Presupuesto
MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO
EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE
JUNIN
Presupuesto 0702073
MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente
Lugar JUNIN - CHANCHAMAYO - PERENE
Precio S/. Parcial S/.Item Descripción Und. Metrado
01 TRABAJOS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.01 1.00 1,129.18 1,129.18
TRAZO Y REPLANTEO INICIAL m01.02 3,331.50 1.40 4,664.10
SEÑALIZACION PARA LIMITE DE SEGURIDAD VIAL (4 USOS). m01.03 200.00 9.43 1,886.00
02 TRABAJOS PRELIMINARES 38.70
TRAZO Y REPLANTEO DURANTE EL PROCESO m202.01 3.80 2.34 8.89
LIMPIEZA DE TERRENO A MANO m202.02 13.80 2.16 29.81
03 MOVIMIENTO DE TIERRAS 156.72
EXCAVACION MANUAL DE ZANJAS M3.03.01 1.15 35.98 41.38
FILTRO DE GRAVA m303.02 0.46 201.27 92.58
ELIMINACION DE MATERIAL EXCEDENTE dprom= 30m m303.03 1.29 17.64 22.76
04 OBRAS DE CONCRETO 1,513.91
SOLADO E=4" M2.04.01 3.35 24.38 81.67
CONCRETO F' C = 175 Kg/cm2 m304.02 1.49 327.13 487.42
ENCOFRADO Y DESENCOFRADO m204.03 14.72 40.62 597.93
ACERO f'y=4200 KG/CM2 kg04.04 81.05 4.28 346.89
05 REVOQUES Y ENLUCIDOS 208.09
TARRAJEO CON IMPERMEABILIZANTES m205.01 3.15 19.30 60.80
TARRAJEOMORTERO C:A 1:5 m205.02 7.22 20.40 147.29
06 ACCESORIOS 200.28
ACCESORIOS CJA. DE CAPTACION und06.01 1.00 200.28 200.28
07 TRABAJOS PRELIMINARES 3,011.25
TRAZO Y REPLANTEO ML07.01 4,125.00 0.73 3,011.25
08 MOVIMIENTO DE TIERRAS 94,545.00
EXCAVACION DE ZANJAS EN TERRENO NORMAL ML08.01 4,125.00 13.24 54,615.00
REFINE Y NIVELACION DE ZANJAS EN TERR. NORMAL ML08.02 4,125.00 2.12 8,745.00
CAMA DE APOYO ML08.03 4,125.00 4.29 17,696.25
RELLENO Y COMP.ZANJAS ML.08.04 4,125.00 3.27 13,488.75
09 SUMINISTRO E INSTALACION DE TUBERIAS 23,040.27
TUBERIA PVC SAP CLASE- 7.5 2" ML09.01 1,558.50 6.22 9,693.87
TUBERIA PVC SAP CLASE-10 1 1/2" m09.02 867.00 11.26 9,762.42
TUBERIA PVC SAP CLASE- 10 1" ML09.03 102.50 5.75 589.38
TUBERIA PVC. SAP DE Ø 3/4" ML09.04 690.00 4.34 2,994.60
10 SUMINISTRO E INSTALACION DE ACCESORIOS 3,963.91
ACCESORIOS TUBERIA CONDUCCION und10.01 1.00 693.11 693.11
PRUEBA HIDRAULICA ML10.02 3,145.00 1.04 3,270.80
11 INSTALACIONES DOMICILIARIAS
12 MOVIMIENTO DE TIERRAS 9,270.10
EXCAVACION DE ZANJAS EN TERRENO NORMAL ML12.01 415.00 15.13 6,278.95
REFINE Y NIVELACION DE ZANJAS EN TERR. NORMAL ML12.02 415.00 2.12 879.80
CAMA DE APOYO PARA TUBERÍAS ML12.03 415.00 1.12 464.80
RELLENO Y COMP.ZANJAS ML.12.04 415.00 4.24 1,759.60
13 SUMINISTRO E INSTALACION DE TUBERIAS 14,388.10
TUBERIA PVC. SAP DE Ø 1/2" ML13.01 415.00 9.29 3,855.35
CAJA DE MEDIDOR und13.02 60.00 106.95 6,417.00
ACCESORIOS CONEXIONES DOMICILIARIAS und13.03 60.00 69.37 4,162.20
14 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO A MANO m214.01 24.75 2.16 53.46
TRAZO REPLANTEO PRELIMINAR m214.02 24.75 2.87 71.03
15 MOVIMIENTO DE TIERRAS
EXCAVACIÓN DE ZANJAS m315.01 15.67 42.35 663.62
NIVELACIÓN Y APISONADO m215.02 27.22 1.32 35.93
ACARREO DE MATERIAL EXCEDENTE dprom= 30m m315.03 19.24 17.64 339.39
16 OBRAS DE CONCRETO SIMPLE
SOLADO f'c= 100 Kg/cm2 E=4" M2.16.01 25.74 24.38 627.54
05/12/2018 15:34:29Fecha :
S10 Página 2
.
Presupuesto
MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO
EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE
JUNIN
Presupuesto 0702073
MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente
Lugar JUNIN - CHANCHAMAYO - PERENE
Precio S/. Parcial S/.Item Descripción Und. Metrado
17 OBRAS DE CONCRETO ARMADO
18 RESERVORIO LOSA DE FONDO
CONCRETO EN LOSA DE FONDO f' c = 210 Kg/cm2 m318.01 6.19 340.93 2,110.36
ENCOFRADO Y DESENCOFRADO m218.02 5.00 40.62 203.10
ACERO f'y=4200 KG/CM2 kg18.03 446.69 4.28 1,911.83
19 RESERVORIO MUROS
CONCRETO f' c = 210 Kg/cm2 m319.01 7.56 422.51 3,194.18
ENCOFRADO Y DESENCOFRADO m219.02 56.16 40.62 2,281.22
ACERO f'y=4200 KG/CM2 kg19.03 826.06 4.28 3,535.54
20 RESERVORIO LOSA SUPERIOR
CONCRETO F'C=210 KG/CM2 m320.01 2.65 413.34 1,095.35
ENCOFRADO Y DESENCOFRADO m220.02 2.52 40.62 102.36
ACERO f'y=4200 KG/CM2 kg20.03 137.76 4.28 589.61
21 TAPA DE RESERVORIO
CONCRETO F'C=210 KG/CM2 m321.01 0.09 370.99 33.39
ENCOFRADO Y DESENCOFRADO m221.02 0.64 40.62 26.00
ACERO f'y=4200 KG/CM2 kg21.03 7.17 4.28 30.69
22 CASETA DE VALVULAS
CONCRETO F'C=210 KG/CM2 m322.01 0.69 370.99 255.98
ENCOFRADO Y DESENCOFRADO m222.02 6.52 40.62 264.84
ACERO f'y=4200 KG/CM2 kg22.03 26.68 4.28 114.19
23 TAPA CASETA DE VALVULAS
CONCRETO F'C=210 KG/CM2 m323.01 0.06 370.99 22.26
ENCOFRADO Y DESENCOFRADO m223.02 1.24 40.62 50.37
