Restructuring) o...ijeei-iaes
 
GIS Based Power Distribution System: A Case study for the Junagadh City
GIS Based Power Distribution System: A Case study for the Junagadh CityGIS Based Power Distribution System: A Case study for the Junagadh City
GIS Based Power Distribution System: A Case study for the Junagadh Cityijsrd.com
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...Harsh Shah
 
Context of smart grids in india knowledge paper of india smart grid day 2013
Context of smart grids in india   knowledge paper of india smart grid day 2013Context of smart grids in india   knowledge paper of india smart grid day 2013
Context of smart grids in india knowledge paper of india smart grid day 2013L&C
 
Indian wind energy status
Indian wind energy statusIndian wind energy status
Indian wind energy statusbazgha khan
 
Market Analysis and Business Plan for Residential Energy Efficiency Services
Market Analysis and Business Plan for Residential Energy Efficiency ServicesMarket Analysis and Business Plan for Residential Energy Efficiency Services
Market Analysis and Business Plan for Residential Energy Efficiency ServicesAlbert Graells Vilella
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 
Indian power market design
Indian power market designIndian power market design
Indian power market designNavajyoti Martha
 
11. Open Access- Intra State, Inter State.pdf
11.  Open Access- Intra State, Inter State.pdf11.  Open Access- Intra State, Inter State.pdf
11. Open Access- Intra State, Inter State.pdfKriteshKumar12
 
IRJET- SMART GRID: The Internet of Electrical Energy System
IRJET- SMART GRID: The Internet of Electrical Energy SystemIRJET- SMART GRID: The Internet of Electrical Energy System
IRJET- SMART GRID: The Internet of Electrical Energy SystemIRJET Journal
 
IRJET - Smart Grid Inspection Robot Exclusively Designed for High Power T...
IRJET -  	  Smart Grid Inspection Robot Exclusively Designed for High Power T...IRJET -  	  Smart Grid Inspection Robot Exclusively Designed for High Power T...
IRJET - Smart Grid Inspection Robot Exclusively Designed for High Power T...IRJET Journal
 
Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...
Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...
Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...AM Publications
 
The integration of smart meters into electrical grids bangladesh chapter
The integration of smart meters into electrical grids bangladesh chapterThe integration of smart meters into electrical grids bangladesh chapter
The integration of smart meters into electrical grids bangladesh chapterAlexander Decker
 
11.the integration of smart meters into electrical grids bangladesh chapter
11.the integration of smart meters into electrical grids bangladesh chapter11.the integration of smart meters into electrical grids bangladesh chapter
11.the integration of smart meters into electrical grids bangladesh chapterAlexander Decker
 
01012010 demand response
01012010 demand response 01012010 demand response
01012010 demand response miguelazo84
 
Print statcom operation on wind
Print statcom operation on windPrint statcom operation on wind
Print statcom operation on windOmkar Koduri
 
Renewable energy for bts (2)
Renewable energy for bts (2)Renewable energy for bts (2)
Renewable energy for bts (2)nasir12345678900
 

Similar to Analytical review of loss reduction techniques in indian power distribution sector – techno managerial approach (20)

International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
A Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in IndiaA Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in India
 
An Investigative and Comprehensive Study about Deregulation (Restructuring) o...
An Investigative and Comprehensive Study about Deregulation (Restructuring) o...An Investigative and Comprehensive Study about Deregulation (Restructuring) o...
An Investigative and Comprehensive Study about Deregulation (Restructuring) o...
 
Ipemr Highlights June10
Ipemr Highlights June10Ipemr Highlights June10
Ipemr Highlights June10
 
GIS Based Power Distribution System: A Case study for the Junagadh City
GIS Based Power Distribution System: A Case study for the Junagadh CityGIS Based Power Distribution System: A Case study for the Junagadh City
GIS Based Power Distribution System: A Case study for the Junagadh City
 
Power generation and supply industry in india an economic analysis of the m...
Power generation and supply industry in india   an economic analysis of the m...Power generation and supply industry in india   an economic analysis of the m...
Power generation and supply industry in india an economic analysis of the m...
 
