2005 07 2010 2013 2014
Human Dev. Index 0.501 0.53 0.539 0.57 0.575
Agriculture value added
(% of GDP)
36.2 34.9 32.7 26.5 27.7
GNI per capita 472 887 1123 1661 1680
Total population
(million)
5.88 6.21 6.44 6.77 6.68
Rural population as % of
population
73 69 67 64 62.4
Poverty rate based on
population
30.7 27.6 26 23.2 -
Main crops production: rice, soybeans, sugarcane,
corn, tobacco
Nutrition facts: high malnutrition rate (40%),
particularly in rural areas
Population density – Economic Indicators
Source: WB, UNDP
Poverty rate and Poverty density
Share of Agriculture in GDP
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
0
100
200
300
400
500
600
700
800
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
GDP per capita (USD)
Agriculture contribution to GDP per capita (USD)
Agriculture contribution to GDP per capita (%)
IFAD funded operations
Portfolio
Closed Loans Active Loans Pipelined Loans
(1980-1985) Casier-Sud
Pioneer Agricultural Project
(2009-2016) Sustainable
Natural Resource Management
and Productivity Enhancement
Project
GAFSP (2016-2020): Global
Agriculture and Food Security
Program - 30 million USD
(1984-1986) Agricutural
Production Project
(2011 - 2017) Souum Son Seun
Jai - Community based Food
Security and Economic
Opportunities Programme
Livestock project (2016-2020)
(with ADB) - 10 million USD
(1988-1992) Rural Credit
Project
(2013-2019) Southern Laos
Food and Nutrition Security
and Market Linkages
Programme
(1991-1997) Xieng Khouang
Agricultural Development
Project
(2006-2014) Rural lovelihoods
Improvement Programme in
Attepeu and Sayabouri
(2007-2013) Northern Region
Sustainable Livelihoods
through Livestock
Development Project
Timeline overview –
COSOP (2011-2015), (2016-2020)
Projects 2005 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Rural livelihoods
Improvement Programme in
Attepeu and Sayabouri
Northern Region
Sustainable Livelihoods
through Livestock Dev
ProjSustainable Natural
Resource Management
and Productivity
Enhancement Project
SSSJ Project
FNML
Pipeline - GAFSP
Pipeline - Livestock
program
Closing project – SNRMP
•Program Target group: 11,250 households would
benefit from the project
•The main target group comprises two primary sub-
groups: (i) poor farming households with proximity to
markets (primary in the lowlands; and (ii) poor farmers
in upland areas (mostly ethnic minority communities
practicing shifting cultivation)
* Total Project cost: $37.8 million
IFAD financing: $15 million
ADB: $20 million
Government of Laos: $2.8 million
* Project Components:
(i) Capacity building for agriculture and natural
resource sector management
(ii) Implementation of agricultural activity and
commercialization subprojects
(iii) Project management
Active project – SSSJ
* Program Target group: 17,000 rural households in
225 poor upland villages in Northern Sayabouri and
Oudomxay
* Total Project cost: $19.3 million
Total IFAD financing:
IFAD DSF Grant: $13.9 million,
World Food Program: $3.7 million,
GIZ: $0.4 million
Government of Laos: $0.8 million,
Beneficiaries: $0.3 million
* Project Components:
(i) Integrated farming systems
(ii) Links to markets
Active project – FNML
•Program Target Group: 10,500 households in
175 poor upland villages in target areas
* Main target group: Population of 175 target
villages
*Secondary target group: The private buyers of the
target products, Smallholders in the target areas
* Total Project cost: $18.82 million
Total IFAD financing:
IFAD DSF Grant: $9.72 million,
ASAP Grant: $5.0 million,
Government of Laos: $0.54 million,
Private sector and Partner Banks: $1.48 million,
Beneficiaries: $0.53 million
• Project Components:
(i) Food Security and Pro-Poor Market Access
(ii) Inclusive Rural Finance Support
(iii) Institutional support
(iv) Smallholder Adaptation for Climate Change
Component (New Component)
Approved Project– SSFSNP
•Program Target group: The project will be implemented in
12 districts and approximately 400 villages in Oudomxai,
Phongsaly, Xieng Khouang and Houaphan provinces in
Nothern Laos. The main target group would be within the
population of 400 target villages with 34,000 small
households.
* Total Project cost: $38.8 million
GAFSP: $30 million (IFAD: $24 million; WFP: $6 million)
Local private enterprises: $0.5 million
Village beneficiary: $2.9 million
GoL: $5.4 million
* Project Components:
(i) Strengthened public services
(ii) Community-driven agriculture-based nutrition
interventions established
(iii) Sustainable and inclusive market-driven partnerships
established
Note: Go to EB Approval April- 2016
Project under design– NSLCP
•Program Target group: The project aims to work with
a total of 300 livestock production and marketing
groups (LPMGs) in the 12 districts, extending the
livestock production and marketing support to at least
4500 households. Infrastructure will benefit additional
10 000 households.
* Total Project cost: $31.5 million
IFAD: $10 million
ADB: $21 million
Government counterpart funds: $0.5 million
* Project Components:
(i) Strengthened smallholders and other livestock
value chain actors
(ii) Strengthened LVC infrastructure
(iii) Improved capacity to access credit
Note: Go to EB Approval December- 2016
Ongoing Grants
0%
20%
40%
60%
80%
100%
120%
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
Grant amount (mill
USD)
% Disbursement
(updated)
IFAD-funded Programmes Performance
(at country and regional levels)
Overall implementation progress
 Over the last 5 years there has been only one instance of a "satisfactory" rating (LDP)
 Average score for the portfolio is 3.84, bordering between “moderately unsatisfactory” and
“moderately satisfactory”
 For all 5 years country average score has been consistently lower the APR regional average
 Average performance dropped from 2014 to 2015
 However, SSSJ has recovered from being a “problem project” to having a “moderately satisfactory”
score in 2015
0
1
2
3
4
5
6
LAO1301LAO1396LAO1459LAO1608LAO1680
Overall implementation
progress
2011 2012 2013 2014 2015
3
4
5
2011 2012 2013 2014 2015
Overall implementation
progress (LAO)
Country average
Regional average
2011 2012 2013 2014 2015 Average
LAO1301 4 4 4 4 4,0
LAO1396 4 4 4 5 4,3
LAO1459 3 3 3 4 4 3,4
LAO1608 4 4 4 3 3,8
LAO1680 4 4 4,0
Country average 3,67 3,75 3,75 4,20 3,67 3,84