ACERO f'y=4200 KG/CM2 kg23.03 6.34 4.28 27.14
24 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES EN INT. DE RESERVORIO m224.01 40.12 36.78 1,475.61
TARRAJEO EN EXT. DE RESERVORIO CON C:A 1:5 M2.24.02 51.84 22.86 1,185.06
TARRAJEO EN CASETA DE VALVULAS m224.03 4.28 36.89 157.89
25 PINTURA
PINTURA LATEX EN EXTERIOR DE RESERVORIO m225.01 51.84 6.82 353.55
PINTURA LATEX EN EXTERIOR DE CASETA DE VÁLVULAS m225.02 4.28 6.38 27.31
26 ACCESORIOS
ACCESORIOS DE RESERVORIO und26.01 1.00 679.54 679.54
SUMINISTRO Y COLOCACION DE HIPOCLORADOR und26.02 1.00 406.55 406.55
27 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO A MANO m227.01 3.80 2.12 8.06
TRAZO, NIVELACION PRELIMINAR m227.02 3.80 2.07 7.87
28 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS P/CAJA DE VALVULA M3.28.01 3.80 35.30 134.14
ELIMINACION DE MATERIAL EXCEDENTE m328.02 4.94 17.64 87.14
29 OBRAS DE CONCRETO ARMADO
CONCRETO F' C = 175 Kg/cm2 m329.01 2.42 423.02 1,023.71
ENCOFRADO Y DESENCOFRADO m229.02 21.33 33.33 710.93
ACERO f'y=4200 KG/CM2 kg29.03 81.00 4.54 367.74
30 ACCESORIOS
31 VALVULAS
VALVULA DE 3/4" und31.01 3.00 110.36 331.08
VALVULA COMPUERTA DE BRONCE ROSCADA DE 1" und31.02 2.00 97.41 194.82
VALVULA COMPUERTA DE BRONCE ROSCADA DE 11/2" und31.03 2.00 160.59 321.18
VALVULA COMPUERTA DE BRONCE ROSCADA DE 2" und31.04 3.00 254.32 762.96
VALVULA AIRE DE 2" DE 2" und31.05 2.00 254.32 508.64
32 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL M2.32.01 28.00 1.35 37.80
TRAZO Y REPLANTEO M2.32.02 28.00 1.54 43.12
05/12/2018 15:34:29Fecha :
S10 Página 3
.
Presupuesto
MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO
EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE
JUNIN
Presupuesto 0702073
MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente
Lugar JUNIN - CHANCHAMAYO - PERENE
Precio S/. Parcial S/.Item Descripción Und. Metrado
33 MOVIMIENTO DE TIERRAS
EXCAVACIÓN MANUAL M3.33.01 22.50 35.30 794.25
ELIMINACION DE MATERIAL EXCEDENTE m333.02 26.00 17.64 458.64
34 OBRAS DE CONCRETO SIMPLE
CONCRETO F'C= 140 KG/CM2 CÁMARA DE ANCLAJE M3.34.01 12.00 239.75 2,877.00
35 OBRAS DE CONCRETO ARMADO
36 ZAPATAS
CONCRETO EN ZAPATAS f'c= 210 KG/CM2 m336.01 5.60 331.53 1,856.57
ACERO f'y=4200 KG/CM2 kg36.02 134.38 4.54 610.09
37 COLUMNAS
CONCRETO f'c= 210 KG/CM2 COLUMNAS M3.37.01 3.25 299.11 972.11
ENCOFRADO Y DESENCOFRADO DE COLUMNAS m237.02 26.00 36.69 953.94
ACERO f'y=4200 KG/CM2 kg37.03 283.04 4.54 1,285.00
38 REVOQUES Y ENLUCIDOS
TARRAJEO EN SUPERFICIE DE COLUMNAS/MORTERO C:A 1:5 m238.01 24.00 18.06 433.44
39 PINTURA
PINTURA ESMALTE EN SUPERFICIE DE COLUMNAS M2.39.01 24.00 8.58 205.92
40 VARIOS
CABLE DE ACERO D=1/2" TIPO BOA, CABLE PRINCIPAL ML.40.01 206.00 24.92 5,133.52
PENDOLAS DE FIERRO LISO D=1/2" CON TEMPLADORES und40.02 90.00 68.69 6,182.10
GUARDA CABLE D=1/2" und40.03 2.00 72.63 145.26
GRAPA MODIFICADA PLATINA 1/2" und40.04 4.00 14.72 58.88
TUBERÍA DE HDP DE 2" ML.40.05 186.50 12.27 2,288.36
APOYO DESLIZANTE-CARRO DE DILATACIÓN INC/ACCESORIOS und40.06 2.00 198.41 396.82
VARILLA DE ANCLAJE FºGº D=1/2"" und40.07 2.00 67.97 135.94
ACCESORIOS DE TUBERÍAS (TRANSIC. PVC UNIONHDPE) und40.08 8.00 65.56 524.48
TEMPLADOR DE 1/2" und40.09 2.00 160.18 320.36
41 TRABAJOS PRELIMINARES 2,782.41
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML m41.01 1,520.44 1.83 2,782.41
42 MOVIMIENTO DE TIERRAS 31,670.76
EXCAVACION A PULSO T.N. HASTA 1.5M ML42.01 1,520.44 15.13 23,004.26
REFINE Y NIVELACION ZANJA TERR. NORMAL M42.02 1,520.44 2.16 3,284.15
CAMA DE APOYO EN TERRENO NORMAL m42.03 1,520.44 2.12 3,223.33
RELLENO Y COMPACT. ZANJA, HASTA 1.50 M m42.04 1,520.44 1.42 2,159.02
43 SUMUNISTRO E INSTALACION DE TUBERIAS 35,383.63
SUMINISTRO E INSTALACION DE TUBERIA PVC. UF, 160mm. m43.01 1,520.44 23.25 35,350.23
SUMINISTRO E INSTALACION DE TUBERIA PVC. UF, 200mm. m43.02 1.00 33.40 33.40
44 PRUEBAS DE TUBERIAS 3,177.72
PRUEBA HIDRAULICA+ESCORRENTIA DE TUB. m44.01 1,520.44 2.09 3,177.72
45 CONSTRUCCION DE BUZONES 73,206.54
EXCAVACION MANUAL P/BUZONES H=1.50m prof. M3.45.01 90.45 43.18 3,905.63
CONSTRUCCION DE BUZON STANDARD HASTA 1.5M und45.02 30.00 2,230.21 66,906.30
ELIMINACION DE MATERIAL EXCEDENTE m345.03 113.06 21.18 2,394.61
46 INSTALACIONES DOMICILIARIAS 17,111.00
EXCAVACION A PULSO T.N. HASTA 1.5M ML46.01 200.00 21.18 4,236.00
REFINE Y NIVELACION ZANJA TERR. NORMAL M46.02 200.00 2.16 432.00
CAMA DE APOYO EN TERRENO NORMAL m46.03 200.00 2.12 424.00
TUBERIA DE PVC SAL 4" ML46.04 200.00 16.33 3,266.00
