ISLAND SCHOOL REDEVELOPMENT
               Sustainable Building Design
                      Workshop Part 2
                              19 SEPT. 2012
TODAY’S CONTENT
                                                                                       2PM
1. Briefing Session:-   Objective of Workshop         By RLP              25 mins.


2. Tasks Session:-   Work in 3 Groups                 By YOU              45 mins.


3. Presentation Session:-     Presented by 3 Groups
                                                      By YOU   [10+10+10] = 30 mins.


4. Conclusion Session:-    Wrap-Up + Q&A
                                                      By ALL              15 mins.

                                                                                       4PM
THE SCHEME
Consolidated Design Based On Previous Workshops
Testing on Borrett Road Site

                               Special room clusters
                      OA   D
            BORRETT R




           Typical classroom clusters
                                                   Flexibility
                                                   to suit variety
                                                of teaching modes
Testing on Borrett Road Site

                               Special room clusters
                      OA   D
            BORRETT R




           Typical classroom clusters
                                                   Flexibility
                                                  Breakout spaces
COACH / VEHICLE
                                                           PARKING & ENTRY
                                     PEDESTRAIN ENTRANCE
                     OAD
           BORRETT R
                                                     DROP OFF
                                   SEN               ENTRANCE    +138.0



                                                                                                UNEXCAVATED
                                                                                                   AREA




                                                                             DRAINAGE RESERVE
         MECHANICAL
                           SPORTS HALL
         PLANT ROOM                              CAR                COACH
                                               PARKING             PARKING




                                         UNEXCAVATED AREA
                                                                                                              CHANGING ROOM

                                                                                                              STAIRS




G/F PLAN (+138.0)
BORRETT ROAD

                        IO      DANCE ROOM, WEIGHTS
               &   CAR D
          GY M                  ROOM, PE CLASSROOM




                             SPORT
                              HALL                          COACH
                                               SWIMMING
     MECHANICAL              BELOW                         PARKING
                                                 POOL
     PLANT ROOM                                             BELOW




                                 POSSIBLE AREA FOR
                                    HYDROPOOL
                                                     UNEXCAVATED AREA
                                                                        CHANGING ROOM

                                                                        STAIRS




LEVEL 1 PLAN (+142.5)
BORRETT ROAD

                               KITCHEN & CANTEEN                   ACCESS TO
            SEATING AREA
           NEXT TO CANTEEN                                        AUDITORIUM     MUSIC
                                                                               AUDITORIUM
               BREAKOUT
               TO SEATING
                  AREA
                              SPORT HALL &
       STAFF                 SWIMMING POOL
       ROOM                      BELOW
                                                       DRAMA
                                                      STUDIO &
                                                      BLACKBOX



                                     UNEXCAVATED AREA
                                                                                            TOILETS

                                                                                            STAIRS




LEVEL 2 PLAN (+147.0)
BORRETT ROAD

                              HOUSE              CAFE       HOUSE
                                                                            MUSIC
                                                                          AUDITORIUM
                                              HOUSE
                 7 ASIDE
              SOCCER FIELD
               (30m x 50m)
                                                                    ENTRANCE PLAZA /
                                 BASKETBALL                          AMPHITHEATRE
                                   COURT
                                                      LRC
                                                                          HOUSE



                             HOUSE            HOUSE                                    STAFF ROOM

                                                                                       TOILETS

                                                            ADMIN                      STAIRS




LEVEL 3 PLAN (+150.0)
BORRETT ROAD

                               SCIENCE & TECHNOLOGY           CREATIVE
                                                                ARTS




                                                    LRC
                                MATH                          ENGLISH



                                                                         STAFF ROOM
                                       HUMANITIES
                                                                         TOILETS

                                                          LANGUAGE       STAIRS




LEVEL 4 (+156.5) & 5 PLAN (+159.5)
BORRETT ROAD
                        SCIENCE & TECHNOLOGY          CREATIVE
                                                        ARTS




                                         SENIOR
                                        STUDENT
                        MATH           COMMONS        ENGLISH
                                          (WITH
                                        PRIVATE
                                        ROOMS)
                                                                 STAFF ROOM
                               HUMANITIES
                                                                 TOILETS

