International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 1995
Project Management Approach on the Adaptive
Enterprise Resource Planning
Hermawan1
, Riyanarto Sarno2
, Muhammad Anshari3
1
Jurusan Teknik Informatika, Fakultas Teknik, Universitas Trunojoyo Madura, Indonesia
2
Jurusan Teknik Informatika, Fakultas Teknologi Informasi, Institut Teknologi Sepuluh Nopember, Indonesia
3
School of Business and Economics, University of Brunei Darussalam, Brunei Darussalam
Abstract—Enterprise Resource Planning (ERP)
implementation is one of key success factors for business
organization’s to endorse their business strategy and goal
alignment with information technology recent. In spite of
its benefits, yet there are many failures in ERP
implementation, whereas between 50% to 75% is
categorized has failed due to lack of top level
management awareness, change of business processes in
project implementation, unsuitable architecture, design,
and technological infrastructure. The study proposes an
Adaptive ERP system that coverage both management
and technology areas with the main characteristic are in
visibility, flexibility, and agility. The Adaptive ERP is
expected becoming as alternative approach to overcome
failures in ERP implementation. The Adaptive ERP has
standardized business process transitioning from Project
Management (PM) into Operational Management (OM)
that generally as baseline for conventional ERP. An
addition, Adaptive ERP has standardized Service
Oriented Architecture (SOA) in order to manage
interoperability of the application services.
Keywords— Adaptive Enterprise Resource Planning,
Project Management, Operational Management, Service
Oriented Architecture.
I. INTRODUCTION
As one of the enterprise information system product that
has become most important in business practice today,
ERP is required by almost enterprise and small medium
enterprises (SMEs) business organizations [1] to manage
their resources (financial, material, manufacture, human,
etc.) and stakeholders (director, customer, vendor, etc.) to
achieve their business strategies and objectives. ERP has
been designed to improve the competitiveness, flexibility,
productivity and responsiveness to the organization and
market growth in the dynamically global economy [2].
Various benefits have been achieved by business
organization that has successed to implement ERP within
integration business environment, standardized business
process procedure, and availibity of business transaction
in real time so have , impact for organization
development[3].
There are facts that many organizations are failed in
optimizing ERP implementation, where between 50% to
75% is categorized failure due to lack of top level
management awareness, change of business processes in
project implementation, unsuitable architecture, technical
implementation, and technological infrastructure choices
[2][3].
Even in the many case studies, many large companies
have invested in large portion for IT technology,
resources, and yet they have failed in the ERP
implementation [4]. The failure of the ERP
implementation is not only caused financial loss of
investment, but also has impact in disordering and halting
business processing.
Other many failures of ERP implementation, founded in
Indonesia country, in investigation many big companies
including State Owned Enterprises such as Semen
Indonesia and PERTAMINA as the two largest
companies in Indonesia that have been expensively
invested by used branded products have been categorized
failed in the ERP implementation.
Therefore, it is required to review ERP business process
strategy that adopted effectively management principal
which have ability to improve overall stakeholders
participation especially top management awareness to
direct operational management, and also radically
changes of business processes.
The Adaptive ERP is intended as an alternative solution
for those entire requirements. The Adaptive ERP has
adopted Project Management as a standardization
business process without leaving management business
process that was covered by operational management.
This study proposes transitioning project management
approach to ERP operational management, in order to
improve business process visibility and flexibility.
This innovation might differ from conventional ERP
approach, and there has been no research founded on the
field of the ERP studies have discussed about ERP with
based on the project management process groups and
activities. In generally ERP modules, the project
management is only being a sub module of ERP.
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 1996
Operational management in many enterprise corporates
that are using make to order manufacture supply with
production system classified by Job-Shop or Batch
production type [5] that produces highly variety of
product, use general purpose machine and facilities, use
highly operators skill, use many outsources machines and
operators, and do detailed activity planning for
sequencing production jobs has operational characteristic
as well as project management.
On the other side, SOA is intended to support Adaptive
ERP architecture, design and technology. SOA as a
principal paradigm, oriented in middle layer service of
application software and works in middleware
infrastructure has more adapted to dynamically business
process improvement that can be managed and
maintained easily when distributed in many
organization’s divisions accordingly depending upon
company's development.
With implement PM and SOA principal, adaptive ERP
frameworks fulfilled three principal characteristic there
are: Availability, Flexibility, and Agility, which
addressed to overcome failures in ERP implementation.
.
II. LITERATURE REVIEW
The ERP is an Enterprise Information System as tool and
strategy of enterprise organization to achieve their
objectives and goal [6], with standardized in many
software modules (finance, manufacture, inventory,
human resource, etc.) which have standardized business
process to managing overall organization’s activities and
stakeholders ( customer, supplier)[7] in order to balance
their demand and supply [8].
Functional modules that are generally included within
ERP software such as: Product Forecasting, Production
Scheduling, Materials Management, Inventory
Management, Purchasing and Receiving, Sales
Operations, Distribution and Logistics, Accounts Payable,
Accounts Receivable, Fixed Asset, General Ledger,
Product Marketing, Strategic Marketing, technical
support, and also management support Cash Bank and
Human Resource Management [9].
Evolution occurs in ERP, adapted to industry
globalization and dinamically stakeholder’s expectation.
ERP I have been created with addition Customer
Relationship Management (CRM) to support relation link
to customer, and Supply Chain Management (SCM) to
support relation link to supplier [9]. Then ERP II
integrated with Business Intelligent to support
organization ability to evaluate and improve business
strategy in upgrading the quality of products [10],
services, and management as response to predictive
analysis in future. The ERP evolution is shown in Figure
1.
Fig.1: ERP modules and evolution (Source: Author’s
compilation, 2016).
1. Project Management
Project is temporary endeavor to create unique product,
service or result. Project management concerns on the
application of knowledge, skills, tools and techniques to
project activities to meet project requirements, where the
project management has process groups of initiating,
planning, executing, monitoring and controlling, and
closing [11].
Within fulfillment of project management business
processes, there are many knowledge areas are existing
and supporting many activities to achieve overall strategy
and objectives, they are: integration, scope, time, cost,
quality, human resource, communication, risk,
procurement management and as addition asset
management [11].
In applications, Project management generally used to
create a new product or service, implementation a new
business process or organization’s structure, change
organization’s structure or strategy.
Different with project management applications,
conventional ERP based on Material Resource Planning
and in generally has adopted operational management.
Characteristic differences between project management
and production management are shown in Table 1.
Table.1: Comparison between Project Management vs.
Operational Management (Source: Author’s Compilation,
2016).
Concerns Project
Management
Operational
Management
Start-End
Point
Clean State,
Specified Start
to End
Existing, No real
Start to End
Outcome Unique Repetitive
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 1997
Live Cycle Temporary Long Time
Frequency Of
Change
Short Long
Managerial
Structure
Simple Complex
Operational Complex Moderate
Risk Coverage High Moderate
Resource Dynamic Static
Activity
Oriented
Human Manufacture
Base of Works Workbase
Structure
Daily operations
According to its characteristics, project management
more adaptive than operational management, therefore
the project management process groups and activities can
be considered to adopt as Adaptive ERP baseline, because
the Adaptive ERP has higher control to adapt various
uncertainty conditions and variable resources that are