EMPALME DE TUBERIA DE CAJA A RED DEDESAGUE und46.05 50.00 175.06 8,753.00
47 VARIOS 208.30
PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO und47.01 10.00 20.83 208.30
48 TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m248.01 517.45 0.27 139.71
TRAZO Y REPLANTEO m248.02 517.45 1.52 786.52
49 MOVIMIENTO DE TIERRAS
05/12/2018 15:34:29Fecha :
S10 Página 4
.
Presupuesto
MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO
EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE
JUNIN
Presupuesto 0702073
MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente
Lugar JUNIN - CHANCHAMAYO - PERENE
Precio S/. Parcial S/.Item Descripción Und. Metrado
EXCAVACION MANUAL EN TERRENO NORMAL m349.01 134.01 17.64 2,363.94
RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO m349.02 26.15 24.31 635.71
ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA D PROM. 30M M3.49.03 129.44 17.64 2,283.32
NIVELACION INTERIOR Y APISONADO m249.04 168.00 16.78 2,819.04
50 OBRAS DE CONCRETO SIMPLE
CIMIENTO CORRIDO 1:10 + 30% PG m350.01 79.20 222.86 17,650.51
SOBRECIMIENTO 1:8 + 25% PM m350.02 18.40 257.14 4,731.38
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO m250.03 287.10 29.42 8,446.48
CONCRETO EN COLUMNAS F C=140 KG/CM2(MURO DE DUCHA) m350.04 0.70 383.83 268.68
ENCOFRADO Y DEDESENCOFRADO SARDINEL DE DUCHA m250.05 28.00 29.42 823.76
51 OBRAS DE CONCRETO ARMADO
52 COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m352.01 9.73 383.83 3,734.67
ACERO f'y=4200 KG/CM2 kg52.02 1,973.04 4.54 8,957.60
ENCOFRADO Y DESENCOFRADO DE COLUMNAS m252.03 181.60 34.76 6,312.42
53 VIGAS
CONCRETO EN VIGAS f'c=210 KG/CM2 m353.01 7.41 336.53 2,493.69
ACERO f'y=4200 KG/CM2 kg53.02 732.30 4.54 3,324.64
ENCOFRADO Y DESENCOFRADO EN VIGAS m253.03 89.50 42.11 3,768.85
54 LOSA DE TECHO DE CAMARA COMPOSTERA
CONCRETO CONCRETO PARA LOSA f'c=210 KG/CM2 m354.01 6.59 336.53 2,217.73
ACERO f'y=4200 KG/CM2 kg54.02 718.48 4.54 3,261.90
ENCOFRADO Y DESENCOFRADO P/LOSA m254.03 105.00 42.11 4,421.55
55 ALBAÑILERIA
MURO DE LADRILLO KK 9X12X24 APAREJO DE SOGA C/M 1:5 X 1.5CM m255.01 624.40 49.19 30,714.24
MURO DE LADRILLO DE CANTO C/M 1:4 X 1.5 CM m255.02 48.00 38.87 1,865.76
56 REVOQUES Y ENLUCIDOS
TARRAJEO FROTACHADO EN INTERIORES m256.01 376.03 21.57 8,110.97
TARRAJEO FROTACHADO DE EXTERIORES m256.02 282.46 18.76 5,298.95
TARRAJEO CON IMPERMEBILIZANTE ACABADO CEMENTO PULIDO M2.56.03 681.00 26.93 18,339.33
TARRAJEO DE SARDINEL DE DUCHA C/CEMENTO PULIDO m256.04 32.40 18.76 607.82
DERRAMES EN COLUMNAS EXTERIORES, mez. C:A 1:4, e=1.5 cm ML56.05 521.00 8.05 4,194.05
DERRAMES EN VIGAS EXTERIORES, mez. C:A 1:4, e=1.5 cm ML56.06 982.50 8.05 7,909.13
BRUÑA DE e= 1cm EN MUROS ML56.07 421.50 4.50 1,896.75
57 PISOS Y PAVIMENTOS
CONCRETO f'c=140 Kg/cm2 (PISO DE CONCRETO) m257.01 16.80 13.02 218.74
VEREDA DE CONCRETO e=4" m257.02 300.07 36.22 10,868.54
ENCOFRADO Y DESENCOFRADO PARA VEREDA m257.03 66.83 42.11 2,814.21
PISO INTERIOR C/ACABADO CEMENTO PULIDO m257.04 213.75 26.45 5,653.69
58 CARPINTERIA DE MADERA
PUERTA DE CALAMINA CON MARCO DE MADERA PARA CASETA und58.01 50.00 177.00 8,850.00
VENTANA DE MADERA INC. MALLA MOSQUITERO PARA CASETA m258.02 62.40 61.24 3,821.38
59 COBERTURA DE CASETA
VIGA DE MADERA TORNILLO O SIMILAR 2" X 3" X 2.90 M und59.01 150.00 80.09 12,013.50
VIGA DE MADERA TORNILLO 2" X 2" X 2.90 M und59.02 100.00 80.09 8,009.00
CORREA DE MADERA TORNILLO DE 2" X 2" L=3.65M und59.03 250.00 80.67 20,167.50
COBERTURA CON CALAMINA GALVANIZADA M2.59.04 529.25 27.67 14,644.35
60 PINTURA
PINTURA EN MUROS EXTERIORES E INTERIORES(DOS MANOS) m260.01 282.46 8.14 2,299.22
PINTURA LATEX EN CONTRAZOCALO m260.02 93.75 12.15 1,139.06
PINTURA DE PUERTA Y VENTANA (DOS MANOS) m260.03 136.67 11.77 1,608.61
61 INSTALACIONES SANITARIAS
62 SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA PVC 1/2" ML62.01 390.00 3.44 1,341.60
63 ACCESORIOS DE REDES
05/12/2018 15:34:29Fecha :
S10 Página 5
.
Presupuesto
MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO
EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE
JUNIN
Presupuesto 0702073
MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente
Lugar JUNIN - CHANCHAMAYO - PERENE
Precio S/. Parcial S/.Item Descripción Und. Metrado
Codo F°G° 1/2" x 90° und63.01 150.00 21.11 3,166.50
Codo PVC 1/2" x 90° und63.02 350.00 13.07 4,574.50
TEE PVC-SAP 1/2" und63.03 100.00 13.87 1,387.00
VALVULA DE COMPUERTA DE BRONCE DE 1/2" und63.04 50.00 79.84 3,992.00