                                                  LANGUAGE       STAIRS




LEVEL 6 PLAN (+162.5)
BORRETT ROAD
                        SCIENCE & TECHNOLOGY         CREATIVE
                                                       ARTS




                        MATH                         ENGLISH



                                                                STAFF ROOM
                               HUMANITIES
                                                                TOILETS

                                                 LANGUAGE       STAIRS




LEVEL 7 PLAN (+165.5)
SENIOR STUDENT   CREATIVE ARTS                     MUSIC
                   COMMONS                                        AUDITORIUM

     SCIENCE &                                                            ENGLISH
    TECHNOLOGY




                                                                               LANGUAGE




                                                                           ADMISSION
     BO OAD
       RR
       R




               LRC
                                                  HUMANITIES
         ET




                                                               HOUSE MEETING ROOM
           T




                            MATHEMATICS
AERIAL VIEW FROM WEST
TODAY’S OBJECTIVES

    To obtain your opinions on   PRIORITY for different applications of Sustainable Building Design.

    To obtain your opinions on   LOCATIONS at New Island School of different applications of
Sustainable Building Design.
1.0 BRIEFING
  Sustainable Building Design
by YOU                                                                                                        by YOU
1. Relocation of Existing                                                                        1.   Green Roof
   Furniture/ Sculpture                                                                          2.   Green Wall
2. Recycling of Existing
                                                          Material
                                                           Use                                   3.   Edible Garden
   Materials

                                                          MU
                                                                                                 4.   Planting Area
3.   Application of Recycled Materials
4.   Prefabrication                                                                              5.   Soccer Field
                                                                      Site Aspects
5.   Modular Design                                                                              6.   Environmental Management Plan
6.   Construction/ Demolition Waste                                                              7.   Neighborhood Daylight Access
     Management Plan                                                                             8.   Noise From Building Equipment




                                                                         SA
7.   Waste Reduction                                                                             9.   ……
8.   … ….


                                                Energy Use                                                 1.   Water Quality Survey
                                                                                                           2.   Water Efficient Irrigation
                                                                                     Water Use

                                                    EU
                                                                                                           3.   Water Recycling
                                                                                                           4.   Water Efficient Appliances


                                                                                      WU
                                                                                                           5.   Monitoring and Control
     by YOU                                                              Indoor
                                                                                                           6.   ……

                                                                     Environmental
1. PV Panel                                                             Quality

                                                                       IEQ
2. BIPV Panel
3. Solar Water Tubes
4.   A/C Units                                                                                        1.   Ventilation in Common Areas
5.   Reduction of CO2 Emissions                                                                       2.   Natural Lighting
6.   Operation and Maintenance                                                                        3.   Room Acoustics
7.   Metering and Monitoring                                                                          4.   Noise Isolation
8.   ……                                                                                               5.   Construction IAQ Management
                                                                                                      6.   ……




                                         Five   Categories of   Sustainable Building Design
1
Energy Use                        PhotoVoltaic System   [PV Panels]

  EU
             2
             Building Integrated PhotoVoltaic System   [BIPV Panels]



             3
                Solar Water Heating System   [Solar Water Tubes]
Energy Use
               1            PV Panel
                            [PhotoVoltaic System]

              As Roof Shades


  EU
              To convert sunlight into electricity
              Photovoltaic installation provides the Building
               with part of its Power needs
              More efficient than BIPV Panel
Energy Use

               EU
                   2
        BIPV Panel
[Building Integrated PhotoVoltaic System]
  As Covers with Skylight
  To convert sunlight into electricity
  Photovoltaic installation provides the
   Building with part of its Power needs
  Less efficient than PV Panel
3
    Solar Water Tubes                                      Energy Use
           [Solar Water Heating System]
 As roof shades or covers
 To convert sunlight into electricity for Swimming Pool
  HEATING and AIR-CONDITIONING within the Campus
                                                             EU
1
                 Green Roof
Site Aspects

  SA                                        2
                               Green Wall



                                 3
               Edible Garden


                                            4
                         Planting Area
Green Roof
1    Reduce CO2 emission and Heat Island Effect
     As Insulation of Building Enclosure
     Can act as Outdoor Performing / Exhibition Areas for
                                                             Site Aspects