Regional average 3,90 4,00 4,00 4,20 4,16 4,05
Coherence between AWPB and implementation
 Country programme performance as been consistently below the regional average,
except for the year 2014
 This suggests that most projects struggle to deliver AWPB physical and/or financial
targets.
0
1
2
3
4
5
6
LAO1301LAO1396LAO1459LAO1608LAO1680
Coherence between AWPB and
implementation
2011 2012 2013 2014 2015
2011 2012 2013 2014 2015 Average
LAO1301 4 3 4 4 3,8
LAO1396 3 3 4 5 3,8
LAO1459 4 4 4 4 4 4,0
LAO1608 4 3 4 4 3,8
LAO1680 4 4 4,0
Country average 3,67 3,50 3,75 4,20 4,00 3,84
Regional average 3,70 3,80 3,90 4,10 4,08 3,92
Performance of M&E
 Country average consistently below regional average
 SSSJ has been continuously rated “moderately unsatisfactory”, SNRMPEP almost consistently
“Moderately Satisfactory”, LDP improved to “Moderately Satisfactory”
 FNML has started on “Moderately Satisfactory” and effort should be made to improve to a 5
“satisfactory”
 Overall improvement required for all projects
 Projects should aim to regularly report on progress at different levels (outcomes, outputs, activities,
etc.)
 Managers should make use of M&E information for planning and decision-making
0
1
2
3
4
5
6
LAO1301LAO1396LAO1459LAO1608LAO1680
Performance of M&E
2011 2012 2013 2014 2015
3
4
5
2011 2012 2013 2014 2015
Performance of M&E
Country average
Regional average
2011 2012 2013 2014 2015 Average
LAO1301 3 3 3 3 3,0
LAO1396 3 3 4 4 3,5
LAO1459 4 4 4 3 4 3,8
LAO1608 4 4 3 3 3,5
LAO1680 4 4 4,0
Country average 3,33 3,50 3,75 3,40 3,67 3,53
Regional average 3,60 3,50 3,90 4,00 4,05 3,81
Gender focus
 Most projects have performed "moderately satisfactorily"
with regard to mainstreaming gender in implementation
and/or targeting women.
 SSSJ has received a score of "3" for the past three years,
while LDP’s performance improved towards project
completion
 For last 5 years average performance for country has been
below regional average
0
1
2
3
4
5
6
LAO1301 LAO1396 LAO1459 LAO1608 LAO1680
Gender focus
2011 2012 2013 2014 2015
2
3
4
5
2011 2012 2013 2014 2015
Gender focus
Country average
Regional average
 Since 2013, there has been a marked improvement in
the extent to which projects manage to reach poor
households effectively, but from a low base
 Still, the country programme performance has been
consistently below the APR regional average
 Best performance is recorded by two projects with a
score of "5" in the past two years of implementation:
LDP and SSSJ
Poverty focus
0
1
2
3
4
5
6
LAO1301 LAO1396 LAO1459 LAO1608 LAO1680
Poverty focus
2011 2012 2013 2014 2015
2
3
4
5
2011 2012 2013 2014 2015
Poverty focus
Country average
Regional average
Innovation and learning
 This indicator measures the extent to which project
activities are generating adequate benefits for project
beneficiaries.
 Completed projects RLIP and LDP were rated
"satisfactory" rating towards completion
 Other projects have received a "moderately
satisfactory" score for this important indicator
 The portfolio average score has been below the APR
regional average for most of the period except in 2013
and 2014
 Performance against "food security" follows a similar
pattern as the indicator "physical/financial assets"
 The average score of "4" recorded over the last 5 years
for the portfolio as a whole
 Important to improve scores especially since most
projects are implemented in districts with a large
proportion of malnourished children and food-insecure
households, as measured by RIMS surveys.
Food security
0
1
2
3
4
5
6
Physical/financial
assets
2011 2012 2013 2014 2015
2
3
4
5
2011 2012 2013 2014 2015
Physical/financial assets
Country average
Regional average
0
1
2
3
4
5
6
Food security
2011 2012 2013 2014 2015
2
3
4
5
2011 2012 2013 2014 2015
Food security
Country average
Regional average
Exit strategy
 The long-term sustainability of project benefits not well
imbedded in project design
 and/or actively pursued through an appropriate exit
strategy
 Trend is similar to that of the entire APR portfolio, but
to a lesser extent,
 Lao portfolio average has been consistently lower that
the regional average.
 Most projects rated "moderately satisfactory"
 LPD seems to have the greatest potential and in fact will
be scaled up in a new project
 Compared with the APR regional portfolio, Lao portfolio
scores were consistently lower.
Potential for replication
and upscaling
0
1
2
3
4
5
6
LAO1301LAO1396LAO1459LAO1608LAO1680
Exit strategy
2011 2012 2013 2014 2015
2
3
4
5
2011 2012 2013 2014 2015
Exit strategy
Country average
Regional average
0
1
2
3
4
5
6
LAO1301LAO1396LAO1459LAO1608LAO1680
Potential for scaling up and
replication
2011 2012 2013 2014 2015
2
3
4
5
2011 2012 2013 2014 2015
Potential for scaling up and
replication
Country average
Regional average
1. Institutional capacity building
2. Effective coordination between central project
coordination unit and provincial/district team
3. Delivering AWPB physical and/or financial targets
4. Timely and transparent procurement and
disbursement
5. M&E: data collection, reporting and use for
programme management
General Issues
1. Improved and timely planning process and programme implementation (faster,
cheaper and better)
• Planning and budgeting =>AWPB <= Financial Management
• Beneficiaries HHs -> M&E
2. Integrated project management system (e.g. M&E for planning, mapping, MIS in
program management, etc.,)
3. KM / KS (Agriculture and Rural Development Sector Working group, considering as the
highest policy platform in the country / case studies and learning events/routes at
country and regional levels in partnership with Procasur, etc.,)
4. Partnerships with other DPs to support programme performance (Lux-Dev, AFD, FAO,
WFP, CIAT, IRRI, WB, ADB, UN-HABITA, etc.,)
5. Coordination/ Capacity building /management to support decentralization initiative
• How to strengthen the in-country capacity for the development of effective pro-poor
investment policies and institutions?
• How to develop the capacity of key service providers for the delivery of quality services?
• How to improve the accountability of public institutions and systems and to ensure
sustainability?
6. Implementation Support Missions/ technical coaching
Way forward/areas needing further support
Laos program presentation April 2016