PRUEBA HIDRÁULICA Y DESINFECCION EN REDES DE AGUA ML.63.05 390.00 0.41 159.90
DUCHA und63.06 50.00 71.16 3,558.00
64 SISTEMA DE DESAGUE
TUBERIA DE PVC SAL 2" ML64.01 313.00 15.24 4,770.12
TUBERIA DE PVC SAL 4" ML64.02 300.00 20.21 6,063.00
65 ACCESORIOS PARA SISTEMA DE DESAGÜE
CODO PVC SAL 2"X90° und65.01 250.00 12.16 3,040.00
CODO PVC SAL 2"X45° und65.02 150.00 20.61 3,091.50
YEE PVC SAL 2" und65.03 100.00 20.61 2,061.00
66 APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO BLANCO und66.01 2.00 156.21 312.42
LAVATORIO DE PARED BLANCO und66.02 2.00 79.81 159.62
67 SALIDA DE DESAGUE Y VENTILACION
SALIDA DE VENTILACION PVC SAL DE 2" pto67.01 50.00 21.83 1,091.50
68 ADITAMENTOS VARIOS
SUMIDERO DE 2" und68.01 2.00 43.47 86.94
REGISTRO DE BRONCE 2" und68.02 50.00 36.95 1,847.50
SOMBRERO VENTILACION PVC DE 2" und68.03 2.00 9.05 18.10
69 CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24" und69.01 50.00 105.25 5,262.50
BIODIGESTOR und69.02 5.00 1,079.63 5,398.15
70 INSTALACION DE POZO DE PERCOLACIÓN
INSTALACIÓN DE POZO DE PERCOLACION und70.01 5.00 561.04 2,805.20
71 TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO m271.01 23.41 1.42 33.24
LIMPIEZA DE TERRENO MANUAL M2.71.02 23.41 3.53 82.64
72 MOVIMIENTO DE TIERRAS
EXCAVACIONES CORTES EN TERRENO CONGLOMERADO A PULSO M3.72.01 74.91 37.81 2,832.35
REFINE Y NIVELACION DE TERRENO NORMAL m272.02 31.13 2.23 69.42
ACARREO DE MATERIAL EXCEDENTE DPROM =30M m372.03 101.53 17.78 1,805.20
ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANO m372.04 101.53 35.14 3,567.76
73 OBRAS DE CONCRETO SIMPLE
SOLADO PARA TANQUE SÉPTICO DE 0.075m MEZCLA 1:12
CEMENTO-HORMIGON
m273.01 2.34 28.55 66.81
74 OBRAS DE CONCRETO ARMADO
75 LOSA DE CIMENTACIÓN
CONCRETO EN LOSA DE FONDO f' c = 210 Kg/cm2 m375.01 8.92 347.00 3,095.24
ACERO f'y=4200 KG/CM2 kg75.02 386.85 4.28 1,655.72
76 MUROS
MURO DE CONCRETO F'C=210 KG/CM2 m376.01 9.90 433.94 4,296.01
ENCOFRADO Y DESENCOFRADO DE MUROS m276.02 101.53 51.04 5,182.09
ACERO f'y=4200 KG/CM2 kg76.03 652.33 4.28 2,791.97
77 LOSA DE TECHO
CONCRETO EN LOSA DE TECHO F'C=210 KG/CM2 m377.01 4.44 360.27 1,599.60
ENCOFRADO Y DESENCOFRADO DE LOSAS m277.02 19.59 41.92 821.21
ACERO f'y=4200 KG/CM2 kg77.03 475.38 4.28 2,034.63
78 REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES m278.01 84.73 19.34 1,638.68
79 INSTALACIONES SANITARIAS
TEE PVC-SP 6° und79.01 2.00 21.61 43.22
Tubería PVC-U UF NTP ISO 4435 S-25 DN 160 ML79.02 45.00 36.42 1,638.90
80 TRABAJOS PRELIMINARES
05/12/2018 15:34:29Fecha :
S10 Página 6
.
Presupuesto
MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO
EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE
JUNIN
Presupuesto 0702073
MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente
Lugar JUNIN - CHANCHAMAYO - PERENE
Precio S/. Parcial S/.Item Descripción Und. Metrado
LIMPIEZA DE TERRENO MANUAL m280.01 35.45 1.33 47.15
TRAZO Y REPLANTEO PRELIMINAR m280.02 35.45 1.42 50.34
81 MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA MANUAL M3.81.01 179.75 37.81 6,796.35
ACARREO DE MATERIAL EXCEDENTE dprom=30m E= 30% m381.02 233.67 17.78 4,154.65
82 OBRAS DE CONCRETO SIMPLE
ANILLO DE CONCRETO f'c= 175 KG/CM2 m382.01 37.64 311.83 11,737.28
ENCOFRADO Y DEDESENCOFRADO DE ANILLO m282.02 8.78 21.01 184.47
83 OBRAS DE CONCRETO ARMADO
84 LOSA SUPERIOR
CONCRETO EN LOSA DE TECHO F'C=210 KG/CM2 m384.01 19.05 360.27 6,863.14
ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m284.02 37.64 41.92 1,577.87
ACERO f'y=4200 KG/CM2 kg84.03 431.45 4.28 1,846.61
TAPA DE CONCRETO DE 0.60m X 0.60m und84.04 3.00 38.81 116.43
CAJA DE REGISTRO DE DESAGÜE 12" X 24" und84.05 3.00 158.15 474.45
85 MUROS Y TABIQUES DE ALBAÑILERIA
MUROS DE LADRILLO CORRIENTE DE CABEZA EN POZO PERCOLADOR m285.01 124.34 56.88 7,072.46
86 INSTALACIONES SANITARIAS
TEE PVC SAL 4" und86.01 24.00 21.61 518.64
TUBERIA DE PVC SAL 4" ML86.02 60.00 15.80 948.00
87 FILTROS
FILTRO DE GRAVA m387.01 72.44 201.27 14,580.00
88 CERCO PERIMETRICO
CERCO PERIMÉTRICO ML.88.01 150.00 38.61 5,791.50
89 CONTROL DE CALIDAD
PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO und89.01 5.00 20.83 104.15
DISEÑO DE MEZCLA DE CONCRETO und89.02 1.00 208.32 208.32
90 FLETE
FLETE TERESTRE GLB90.01 1.00 28,000.00 28,000.00
COSTO DIRECTO 802,099.36
GASTOS GENERALES 5% 40,104.97
UTILIDAD 5% 40,104.97
SUB TOTAL 882,309.30
IGV 18% 158,815.67
VALOR REFERENCIAL DE OBRA 1,041,124.97
SUPERVISION 2.5% 26,028.12
EXPEDIENTE TECNICO 1.5% 15,616.87
TOTAL PRESUPUESTO 1,082,769.96
05/12/2018 15:34:29Fecha :