Context of smart grids in india knowledge paper of india smart grid day 2013
Context of smart grids in india   knowledge paper of india smart grid day 2013Context of smart grids in india   knowledge paper of india smart grid day 2013
Context of smart grids in india knowledge paper of india smart grid day 2013
 
Indian wind energy status
Indian wind energy statusIndian wind energy status
Indian wind energy status
 
Market Analysis and Business Plan for Residential Energy Efficiency Services
Market Analysis and Business Plan for Residential Energy Efficiency ServicesMarket Analysis and Business Plan for Residential Energy Efficiency Services
Market Analysis and Business Plan for Residential Energy Efficiency Services
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Indian power market design
Indian power market designIndian power market design
Indian power market design
 
11. Open Access- Intra State, Inter State.pdf
11.  Open Access- Intra State, Inter State.pdf11.  Open Access- Intra State, Inter State.pdf
11. Open Access- Intra State, Inter State.pdf
 
IRJET- SMART GRID: The Internet of Electrical Energy System
IRJET- SMART GRID: The Internet of Electrical Energy SystemIRJET- SMART GRID: The Internet of Electrical Energy System
IRJET- SMART GRID: The Internet of Electrical Energy System
 
IRJET - Smart Grid Inspection Robot Exclusively Designed for High Power T...
IRJET -  	  Smart Grid Inspection Robot Exclusively Designed for High Power T...IRJET -  	  Smart Grid Inspection Robot Exclusively Designed for High Power T...
IRJET - Smart Grid Inspection Robot Exclusively Designed for High Power T...
 
Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...
Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...
Development of Smart Plug and Energy Price Forecasting Technique to Reduce Pe...
 
The integration of smart meters into electrical grids bangladesh chapter
The integration of smart meters into electrical grids bangladesh chapterThe integration of smart meters into electrical grids bangladesh chapter
The integration of smart meters into electrical grids bangladesh chapter
 
11.the integration of smart meters into electrical grids bangladesh chapter
11.the integration of smart meters into electrical grids bangladesh chapter11.the integration of smart meters into electrical grids bangladesh chapter
11.the integration of smart meters into electrical grids bangladesh chapter
 
01012010 demand response
01012010 demand response 01012010 demand response
01012010 demand response
 
Print statcom operation on wind
Print statcom operation on windPrint statcom operation on wind
Print statcom operation on wind
 
Renewable energy for bts (2)
Renewable energy for bts (2)Renewable energy for bts (2)
Renewable energy for bts (2)
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

Analytical review of loss reduction techniques in indian power distribution sector – techno managerial approach