More Related Content

What's hot

Aspire programme Cambodia Ifad 20 april 2016
Aspire programme Cambodia Ifad 20 april 2016Aspire programme Cambodia Ifad 20 april 2016
Aspire programme Cambodia Ifad 20 april 2016ifadseahub
 
Project presentations tssd cambodia adb ifad 20 april 2016
Project presentations tssd cambodia adb ifad 20 april 2016Project presentations tssd cambodia adb ifad 20 april 2016
Project presentations tssd cambodia adb ifad 20 april 2016ifadseahub
 
2. COSOP results review mtr 2016
2. COSOP results review mtr 20162. COSOP results review mtr 2016
2. COSOP results review mtr 2016ifadseahub
 
13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progress13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progressifadseahub
 
Project achievments of PADEE cambodia ifad 20 april 2016 final
Project achievments of PADEE cambodia ifad 20 april 2016 finalProject achievments of PADEE cambodia ifad 20 april 2016 final
Project achievments of PADEE cambodia ifad 20 april 2016 finalifadseahub
 
17. COSOP Looking Forward
17. COSOP Looking Forward17. COSOP Looking Forward
17. COSOP Looking Forwardifadseahub
 
1. COSOP 2013-2018
1. COSOP 2013-20181. COSOP 2013-2018
1. COSOP 2013-2018ifadseahub
 
The CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in Nigeria
The CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in NigeriaThe CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in Nigeria
The CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in NigeriaFrancois Stepman
 
THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...
THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...
THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...Francois Stepman
 
IFAD Vietnam Country Programme Evaluation March 2011
IFAD Vietnam Country Programme Evaluation March 2011IFAD Vietnam Country Programme Evaluation March 2011
IFAD Vietnam Country Programme Evaluation March 2011IFAD Vietnam
 
Ethiopian Experience in Irrigatiion Development by Mr. Zena Habtewold Biru
Ethiopian Experience in Irrigatiion Development by Mr. Zena Habtewold BiruEthiopian Experience in Irrigatiion Development by Mr. Zena Habtewold Biru
Ethiopian Experience in Irrigatiion Development by Mr. Zena Habtewold BiruMalabo-Montpellier-Panel
 
The role of the media in the Comprehensive Africa Agriculture Development Pro...
The role of the media in the Comprehensive Africa Agriculture Development Pro...The role of the media in the Comprehensive Africa Agriculture Development Pro...
The role of the media in the Comprehensive Africa Agriculture Development Pro...Francois Stepman
 