More Related Content

Similar to MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE

Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Oleg Buyanov
 
Valorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonValorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonEdd Leo G
 
Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999 b3ge14000-99...
Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999  b3ge14000-99...Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999  b3ge14000-99...
Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999 b3ge14000-99...didkkskdmdm
 

Similar to MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE (10)

Lista de precios iccu 2016
Lista de precios iccu 2016 Lista de precios iccu 2016
Lista de precios iccu 2016
 
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
 
Acquisition management
Acquisition management Acquisition management
Acquisition management
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
 
Estructuras METRADO
Estructuras METRADOEstructuras METRADO
Estructuras METRADO
 
Pres 001
Pres 001Pres 001
Pres 001
 
Valorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonValorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddson
 
Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999 b3ge14000-99...
Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999  b3ge14000-99...Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999  b3ge14000-99...
Massey ferguson th.6030 st3 a telescopic handler (b3gd14000 999 b3ge14000-99...
 
Acquisition management
Acquisition managementAcquisition management
Acquisition management
 
Te 300 2017 chassis
Te 300 2017 chassisTe 300 2017 chassis
Te 300 2017 chassis
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE

  • 1. S10 Página 1 . Presupuesto MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE JUNIN Presupuesto 0702073 MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente Lugar JUNIN - CHANCHAMAYO - PERENE Precio S/. Parcial S/.Item Descripción Und. Metrado 01 TRABAJOS PRELIMINARES CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und01.01 1.00 1,129.18 1,129.18 TRAZO Y REPLANTEO INICIAL m01.02 3,331.50 1.40 4,664.10 SEÑALIZACION PARA LIMITE DE SEGURIDAD VIAL (4 USOS). m01.03 200.00 9.43 1,886.00 02 TRABAJOS PRELIMINARES 38.70 TRAZO Y REPLANTEO DURANTE EL PROCESO m202.01 3.80 2.34 8.89 LIMPIEZA DE TERRENO A MANO m202.02 13.80 2.16 29.81 03 MOVIMIENTO DE TIERRAS 156.72 EXCAVACION MANUAL DE ZANJAS M3.03.01 1.15 35.98 41.38 FILTRO DE GRAVA m303.02 0.46 201.27 92.58 ELIMINACION DE MATERIAL EXCEDENTE dprom= 30m m303.03 1.29 17.64 22.76 04 OBRAS DE CONCRETO 1,513.91 SOLADO E=4" M2.04.01 3.35 24.38 81.67 CONCRETO F' C = 175 Kg/cm2 m304.02 1.49 327.13 487.42 ENCOFRADO Y DESENCOFRADO m204.03 14.72 40.62 597.93 ACERO f'y=4200 KG/CM2 kg04.04 81.05 4.28 346.89 05 REVOQUES Y ENLUCIDOS 208.09 TARRAJEO CON IMPERMEABILIZANTES m205.01 3.15 19.30 60.80 TARRAJEOMORTERO C:A 1:5 m205.02 7.22 20.40 147.29 06 ACCESORIOS 200.28 ACCESORIOS CJA. DE CAPTACION und06.01 1.00 200.28 200.28 07 TRABAJOS PRELIMINARES 3,011.25 TRAZO Y REPLANTEO ML07.01 4,125.00 0.73 3,011.25 08 MOVIMIENTO DE TIERRAS 94,545.00 EXCAVACION DE ZANJAS EN TERRENO NORMAL ML08.01 4,125.00 13.24 54,615.00 REFINE Y NIVELACION DE ZANJAS EN TERR. NORMAL ML08.02 4,125.00 2.12 8,745.00 CAMA DE APOYO ML08.03 4,125.00 4.29 17,696.25 RELLENO Y COMP.ZANJAS ML.08.04 4,125.00 3.27 13,488.75 09 SUMINISTRO E INSTALACION DE TUBERIAS 23,040.27 TUBERIA PVC SAP CLASE- 7.5 2" ML09.01 1,558.50 6.22 9,693.87 TUBERIA PVC SAP CLASE-10 1 1/2" m09.02 867.00 11.26 9,762.42 TUBERIA PVC SAP CLASE- 10 1" ML09.03 102.50 5.75 589.38 TUBERIA PVC. SAP DE Ø 3/4" ML09.04 690.00 4.34 2,994.60 10 SUMINISTRO E INSTALACION DE ACCESORIOS 3,963.91 ACCESORIOS TUBERIA CONDUCCION und10.01 1.00 693.11 693.11 PRUEBA HIDRAULICA ML10.02 3,145.00 1.04 3,270.80 11 INSTALACIONES DOMICILIARIAS 12 MOVIMIENTO DE TIERRAS 9,270.10 EXCAVACION DE ZANJAS EN TERRENO NORMAL ML12.01 415.00 15.13 6,278.95 REFINE Y NIVELACION DE ZANJAS EN TERR. NORMAL ML12.02 415.00 2.12 879.80 CAMA DE APOYO PARA TUBERÍAS ML12.03 415.00 1.12 464.80 RELLENO Y COMP.ZANJAS ML.12.04 415.00 4.24 1,759.60 13 SUMINISTRO E INSTALACION DE TUBERIAS 14,388.10 TUBERIA PVC. SAP DE Ø 1/2" ML13.01 415.00 9.29 3,855.35 CAJA DE MEDIDOR und13.02 60.00 106.95 6,417.00 ACCESORIOS CONEXIONES DOMICILIARIAS und13.03 60.00 69.37 4,162.20 14 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO A MANO m214.01 24.75 2.16 53.46 TRAZO REPLANTEO PRELIMINAR m214.02 24.75 2.87 71.03 15 MOVIMIENTO DE TIERRAS EXCAVACIÓN DE ZANJAS m315.01 15.67 42.35 663.62 NIVELACIÓN Y APISONADO m215.02 27.22 1.32 35.93 ACARREO DE MATERIAL EXCEDENTE dprom= 30m m315.03 19.24 17.64 339.39 16 OBRAS DE CONCRETO SIMPLE SOLADO f'c= 100 Kg/cm2 E=4" M2.16.01 25.74 24.38 627.54 05/12/2018 15:34:29Fecha :