                                                                SA
      Arts / Music
Site Aspects

           SA

               2
   Green Wall
 To Dress-up Blank Walls
 Can be located at External Wall
 Incorporate Nature into Building
  Design
2                       Site Aspects
  Green Wall
                                         SA
 To Dress-up Blank Walls of
 Can be located at Internal Wall
 Give interior space the character
  of exterior
Site Aspects

             SA

                 3
 Edible Garden
 As Insulation of Building Enclosure
 For Educational Purposes and
  inclusion into School Curriculum
 To Reduce CO2 emission and Heat
  Island Effect
25%
                          4
Site Aspects   Planting Area
   SA
                For Educational Purposes and
                 School Syllabus
                For a Better Environment for
                 School Campus
                To Reduce CO2 emission and
                 Heat Island Effect
Material Use

  MU           1
                             Recycle of Existing Materials




               2
               Relocation of Existing Furniture/ Sculpture
1                   Material Use

       Recycle of
 Existing Materials
                                  MU
 Featured wall at strategic
  locations of the new school
Material Use

          MU

              2
        Relocation of
          Existing
1. Furniture
2. Sculpture, etc.
 Collective memory
 Features at strategic locations
  of the new school
2.0 TASKS
  In THREE Groups
45 mins. TASK




Energy Use      Site Aspects   Material Use

  EU               SA            MU
 Group EU        Group SA        Group MU
Energy Use

  EU
 Group EU
35%
  Energy Use
                   Group EU:-
                   WHAT TO DO… …
     EU
                                                           ?
                              A. PV Panel
                                                         ? 1 ?
                                                         2 3
                              B. BIPV Panel
To do (1): set Priority for   C. Solar Water Tubes




To do (2): preferred Location                    1. on   Model
                                                 2.   on Perspective
1. Mark on Model…
                                                      2. Mark on Perspective…
 Energy Use

     EU
                               POSSIBLE AREA:-
                               Over the Courtyard to
                               create a Semi-Open Space
                                                                                         POSSIBLE AREA:-
                                                                                         Any Roof Top

Group EU:-
POSSIBLE AREAS:-
 Roof Top
 A. PV Panel

 B. BIPV Panel   C. Solar Water Tubes


Group EU’s Consideration:-
                                                            POSSIBLE AREA:-
 Orientation of Massing
                                                            As Sun-Shading Screens for
                                                            Classrooms
1. Mark on Model…
                                        2. Mark on Perspective…
   Energy Use

         EU
                                                   SAY:-
Group EU:-                                  C
                                                             A
CONSTRAINTS                                           B
 Only on 3 Locations

 A. PV Panel

 B. BIPV Panel   C. Solar Water Tubes


Group EU’s Consideration:-
 Orientation of Massing
Site Aspects

   SA
  Group SA
Site Aspects   Group SA:-
     SA          WHAT TO DO… …
                                                 ?
                                               ? 1 ?
                          Green Roof

                          Green Wall

To do (1): set Priority
                                               2 3
                          Edible Garden

                          Planting Area




To do (2): preferred Location             1. on   Model
                                          2.   on Perspective
1. Mark on Model…
                                        2. Mark on Perspective…
  Site Aspects

        SA
Group SA:-
POSSIBLE AREAS:-
Roof Top, Internal Areas [green wall]
                                                        POSSIBLE AREAS:-
 A. Green Roof    C. Edible Garden                      • Roof Top, External Wall
                                                        • Internal Areas [Green Wall]
 B. Green Wall    D. Planting Area                      • Grounds, Open Spaces


Group EU’s Consideration:-
 Orientation of Massing
1. Mark on Model…
                                     2. Mark on Perspective…
    Site Aspects

          SA
                                         C               SAY:-
Group SA:-
                                                                                  A
CONSTRAINTS                          D                         B
 Only on 4 Locations

 A. Green Roof    C. Edible Garden

 B. Green Wall    D. Planting Area
                                          E. SPECIAL TOPIC:-
Group EU’s Consideration:-                Real Grass OR Artificial ?
                                          •   Maintenance Cost
 Orientation of Massing                  •   Operation Schedule/ Opening Hours
Material Use

  MU
   Group MU
Material Use   Group MU:-
    MU           WHAT TO DO… …                Existing    Relocation
                                              Materials   of Existing
                                               To Be      Furniture/
                                              Recycled    Sculpture
                                To Record