running dynamically.
2. Service Oriented Architecture
SOA is a design paradigm in software engineering which
introduces as a concept of services that can be represented
as functionalities of an application [12]. It’s addressed in
order to help reducing complexities in software
development, where this paradigm should be flexible in
adapting within a heterogeneous and decentralized
information system [12]. Furthermore, SOA can help to
bridge business process requirements and IT component
services.
As an extension of design paradigm of SOA, Service
Resource Oriented Architecture (SROA) as alternative
best practice solution framework for agile model driven
design include strategy to composition and decomposition
webservice for REST and SOAP, distribution and
integration software component and service, and also
webservice orchestras within Business Process Model
Notation (BPMN) inside Business Process Management
Suite (BPMS) infrastructure technology [14].
3. Adaptive ERP
The basic principle of Adaptive is learning by doing,
where not only give attention to how uncertainty behavior
of working on the ecosystem but also how to manage
uncertainty in the best manner to achieve progress and
improvement [15].
Similarly, the Adaptive ERP is able to improve business
strategy and technology with the variety of changes both
in the internal environment of the organization and with
the external environment, but while maintaining
performance in visibility and flexibility [16].
On the side of the business strategy and objectives,
business process becomes the most important factor. The
Adaptive ERP should be able to maintain the visibility of
business processes in the overall organization divisions in
order to integrate across divisions, and having the
flexibility to adapt with improvement of business
processes.
Comparison Visibility and Flexibility in Adaptive ERP
can be illustrated in Figure 2, the steady state system not
yet to adopt operational management based on ERP
where Visibility and Flexibility on business processes in
lowest level because business process management and
transaction data are managed within traditionally
management, so has impact it too hard to managed and
maintained.
While in the Centralized Enterprise, that used centralized
and monolithic ERP has highest visibility level in the
integration of business process management and data
transaction in the large organizations with the same
business transaction location and system, despite of the
flexibility is low for many divisions which have different
business processes and locations.
In contrast to the decentralized where each division works
separately with the specification of business processes
and transaction data independently has highest flexibility,
but has low visibility to integrate.
By the using of Adaptive ERP, it has ability to get a good
flexibility because the system is running in the distributed
system, and also still maintaining visibility remains high
with their synchronization and integration of business
processes through support of agility of SOA technology
in middleware infrastructure (i.e.: BPMS, ESB ) and
middle layer software (WSDL, BPEL).
SOA is managed by adaptive workflow, refers to the
ability of the workflow management system to
dynamically adapted with the model (such as: BPMN) to
manage activity as service during runtime that is intended
to income flexibility in distributed system [17].
For those reasons, the adaptive ERP is intended to be able
to adapt to perform a unique and dynamically business
environment includes management and technology
strategy, to get the best solutions on the improvement
organization ecosystems with efficient in cost and time.
Three characteristics of the Adaptive ERP: Visibility,
Flexibility and Agility must be present as the most
important keys to build adaptive ERP.
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 1998
Fig.2: Comparison between ERP systems in visibility and
flexibility [16].
4. Related Works and Contributions
In the previous study has been described ERP and
Operational Management are linked conceptually. Based
on the identified effects of ERP, describes predictive
analysis on the managerial tasks of the production and
operations manager in an ERP environment have
potential relevance to future research [18]. In change
Strategy describes the main factors affecting Information
and Communication Technology (ICT) adoption and
process redesign within organizations, with the objective
to define a systematization framework and a set of
methods and tools useful for scholars and practitioners
that is included strategy, people, process, and enablers
[19]. This study has novelty as future research for
transitioning project management within ERP operational
management and detailing strategy, people and process to
improve business processes within The Adaptive ERP to
overcome failures in the conventional ERP
implementation.
III. METHODS AND DISCUSSION
In this study conducted the various literature and study in
scope ERP implementation failures. Also analyze the
causing linkages and founded the hypothesis. The
different viewpoint from many earlier studies, this study
not only put the project management as early in the
project implementation, but addresses the project
management be an alternative operational management in
the Adaptive ERP. Then the researchers build model and
software to implement these method and share it with
company that have operations management compatibility
to determine whether the method suitable to be adapted to
the operational ERP and obtains benefit results. In this
discuss only describe in the project management approach
within the Adaptive ERP conducted to the causing of
ERP implementation failures. The SOA approach will
discuss in the next our other paper.
3.1 Defines Key Factors of ERP Implementation
Failures
To analyze the problems of three main factors of ERP
implementation failure, necessary to determine the key
factors related to the main problem.
Fig.3: Comparison between ERP systems in visibility and
flexibility (Source: Author’s compilation, 2016)
• In the first problem, addressed to the top
management awareness problem founded four key
as the primary responsibility of the top management
level they are: initiative, authorization, direction,
and finalization. Top level management should be
has the strongest initiative for the implementation
and operation of ERP and then give authorization
and direction for planning by the managerial, and
then find out exactly progress and finalization.
• Next to the second problem, addressed to the
business process improvement, three key that take
effect, they are: Quality Performance, Risk
Assessment and Controlling Change. Quality
performance needed as a parameter objective, if
those parameters are not fulfilled or failed, it would
cause various impacts of risk. It needs quantification
of the parameters of performance and risk. Change
control required as authorization to improve quality
performance and reduce the defect of the risk
impact.
• While for the third problems, addressed to
unsuitable Architecture, design, and technology 3
main keys should be solutions: compliance
architecture view, fitness model driven design, and
the agile technology. Multi perspective view
architecture is used to provide an collaboration of
brainware, software and hardware architecture that
can be understood by all stakeholders [20], with the
Business Architecture View as a priority. Suitability
business architecture transformation into software
Visibility
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 1999
architecture can be achieved through the using of the
model-driven design, SOA and agile support
technology. Interoperability of software modules,
the adaptation for improvement business processes
and evolution of software in the future will be
achieved.
3.2 Establishment of Keys Relation to Solution
Hypothesis
For mapping the problem points with the hypothesis of
solutions, it is necessary to conduct processes and tools,
as shown in Table 2.
Table.2: Relation Between problem and solution keys
(Source: Author’s Compilation, 2016).
KeySolution Project
Management
Service Oriented
Architecture
Initiative Initiating
stage
Authorization Planning
Stage
Direction Executing
Stage
Finalization Closing
Stage
Quality
Performance
Quality
Plan,
Quality
Assurance,
Quality
Control
Risk Assessment Risk Plan,
Risk
Assessment,
Risk Control
Change Control Integrated
Change
Control
Business Logic (
WSDL, OWLS)
Business
Architecture View
BPMN
Model Driven
Design
BPMN to BPEL
Agile Technology ESB, BPMS
3.3 Project Management as a Management Solution
Approach
Top level management awareness problem can be solved
by including them to ERP operational, whereas they have
responsibilities to manage portfolio management in ERP
operational for initiating, authorizing, directing,
finalizing, and integrating on project to others, this has
applied Top-Down and Bottom-Up policy in the project
management stage.
While for the middle level managerial, has responsibility
in program management for the planning, monitoring and
controlling in the quality performance, risk analysis, and
control changes in business strategy and operational
implementation of ERP then for the works executing is
performed by the low level operator.