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 30 ANALYTICAL REVIEW OF LOSS REDUCTION TECHNIQUES IN INDIAN POWER DISTRIBUTION SECTOR – TECHNO MANAGERIAL APPROACH Isaac Ramalla1, Nithin Namburi2 1EEE Department, UPES, Dehradun, India 2EEE Department, UPES, Dehradun, India Abstract Electrical power is important for economic development and also to improve the quality of life. It will be key input to any activity related to economics in industrial, agricultural, trade, commercial or the service sector. A rapidly developing economy like India faces an ever increasing demand for electrical power. Power distribution is the last stage within the delivery (before retail) of electricity to end user. A distribution system carries power from the transmission system and delivers it to customers. Typically, the distribution system would come with medium voltage (<50 KV) power lines, pole mounted transformers and electrical substations, low voltage (<1000V) generally electricity meters and distribution wiring. Distribution is that the important section of electricity price chain because it completes the revenue cycle. Sadly, in India, it's conjointly the weakest ling troubled because it is by poor monetary health, poor assortment efficiencies, poor governance, poor social control practices and lack of responsibility. The distribution sector caters to rural and concrete areas. Post restructuring of the electricity sector, most of the states have engraved out multiple distribution firms with its monopoly space. Presently Republic of India has seven classes of distribution entities The AT&C losses is one of the major problems of the Indian power sector, we know that India is struggling with the demand-supply gap existing in power sector and trying to recover these gap with different steps, and the AT&C losses is one of the major milestones of reducing the demand supply gap in the country, also it obligates a burden on the consumers as the T&D losses are included in the tariff that they are paying. The AT&C losses has two components technical losses and the commercial losses, the AT&C losses are 28.44% (average 2009) in the country, out of them most of the losses are of commercial only. -------------------------------------------------------------------***------------------------------------------------------------------- 1. INTRODUCTION Due The electricity sector in Republic of India is on the coinciding list of the constitution and therefore both the Centre and also the States having important jurisdiction over the world. Until 1975, every state had a State Electricity Board that was a vertically integrated monopoly liable for generation, transmission and distribution of electricity therein specific state. In 1975, the central government established generation firms like NTPC, NHPC and NEEPCO below the central sector to enhance a lot of required capability addition within the country. Soon after, grid was started to produce interstate and inter-regional transmission connectivity and capacity leading to the event of a national network. However, the world continued to be stricken by demand-supply gaps, high technical and commercial losses notably within the distribution section further as poor monetary and operational performance. In 1991, the Government of India (GoI) initiated reforms of the facility sector as a part of the larger exercise liberalizing the Indian economy. So as to enhance the supply-demand gap, the GoI permissible the entry of the private sector in electricity generation. There was no law exclusion private sector in electricity distribution even if most of sector was presently below the state governments. In the mid-1990s, it had been recognized that the mere augmentation of capacity wouldn't be adequate and also the sector needed much more targeted interventions. By the command of the World Bank, govt. of India enacted the state Power Reforms Act in 1995 that entailed the restructuring of the state Electricity Board through a method of purposeful unbundling and also the putting in of the State Electricity Regulatory Commission (SERC) as associate degree freelance regulator for the sector. This model was reforms was derived (sometimes with minor variations) in many different states across the country like state, Karnataka, Uttar Pradesh, Haryana etc. In 1998, the GoI enacted the Electricity Regulative Commissions Act that enabled the states to line up regulative commissions however failed to give the legislative foundation for restructuring the sector. Each restructuring and putting in associate degree ERC continued to be a possibility that states may exercise however wasn't obligatory. It had been solely once the enactment of the EA 2003 was the putting in of a regulative commission in each state created mandatory. However, as way as unbundling was involved, the sole mandatory demand was the separation of the transmission wires from trading for the aim of facilitating open access as a precursor to competition. The distribution firms continued to be native space monopolies although one state-wide distribution company was split into many firms for the sake of up operational potency.