FAO medium-term strategic framework for cooperation in family farming 2012-2015
FAO medium-term strategic framework for cooperation in family farming 2012-2015FAO medium-term strategic framework for cooperation in family farming 2012-2015
FAO medium-term strategic framework for cooperation in family farming 2012-2015FAO
 
2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...
2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...
2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...AKADEMIYA2063
 

What's hot (20)

Aspire programme Cambodia Ifad 20 april 2016
Aspire programme Cambodia Ifad 20 april 2016Aspire programme Cambodia Ifad 20 april 2016
Aspire programme Cambodia Ifad 20 april 2016
 
Project presentations tssd cambodia adb ifad 20 april 2016
Project presentations tssd cambodia adb ifad 20 april 2016Project presentations tssd cambodia adb ifad 20 april 2016
Project presentations tssd cambodia adb ifad 20 april 2016
 
2. COSOP results review mtr 2016
2. COSOP results review mtr 20162. COSOP results review mtr 2016
2. COSOP results review mtr 2016
 
12 presentation cosop
12 presentation cosop12 presentation cosop
12 presentation cosop
 
13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progress13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progress
 
Project achievments of PADEE cambodia ifad 20 april 2016 final
Project achievments of PADEE cambodia ifad 20 april 2016 finalProject achievments of PADEE cambodia ifad 20 april 2016 final
Project achievments of PADEE cambodia ifad 20 april 2016 final
 
17. COSOP Looking Forward
17. COSOP Looking Forward17. COSOP Looking Forward
17. COSOP Looking Forward
 
Concept note
Concept noteConcept note
Concept note
 
1. COSOP 2013-2018
1. COSOP 2013-20181. COSOP 2013-2018
1. COSOP 2013-2018
 
The CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in Nigeria
The CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in NigeriaThe CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in Nigeria
The CAADP, ECOWAP, APP, NAIP and Poverty and Hunger reduction in Nigeria
 
THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...
THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...
THE COMPREHENSIVE AFRICA AGRICULTURE DEVELOPMENT PROGRAMME (CAADP) AND THE NA...
 
IFAD Vietnam Country Programme Evaluation March 2011
IFAD Vietnam Country Programme Evaluation March 2011IFAD Vietnam Country Programme Evaluation March 2011
IFAD Vietnam Country Programme Evaluation March 2011
 
2015 ReSAKSS Conference – Day 1 - Mawuli Sablah
2015 ReSAKSS Conference – Day 1 - Mawuli Sablah2015 ReSAKSS Conference – Day 1 - Mawuli Sablah
2015 ReSAKSS Conference – Day 1 - Mawuli Sablah
 
Ethiopian Experience in Irrigatiion Development by Mr. Zena Habtewold Biru
Ethiopian Experience in Irrigatiion Development by Mr. Zena Habtewold BiruEthiopian Experience in Irrigatiion Development by Mr. Zena Habtewold Biru
Ethiopian Experience in Irrigatiion Development by Mr. Zena Habtewold Biru
 
11. AIMS
11. AIMS11. AIMS
11. AIMS
 
The role of the media in the Comprehensive Africa Agriculture Development Pro...
The role of the media in the Comprehensive Africa Agriculture Development Pro...The role of the media in the Comprehensive Africa Agriculture Development Pro...
The role of the media in the Comprehensive Africa Agriculture Development Pro...
 
2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 1 - Godfrey Bahiigwa
 
FAO medium-term strategic framework for cooperation in family farming 2012-2015
FAO medium-term strategic framework for cooperation in family farming 2012-2015FAO medium-term strategic framework for cooperation in family farming 2012-2015
FAO medium-term strategic framework for cooperation in family farming 2012-2015
 
3 Learning and outreach event on scaling-up
3 Learning and outreach event on scaling-up3 Learning and outreach event on scaling-up
3 Learning and outreach event on scaling-up
 
2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...
2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...
2020 ReSAKSS Annual Conference - Plenary Session II—Enabling Environment for ...
 

Similar to Laos program presentation April 2016

Laos Country program presentation 06 may 2015
Laos Country program presentation 06 may 2015Laos Country program presentation 06 may 2015
Laos Country program presentation 06 may 2015Benoît THIERRY
 
IFAD Laos Country program presentation 06 may
IFAD Laos Country program presentation 06 mayIFAD Laos Country program presentation 06 may
IFAD Laos Country program presentation 06 mayifadseahub
 
ifpri_rwa_agri_investment_priorities_eprn_5-22.pptx
ifpri_rwa_agri_investment_priorities_eprn_5-22.pptxifpri_rwa_agri_investment_priorities_eprn_5-22.pptx
ifpri_rwa_agri_investment_priorities_eprn_5-22.pptxErnest Bonah, Ph.D
 
The Future of Ethiopia’s Agriculture: Drivers and Scenarios
The Future of Ethiopia’s Agriculture:  Drivers and ScenariosThe Future of Ethiopia’s Agriculture:  Drivers and Scenarios
The Future of Ethiopia’s Agriculture: Drivers and Scenariosessp2
 