To illustrate the ERP business process by adopting those
policy given one example of its application within the
Financial & Accounting domain as a domain that has the
most critical and important activity in the ERP, as shown
in Figure 4. Also we give definition on the Adaptive ERP
live cycle process group in Table 2.
Fig.4: Process group cycle in Top Down – Bottom Up
Policy (Source: Author’s Compilation, 2016).
The main difference strategies between the Adaptive ERP
based on project management and the conventional ERP
based on operational management are within Initiating-
Closing stages as start-to-end business processing, and
Workbase Structure (WBS) as activities map.
Table.2: Definition of ERP live cycle process group
(Source: Author’s Compilation, 2016).
Initiating The process stage consists of the
initially activities that must be achieved
as a authorization, foundation,
stimulants, or prerequisite subsequent
activities
Planning The process stage consists of set of the
planning activities as the strategy that is
managed by middle managers in every
business process, to achieve objectives
of the business process.
Executing The process stage consist of the work
activities in executing set of activities
that has been planned, to be done by the
technically operator on the field
Monitoring
&
The process stage consist of monitoring
and controlling Activities in tracking
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 2000
Controlling working activities, measuring quality
performance, quantifying risk and
request changes improvement to
increase quality performance and
reduce the risk impact.
Closing The process stage consist of
formalization activities that be sign of
business process has completed
Within the Initiating-Closing stage the adaptive ERP has
advantages flexibility in managing the duration of
management cycle, where companies can choose
monthly, quarterly, semiannual or annual year
dynamically on its cycle. For later in every cycle can be
integrated without would have affected to transaction has
been running during the previous cycle.
The addition of the WBS incoming operational
management not based on daily operational to manage
overall resources. WBS hierarchically structured to
manages overall resources inherent within processes and
activities. This approach is inherent with Activity Base
Cost (ABC) [21], as shown in Figure 5. WBS as a basis of
planning, executing, and monitoring-controlling in
dynamically operational, and tracking both overall and
detail financial transactions.
IV. RESULTS
From one of implementation sharing result in PT. Iglas
Indonesia as one of State Owned Corporate that is
producing glass bottles to serve various demands of
beverage and pharmaceutical industry with mass
production and use make to order supply type, it was
founded that the strategy of using project management to
operational transactions in the Adaptive ERP system is
more suitable compared with a previous information
system.
By using this system, the organization’s is easier to
manage budget planning, calculating the unit cost of
production, calculating variable costs, and incomes
financial quality measurement and risk controlling for
each production activity, and other various financial
analysis.WBS Also dynamically applied in other
operational domains , such as: Material Production,
Inventory-Warehouse, Human Resource, Asset
management, CRM, and SCM.
V. CONCLUSION
This study concluded, The Adapted ERP that has
supported by project management principal and
knowledge’s has visibility to fulfill standardization ERP
operational management, and has flexibility for managing
operational duration by using process groups and
allocating details operational in activity base cost inside
WBS.
VI. FUTURE WORKS
On the future study will have been required to describe
SOA pattern to support the Adaptive ERP development
[22], and also Business Process Innovations (BPI) with
process mining auditing [23] in overall ERP modules
such as: Financial Accounting, Material Production,
Inventory-Warehouse, Human Resource, Asset
management, CRM, and SCM. Also to fulfill ERP-BI
supporting can be used many key performance indicators
[24] from extraction data in OLAP and big data as
predictive analysis.
ACKNOWLEDGEMENTS
This study supported by founding from research grant
(PHB) of KeMenRistekDikti Indonesia 2016.
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 2001
Fig.5: The Business Process of Financial Accounting within the Adaptive ERP (Source: Author’s Compilation, 2016).
Fig.6: Operational transaction within WBS activity of the Adaptive ERP (Source: Author’s Compilation, 2016).
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 2002
Fig.7: The Adaptive ERP Software Share Implementation in PT. Iglas Industry (Source: Author’s Compilation, 2016).
REFERENCES
[1] Eli Hustad, Dag H. Olsen. Critical Issues across the
ERP Life Cycle in Small-and-Medium Sized
Enterprises: Experiences from a Multiple Case
Study, Elsevier Procedia Technology vol. 9, 2013,
pp.179–188.
[2] R. Saravanan, Critical Success Factors of ERP
Implementations - An Analysis, IRC’S International
Journal of Multidisciplinary Research in Social &
Management Sciences, vol. 2, issue: 2, June 2014.
[3] Poonam Garg, Critical Failure Factors for Enterprise
Resource Planning Implementations in Indian Retail
Organizations: An Exploratory Study, Journal of
Information Technology Impact, Vol. 10, No. 1,
2010, pp. 35-44.
[4] Indu Perepu, Viviek Gupta, ERP lmplementation
Failure at Hershey Foods Corporation, ICFAI
Center For management Research (ICMR), 2008.
[5] S. Anil Kumar, N. Suresh, Operations Management
(New Delhi: New Age International Ltd, pp. 4-5,
2009).
[6] Abdullah AL-Malaise AL-Ghamdi, et All., Change
Management for Human in Enterprise Resource
Planning System, International Journal of Computer
Trends and Technology (IJCTT), vol.6 no.2
December 2013.
[7] Bilge Özkarabacak, et all., A comparison analysis
between ERP and EAI, The Economies of Balkan
and Eastern Europe Countries in the Changed World
(EBEEC 2013), Procedia Economics and Finance 9
2014 , pp.488–500. DOI: 10.1016/S2212-
5671(14)00050-1.
[8] Muhmmad I. Nofal, et all., Integration of Business
Intelligence and Enterprise Resource Planning
within Organizations, The 4th International
Conference on Electrical Engineering and
Informatics (ICEEI 2013), Procedia Technology
vol.11 2013, pp.658-665.
[9] Riyanarto Sarno, et all., A Service Portfolio for an
Enterprise Resource Planning, IJCSNS International
Journal of Computer Science and Network Security,
vol.10 No.3, March 2010.
[10]Rastislav Rajnoha, et all., Business information
systems: research study and methodological
proposals for ERP implementation process
improvement, 2nd World Conference on Business,
Economics And Management WCBEM 2013,
Procedia - Social and Behavioral Sciences, vol.109
International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016]
Infogain Publication (Infogainpublication.com) ISSN : 2454-1311
www.ijaems.com Page | 2003
January 2014, pp.165-170.
DOI:10.1016/j.sbspro.2013.12.438
[11]A guide to the project management body of
knowledge (PMBOK® guide) 5 (Pennsylvania:
Project Management Institute, Inc., 2013).
[12]Erl Thomas. SOA: Principles of Service Design
(Boston: Prentice Hall pp.71 – 75, 2007)
[13]Daniel Minoli. Enterprise Architecture A to Z. (Boca
Raton: Auerbach Publications, pp.408-415, 2008)
[14]Hermawan, Riyanarto Sarno, Developing
Distributed System Within Service Resource
Oriented Architecture, TELKOMNIKA, Vol.10,
No.2, Juny 2012, pp. 1-15.
[15]Catherine Allan, George H. Stankey, Adaptive
Environmental Management: A Practitioner's Guide,
Springer 2009.
[16]Theodorus Evgeneou, Information Integration and
Information Strategies for Adaptive Enterprises,
Elsevier Science European Management Journal
Vol. 20, No. 5 , 2002, pp. 486–494.
[17]Manfred Reichert, et All., Flexibility for Distributed
Workflows, Handbook of Research on Complex
Dynamic Process Management. pp. 137-171. IGI
Global, Hershey, 2012. DOI: 10.4018/978-1-60566-
669-3.
[18]Kim Sundtoft Hald, Jan Mauritsen., Enterprise
resource planning, operations and management:
Enabling and constraining ERP and the role of the
production and operations manager, International
Journal of Operations & Production Management,
Vol. 33 Iss: 8, pp.1075 – 1104, 2013.
[19]Alessandro Margherita, Claudio Petti, ICT-enabled
and Process-based Change: An Integrative
Roadmap, Business Process Management Journal,
Vol. 16 Issue: 3, pp.473 – 491, 2010.
[20]Hermawan, et all., Collaborated Architecture
Framework for Composition UML 2.0 in Zachman,
ICET4SD Nopember 2015.
[21]Lu Ansheng, Activity-Based Costing (ABC) and Its
Application in ERP, Intelligence Science and
Information Engineering (ISIE), IEEE 2011,
DOI: 10.1109/ISIE.2011.77.
[22]Erl Thomas. SOA Design Pattern (Prentice Hall:
Chapter6 Foundation Service Inventory, p.123.
2008).
[23]Mieke Jans, et All., The case for process mining in
auditing: Sources of value added and areas of
application, International Journal of Accounting
Information Systems pp. 1–20, Elsevier 2013.
Doi:10.1016/j.accinf.2012.06.015.
[24]Hermawan, et All. Performance Measurement Of
Project Management By Using FANP Balanced
Scorecard, Journal of Theoretical and Applied
Information Technology, January 2016. Vol.83.
No.2.