To do (1): 30 mins. Site Walk                   1 & 2
To do (2): preferred Location       1. on      Model
                                    2.      on Perspective
1. Mark on Model…
                                      2. Mark on Perspective…
   Material Use

       MU                                         Wall built by
                                                existing Materials




Group MU:-                                                           SAY:-
WHAT & WHERE ?                                                               Sculpture

 A. What to Pick
 B. Where to Put

Group MU’s Consideration:-
 at Entrance/ Common Space or Internal Area?
 items with collective memories?
Energy Use

   EU
     +

Site Aspects

   SA
               Question for All Groups,
     +
               MONITOR for
Material Use   1. Energy Generation &
               2. Energy Consumption
  MU           WHERE to Put?
Mark on Model…          Monitor for Energy
                                      Generation & Consumption

Energy Use

   EU           To be placed at
     +           Courtyard ?


Site Aspects

   SA
     +                                                           To be placed at
                Or Somewhere else ?                              Main Entrance ?
Material Use

  MU
LET’S GO
Group EU, SA & MA
3.0 PRESENTATION
        By Group EU, SA & MA
4.0 CONCLUSION
      Questions & Answers
END
Thank You

More Related Content

More from gwsis

20150122 isr students workshop
20150122 isr students workshop20150122 isr students workshop
20150122 isr students workshop
gwsis
 
Esf island school decant report 100614
Esf island school decant report 100614Esf island school decant report 100614
Esf island school decant report 100614
gwsis
 
Intuition tok 2
Intuition tok 2Intuition tok 2
Intuition tok 2
gwsis
 
Decant workshop 3.9.13
Decant workshop 3.9.13Decant workshop 3.9.13
Decant workshop 3.9.13
gwsis
 
Cas week ppt
Cas week pptCas week ppt
Cas week ppt
gwsis
 
Pshe cas
Pshe casPshe cas
Pshe cas
gwsis
 
Pshe project ark eden powerpoint
Pshe project ark eden powerpointPshe project ark eden powerpoint
Pshe project ark eden powerpoint
gwsis
 
Pshe cas saving the pink dolphins
Pshe cas saving the pink dolphins Pshe cas saving the pink dolphins
Pshe cas saving the pink dolphins
gwsis
 
Saving the dogs
Saving the dogsSaving the dogs
Saving the dogs
gwsis
 
Pshe
PshePshe
Pshe
gwsis
 
Tekfishprezi
TekfishpreziTekfishprezi
Tekfishprezi
gwsis
 
Mothers choice
Mothers choiceMothers choice
Mothers choice
gwsis
 
Cas exhibition
Cas exhibitionCas exhibition
Cas exhibition
gwsis
 
Tok prezis 2013
Tok prezis 2013Tok prezis 2013
Tok prezis 2013
gwsis
 
Students 8 ways thinking q #1
Students 8 ways thinking q #1Students 8 ways thinking q #1
Students 8 ways thinking q #1
gwsis
 
Students 8 ways thinking q #2
Students 8 ways thinking q #2Students 8 ways thinking q #2
Students 8 ways thinking q #2
gwsis
 
Thinking questions final
Thinking questions finalThinking questions final
Thinking questions final
gwsis
 
Thinking questions
Thinking questionsThinking questions
Thinking questions
gwsis
 
Mock trial car accident (1) copy
Mock trial car accident (1) copyMock trial car accident (1) copy
Mock trial car accident (1) copy
gwsis
 
Tok ethics 10.4.13
Tok ethics 10.4.13Tok ethics 10.4.13
Tok ethics 10.4.13
gwsis
 

More from gwsis (20)

20150122 isr students workshop
20150122 isr students workshop20150122 isr students workshop
20150122 isr students workshop
 
Esf island school decant report 100614
Esf island school decant report 100614Esf island school decant report 100614
Esf island school decant report 100614
 
Intuition tok 2
Intuition tok 2Intuition tok 2
Intuition tok 2
 
Decant workshop 3.9.13
Decant workshop 3.9.13Decant workshop 3.9.13
Decant workshop 3.9.13
 