TrackFin results in Brazil
TrackFin results in BrazilTrackFin results in Brazil
TrackFin results in BrazilTrackFin
 
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxLECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxmansoor584949
 
Peru: A regional apparoach to territorial development
Peru: A regional apparoach to territorial developmentPeru: A regional apparoach to territorial development
Peru: A regional apparoach to territorial developmentOECDregions
 
Davao bottom up budgeting
Davao bottom up budgetingDavao bottom up budgeting
Davao bottom up budgetingWBKDC
 
Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017Benoît THIERRY
 
Provincial economic review outlook 2012
Provincial economic review outlook 2012Provincial economic review outlook 2012
Provincial economic review outlook 2012Dr Lendy Spires
 
Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...
Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...
Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...OECD Governance
 

Similar to Laos program presentation April 2016 (20)

02 ifad portfolio review
02 ifad portfolio review02 ifad portfolio review
02 ifad portfolio review
 
Laos Country program presentation 06 may 2015
Laos Country program presentation 06 may 2015Laos Country program presentation 06 may 2015
Laos Country program presentation 06 may 2015
 
IFAD Laos Country program presentation 06 may
IFAD Laos Country program presentation 06 mayIFAD Laos Country program presentation 06 may
IFAD Laos Country program presentation 06 may
 
WCA Regional Result Management Plan
WCA Regional Result Management PlanWCA Regional Result Management Plan
WCA Regional Result Management Plan
 
ifpri_rwa_agri_investment_priorities_eprn_5-22.pptx
ifpri_rwa_agri_investment_priorities_eprn_5-22.pptxifpri_rwa_agri_investment_priorities_eprn_5-22.pptx
ifpri_rwa_agri_investment_priorities_eprn_5-22.pptx
 
Beyond 2015
Beyond 2015Beyond 2015
Beyond 2015
 
2015 bub
2015 bub2015 bub
2015 bub
 
The Future of Ethiopia’s Agriculture: Drivers and Scenarios
The Future of Ethiopia’s Agriculture:  Drivers and ScenariosThe Future of Ethiopia’s Agriculture:  Drivers and Scenarios
The Future of Ethiopia’s Agriculture: Drivers and Scenarios
 
LaoReportDraftFinal on Public Expenditure
LaoReportDraftFinal on Public ExpenditureLaoReportDraftFinal on Public Expenditure
LaoReportDraftFinal on Public Expenditure
 
Tracking CAADP Implementation and Key Outcome Indicators
Tracking CAADP Implementation and Key Outcome IndicatorsTracking CAADP Implementation and Key Outcome Indicators
Tracking CAADP Implementation and Key Outcome Indicators
 
TrackFin results in Brazil
TrackFin results in BrazilTrackFin results in Brazil
TrackFin results in Brazil
 
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxLECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
 
Peru: A regional apparoach to territorial development
Peru: A regional apparoach to territorial developmentPeru: A regional apparoach to territorial development
Peru: A regional apparoach to territorial development
 
Final project lekogo
Final project lekogoFinal project lekogo
Final project lekogo
 
Davao bottom up budgeting
Davao bottom up budgetingDavao bottom up budgeting
Davao bottom up budgeting
 
Sustaining CAADP Momentum: Growth and Investment Analysis
Sustaining CAADP Momentum: Growth and Investment Analysis Sustaining CAADP Momentum: Growth and Investment Analysis
Sustaining CAADP Momentum: Growth and Investment Analysis
 
Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017
 
Provincial economic review outlook 2012
Provincial economic review outlook 2012Provincial economic review outlook 2012
Provincial economic review outlook 2012
 
Providing access to finance for smallholder farmers
Providing access to finance for smallholder farmersProviding access to finance for smallholder farmers
Providing access to finance for smallholder farmers
 
Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...
Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...
Philippine fiscal and expenditure management reforms - Rolando Toledo - Phili...
 

More from ifadseahub

Main drinking water supply scheme
Main drinking water supply schemeMain drinking water supply scheme
Main drinking water supply schemeifadseahub
 
Tentative program 35th years of Laos-IFAD partnership
Tentative program 35th years of Laos-IFAD partnershipTentative program 35th years of Laos-IFAD partnership
Tentative program 35th years of Laos-IFAD partnershipifadseahub
 
Lao Gafsp Press Release
Lao Gafsp Press ReleaseLao Gafsp Press Release
Lao Gafsp Press Releaseifadseahub
 
16. MIS for Project Monitoring and Evaluation
16. MIS for Project Monitoring and Evaluation 16. MIS for Project Monitoring and Evaluation
16. MIS for Project Monitoring and Evaluation ifadseahub
 
15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendationsifadseahub
 
12. Building adaptive capacity through the scaling-up of renewable energy tec...
12. Building adaptive capacity through the scaling-up of renewable energy tec...12. Building adaptive capacity through the scaling-up of renewable energy tec...
12. Building adaptive capacity through the scaling-up of renewable energy tec...ifadseahub
 
5. Panel briefing notes
5. Panel briefing notes5. Panel briefing notes
5. Panel briefing notesifadseahub
 
4. COSOP workshop agenda 2016
4. COSOP workshop agenda 20164. COSOP workshop agenda 2016
4. COSOP workshop agenda 2016ifadseahub
 