More Related Content

What's hot

Migrating from a legacy enterprise resource planning (erp) system to a new er...
Migrating from a legacy enterprise resource planning (erp) system to a new er...Migrating from a legacy enterprise resource planning (erp) system to a new er...
Migrating from a legacy enterprise resource planning (erp) system to a new er...eSAT Publishing House
 
The use of_reference_models_in_business_process_renovation
The use of_reference_models_in_business_process_renovationThe use of_reference_models_in_business_process_renovation
The use of_reference_models_in_business_process_renovationemedin
 
Enterprise Resource Planning (ERP)
Enterprise Resource Planning (ERP)Enterprise Resource Planning (ERP)
Enterprise Resource Planning (ERP)Uttar Tamang ✔
 
The role of erp for global businesses
The role of erp for global businessesThe role of erp for global businesses
The role of erp for global businessesasmamaw
 
Erp Enterprise Resource Planning
Erp   Enterprise Resource PlanningErp   Enterprise Resource Planning
Erp Enterprise Resource PlanningVIshal Gujarathi
 
Operation Management unit - I Materials
Operation Management   unit - I MaterialsOperation Management   unit - I Materials
Operation Management unit - I Materialskrishkore
 
Assessing the Feasibility of Developing a Federated ERP System
Assessing the Feasibility of Developing a Federated ERP SystemAssessing the Feasibility of Developing a Federated ERP System
Assessing the Feasibility of Developing a Federated ERP SystemIJMIT JOURNAL
 
Erp research agenda(imds)
Erp research agenda(imds)Erp research agenda(imds)
Erp research agenda(imds)012roger
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignIDES Editor
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignIDES Editor
 
ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)Sujeet TAMBE
 
10. What Managers Should Know About Erp Erpii
10. What Managers Should Know About Erp Erpii10. What Managers Should Know About Erp Erpii
10. What Managers Should Know About Erp ErpiiDonovan Mulder
 
Erp (Enterprise Resource Planning)
Erp (Enterprise Resource Planning)Erp (Enterprise Resource Planning)
Erp (Enterprise Resource Planning)Vibhor Agarwal
 

What's hot (17)

6d5a24 risks and benefits
6d5a24 risks and benefits6d5a24 risks and benefits
6d5a24 risks and benefits
 
025 Enterprise Resources Management
025 Enterprise Resources Management025 Enterprise Resources Management
025 Enterprise Resources Management
 
Migrating from a legacy enterprise resource planning (erp) system to a new er...
Migrating from a legacy enterprise resource planning (erp) system to a new er...Migrating from a legacy enterprise resource planning (erp) system to a new er...
Migrating from a legacy enterprise resource planning (erp) system to a new er...
 
The use of_reference_models_in_business_process_renovation
The use of_reference_models_in_business_process_renovationThe use of_reference_models_in_business_process_renovation
The use of_reference_models_in_business_process_renovation
 
Enterprise Resource Planning (ERP)
Enterprise Resource Planning (ERP)Enterprise Resource Planning (ERP)
Enterprise Resource Planning (ERP)
 
The role of erp for global businesses
The role of erp for global businessesThe role of erp for global businesses
The role of erp for global businesses
 
Erp Enterprise Resource Planning
Erp   Enterprise Resource PlanningErp   Enterprise Resource Planning
Erp Enterprise Resource Planning
 
Operation Management unit - I Materials
Operation Management   unit - I MaterialsOperation Management   unit - I Materials
Operation Management unit - I Materials
 
Assessing the Feasibility of Developing a Federated ERP System
Assessing the Feasibility of Developing a Federated ERP SystemAssessing the Feasibility of Developing a Federated ERP System
Assessing the Feasibility of Developing a Federated ERP System
 
Introduction to ERP
Introduction to ERPIntroduction to ERP
Introduction to ERP
 
What is ERP
What is ERPWhat is ERP
What is ERP
 
Erp research agenda(imds)
Erp research agenda(imds)Erp research agenda(imds)
Erp research agenda(imds)
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process Redesign
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process Redesign
 
ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)ERP (ENTERPRISE RESOURCE PLANNING)
ERP (ENTERPRISE RESOURCE PLANNING)
 
10. What Managers Should Know About Erp Erpii
10. What Managers Should Know About Erp Erpii10. What Managers Should Know About Erp Erpii
10. What Managers Should Know About Erp Erpii
 
Erp (Enterprise Resource Planning)
Erp (Enterprise Resource Planning)Erp (Enterprise Resource Planning)
Erp (Enterprise Resource Planning)
 

Viewers also liked

Производство ткани из растительных волокон
Производство ткани из растительных волоконПроизводство ткани из растительных волокон
Производство ткани из растительных волоконdrofa-ventana
 
Programación curricular y unidades didácticas
Programación curricular y unidades didácticasProgramación curricular y unidades didácticas
Programación curricular y unidades didácticasDaniel Salas Chavez
 