Cas week ppt
Cas week pptCas week ppt
Cas week ppt
 
Pshe cas
Pshe casPshe cas
Pshe cas
 
Pshe project ark eden powerpoint
Pshe project ark eden powerpointPshe project ark eden powerpoint
Pshe project ark eden powerpoint
 
Pshe cas saving the pink dolphins
Pshe cas saving the pink dolphins Pshe cas saving the pink dolphins
Pshe cas saving the pink dolphins
 
Saving the dogs
Saving the dogsSaving the dogs
Saving the dogs
 
Pshe
PshePshe
Pshe
 
Tekfishprezi
TekfishpreziTekfishprezi
Tekfishprezi
 
Mothers choice
Mothers choiceMothers choice
Mothers choice
 
Cas exhibition
Cas exhibitionCas exhibition
Cas exhibition
 
Tok prezis 2013
Tok prezis 2013Tok prezis 2013
Tok prezis 2013
 
Students 8 ways thinking q #1
Students 8 ways thinking q #1Students 8 ways thinking q #1
Students 8 ways thinking q #1
 
Students 8 ways thinking q #2
Students 8 ways thinking q #2Students 8 ways thinking q #2
Students 8 ways thinking q #2
 
Thinking questions final
Thinking questions finalThinking questions final
Thinking questions final
 
Thinking questions
Thinking questionsThinking questions
Thinking questions
 
Mock trial car accident (1) copy
Mock trial car accident (1) copyMock trial car accident (1) copy
Mock trial car accident (1) copy
 