  • 2. S10 Página 2 . Presupuesto MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE JUNIN Presupuesto 0702073 MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente Lugar JUNIN - CHANCHAMAYO - PERENE Precio S/. Parcial S/.Item Descripción Und. Metrado 17 OBRAS DE CONCRETO ARMADO 18 RESERVORIO LOSA DE FONDO CONCRETO EN LOSA DE FONDO f' c = 210 Kg/cm2 m318.01 6.19 340.93 2,110.36 ENCOFRADO Y DESENCOFRADO m218.02 5.00 40.62 203.10 ACERO f'y=4200 KG/CM2 kg18.03 446.69 4.28 1,911.83 19 RESERVORIO MUROS CONCRETO f' c = 210 Kg/cm2 m319.01 7.56 422.51 3,194.18 ENCOFRADO Y DESENCOFRADO m219.02 56.16 40.62 2,281.22 ACERO f'y=4200 KG/CM2 kg19.03 826.06 4.28 3,535.54 20 RESERVORIO LOSA SUPERIOR CONCRETO F'C=210 KG/CM2 m320.01 2.65 413.34 1,095.35 ENCOFRADO Y DESENCOFRADO m220.02 2.52 40.62 102.36 ACERO f'y=4200 KG/CM2 kg20.03 137.76 4.28 589.61 21 TAPA DE RESERVORIO CONCRETO F'C=210 KG/CM2 m321.01 0.09 370.99 33.39 ENCOFRADO Y DESENCOFRADO m221.02 0.64 40.62 26.00 ACERO f'y=4200 KG/CM2 kg21.03 7.17 4.28 30.69 22 CASETA DE VALVULAS CONCRETO F'C=210 KG/CM2 m322.01 0.69 370.99 255.98 ENCOFRADO Y DESENCOFRADO m222.02 6.52 40.62 264.84 ACERO f'y=4200 KG/CM2 kg22.03 26.68 4.28 114.19 23 TAPA CASETA DE VALVULAS CONCRETO F'C=210 KG/CM2 m323.01 0.06 370.99 22.26 ENCOFRADO Y DESENCOFRADO m223.02 1.24 40.62 50.37 ACERO f'y=4200 KG/CM2 kg23.03 6.34 4.28 27.14 24 REVOQUES Y ENLUCIDOS TARRAJEO CON IMPERMEABILIZANTES EN INT. DE RESERVORIO m224.01 40.12 36.78 1,475.61 TARRAJEO EN EXT. DE RESERVORIO CON C:A 1:5 M2.24.02 51.84 22.86 1,185.06 TARRAJEO EN CASETA DE VALVULAS m224.03 4.28 36.89 157.89 25 PINTURA PINTURA LATEX EN EXTERIOR DE RESERVORIO m225.01 51.84 6.82 353.55 PINTURA LATEX EN EXTERIOR DE CASETA DE VÁLVULAS m225.02 4.28 6.38 27.31 26 ACCESORIOS ACCESORIOS DE RESERVORIO und26.01 1.00 679.54 679.54 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und26.02 1.00 406.55 406.55 27 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO A MANO m227.01 3.80 2.12 8.06 TRAZO, NIVELACION PRELIMINAR m227.02 3.80 2.07 7.87 28 MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS P/CAJA DE VALVULA M3.28.01 3.80 35.30 134.14 ELIMINACION DE MATERIAL EXCEDENTE m328.02 4.94 17.64 87.14 29 OBRAS DE CONCRETO ARMADO CONCRETO F' C = 175 Kg/cm2 m329.01 2.42 423.02 1,023.71 ENCOFRADO Y DESENCOFRADO m229.02 21.33 33.33 710.93 ACERO f'y=4200 KG/CM2 kg29.03 81.00 4.54 367.74 30 ACCESORIOS 31 VALVULAS VALVULA DE 3/4" und31.01 3.00 110.36 331.08 VALVULA COMPUERTA DE BRONCE ROSCADA DE 1" und31.02 2.00 97.41 194.82 VALVULA COMPUERTA DE BRONCE ROSCADA DE 11/2" und31.03 2.00 160.59 321.18 VALVULA COMPUERTA DE BRONCE ROSCADA DE 2" und31.04 3.00 254.32 762.96 VALVULA AIRE DE 2" DE 2" und31.05 2.00 254.32 508.64 32 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2.32.01 28.00 1.35 37.80 TRAZO Y REPLANTEO M2.32.02 28.00 1.54 43.12 05/12/2018 15:34:29Fecha :
  • 3. S10 Página 3 . Presupuesto MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE JUNIN Presupuesto 0702073 MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente Lugar JUNIN - CHANCHAMAYO - PERENE Precio S/. Parcial S/.Item Descripción Und. Metrado 33 MOVIMIENTO DE TIERRAS EXCAVACIÓN MANUAL M3.33.01 22.50 35.30 794.25 ELIMINACION DE MATERIAL EXCEDENTE m333.02 26.00 17.64 458.64 34 OBRAS DE CONCRETO SIMPLE CONCRETO F'C= 140 KG/CM2 CÁMARA DE ANCLAJE M3.34.01 12.00 239.75 2,877.00 35 OBRAS DE CONCRETO ARMADO 36 ZAPATAS CONCRETO EN ZAPATAS f'c= 210 KG/CM2 m336.01 5.60 331.53 1,856.57 ACERO f'y=4200 KG/CM2 kg36.02 134.38 4.54 610.09 37 COLUMNAS CONCRETO f'c= 210 KG/CM2 COLUMNAS M3.37.01 3.25 299.11 972.11 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m237.02 26.00 36.69 953.94 ACERO f'y=4200 KG/CM2 kg37.03 283.04 4.54 1,285.00 38 REVOQUES Y ENLUCIDOS TARRAJEO EN SUPERFICIE DE COLUMNAS/MORTERO C:A 1:5 m238.01 24.00 18.06 433.44 39 PINTURA PINTURA ESMALTE EN SUPERFICIE DE COLUMNAS M2.39.01 24.00 8.58 205.92 40 VARIOS CABLE DE ACERO D=1/2" TIPO BOA, CABLE PRINCIPAL ML.40.01 206.00 24.92 5,133.52 PENDOLAS DE FIERRO LISO D=1/2" CON TEMPLADORES und40.02 90.00 68.69 6,182.10 GUARDA CABLE D=1/2" und40.03 2.00 72.63 145.26 GRAPA MODIFICADA PLATINA 1/2" und40.04 4.00 14.72 58.88 TUBERÍA DE HDP DE 2" ML.40.05 186.50 12.27 2,288.36 APOYO DESLIZANTE-CARRO DE DILATACIÓN INC/ACCESORIOS und40.06 2.00 198.41 396.82 VARILLA DE ANCLAJE FºGº D=1/2"" und40.07 2.00 67.97 135.94 ACCESORIOS DE TUBERÍAS (TRANSIC. PVC UNIONHDPE) und40.08 8.00 65.56 524.48 TEMPLADOR DE 1/2" und40.09 2.00 160.18 320.36 41 TRABAJOS PRELIMINARES 2,782.41 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS/ML m41.01 1,520.44 1.83 2,782.41 42 MOVIMIENTO DE TIERRAS 31,670.76 EXCAVACION A PULSO T.N. HASTA 1.5M ML42.01 1,520.44 15.13 23,004.26 REFINE Y NIVELACION ZANJA TERR. NORMAL M42.02 1,520.44 2.16 3,284.15 CAMA DE APOYO EN TERRENO NORMAL m42.03 1,520.44 2.12 3,223.33 RELLENO Y COMPACT. ZANJA, HASTA 1.50 M m42.04 1,520.44 