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 31 The EA 2003 provides for the grant of multiple distribution licensees within the same space through independent distribution systems, so as to facilitate competition within the distribution business. Section 62 (1)(d) specifies that just in case there are quite one distribution licensee within the same space, the SERC could confirm solely the ceiling on the retail tariff so as to push competition. With a read to produce advantages of promoting competition to any or all group of consumers, the second and next in line licensee for distribution within the same space shall have duty to provide to any or all consumers in correspondence with provisions of section 43 of the Indian Electricity Act 2003. The state regulatory commissions needed to control the tariff payable together with connection charges to be collected by a distribution licensee below the provisions in the Act. This can be expected to make sure that more than one distribution licensee doesn't resort to cherry selecting by hard unreasonable affiliation charges from consumers. 1.1 Electricity Distribution Network Configuration Electricity Distribution networks are usually of 2 types: o Radial distribution network o Interconnected distribution network A radial distribution network leaves the plant and passes through the network space with no traditional connections to the other supply. This can be usually a protracted rural line with isolated load areas. An interconnected or ring network is mostly found in additional urban or developed areas and can have multiple connections to different points of sources. These connections are commonly open however permit varied by the operational entity by closing and gap switches. Operations of those switches could also be from a device from far away center or by linemen. The good thing about the interconnected model is that within the event of fault or needed maintenance, a tiny low space of network is isolated and also the remaining will unbroken. 1.2 Market Structure of Distribution Electricity Distribution may be a network business that includes two separate and clearly different businesses (a) The hardware part comprising the wires and associated transformers meters etc. and (b) The package part comprising actual offer and also the client interface. In India, distribution firms across most of the states are {a local a space| neighborhood} area monopoly comprising each distribution. Much of the distribution business in Republic of India is in hand and managed by authorities. though in hand by the govt., these distribution firms are corporatized with the expectation that it would give them the desired autonomy and to include state-of-art social control practices at the same time as they need monopoly right of distribution in their space. However, sure long standing distribution licensees are operational within the personal sector since the introduction of electricity within the country. Examples are Tata Power, R below D (formerly BSES) in Bombay, CESC in urban center and Torrent in Ahmedabad and Surat in Gujarat. The Electricity Act 2003 however permits for the regulator to produce for multiple and parallel distribution licensees within the same space of operation as long as the second licensee constructs its own distribution network. This still doesn't give for client alternative except at the commencement of the link between the utility and customer nor will it give for switching.For historical reasons, it's solely the town of Bombay, wherever multiple distribution licensees have operated, in their client alternative. The residents of Bombay, the industrial capital of the country, relish 24X7 electricity offer and don't have inverters or voltage stabilizers that are the standard cope mechanisms for electricity shoppers in different components of the country. Later in 2008, below a Supreme Court judgment, TPC was recognized to be holding a license to provide electricity to even retail consumers in BEST and also the R Infra-D areas. Twenty five TPC began operational as a parallel distribution licensee in these areas. As consumers began to exercise alternative, it became indefensible for TPC to get its own lines and also the geographic area Electricity Regulatory Commission came out with associate degree order permitting the utilization of open access on the distribution network for a wheeling charge and a cross grant surcharge. On 30th November 2011, the Ministry of Power issued a circular stating {that consumers| that buyers that customers} with a capability of one MW and on top of were thought- about open access players and also the regulator had no jurisdiction on fixing variable or energy charges for them This notification was reiterated on 3rd August 2012 leading the CERC and also the Forum of Regulators to fits the notification. Presently none of the states have operationalized the notification although several of them have had public hearings on the matter and place it on hold. If this notification will become operationalized, the impact on the structure of electricity distribution would be important as they might not be native space monopolies a minimum of four big customers. A recent trend in distribution management has been the carving out of franchisee areas notably that comprising of urban areas or urban areas with a rural part associate degreed concern a competitive bid for an input-based franchisee. The target for revenue assortment and T&D loss reduction is decided through a bidding mechanism. Newly privatized distribution utilities that are joint ventures with the state governments have had mixed results. In state the four distribution firms covering each 2. POWER TRANSMISSION AND DISTRIBUTION SYSTEM OF INDIA Historically the electricity business is owned by public establishment however beginning within the 1970s country began the method of deregulation and privatization of power sector, resulting in electricity markets. A serious focus of