Tok ethics 10.4.13
Tok ethics 10.4.13Tok ethics 10.4.13
Tok ethics 10.4.13
 

20120919 is sustain_presented-2

  • 1. ISLAND SCHOOL REDEVELOPMENT Sustainable Building Design Workshop Part 2 19 SEPT. 2012
  • 2. TODAY’S CONTENT 2PM 1. Briefing Session:- Objective of Workshop By RLP 25 mins. 2. Tasks Session:- Work in 3 Groups By YOU 45 mins. 3. Presentation Session:- Presented by 3 Groups By YOU [10+10+10] = 30 mins. 4. Conclusion Session:- Wrap-Up + Q&A By ALL 15 mins. 4PM
  • 3. THE SCHEME Consolidated Design Based On Previous Workshops
  • 4. Testing on Borrett Road Site Special room clusters OA D BORRETT R Typical classroom clusters Flexibility to suit variety of teaching modes
  • 5. Testing on Borrett Road Site Special room clusters OA D BORRETT R Typical classroom clusters Flexibility Breakout spaces
  • 6. COACH / VEHICLE PARKING & ENTRY PEDESTRAIN ENTRANCE OAD BORRETT R DROP OFF SEN ENTRANCE +138.0 UNEXCAVATED AREA DRAINAGE RESERVE MECHANICAL SPORTS HALL PLANT ROOM CAR COACH PARKING PARKING UNEXCAVATED AREA CHANGING ROOM STAIRS G/F PLAN (+138.0)
  • 7. BORRETT ROAD IO DANCE ROOM, WEIGHTS & CAR D GY M ROOM, PE CLASSROOM SPORT HALL COACH SWIMMING MECHANICAL BELOW PARKING POOL PLANT ROOM BELOW POSSIBLE AREA FOR HYDROPOOL UNEXCAVATED AREA CHANGING ROOM STAIRS LEVEL 1 PLAN (+142.5)
  • 8. BORRETT ROAD KITCHEN & CANTEEN ACCESS TO SEATING AREA NEXT TO CANTEEN AUDITORIUM MUSIC AUDITORIUM BREAKOUT TO SEATING AREA SPORT HALL & STAFF SWIMMING POOL ROOM BELOW DRAMA STUDIO & BLACKBOX UNEXCAVATED AREA TOILETS STAIRS LEVEL 2 PLAN (+147.0)
  • 9. BORRETT ROAD HOUSE CAFE HOUSE MUSIC AUDITORIUM HOUSE 7 ASIDE SOCCER FIELD (30m x 50m) ENTRANCE PLAZA / BASKETBALL AMPHITHEATRE COURT LRC HOUSE HOUSE HOUSE STAFF ROOM TOILETS ADMIN STAIRS LEVEL 3 PLAN (+150.0)
  • 10. BORRETT ROAD SCIENCE & TECHNOLOGY CREATIVE ARTS LRC MATH ENGLISH STAFF ROOM HUMANITIES TOILETS LANGUAGE STAIRS LEVEL 4 (+156.5) & 5 PLAN (+159.5)
  • 11. BORRETT ROAD SCIENCE & TECHNOLOGY CREATIVE ARTS SENIOR STUDENT MATH COMMONS ENGLISH (WITH PRIVATE ROOMS) STAFF ROOM HUMANITIES TOILETS LANGUAGE STAIRS LEVEL 6 PLAN (+162.5)
  • 12. BORRETT ROAD SCIENCE & TECHNOLOGY CREATIVE ARTS MATH ENGLISH STAFF ROOM HUMANITIES TOILETS LANGUAGE STAIRS LEVEL 7 PLAN (+165.5)
  • 13. SENIOR STUDENT CREATIVE ARTS MUSIC COMMONS AUDITORIUM SCIENCE & ENGLISH TECHNOLOGY LANGUAGE ADMISSION BO OAD RR R LRC HUMANITIES ET HOUSE MEETING ROOM T MATHEMATICS AERIAL VIEW FROM WEST
  • 14. TODAY’S OBJECTIVES  To obtain your opinions on PRIORITY for different applications of Sustainable Building Design.  To obtain your opinions on LOCATIONS at New Island School of different applications of Sustainable Building Design.
  • 15. 1.0 BRIEFING Sustainable Building Design
  • 16. by YOU by YOU 1. Relocation of Existing 1. Green Roof Furniture/ Sculpture 2. Green Wall 2. Recycling of Existing Material Use 3. Edible Garden Materials MU 4. Planting Area 3. Application of Recycled Materials 4. Prefabrication 5. Soccer Field Site Aspects 5. Modular Design 6. Environmental Management Plan 6. Construction/ Demolition Waste 7. Neighborhood Daylight Access Management Plan 8. Noise From Building Equipment SA 7. Waste Reduction 9. …… 8. … …. Energy Use 1. Water Quality Survey 2. Water Efficient Irrigation Water Use EU 3. Water Recycling 4. Water Efficient Appliances WU 5. Monitoring and Control by YOU Indoor 6. …… Environmental 1. PV Panel Quality IEQ 2. BIPV Panel 3. Solar Water Tubes 4. A/C Units 1. Ventilation in Common Areas 5. Reduction of CO2 Emissions 2. Natural Lighting 6. Operation and Maintenance 3. Room Acoustics 7. Metering and Monitoring 4. Noise Isolation 8. …… 5. Construction IAQ Management 6. …… Five Categories of Sustainable Building Design
  • 17. 1 Energy Use PhotoVoltaic System [PV Panels] EU 2 Building Integrated PhotoVoltaic System [BIPV Panels] 3 Solar Water Heating System [Solar Water Tubes]
  • 18. Energy Use 1 PV Panel [PhotoVoltaic System]  As Roof Shades EU  To convert sunlight into electricity  Photovoltaic installation provides the Building with part of its Power needs  More efficient than BIPV Panel
  • 19. Energy Use EU 2 BIPV Panel [Building Integrated PhotoVoltaic System]  As Covers with Skylight  To convert sunlight into electricity  Photovoltaic installation provides the Building with part of its Power needs  Less efficient than PV Panel