Taxchin Educom Profile
Taxchin Educom ProfileTaxchin Educom Profile
Taxchin Educom ProfileTaxchin Educom
 
Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...
Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...
Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...iLabora
 

Viewers also liked (10)

Presentación sin título
Presentación sin títuloPresentación sin título
Presentación sin título
 
Производство ткани из растительных волокон
Производство ткани из растительных волоконПроизводство ткани из растительных волокон
Производство ткани из растительных волокон
 
Senhor jesus
Senhor jesusSenhor jesus
Senhor jesus
 
Tarea 7
Tarea 7Tarea 7
Tarea 7
 
Programación curricular y unidades didácticas
Programación curricular y unidades didácticasProgramación curricular y unidades didácticas
Programación curricular y unidades didácticas
 
Campaña unitec
Campaña unitecCampaña unitec
Campaña unitec
 
Diapositiva slideshare
Diapositiva slideshareDiapositiva slideshare
Diapositiva slideshare
 
Taxchin Educom Profile
Taxchin Educom ProfileTaxchin Educom Profile
Taxchin Educom Profile
 
Tarea de seminario 2
Tarea de seminario 2Tarea de seminario 2
Tarea de seminario 2
 
Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...
Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...
Ficha curso Tramitación Procesal y Administrativa de la Administración de Jus...
 

Similar to 10 project management approach on the adaptive enterprise resource planning

CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...
CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...
CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...cscpconf
 
Post implementation performance evaluation of enterprise resource planning in...
Post implementation performance evaluation of enterprise resource planning in...Post implementation performance evaluation of enterprise resource planning in...
Post implementation performance evaluation of enterprise resource planning in...Alexander Decker
 
Pre assessment model for erp implementation
Pre assessment model for erp implementationPre assessment model for erp implementation
Pre assessment model for erp implementationIAEME Publication
 
Pre assessment model for erp implementation
Pre assessment model for erp implementationPre assessment model for erp implementation
Pre assessment model for erp implementationIAEME Publication
 
An Empirical Investigation Of Factors Affecting ERP Impact
An Empirical Investigation Of Factors Affecting ERP ImpactAn Empirical Investigation Of Factors Affecting ERP Impact
An Empirical Investigation Of Factors Affecting ERP ImpactLisa Muthukumar
 
Digitalization of operations of micro industries using web-based ERP system.
Digitalization of operations of micro industries using web-based ERP system.Digitalization of operations of micro industries using web-based ERP system.
Digitalization of operations of micro industries using web-based ERP system.IRJET Journal
 
ERP System Implementation Benefits and Economic
ERP System Implementation Benefits and EconomicERP System Implementation Benefits and Economic
ERP System Implementation Benefits and EconomicBaker Khader Abdallah, PMP
 
Enterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTEnterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTSiddharth Modi
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planningAakashTiwari43
 
01 enterprise resource planning 2
01 enterprise resource planning 201 enterprise resource planning 2
01 enterprise resource planning 2prj_publication
 
Investigation and Study of Vital Factors in Selection, Implementation and Sat...
Investigation and Study of Vital Factors in Selection, Implementation and Sat...Investigation and Study of Vital Factors in Selection, Implementation and Sat...
Investigation and Study of Vital Factors in Selection, Implementation and Sat...IJECEIAES
 
PORTAL APPLICATION USING SAP
PORTAL APPLICATION USING SAPPORTAL APPLICATION USING SAP
PORTAL APPLICATION USING SAPIRJET Journal
 
An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...
An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...
An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...IOSR Journals
 

Similar to 10 project management approach on the adaptive enterprise resource planning (20)

CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...
CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...
CRITICAL SUCCESS FACTORS (CSFS) OF ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM ...
 
692 684-1-pb
692 684-1-pb692 684-1-pb
692 684-1-pb
 
Post implementation performance evaluation of enterprise resource planning in...
Post implementation performance evaluation of enterprise resource planning in...Post implementation performance evaluation of enterprise resource planning in...
Post implementation performance evaluation of enterprise resource planning in...
 
Pre assessment model for erp implementation
Pre assessment model for erp implementationPre assessment model for erp implementation
Pre assessment model for erp implementation
 
Pre assessment model for erp implementation
Pre assessment model for erp implementationPre assessment model for erp implementation
Pre assessment model for erp implementation
 
An Empirical Investigation Of Factors Affecting ERP Impact
An Empirical Investigation Of Factors Affecting ERP ImpactAn Empirical Investigation Of Factors Affecting ERP Impact
An Empirical Investigation Of Factors Affecting ERP Impact
 
Digitalization of operations of micro industries using web-based ERP system.
Digitalization of operations of micro industries using web-based ERP system.Digitalization of operations of micro industries using web-based ERP system.
Digitalization of operations of micro industries using web-based ERP system.
 
ERP
ERPERP
ERP
 
ERP System Implementation Benefits and Economic
ERP System Implementation Benefits and EconomicERP System Implementation Benefits and Economic
ERP System Implementation Benefits and Economic
 
Enterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTEnterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPT
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planning
 
Erp presentation
Erp presentationErp presentation
Erp presentation
 
01 enterprise resource planning 2
01 enterprise resource planning 201 enterprise resource planning 2
01 enterprise resource planning 2
 
10.1.1.87.8236
10.1.1.87.823610.1.1.87.8236
10.1.1.87.8236
 
Investigation and Study of Vital Factors in Selection, Implementation and Sat...
Investigation and Study of Vital Factors in Selection, Implementation and Sat...Investigation and Study of Vital Factors in Selection, Implementation and Sat...
Investigation and Study of Vital Factors in Selection, Implementation and Sat...
 
ERP
ERPERP
ERP
 
PORTAL APPLICATION USING SAP
PORTAL APPLICATION USING SAPPORTAL APPLICATION USING SAP
PORTAL APPLICATION USING SAP
 
Erp 2
Erp 2Erp 2
Erp 2
 
An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...
An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...
An Effective Model for Evaluating Organizational Risk and Cost in ERP Impleme...
 