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 32 those was the elimination of the previous thus referred to as natural monopoly of the generation, transmission and distribution. As a consequence, electricity has become additional of trade goods. The separation has also led to the event of latest word to explain the business units e.g. line company, wire business and Network Company. In Republic of India the facility distribution has continuously been thought-about to be a traditional affair i.e. providing an affiliation, request and revenue realization. Outages or failures on the distribution system have an effect on the buyer straightaway. These systems are additional vulnerable and have less backup capability than bulk power offer system and generation. The matter is, any aggravated by losses, poor voltage rules etc. frequent cycle of power shortages impose restriction on the distribution system. 2.1 Losses in Electricity Distribution System Power generated in power plant goes through giant electrical equipment; advanced networks like Transformers, Overhead Lines, Cables & Lamps; different equipment’s and reaches at the end users. Its unavoidable fact that the Units of electrical energy generated by station don’t match with the units consumed to the customers. Some proportion of the power is lost within the Distribution network. This distinction within the generated & distributed units is understood as Transmission and Distribution loss.  Transmission and Distribution losses are the amounts that don't seem to be paid for by users.  T&D Losses= (Energy Input to feeder (Kwh)- Billed Energy to Consumer (Kwh)) / Energy Input kWh x100).  Distribution is thought of because the poorest link within the entire electricity sector. India power transmission and distribution network Types of Transmission and Distribution Losses 1. Technical Losses 2. Commercial Losses (Non-Technical Losses) 2.1.1 Technical Losses  These losses are owing to energy evaporations within the conductors, instrumentality used for cable, electrical device, sub- cable and distribution Line losses and magnetic core losses in transformers.  Technical losses are 22.5%, and rely on the network characteristics and therefore the mode of operations.  The major quantity of losses in power system grid is in primary distribution and secondary distribution lines. So the first and secondary distribution systems should be correctly planned to confirm among limits.  The surprising load increase was reflected within the increase of technical losses on top of the conventional level  Losses are inherent to the distribution of electricity and can't be eliminated. There are the types of Technical Losses. 2.1.1.1 Permanent / Fixed Technical losses: Fixed losses don't change as per current. These losses are of heat and noise and occur as long as an electrical device is energized. Between 1/4 and 1/3 of technical losses on distribution networks are fixed losses. Fixed losses on a network are influenced within the ways set out below.  Corona Losses.  Leakage Current Losses.  Dielectric Losses.  Open-Circuit Losses.  Losses Caused By Continuous Load of Measure Components  Losses Caused By Continuous Load of Management Elements. 2.1.1.2 Variable Technical losses  Variable losses vary with the number of Electricity distributed and square measure, a lot of exactly, proportional to the square of this. Consequently, a tenth increase in current results in a rise in losses of more than 125th.  By increasing the cross-sectional space of cables and conductors for a given load, losses can fall. This results in an immediate decrease between value of losses and price of capital expenditure. It’s been prompt that optimum average utilization rate on a distribution network that considers the price of losses in its style may be as low as thirty per cent.  Joule line losses in lines in every voltage level  Impedance Losses  Losses caused by resistance.
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 33 Major Reasons for Technical Losses:  Protracted Electric Distribution lines  Inadequate Conductors Size of Distribution lines  Installation of DT far from load centers  Low Power Issue Of Primary And Secondary Distribution System  Poor Workmanship  Feeder Current and Load Balancing In Feeder  Load factor effect on Losses  Sizing of Transformer and Selection of Transformer  Balancing Three Phase Loads  Switching Off the Transformers 2.1.2 Commercial Losses Commercial losses are at 16.6%, and associated with meter reading losses, defective meter and error in meter reading, charge of client energy consumption, lack of administration, monetary constraints, and estimating unmetered provider of energy similarly as energy thefts. 