  • 20. 3 Solar Water Tubes Energy Use [Solar Water Heating System]  As roof shades or covers  To convert sunlight into electricity for Swimming Pool HEATING and AIR-CONDITIONING within the Campus EU
  • 21. 1 Green Roof Site Aspects SA 2 Green Wall 3 Edible Garden 4 Planting Area
  • 22. Green Roof 1  Reduce CO2 emission and Heat Island Effect  As Insulation of Building Enclosure  Can act as Outdoor Performing / Exhibition Areas for Site Aspects SA Arts / Music
  • 23. Site Aspects SA 2 Green Wall  To Dress-up Blank Walls  Can be located at External Wall  Incorporate Nature into Building Design
  • 24. 2 Site Aspects Green Wall SA  To Dress-up Blank Walls of  Can be located at Internal Wall  Give interior space the character of exterior
  • 25. Site Aspects SA 3 Edible Garden  As Insulation of Building Enclosure  For Educational Purposes and inclusion into School Curriculum  To Reduce CO2 emission and Heat Island Effect
  • 26. 25% 4 Site Aspects Planting Area SA  For Educational Purposes and School Syllabus  For a Better Environment for School Campus  To Reduce CO2 emission and Heat Island Effect
  • 27. Material Use MU 1 Recycle of Existing Materials 2 Relocation of Existing Furniture/ Sculpture
  • 28. 1 Material Use Recycle of Existing Materials MU  Featured wall at strategic locations of the new school
  • 29. Material Use MU 2 Relocation of Existing 1. Furniture 2. Sculpture, etc.  Collective memory  Features at strategic locations of the new school
  • 30. 2.0 TASKS In THREE Groups
  • 31. 45 mins. TASK Energy Use Site Aspects Material Use EU SA MU Group EU Group SA Group MU
  • 32. Energy Use EU Group EU
  • 33. 35% Energy Use Group EU:- WHAT TO DO… … EU ? A. PV Panel ? 1 ? 2 3 B. BIPV Panel To do (1): set Priority for C. Solar Water Tubes To do (2): preferred Location 1. on Model 2. on Perspective
  • 34. 1. Mark on Model… 2. Mark on Perspective… Energy Use EU POSSIBLE AREA:- Over the Courtyard to create a Semi-Open Space POSSIBLE AREA:- Any Roof Top Group EU:- POSSIBLE AREAS:- Roof Top A. PV Panel B. BIPV Panel C. Solar Water Tubes Group EU’s Consideration:- POSSIBLE AREA:-  Orientation of Massing As Sun-Shading Screens for Classrooms
  • 35. 1. Mark on Model… 2. Mark on Perspective… Energy Use EU SAY:- Group EU:- C A CONSTRAINTS B  Only on 3 Locations A. PV Panel B. BIPV Panel C. Solar Water Tubes Group EU’s Consideration:-  Orientation of Massing
  • 36. Site Aspects SA Group SA
  • 37. Site Aspects Group SA:- SA WHAT TO DO… … ? ? 1 ? Green Roof Green Wall To do (1): set Priority 2 3 Edible Garden Planting Area To do (2): preferred Location 1. on Model 2. on Perspective
  • 38. 1. Mark on Model… 2. Mark on Perspective… Site Aspects SA Group SA:- POSSIBLE AREAS:- Roof Top, Internal Areas [green wall] POSSIBLE AREAS:- A. Green Roof C. Edible Garden • Roof Top, External Wall • Internal Areas [Green Wall] B. Green Wall D. Planting Area • Grounds, Open Spaces Group EU’s Consideration:-  Orientation of Massing
  • 39. 1. Mark on Model… 2. Mark on Perspective… Site Aspects SA C SAY:- Group SA:- A CONSTRAINTS D B  Only on 4 Locations A. Green Roof C. Edible Garden B. Green Wall D. Planting Area E. SPECIAL TOPIC:- Group EU’s Consideration:- Real Grass OR Artificial ? • Maintenance Cost  Orientation of Massing • Operation Schedule/ Opening Hours
  • 40. Material Use MU Group MU
  • 41. Material Use Group MU:- MU WHAT TO DO… … Existing Relocation Materials of Existing To Be Furniture/ Recycled Sculpture To Record To do (1): 30 mins. Site Walk 1 & 2 To do (2): preferred Location 1. on Model 2. on Perspective
  • 42. 1. Mark on Model… 2. Mark on Perspective… Material Use MU Wall built by existing Materials Group MU:- SAY:- WHAT & WHERE ? Sculpture  A. What to Pick  B. Where to Put Group MU’s Consideration:-  at Entrance/ Common Space or Internal Area?  items with collective memories?
  • 43. Energy Use EU + Site Aspects SA Question for All Groups, + MONITOR for Material Use 1. Energy Generation & 2. Energy Consumption MU WHERE to Put?
  • 44. Mark on Model… Monitor for Energy Generation & Consumption Energy Use EU To be placed at + Courtyard ? Site Aspects SA + To be placed at Or Somewhere else ? Main Entrance ? Material Use MU
  • 46. 3.0 PRESENTATION By Group EU, SA & MA
  • 47. 4.0 CONCLUSION Questions & Answers