Erp
ErpErp
Erp
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

10 project management approach on the adaptive enterprise resource planning

  • 1. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 1995 Project Management Approach on the Adaptive Enterprise Resource Planning Hermawan1 , Riyanarto Sarno2 , Muhammad Anshari3 1 Jurusan Teknik Informatika, Fakultas Teknik, Universitas Trunojoyo Madura, Indonesia 2 Jurusan Teknik Informatika, Fakultas Teknologi Informasi, Institut Teknologi Sepuluh Nopember, Indonesia 3 School of Business and Economics, University of Brunei Darussalam, Brunei Darussalam Abstract—Enterprise Resource Planning (ERP) implementation is one of key success factors for business organization’s to endorse their business strategy and goal alignment with information technology recent. In spite of its benefits, yet there are many failures in ERP implementation, whereas between 50% to 75% is categorized has failed due to lack of top level management awareness, change of business processes in project implementation, unsuitable architecture, design, and technological infrastructure. The study proposes an Adaptive ERP system that coverage both management and technology areas with the main characteristic are in visibility, flexibility, and agility. The Adaptive ERP is expected becoming as alternative approach to overcome failures in ERP implementation. The Adaptive ERP has standardized business process transitioning from Project Management (PM) into Operational Management (OM) that generally as baseline for conventional ERP. An addition, Adaptive ERP has standardized Service Oriented Architecture (SOA) in order to manage interoperability of the application services. Keywords— Adaptive Enterprise Resource Planning, Project Management, Operational Management, Service Oriented Architecture. I. INTRODUCTION As one of the enterprise information system product that has become most important in business practice today, ERP is required by almost enterprise and small medium enterprises (SMEs) business organizations [1] to manage their resources (financial, material, manufacture, human, etc.) and stakeholders (director, customer, vendor, etc.) to achieve their business strategies and objectives. ERP has been designed to improve the competitiveness, flexibility, productivity and responsiveness to the organization and market growth in the dynamically global economy [2]. Various benefits have been achieved by business organization that has successed to implement ERP within integration business environment, standardized business process procedure, and availibity of business transaction in real time so have , impact for organization development[3]. There are facts that many organizations are failed in optimizing ERP implementation, where between 50% to 75% is categorized failure due to lack of top level management awareness, change of business processes in project implementation, unsuitable architecture, technical implementation, and technological infrastructure choices [2][3]. Even in the many case studies, many large companies have invested in large portion for IT technology, resources, and yet they have failed in the ERP implementation [4]. The failure of the ERP implementation is not only caused financial loss of investment, but also has impact in disordering and halting business processing. Other many failures of ERP implementation, founded in Indonesia country, in investigation many big companies including State Owned Enterprises such as Semen Indonesia and PERTAMINA as the two largest companies in Indonesia that have been expensively invested by used branded products have been categorized failed in the ERP implementation. Therefore, it is required to review ERP business process strategy that adopted effectively management principal which have ability to improve overall stakeholders participation especially top management awareness to direct operational management, and also radically changes of business processes. The Adaptive ERP is intended as an alternative solution for those entire requirements. The Adaptive ERP has adopted Project Management as a standardization business process without leaving management business process that was covered by operational management. This study proposes transitioning project management approach to ERP operational management, in order to improve business process visibility and flexibility. This innovation might differ from conventional ERP approach, and there has been no research founded on the field of the ERP studies have discussed about ERP with based on the project management process groups and activities. In generally ERP modules, the project management is only being a sub module of ERP.
  • 2. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 1996 Operational management in many enterprise corporates that are using make to order manufacture supply with production system classified by Job-Shop or Batch production type [5] that produces highly variety of product, use general purpose machine and facilities, use highly operators skill, use many outsources machines and operators, and do detailed activity planning for sequencing production jobs has operational characteristic as well as project management. On the other side, SOA is intended to support Adaptive ERP architecture, design and technology. SOA as a principal paradigm, oriented in middle layer service of application software and works in middleware infrastructure has more adapted to dynamically business process improvement that can be managed and maintained easily when distributed in many organization’s divisions accordingly depending upon company's development. With implement PM and SOA principal, adaptive ERP frameworks fulfilled three principal characteristic there are: Availability, Flexibility, and Agility, which addressed to overcome failures in ERP implementation. . II. LITERATURE REVIEW The ERP is an Enterprise Information System as tool and strategy of enterprise organization to achieve their objectives and goal [6], with standardized in many software modules (finance, manufacture, inventory, human resource, etc.) which have standardized business process to managing overall organization’s activities and stakeholders ( customer, supplier)[7] in order to balance their demand and supply [8]. Functional modules that are generally included within ERP software such as: Product Forecasting, Production Scheduling, Materials Management, Inventory Management, Purchasing and Receiving, Sales Operations, Distribution and Logistics, Accounts Payable, Accounts Receivable, Fixed Asset, General Ledger, Product Marketing, Strategic Marketing, technical support, and also management support Cash Bank and Human Resource Management [9]. Evolution occurs in ERP, adapted to industry globalization and dinamically stakeholder’s expectation. ERP I have been created with addition Customer Relationship Management (CRM) to support relation link to customer, and Supply Chain Management (SCM) to support relation link to supplier [9]. Then ERP II integrated with Business Intelligent to support organization ability to evaluate and improve business strategy in upgrading the quality of products [10], services, and management as response to predictive analysis in future. The ERP evolution is shown in Figure 1. Fig.1: ERP modules and evolution (Source: Author’s compilation, 2016). 1. Project Management Project is temporary endeavor to create unique product, service or result. Project management concerns on the application of knowledge, skills, tools and techniques to project activities to meet project requirements, where the project management has process groups of initiating, planning, executing, monitoring and controlling, and closing [11]. Within fulfillment of project management business processes, there are many knowledge areas are existing and supporting many activities to achieve overall strategy and objectives, they are: integration, scope, time, cost, quality, human resource, communication, risk, procurement management and as addition asset management [11]. In applications, Project management generally used to create a new product or service, implementation a new business process or organization’s structure, change organization’s structure or strategy. Different with project management applications, conventional ERP based on Material Resource Planning and in generally has adopted operational management. Characteristic differences between project management and production management are shown in Table 1. Table.1: Comparison between Project Management vs. Operational Management (Source: Author’s Compilation, 2016). Concerns Project Management Operational Management Start-End Point Clean State, Specified Start to End Existing, No real Start to End Outcome Unique Repetitive