1.42 2,159.02 43 SUMUNISTRO E INSTALACION DE TUBERIAS 35,383.63 SUMINISTRO E INSTALACION DE TUBERIA PVC. UF, 160mm. m43.01 1,520.44 23.25 35,350.23 SUMINISTRO E INSTALACION DE TUBERIA PVC. UF, 200mm. m43.02 1.00 33.40 33.40 44 PRUEBAS DE TUBERIAS 3,177.72 PRUEBA HIDRAULICA+ESCORRENTIA DE TUB. m44.01 1,520.44 2.09 3,177.72 45 CONSTRUCCION DE BUZONES 73,206.54 EXCAVACION MANUAL P/BUZONES H=1.50m prof. M3.45.01 90.45 43.18 3,905.63 CONSTRUCCION DE BUZON STANDARD HASTA 1.5M und45.02 30.00 2,230.21 66,906.30 ELIMINACION DE MATERIAL EXCEDENTE m345.03 113.06 21.18 2,394.61 46 INSTALACIONES DOMICILIARIAS 17,111.00 EXCAVACION A PULSO T.N. HASTA 1.5M ML46.01 200.00 21.18 4,236.00 REFINE Y NIVELACION ZANJA TERR. NORMAL M46.02 200.00 2.16 432.00 CAMA DE APOYO EN TERRENO NORMAL m46.03 200.00 2.12 424.00 TUBERIA DE PVC SAL 4" ML46.04 200.00 16.33 3,266.00 EMPALME DE TUBERIA DE CAJA A RED DEDESAGUE und46.05 50.00 175.06 8,753.00 47 VARIOS 208.30 PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO und47.01 10.00 20.83 208.30 48 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m248.01 517.45 0.27 139.71 TRAZO Y REPLANTEO m248.02 517.45 1.52 786.52 49 MOVIMIENTO DE TIERRAS 05/12/2018 15:34:29Fecha :
  • 4. S10 Página 4 . Presupuesto MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE JUNIN Presupuesto 0702073 MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente Lugar JUNIN - CHANCHAMAYO - PERENE Precio S/. Parcial S/.Item Descripción Und. Metrado EXCAVACION MANUAL EN TERRENO NORMAL m349.01 134.01 17.64 2,363.94 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO m349.02 26.15 24.31 635.71 ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA D PROM. 30M M3.49.03 129.44 17.64 2,283.32 NIVELACION INTERIOR Y APISONADO m249.04 168.00 16.78 2,819.04 50 OBRAS DE CONCRETO SIMPLE CIMIENTO CORRIDO 1:10 + 30% PG m350.01 79.20 222.86 17,650.51 SOBRECIMIENTO 1:8 + 25% PM m350.02 18.40 257.14 4,731.38 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO m250.03 287.10 29.42 8,446.48 CONCRETO EN COLUMNAS F C=140 KG/CM2(MURO DE DUCHA) m350.04 0.70 383.83 268.68 ENCOFRADO Y DEDESENCOFRADO SARDINEL DE DUCHA m250.05 28.00 29.42 823.76 51 OBRAS DE CONCRETO ARMADO 52 COLUMNAS CONCRETO EN COLUMNAS F'C=210 KG/CM2 m352.01 9.73 383.83 3,734.67 ACERO f'y=4200 KG/CM2 kg52.02 1,973.04 4.54 8,957.60 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m252.03 181.60 34.76 6,312.42 53 VIGAS CONCRETO EN VIGAS f'c=210 KG/CM2 m353.01 7.41 336.53 2,493.69 ACERO f'y=4200 KG/CM2 kg53.02 732.30 4.54 3,324.64 ENCOFRADO Y DESENCOFRADO EN VIGAS m253.03 89.50 42.11 3,768.85 54 LOSA DE TECHO DE CAMARA COMPOSTERA CONCRETO CONCRETO PARA LOSA f'c=210 KG/CM2 m354.01 6.59 336.53 2,217.73 ACERO f'y=4200 KG/CM2 kg54.02 718.48 4.54 3,261.90 ENCOFRADO Y DESENCOFRADO P/LOSA m254.03 105.00 42.11 4,421.55 55 ALBAÑILERIA MURO DE LADRILLO KK 9X12X24 APAREJO DE SOGA C/M 1:5 X 1.5CM m255.01 624.40 49.19 30,714.24 MURO DE LADRILLO DE CANTO C/M 1:4 X 1.5 CM m255.02 48.00 38.87 1,865.76 56 REVOQUES Y ENLUCIDOS TARRAJEO FROTACHADO EN INTERIORES m256.01 376.03 21.57 8,110.97 TARRAJEO FROTACHADO DE EXTERIORES m256.02 282.46 18.76 5,298.95 TARRAJEO CON IMPERMEBILIZANTE ACABADO CEMENTO PULIDO M2.56.03 681.00 26.93 18,339.33 TARRAJEO DE SARDINEL DE DUCHA C/CEMENTO PULIDO m256.04 32.40 18.76 607.82 DERRAMES EN COLUMNAS EXTERIORES, mez. C:A 1:4, e=1.5 cm ML56.05 521.00 8.05 4,194.05 DERRAMES EN VIGAS EXTERIORES, mez. C:A 1:4, e=1.5 cm ML56.06 982.50 8.05 7,909.13 BRUÑA DE e= 1cm EN MUROS ML56.07 421.50 4.50 1,896.75 57 PISOS Y PAVIMENTOS CONCRETO f'c=140 Kg/cm2 (PISO DE CONCRETO) m257.01 16.80 13.02 218.74 VEREDA DE CONCRETO e=4" m257.02 300.07 36.22 10,868.54 ENCOFRADO Y DESENCOFRADO PARA VEREDA m257.03 66.83 42.11 2,814.21 PISO INTERIOR C/ACABADO CEMENTO PULIDO m257.04 213.75 26.45 5,653.69 58 CARPINTERIA DE MADERA PUERTA DE CALAMINA CON MARCO DE MADERA PARA CASETA und58.01 50.00 177.00 8,850.00 VENTANA DE MADERA INC. MALLA MOSQUITERO PARA CASETA m258.02 62.40 61.24 3,821.38 59 COBERTURA DE CASETA VIGA DE MADERA TORNILLO O SIMILAR 2" X 3" X 2.90 M und59.01 150.00 80.09 12,013.50 VIGA DE MADERA TORNILLO 2" X 2" X 2.90 M und59.02 100.00 80.09 8,009.00 CORREA DE MADERA TORNILLO DE 2" X 2" L=3.65M und59.03 250.00 80.67 20,167.50 COBERTURA CON CALAMINA GALVANIZADA M2.59.04 529.25 27.67 14,644.35 60 PINTURA PINTURA EN MUROS EXTERIORES E INTERIORES(DOS MANOS) m260.01 282.46 8.14 2,299.22 PINTURA LATEX EN CONTRAZOCALO m260.02 93.75 12.15 1,139.06 PINTURA DE PUERTA Y VENTANA (DOS MANOS) m260.03 136.67 11.77 1,608.61 61 INSTALACIONES SANITARIAS 62 SISTEMA DE AGUA FRIA SALIDA DE AGUA FRIA PVC 1/2" ML62.01 390.00 3.44 1,341.60 63 ACCESORIOS DE REDES 05/12/2018 15:34:29Fecha :