Strategic challenges in the agriculture sector
Strategic challenges in the agriculture sectorStrategic challenges in the agriculture sector
Strategic challenges in the agriculture sectorifadseahub
 
Participatory 3 dimensional mapping
Participatory 3 dimensional mappingParticipatory 3 dimensional mapping
Participatory 3 dimensional mappingifadseahub
 
Farmer business school
Farmer business schoolFarmer business school
Farmer business schoolifadseahub
 
Reaping the rewards
Reaping the rewardsReaping the rewards
Reaping the rewardsifadseahub
 
Community based seed systems
Community based seed systemsCommunity based seed systems
Community based seed systemsifadseahub
 
Local farmers as organizers
Local farmers as organizersLocal farmers as organizers
Local farmers as organizersifadseahub
 

More from ifadseahub (14)

Main drinking water supply scheme
Main drinking water supply schemeMain drinking water supply scheme
Main drinking water supply scheme
 
Tentative program 35th years of Laos-IFAD partnership
Tentative program 35th years of Laos-IFAD partnershipTentative program 35th years of Laos-IFAD partnership
Tentative program 35th years of Laos-IFAD partnership
 
Lao Gafsp Press Release
Lao Gafsp Press ReleaseLao Gafsp Press Release
Lao Gafsp Press Release
 
16. MIS for Project Monitoring and Evaluation
16. MIS for Project Monitoring and Evaluation 16. MIS for Project Monitoring and Evaluation
16. MIS for Project Monitoring and Evaluation
 
15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations
 
12. Building adaptive capacity through the scaling-up of renewable energy tec...
12. Building adaptive capacity through the scaling-up of renewable energy tec...12. Building adaptive capacity through the scaling-up of renewable energy tec...
12. Building adaptive capacity through the scaling-up of renewable energy tec...
 
5. Panel briefing notes
5. Panel briefing notes5. Panel briefing notes
5. Panel briefing notes
 
4. COSOP workshop agenda 2016
4. COSOP workshop agenda 20164. COSOP workshop agenda 2016
4. COSOP workshop agenda 2016
 
Strategic challenges in the agriculture sector
Strategic challenges in the agriculture sectorStrategic challenges in the agriculture sector
Strategic challenges in the agriculture sector
 
Participatory 3 dimensional mapping
Participatory 3 dimensional mappingParticipatory 3 dimensional mapping
Participatory 3 dimensional mapping
 
Farmer business school
Farmer business schoolFarmer business school
Farmer business school
 
Reaping the rewards
Reaping the rewardsReaping the rewards
Reaping the rewards
 
Community based seed systems
Community based seed systemsCommunity based seed systems
Community based seed systems
 
Local farmers as organizers
Local farmers as organizersLocal farmers as organizers
Local farmers as organizers
 

Recently uploaded

Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxHenryBriggs2
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 

Recently uploaded (20)

Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptx
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 