  • 3. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 1997 Live Cycle Temporary Long Time Frequency Of Change Short Long Managerial Structure Simple Complex Operational Complex Moderate Risk Coverage High Moderate Resource Dynamic Static Activity Oriented Human Manufacture Base of Works Workbase Structure Daily operations According to its characteristics, project management more adaptive than operational management, therefore the project management process groups and activities can be considered to adopt as Adaptive ERP baseline, because the Adaptive ERP has higher control to adapt various uncertainty conditions and variable resources that are running dynamically. 2. Service Oriented Architecture SOA is a design paradigm in software engineering which introduces as a concept of services that can be represented as functionalities of an application [12]. It’s addressed in order to help reducing complexities in software development, where this paradigm should be flexible in adapting within a heterogeneous and decentralized information system [12]. Furthermore, SOA can help to bridge business process requirements and IT component services. As an extension of design paradigm of SOA, Service Resource Oriented Architecture (SROA) as alternative best practice solution framework for agile model driven design include strategy to composition and decomposition webservice for REST and SOAP, distribution and integration software component and service, and also webservice orchestras within Business Process Model Notation (BPMN) inside Business Process Management Suite (BPMS) infrastructure technology [14]. 3. Adaptive ERP The basic principle of Adaptive is learning by doing, where not only give attention to how uncertainty behavior of working on the ecosystem but also how to manage uncertainty in the best manner to achieve progress and improvement [15]. Similarly, the Adaptive ERP is able to improve business strategy and technology with the variety of changes both in the internal environment of the organization and with the external environment, but while maintaining performance in visibility and flexibility [16]. On the side of the business strategy and objectives, business process becomes the most important factor. The Adaptive ERP should be able to maintain the visibility of business processes in the overall organization divisions in order to integrate across divisions, and having the flexibility to adapt with improvement of business processes. Comparison Visibility and Flexibility in Adaptive ERP can be illustrated in Figure 2, the steady state system not yet to adopt operational management based on ERP where Visibility and Flexibility on business processes in lowest level because business process management and transaction data are managed within traditionally management, so has impact it too hard to managed and maintained. While in the Centralized Enterprise, that used centralized and monolithic ERP has highest visibility level in the integration of business process management and data transaction in the large organizations with the same business transaction location and system, despite of the flexibility is low for many divisions which have different business processes and locations. In contrast to the decentralized where each division works separately with the specification of business processes and transaction data independently has highest flexibility, but has low visibility to integrate. By the using of Adaptive ERP, it has ability to get a good flexibility because the system is running in the distributed system, and also still maintaining visibility remains high with their synchronization and integration of business processes through support of agility of SOA technology in middleware infrastructure (i.e.: BPMS, ESB ) and middle layer software (WSDL, BPEL). SOA is managed by adaptive workflow, refers to the ability of the workflow management system to dynamically adapted with the model (such as: BPMN) to manage activity as service during runtime that is intended to income flexibility in distributed system [17]. For those reasons, the adaptive ERP is intended to be able to adapt to perform a unique and dynamically business environment includes management and technology strategy, to get the best solutions on the improvement organization ecosystems with efficient in cost and time. Three characteristics of the Adaptive ERP: Visibility, Flexibility and Agility must be present as the most important keys to build adaptive ERP.
  • 4. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 1998 Fig.2: Comparison between ERP systems in visibility and flexibility [16]. 4. Related Works and Contributions In the previous study has been described ERP and Operational Management are linked conceptually. Based on the identified effects of ERP, describes predictive analysis on the managerial tasks of the production and operations manager in an ERP environment have potential relevance to future research [18]. In change Strategy describes the main factors affecting Information and Communication Technology (ICT) adoption and process redesign within organizations, with the objective to define a systematization framework and a set of methods and tools useful for scholars and practitioners that is included strategy, people, process, and enablers [19]. This study has novelty as future research for transitioning project management within ERP operational management and detailing strategy, people and process to improve business processes within The Adaptive ERP to overcome failures in the conventional ERP implementation. III. METHODS AND DISCUSSION In this study conducted the various literature and study in scope ERP implementation failures. Also analyze the causing linkages and founded the hypothesis. The different viewpoint from many earlier studies, this study not only put the project management as early in the project implementation, but addresses the project management be an alternative operational management in the Adaptive ERP. Then the researchers build model and software to implement these method and share it with company that have operations management compatibility to determine whether the method suitable to be adapted to the operational ERP and obtains benefit results. In this discuss only describe in the project management approach within the Adaptive ERP conducted to the causing of ERP implementation failures. The SOA approach will discuss in the next our other paper. 3.1 Defines Key Factors of ERP Implementation Failures To analyze the problems of three main factors of ERP implementation failure, necessary to determine the key factors related to the main problem. Fig.3: Comparison between ERP systems in visibility and flexibility (Source: Author’s compilation, 2016) • In the first problem, addressed to the top management awareness problem founded four key as the primary responsibility of the top management level they are: initiative, authorization, direction, and finalization. Top level management should be has the strongest initiative for the implementation and operation of ERP and then give authorization and direction for planning by the managerial, and then find out exactly progress and finalization. • Next to the second problem, addressed to the business process improvement, three key that take effect, they are: Quality Performance, Risk Assessment and Controlling Change. Quality performance needed as a parameter objective, if those parameters are not fulfilled or failed, it would cause various impacts of risk. It needs quantification of the parameters of performance and risk. Change control required as authorization to improve quality performance and reduce the defect of the risk impact. • While for the third problems, addressed to unsuitable Architecture, design, and technology 3 main keys should be solutions: compliance architecture view, fitness model driven design, and the agile technology. Multi perspective view architecture is used to provide an collaboration of brainware, software and hardware architecture that can be understood by all stakeholders [20], with the Business Architecture View as a priority. Suitability business architecture transformation into software Visibility
  • 5. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 1999 architecture can be achieved through the using of the model-driven design, SOA and agile support technology. Interoperability of software modules, the adaptation for improvement business processes and evolution of software in the future will be achieved. 3.2 Establishment of Keys Relation to Solution Hypothesis For mapping the problem points with the hypothesis of solutions, it is necessary to conduct processes and tools, as shown in Table 2. Table.2: Relation Between problem and solution keys (Source: Author’s Compilation, 2016). KeySolution Project Management Service Oriented Architecture Initiative Initiating stage Authorization Planning Stage Direction Executing Stage Finalization Closing Stage Quality Performance Quality Plan, Quality Assurance, Quality Control Risk Assessment Risk Plan, Risk Assessment, Risk Control Change Control Integrated Change Control Business Logic ( WSDL, OWLS) Business Architecture View BPMN Model Driven Design BPMN to BPEL Agile Technology ESB, BPMS 3.3 Project Management as a Management Solution Approach Top level management awareness problem can be solved by including them to ERP operational, whereas they have responsibilities to manage portfolio management in ERP operational for initiating, authorizing, directing, finalizing, and integrating on project to others, this has applied Top-Down and Bottom-Up policy in the project management stage. While for the middle level managerial, has responsibility in program management for the planning, monitoring and controlling in the quality performance, risk analysis, and control changes in business strategy and operational implementation of ERP then for the works executing is performed by the low level operator. To illustrate the ERP business process by adopting those policy given one example of its application within the Financial & Accounting domain as a domain that has the most critical and important activity in the ERP, as shown in Figure 4. Also we give definition on the Adaptive ERP live cycle process group in Table 2. Fig.4: Process group cycle in Top Down – Bottom Up Policy (Source: Author’s Compilation, 2016). The main difference strategies between the Adaptive ERP based on project management and the conventional ERP based on operational management are within Initiating- Closing stages as start-to-end business processing, and Workbase Structure (WBS) as activities map. Table.2: Definition of ERP live cycle process group (Source: Author’s Compilation, 2016). Initiating The process stage consists of the initially activities that must be achieved as a authorization, foundation, stimulants, or prerequisite subsequent activities Planning The process stage consists of set of the planning activities as the strategy that is managed by middle managers in every business process, to achieve objectives of the business process. Executing The process stage consist of the work activities in executing set of activities that has been planned, to be done by the technically operator on the field Monitoring & The process stage consist of monitoring and controlling Activities in tracking