  • 5. S10 Página 5 . Presupuesto MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE JUNIN Presupuesto 0702073 MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente Lugar JUNIN - CHANCHAMAYO - PERENE Precio S/. Parcial S/.Item Descripción Und. Metrado Codo F°G° 1/2" x 90° und63.01 150.00 21.11 3,166.50 Codo PVC 1/2" x 90° und63.02 350.00 13.07 4,574.50 TEE PVC-SAP 1/2" und63.03 100.00 13.87 1,387.00 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und63.04 50.00 79.84 3,992.00 PRUEBA HIDRÁULICA Y DESINFECCION EN REDES DE AGUA ML.63.05 390.00 0.41 159.90 DUCHA und63.06 50.00 71.16 3,558.00 64 SISTEMA DE DESAGUE TUBERIA DE PVC SAL 2" ML64.01 313.00 15.24 4,770.12 TUBERIA DE PVC SAL 4" ML64.02 300.00 20.21 6,063.00 65 ACCESORIOS PARA SISTEMA DE DESAGÜE CODO PVC SAL 2"X90° und65.01 250.00 12.16 3,040.00 CODO PVC SAL 2"X45° und65.02 150.00 20.61 3,091.50 YEE PVC SAL 2" und65.03 100.00 20.61 2,061.00 66 APARATOS Y ACCESORIOS SANITARIOS INODORO TANQUE BAJO BLANCO und66.01 2.00 156.21 312.42 LAVATORIO DE PARED BLANCO und66.02 2.00 79.81 159.62 67 SALIDA DE DESAGUE Y VENTILACION SALIDA DE VENTILACION PVC SAL DE 2" pto67.01 50.00 21.83 1,091.50 68 ADITAMENTOS VARIOS SUMIDERO DE 2" und68.01 2.00 43.47 86.94 REGISTRO DE BRONCE 2" und68.02 50.00 36.95 1,847.50 SOMBRERO VENTILACION PVC DE 2" und68.03 2.00 9.05 18.10 69 CAMARAS DE INSPECCION CAJA DE REGISTRO DE DESAGUE 12" X 24" und69.01 50.00 105.25 5,262.50 BIODIGESTOR und69.02 5.00 1,079.63 5,398.15 70 INSTALACION DE POZO DE PERCOLACIÓN INSTALACIÓN DE POZO DE PERCOLACION und70.01 5.00 561.04 2,805.20 71 TRABAJOS PRELIMINARES TRAZO Y REPLANTEO m271.01 23.41 1.42 33.24 LIMPIEZA DE TERRENO MANUAL M2.71.02 23.41 3.53 82.64 72 MOVIMIENTO DE TIERRAS EXCAVACIONES CORTES EN TERRENO CONGLOMERADO A PULSO M3.72.01 74.91 37.81 2,832.35 REFINE Y NIVELACION DE TERRENO NORMAL m272.02 31.13 2.23 69.42 ACARREO DE MATERIAL EXCEDENTE DPROM =30M m372.03 101.53 17.78 1,805.20 ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANO m372.04 101.53 35.14 3,567.76 73 OBRAS DE CONCRETO SIMPLE SOLADO PARA TANQUE SÉPTICO DE 0.075m MEZCLA 1:12 CEMENTO-HORMIGON m273.01 2.34 28.55 66.81 74 OBRAS DE CONCRETO ARMADO 75 LOSA DE CIMENTACIÓN CONCRETO EN LOSA DE FONDO f' c = 210 Kg/cm2 m375.01 8.92 347.00 3,095.24 ACERO f'y=4200 KG/CM2 kg75.02 386.85 4.28 1,655.72 76 MUROS MURO DE CONCRETO F'C=210 KG/CM2 m376.01 9.90 433.94 4,296.01 ENCOFRADO Y DESENCOFRADO DE MUROS m276.02 101.53 51.04 5,182.09 ACERO f'y=4200 KG/CM2 kg76.03 652.33 4.28 2,791.97 77 LOSA DE TECHO CONCRETO EN LOSA DE TECHO F'C=210 KG/CM2 m377.01 4.44 360.27 1,599.60 ENCOFRADO Y DESENCOFRADO DE LOSAS m277.02 19.59 41.92 821.21 ACERO f'y=4200 KG/CM2 kg77.03 475.38 4.28 2,034.63 78 REVOQUES Y ENLUCIDOS TARRAJEO CON IMPERMEABILIZANTES m278.01 84.73 19.34 1,638.68 79 INSTALACIONES SANITARIAS TEE PVC-SP 6° und79.01 2.00 21.61 43.22 Tubería PVC-U UF NTP ISO 4435 S-25 DN 160 ML79.02 45.00 36.42 1,638.90 80 TRABAJOS PRELIMINARES 05/12/2018 15:34:29Fecha :
  • 6. S10 Página 6 . Presupuesto MEJORAMIENTO DEL SERVICIO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO SANITARIO EN EL ANEXO DE BUENA VISTA DEL DISTRITO DE PERENE - PROVINCIA DE CHANCHAMAYO - DEPARTAMENTO DE JUNIN Presupuesto 0702073 MUNICIPALIDAD DISTRITAL DE PERENE 28/11/2018Costo alCliente Lugar JUNIN - CHANCHAMAYO - PERENE Precio S/. Parcial S/.Item Descripción Und. Metrado LIMPIEZA DE TERRENO MANUAL m280.01 35.45 1.33 47.15 TRAZO Y REPLANTEO PRELIMINAR m280.02 35.45 1.42 50.34 81 MOVIMIENTO DE TIERRAS EXCAVACION MASIVA MANUAL M3.81.01 179.75 37.81 6,796.35 ACARREO DE MATERIAL EXCEDENTE dprom=30m E= 30% m381.02 233.67 17.78 4,154.65 82 OBRAS DE CONCRETO SIMPLE ANILLO DE CONCRETO f'c= 175 KG/CM2 m382.01 37.64 311.83 11,737.28 ENCOFRADO Y DEDESENCOFRADO DE ANILLO m282.02 8.78 21.01 184.47 83 OBRAS DE CONCRETO ARMADO 84 LOSA SUPERIOR CONCRETO EN LOSA DE TECHO F'C=210 KG/CM2 m384.01 19.05 360.27 6,863.14 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m284.02 37.64 41.92 1,577.87 ACERO f'y=4200 KG/CM2 kg84.03 431.45 4.28 1,846.61 TAPA DE CONCRETO DE 0.60m X 0.60m und84.04 3.00 38.81 116.43 CAJA DE REGISTRO DE DESAGÜE 12" X 24" und84.05 3.00 158.15 474.45 85 MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO CORRIENTE DE CABEZA EN POZO PERCOLADOR m285.01 124.34 56.88 7,072.46 86 INSTALACIONES SANITARIAS TEE PVC SAL 4" und86.01 24.00 21.61 518.64 TUBERIA DE PVC SAL 4" ML86.02 60.00 15.80 948.00 87 FILTROS FILTRO DE GRAVA m387.01 72.44 201.27 14,580.00 88 CERCO PERIMETRICO CERCO PERIMÉTRICO ML.88.01 150.00 38.61 5,791.50 89 CONTROL DE CALIDAD PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO und89.01 5.00 20.83 104.15 DISEÑO DE MEZCLA DE CONCRETO und89.02 1.00 208.32 208.32 90 FLETE FLETE TERESTRE GLB90.01 1.00 28,000.00 28,000.00 COSTO DIRECTO 802,099.36 GASTOS GENERALES 5% 40,104.97 UTILIDAD 5% 40,104.97 SUB TOTAL 882,309.30 IGV 18% 158,815.67 VALOR REFERENCIAL DE OBRA 1,041,124.97 SUPERVISION 2.5% 26,028.12 EXPEDIENTE TECNICO 1.5% 15,616.87 TOTAL PRESUPUESTO 1,082,769.96 05/12/2018 15:34:29Fecha :