Laos program presentation April 2016

  • 1. Lao PDR Program Presentation April 2016 South East Asia Hub
  • 2. 2005 07 2010 2013 2014 Human Dev. Index 0.501 0.53 0.539 0.57 0.575 Agriculture value added (% of GDP) 36.2 34.9 32.7 26.5 27.7 GNI per capita 472 887 1123 1661 1680 Total population (million) 5.88 6.21 6.44 6.77 6.68 Rural population as % of population 73 69 67 64 62.4 Poverty rate based on population 30.7 27.6 26 23.2 - Main crops production: rice, soybeans, sugarcane, corn, tobacco Nutrition facts: high malnutrition rate (40%), particularly in rural areas Population density – Economic Indicators Source: WB, UNDP
  • 3. Poverty rate and Poverty density
  • 4. Share of Agriculture in GDP 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0% 45.0% 0 100 200 300 400 500 600 700 800 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 GDP per capita (USD) Agriculture contribution to GDP per capita (USD) Agriculture contribution to GDP per capita (%)
  • 6. Portfolio Closed Loans Active Loans Pipelined Loans (1980-1985) Casier-Sud Pioneer Agricultural Project (2009-2016) Sustainable Natural Resource Management and Productivity Enhancement Project GAFSP (2016-2020): Global Agriculture and Food Security Program - 30 million USD (1984-1986) Agricutural Production Project (2011 - 2017) Souum Son Seun Jai - Community based Food Security and Economic Opportunities Programme Livestock project (2016-2020) (with ADB) - 10 million USD (1988-1992) Rural Credit Project (2013-2019) Southern Laos Food and Nutrition Security and Market Linkages Programme (1991-1997) Xieng Khouang Agricultural Development Project (2006-2014) Rural lovelihoods Improvement Programme in Attepeu and Sayabouri (2007-2013) Northern Region Sustainable Livelihoods through Livestock Development Project
  • 7. Timeline overview – COSOP (2011-2015), (2016-2020) Projects 2005 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Rural livelihoods Improvement Programme in Attepeu and Sayabouri Northern Region Sustainable Livelihoods through Livestock Dev ProjSustainable Natural Resource Management and Productivity Enhancement Project SSSJ Project FNML Pipeline - GAFSP Pipeline - Livestock program
  • 8. Closing project – SNRMP •Program Target group: 11,250 households would benefit from the project •The main target group comprises two primary sub- groups: (i) poor farming households with proximity to markets (primary in the lowlands; and (ii) poor farmers in upland areas (mostly ethnic minority communities practicing shifting cultivation) * Total Project cost: $37.8 million IFAD financing: $15 million ADB: $20 million Government of Laos: $2.8 million * Project Components: (i) Capacity building for agriculture and natural resource sector management (ii) Implementation of agricultural activity and commercialization subprojects (iii) Project management
  • 9. Active project – SSSJ * Program Target group: 17,000 rural households in 225 poor upland villages in Northern Sayabouri and Oudomxay * Total Project cost: $19.3 million Total IFAD financing: IFAD DSF Grant: $13.9 million, World Food Program: $3.7 million, GIZ: $0.4 million Government of Laos: $0.8 million, Beneficiaries: $0.3 million * Project Components: (i) Integrated farming systems (ii) Links to markets
  • 10. Active project – FNML •Program Target Group: 10,500 households in 175 poor upland villages in target areas * Main target group: Population of 175 target villages *Secondary target group: The private buyers of the target products, Smallholders in the target areas * Total Project cost: $18.82 million Total IFAD financing: IFAD DSF Grant: $9.72 million, ASAP Grant: $5.0 million, Government of Laos: $0.54 million, Private sector and Partner Banks: $1.48 million, Beneficiaries: $0.53 million • Project Components: (i) Food Security and Pro-Poor Market Access (ii) Inclusive Rural Finance Support (iii) Institutional support (iv) Smallholder Adaptation for Climate Change Component (New Component)
  • 11. Approved Project– SSFSNP •Program Target group: The project will be implemented in 12 districts and approximately 400 villages in Oudomxai, Phongsaly, Xieng Khouang and Houaphan provinces in Nothern Laos. The main target group would be within the population of 400 target villages with 34,000 small households. * Total Project cost: $38.8 million GAFSP: $30 million (IFAD: $24 million; WFP: $6 million) Local private enterprises: $0.5 million Village beneficiary: $2.9 million GoL: $5.4 million * Project Components: (i) Strengthened public services (ii) Community-driven agriculture-based nutrition interventions established (iii) Sustainable and inclusive market-driven partnerships established Note: Go to EB Approval April- 2016
  • 12. Project under design– NSLCP •Program Target group: The project aims to work with a total of 300 livestock production and marketing groups (LPMGs) in the 12 districts, extending the livestock production and marketing support to at least 4500 households. Infrastructure will benefit additional 10 000 households. * Total Project cost: $31.5 million IFAD: $10 million ADB: $21 million Government counterpart funds: $0.5 million * Project Components: (i) Strengthened smallholders and other livestock value chain actors (ii) Strengthened LVC infrastructure (iii) Improved capacity to access credit Note: Go to EB Approval December- 2016
  • 14. IFAD-funded Programmes Performance (at country and regional levels)
  • 15. Overall implementation progress  Over the last 5 years there has been only one instance of a "satisfactory" rating (LDP)  Average score for the portfolio is 3.84, bordering between “moderately unsatisfactory” and “moderately satisfactory”  For all 5 years country average score has been consistently lower the APR regional average  Average performance dropped from 2014 to 2015  However, SSSJ has recovered from being a “problem project” to having a “moderately satisfactory” score in 2015 0 1 2 3 4 5 6 LAO1301LAO1396LAO1459LAO1608LAO1680 Overall implementation progress 2011 2012 2013 2014 2015 3 4 5 2011 2012 2013 2014 2015 Overall implementation progress (LAO) Country average Regional average 2011 2012 2013 2014 2015 Average LAO1301 4 4 4 4 4,0 LAO1396 4 4 4 5 4,3 LAO1459 3 3 3 4 4 3,4 LAO1608 4 4 4 3 3,8 LAO1680 4 4 4,0 Country average 3,67 3,75 3,75 4,20 3,67 3,84 Regional average 3,90 4,00 4,00 4,20 4,16 4,05
