Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Spm project Georgiu Stefan
1. UNIVERSITATEA “POLITEHNICA” DIN TIMISOARA
FACULTATEA DE AUTOMATICA SI CALCULATOARE
Wireless diagnosis and monitoring of the autovehicle
Software verification phase of one iteration of the
V cycle
Stefan Georgiu , An 1 AES
TIMIŞOARA 2014
3. Software verification phases
1. Test cases creation and requirements review
• Starts as soon as the start of preparation meeting is
completed;
2. Test cases review
• Is included at the end of the preparation phase
• The start of each module depends if the module was
completed in test cases preparation phase
3. Software verification phase
• When the test cases are finished and the software is released
to the verification team, the practical software verification can
start.
4. Meetings
3
10. Advantages of having a project plan
• Avoid Completion Confusion;
• Keep Everyone on the Same Page (tracking);
• Understand Task Relationships;
• Effectively Allocate Resources;
• Get a Handle on the Future.
10