2.1.2.1 Main Reasons for Non-Technical Losses  Power Theft  Metering Inaccuracies  Unmetered Losses for terribly little Load  Unmetered supply  Error in Meter Reading  Billing Problems 2.1.2.2 Analysis of Loss Reduction Techniques in Distribution Sector Technical Losses  Converting lv Line to HV Line  Large commercial / Industrial consumer gets direct Line from Feeder  Adopting High Voltage Distribution Service (HVDS) for Agricultural Customer  Adopting Arial Bundle Conductor  Reduce number of Transformer  Utilize Feeder on its Average Capacity  Replacements of old Conductor/Cables  Feeder Renovation / Improvement Program  Industrial / Urban Focus Program  Strictly Follow Preventive Maintenance Program  Preventing Leakages at Insulators  Automatic Voltage booster  Better Management of Distribution Transformers o Addition of Distribution Transformers o Relocation Of Power Distribution Transformers At Load Centers o Guarding Against Loss In Transformer  Load Equalization and Load Management  Capacitor Installation o Across Individual Customers o At Vantage Points on LT and Eleven Potential Unit Feeders o At Distribution Electrical Device (On The Secondary Side (LT Side)) o At 33/11 KV Substations o Improving Joints and Connections o ARTIFICIAL INTELLIGENCE  Artificial Neural Network  Simulated Algorithm  Ant Formula Non-Technical Losses: (Managerial Prospective)  Creating Mapping / Information of Distribution Line  Implementation of Energy Audits Schemes  Mitigating power stealing by Power stealing checking Drives  Replacement of Faulty/Sluggish Energy Meter  Bill collection facility  Reduce Debit areas of Sub Division  Watchdog effect on users. 2.1.3 Countermeasures for Distribution Loss  Leveling distribution system masses by ‡Leveling distribution system masses by network reconfiguration (for MV, LV system)  Power issue correction by capacitance placement  Install new feeders  Install new transformers  Build a station  Re-conductoring (Replace with larger cross section conductors) 2.1.3.1 Leveling of Distribution System Masses by Network Re-Configuration  Some masses within the significant loaded feeder shifted to a different gently loaded feeder  Sectionalizing switchgear allocation for load shift (new interconnection between feeders is also required)  Optimal switching allocation may be done by distribution system analysis software system 2.1.3.2 Power Issue Correction by Capacitance Placement  Improvement of power issue reduces power flow in a very feeder. Thus, system loss reduction achieved  Power issue improved by compensating the reactive power. 2.1.3.3 Install New Feeders /Transformers /Substations  significant loaded space to be equipped by new feeder so existing feeder provides less masses (for new feeder install, typically new HV/MV transformer needed) typically new HV/MV transformer needed)
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 12 | ICAESA - 2014 | Jun-2014, Available @ http://www.ijret.org 34  New station to be inbuilt the middle of high load density spaces different existing feeder provides less masses area so existing feeder provides less masses. 3. CONCLUSIONS Distribution system takes for highest technical and non- technical losses in power sector. The endeavor of an influence distribution utility ought to cut back leakages by eliminating causes of non-technical losses and by minimizing technical losses. The main factors that contribute to high technical losses are low investments in distribution system, large-scale rural electrification, ad-hoc growth of the system, too several transformation stages, low power issue, caliber of excipient, poor construction and inadequate maintenance of apparatus, improper load management and Distribution Transformers not set at load centers. The factors that contributive to high industrial losses are theft/pilferage by existing client, black affiliation from distribution line by non-customers, incorrect estimation of energy consumption in respect of metered connections, defective metering, meter reading errors, belated request and poor revenue assortment and lack of answerableness. The measures to scale back the technical losses are network reconfiguration, network reconductoring, preventing discharge at insulators, using automatic voltage booster, load reconciliation and load management, capacitor installation etc. The measures to scale back the industrial losses are dominant direct sound by non-customers and customers, pre-paid metering; implementation of IT enabled tools, etc. Technical losses may be reduced to explicit acceptable levels. the suitable technical power loss levels are within the vary of 8.25% to 15.5% looking on configuration of the network, physical parameters of the network, level of loading and current in operation voltage of commercial losses.  Cut back request errors: As during this methodology the recharge coupons are issued to the customers for his or her power demand that they'd use for his or her consumption, as a result of this there's no got to generate and deliver the bills which might lead to the reduction of the industrial losses to a great extent.  Magnified collection Efficiency: As during this methodology the buyer would take the recharge coupons from the utilities that they need to pay ahead so there's no doubt of the gathering potency but 100%. All the payment would be received by the utilities ahead before the consumption of electricity.  Reduced Power Theft: Because the power felony is that the largest contributor of the industrial losses, with the installation of the paid meters the facility felony cases would additionally cut back because the person may solely use the electricity when recharging with the coupons.  Consumption as per the requirement: during this methodology it's showed unceasingly on the display of the meter that what's the consumption of the various gadgets and devices employed by the buyer, additionally it displays that what's the number remained to be consumed and when minimum limit the meter can begin creating beeping sound, at now of your time the buyer may manage the load as per the necessity which might lead to the effective use of electricity and an oversized quantity of power is also saved.