  • 16. Coherence between AWPB and implementation  Country programme performance as been consistently below the regional average, except for the year 2014  This suggests that most projects struggle to deliver AWPB physical and/or financial targets. 0 1 2 3 4 5 6 LAO1301LAO1396LAO1459LAO1608LAO1680 Coherence between AWPB and implementation 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 Average LAO1301 4 3 4 4 3,8 LAO1396 3 3 4 5 3,8 LAO1459 4 4 4 4 4 4,0 LAO1608 4 3 4 4 3,8 LAO1680 4 4 4,0 Country average 3,67 3,50 3,75 4,20 4,00 3,84 Regional average 3,70 3,80 3,90 4,10 4,08 3,92
  • 17. Performance of M&E  Country average consistently below regional average  SSSJ has been continuously rated “moderately unsatisfactory”, SNRMPEP almost consistently “Moderately Satisfactory”, LDP improved to “Moderately Satisfactory”  FNML has started on “Moderately Satisfactory” and effort should be made to improve to a 5 “satisfactory”  Overall improvement required for all projects  Projects should aim to regularly report on progress at different levels (outcomes, outputs, activities, etc.)  Managers should make use of M&E information for planning and decision-making 0 1 2 3 4 5 6 LAO1301LAO1396LAO1459LAO1608LAO1680 Performance of M&E 2011 2012 2013 2014 2015 3 4 5 2011 2012 2013 2014 2015 Performance of M&E Country average Regional average 2011 2012 2013 2014 2015 Average LAO1301 3 3 3 3 3,0 LAO1396 3 3 4 4 3,5 LAO1459 4 4 4 3 4 3,8 LAO1608 4 4 3 3 3,5 LAO1680 4 4 4,0 Country average 3,33 3,50 3,75 3,40 3,67 3,53 Regional average 3,60 3,50 3,90 4,00 4,05 3,81
  • 18. Gender focus  Most projects have performed "moderately satisfactorily" with regard to mainstreaming gender in implementation and/or targeting women.  SSSJ has received a score of "3" for the past three years, while LDP’s performance improved towards project completion  For last 5 years average performance for country has been below regional average 0 1 2 3 4 5 6 LAO1301 LAO1396 LAO1459 LAO1608 LAO1680 Gender focus 2011 2012 2013 2014 2015 2 3 4 5 2011 2012 2013 2014 2015 Gender focus Country average Regional average  Since 2013, there has been a marked improvement in the extent to which projects manage to reach poor households effectively, but from a low base  Still, the country programme performance has been consistently below the APR regional average  Best performance is recorded by two projects with a score of "5" in the past two years of implementation: LDP and SSSJ Poverty focus 0 1 2 3 4 5 6 LAO1301 LAO1396 LAO1459 LAO1608 LAO1680 Poverty focus 2011 2012 2013 2014 2015 2 3 4 5 2011 2012 2013 2014 2015 Poverty focus Country average Regional average
  • 19. Innovation and learning  This indicator measures the extent to which project activities are generating adequate benefits for project beneficiaries.  Completed projects RLIP and LDP were rated "satisfactory" rating towards completion  Other projects have received a "moderately satisfactory" score for this important indicator  The portfolio average score has been below the APR regional average for most of the period except in 2013 and 2014  Performance against "food security" follows a similar pattern as the indicator "physical/financial assets"  The average score of "4" recorded over the last 5 years for the portfolio as a whole  Important to improve scores especially since most projects are implemented in districts with a large proportion of malnourished children and food-insecure households, as measured by RIMS surveys. Food security 0 1 2 3 4 5 6 Physical/financial assets 2011 2012 2013 2014 2015 2 3 4 5 2011 2012 2013 2014 2015 Physical/financial assets Country average Regional average 0 1 2 3 4 5 6 Food security 2011 2012 2013 2014 2015 2 3 4 5 2011 2012 2013 2014 2015 Food security Country average Regional average
  • 20. Exit strategy  The long-term sustainability of project benefits not well imbedded in project design  and/or actively pursued through an appropriate exit strategy  Trend is similar to that of the entire APR portfolio, but to a lesser extent,  Lao portfolio average has been consistently lower that the regional average.  Most projects rated "moderately satisfactory"  LPD seems to have the greatest potential and in fact will be scaled up in a new project  Compared with the APR regional portfolio, Lao portfolio scores were consistently lower. Potential for replication and upscaling 0 1 2 3 4 5 6 LAO1301LAO1396LAO1459LAO1608LAO1680 Exit strategy 2011 2012 2013 2014 2015 2 3 4 5 2011 2012 2013 2014 2015 Exit strategy Country average Regional average 0 1 2 3 4 5 6 LAO1301LAO1396LAO1459LAO1608LAO1680 Potential for scaling up and replication 2011 2012 2013 2014 2015 2 3 4 5 2011 2012 2013 2014 2015 Potential for scaling up and replication Country average Regional average
  • 21. 1. Institutional capacity building 2. Effective coordination between central project coordination unit and provincial/district team 3. Delivering AWPB physical and/or financial targets 4. Timely and transparent procurement and disbursement 5. M&E: data collection, reporting and use for programme management General Issues
  • 22. 1. Improved and timely planning process and programme implementation (faster, cheaper and better) • Planning and budgeting =>AWPB <= Financial Management • Beneficiaries HHs -> M&E 2. Integrated project management system (e.g. M&E for planning, mapping, MIS in program management, etc.,) 3. KM / KS (Agriculture and Rural Development Sector Working group, considering as the highest policy platform in the country / case studies and learning events/routes at country and regional levels in partnership with Procasur, etc.,) 4. Partnerships with other DPs to support programme performance (Lux-Dev, AFD, FAO, WFP, CIAT, IRRI, WB, ADB, UN-HABITA, etc.,) 5. Coordination/ Capacity building /management to support decentralization initiative • How to strengthen the in-country capacity for the development of effective pro-poor investment policies and institutions? • How to develop the capacity of key service providers for the delivery of quality services? • How to improve the accountability of public institutions and systems and to ensure sustainability? 6. Implementation Support Missions/ technical coaching Way forward/areas needing further support