  • 6. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 2000 Controlling working activities, measuring quality performance, quantifying risk and request changes improvement to increase quality performance and reduce the risk impact. Closing The process stage consist of formalization activities that be sign of business process has completed Within the Initiating-Closing stage the adaptive ERP has advantages flexibility in managing the duration of management cycle, where companies can choose monthly, quarterly, semiannual or annual year dynamically on its cycle. For later in every cycle can be integrated without would have affected to transaction has been running during the previous cycle. The addition of the WBS incoming operational management not based on daily operational to manage overall resources. WBS hierarchically structured to manages overall resources inherent within processes and activities. This approach is inherent with Activity Base Cost (ABC) [21], as shown in Figure 5. WBS as a basis of planning, executing, and monitoring-controlling in dynamically operational, and tracking both overall and detail financial transactions. IV. RESULTS From one of implementation sharing result in PT. Iglas Indonesia as one of State Owned Corporate that is producing glass bottles to serve various demands of beverage and pharmaceutical industry with mass production and use make to order supply type, it was founded that the strategy of using project management to operational transactions in the Adaptive ERP system is more suitable compared with a previous information system. By using this system, the organization’s is easier to manage budget planning, calculating the unit cost of production, calculating variable costs, and incomes financial quality measurement and risk controlling for each production activity, and other various financial analysis.WBS Also dynamically applied in other operational domains , such as: Material Production, Inventory-Warehouse, Human Resource, Asset management, CRM, and SCM. V. CONCLUSION This study concluded, The Adapted ERP that has supported by project management principal and knowledge’s has visibility to fulfill standardization ERP operational management, and has flexibility for managing operational duration by using process groups and allocating details operational in activity base cost inside WBS. VI. FUTURE WORKS On the future study will have been required to describe SOA pattern to support the Adaptive ERP development [22], and also Business Process Innovations (BPI) with process mining auditing [23] in overall ERP modules such as: Financial Accounting, Material Production, Inventory-Warehouse, Human Resource, Asset management, CRM, and SCM. Also to fulfill ERP-BI supporting can be used many key performance indicators [24] from extraction data in OLAP and big data as predictive analysis. ACKNOWLEDGEMENTS This study supported by founding from research grant (PHB) of KeMenRistekDikti Indonesia 2016.
  • 7. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 2001 Fig.5: The Business Process of Financial Accounting within the Adaptive ERP (Source: Author’s Compilation, 2016). Fig.6: Operational transaction within WBS activity of the Adaptive ERP (Source: Author’s Compilation, 2016).
  • 8. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 2002 Fig.7: The Adaptive ERP Software Share Implementation in PT. Iglas Industry (Source: Author’s Compilation, 2016). REFERENCES [1] Eli Hustad, Dag H. Olsen. Critical Issues across the ERP Life Cycle in Small-and-Medium Sized Enterprises: Experiences from a Multiple Case Study, Elsevier Procedia Technology vol. 9, 2013, pp.179–188. [2] R. Saravanan, Critical Success Factors of ERP Implementations - An Analysis, IRC’S International Journal of Multidisciplinary Research in Social & Management Sciences, vol. 2, issue: 2, June 2014. [3] Poonam Garg, Critical Failure Factors for Enterprise Resource Planning Implementations in Indian Retail Organizations: An Exploratory Study, Journal of Information Technology Impact, Vol. 10, No. 1, 2010, pp. 35-44. [4] Indu Perepu, Viviek Gupta, ERP lmplementation Failure at Hershey Foods Corporation, ICFAI Center For management Research (ICMR), 2008. [5] S. Anil Kumar, N. Suresh, Operations Management (New Delhi: New Age International Ltd, pp. 4-5, 2009). [6] Abdullah AL-Malaise AL-Ghamdi, et All., Change Management for Human in Enterprise Resource Planning System, International Journal of Computer Trends and Technology (IJCTT), vol.6 no.2 December 2013. [7] Bilge Özkarabacak, et all., A comparison analysis between ERP and EAI, The Economies of Balkan and Eastern Europe Countries in the Changed World (EBEEC 2013), Procedia Economics and Finance 9 2014 , pp.488–500. DOI: 10.1016/S2212- 5671(14)00050-1. [8] Muhmmad I. Nofal, et all., Integration of Business Intelligence and Enterprise Resource Planning within Organizations, The 4th International Conference on Electrical Engineering and Informatics (ICEEI 2013), Procedia Technology vol.11 2013, pp.658-665. [9] Riyanarto Sarno, et all., A Service Portfolio for an Enterprise Resource Planning, IJCSNS International Journal of Computer Science and Network Security, vol.10 No.3, March 2010. [10]Rastislav Rajnoha, et all., Business information systems: research study and methodological proposals for ERP implementation process improvement, 2nd World Conference on Business, Economics And Management WCBEM 2013, Procedia - Social and Behavioral Sciences, vol.109
  • 9. International Journal of Advanced Engineering, Management and Science (IJAEMS) [Vol-2, Issue-12, Dec.- 2016] Infogain Publication (Infogainpublication.com) ISSN : 2454-1311 www.ijaems.com Page | 2003 January 2014, pp.165-170. DOI:10.1016/j.sbspro.2013.12.438 [11]A guide to the project management body of knowledge (PMBOK® guide) 5 (Pennsylvania: Project Management Institute, Inc., 2013). [12]Erl Thomas. SOA: Principles of Service Design (Boston: Prentice Hall pp.71 – 75, 2007) [13]Daniel Minoli. Enterprise Architecture A to Z. (Boca Raton: Auerbach Publications, pp.408-415, 2008) [14]Hermawan, Riyanarto Sarno, Developing Distributed System Within Service Resource Oriented Architecture, TELKOMNIKA, Vol.10, No.2, Juny 2012, pp. 1-15. [15]Catherine Allan, George H. Stankey, Adaptive Environmental Management: A Practitioner's Guide, Springer 2009. [16]Theodorus Evgeneou, Information Integration and Information Strategies for Adaptive Enterprises, Elsevier Science European Management Journal Vol. 20, No. 5 , 2002, pp. 486–494. [17]Manfred Reichert, et All., Flexibility for Distributed Workflows, Handbook of Research on Complex Dynamic Process Management. pp. 137-171. IGI Global, Hershey, 2012. DOI: 10.4018/978-1-60566- 669-3. [18]Kim Sundtoft Hald, Jan Mauritsen., Enterprise resource planning, operations and management: Enabling and constraining ERP and the role of the production and operations manager, International Journal of Operations & Production Management, Vol. 33 Iss: 8, pp.1075 – 1104, 2013. [19]Alessandro Margherita, Claudio Petti, ICT-enabled and Process-based Change: An Integrative Roadmap, Business Process Management Journal, Vol. 16 Issue: 3, pp.473 – 491, 2010. [20]Hermawan, et all., Collaborated Architecture Framework for Composition UML 2.0 in Zachman, ICET4SD Nopember 2015. [21]Lu Ansheng, Activity-Based Costing (ABC) and Its Application in ERP, Intelligence Science and Information Engineering (ISIE), IEEE 2011, DOI: 10.1109/ISIE.2011.77. [22]Erl Thomas. SOA Design Pattern (Prentice Hall: Chapter6 Foundation Service Inventory, p.123. 2008). [23]Mieke Jans, et All., The case for process mining in auditing: Sources of value added and areas of application, International Journal of Accounting Information Systems pp. 1–20, Elsevier 2013. Doi:10.1016/j.accinf.2012.06.015. [24]Hermawan, et All. Performance Measurement Of Project Management By Using FANP Balanced Scorecard, Journal of Theoretical and Applied Information Technology, January 2016. Vol.83. No.2.