cement australia energy efficiency
1. Introduction
Cement Australia has certain reporting obligations under the Energy Efficiency Opportunities
(EEO) legislation. Information provided herewith is in fulfilment of the EEO requirement to
provide an annual update public report providing details of further assessments undertaken
and updates to Cement Australia's business response to the outcomes of assessments.
This public report relates to the period from 1 July 2006 to 30 June 2010.
Cement production is an energy intensive
activity, with energy a major component of
production cost and contributing substantially to the overall competitiveness of our business.
As a result, Cement Australia, including its se
nior managers, executive and board give careful
consideration to energy use and energy efficiency opportunities.
This document had been presented to and approved by the board of directors.
2. Summary of Assessment Methodology and Energy Use
As described in Cement Australia's Assessment and Reporting Schedule (submitted to the
Australian Government, Department of Resources, Energy and Tourism in December 2007),
EEO assessments are incorporated into Cement Australia's annual plant performance
assessment process which consists of: the Plant Master Plan (PMP); Annual Technical
Review (ATR); the CAPEX project planning pr
ocess; and the five-year Business Plan. The
ATR and PMP examine energy use in det
ail by energy type and production area.
The introduction of mandatory greenhouse and energy reporting under the National
Greenhouse and Energy Reporting System (NGERS) in 2008 prompted a review of the
structure of the Cement Australia controlling corporation and group as per definitions under the
NGERS legislation. In accordance with amendments to the EEO regulations in 2008 to
streamline reporting entities between the two
reporting systems, this review prompted a
number of minor modifications to Cement Australia's reporting structure. For the purposes of
this public report "Cement Australia" is taken to refer jointly to Cement Australia Holdings Pty
Limited and Cement Australia Pty Limited.
Cement Australia's total current energy use for the period 1 July 2009 to 30 June 2010 totals
14.09 PJ with 13.2 PJ or 94% being consumed at the three sites which trigger the 0.5PJ site
threshold (the Rockhampton integrated clinker/cement manufacturing facility was mothballed
early in the current reporting period).
For this same reporting period, Cement Australia assessed energy use at our three largest
manufacturing sites and our largest grinding plant. Energy types used at the reportable sites
include grid electricity, coal, diesel, natural gas
and gasoline. Energy is also substituted by
recycled sources including spent cell liners and
blended alternative fuels from a subsidiary
industrial waste reprocessing facility, Geocycle.
3 Operational variations occurring during the reporting period
3.1 Production variations
Production variations across company operations over the reporting period were within 10% of
previous reporting periods with the exception of the Rockhampton facility which was
mothballed early in the reporting period.
3.2 Streamlining of EEO and NGERS
In-line with the intent of the Australian Government's National Greenhouse and Energy
Reporting Streamlining Protocol, Cement Australia has established a greenhouse and energy
reporting system designed to meet the requirements of both NGERS and EEO. As indicated in
Section 2 above, the participation rules under NGERS, which post-dated Cement Australia's initial
ARS and EEO report, has resulted in as lightly modified EEO reporting structure which has been
implemented for this current EEO reporting period.
Energy consumption data compiled for NGERS
reporting purposes is used for meeting EEO
energy consumption reporting requirements. This process is defined in Group Procedure
CAS-PR-10.02 (CO2 Data Inventory and Reporting Procedure).
Cement Australia's Greenhouse and Energy
Management System ("GEMS") database was
designed initially to the requirements of the now defunct Greenhouse Challenge program but
has been enhanced to facilitate the tracking of greenhouse gas abatement, energy efficiency
and financial indicators associated with projects.
4 Energy Efficiency Opportunities that have been identified and evaluated
4.1 New assessments completed or not reported since last Public Report
Cement Australia has a formal and systematic annual process to review and assess the energy
performance of its cement manufacturing facilities and grinding plants, called the Annual
Technical Review (ATR). Data collected and calculated from the ATR is analysed and
compared to previous year's data, global benchmarks and defined performance targets.
Cement Australia (Kandos) Pty Ltd–Kandos site.
Assessment through annual ATR/PMP process
Cement Australia (Goliath) Pty Ltd–Railton site.
Assessment through annual ATR/PMP process Cement
Australia (Queensland) Pty. Ltd.–Gladstonesite
Assessment through annual ATR/PMP process
Cement Australia (Queensland) Pty Ltd–Bulwer Island site
Assessment through annual ATR/PMP process
4.2 Update of assessments reported in previous Public Reports
The status of the following Energy Efficiency Opportunities (assessed to an accuracy of better
than ±30%) as a result of previous assessments has been updated for each reporting entity.
5 Details of significant opportunities found through EEO assessments
Cement Australia (Goliath) Pty. Ltd.
-A number of small initiatives have resulted in a significant reduction (5%) in specific
electrical energy (ie kWh/tonne produced). These initiatives are:
– New media design for cement mills;
– Mill repairs and liner plate replacement; and
– Improved grindability and reactivity of clinker
-An energy audit was completed in October 2010 using the Cement Benchmarking & Energy
Savings Tool (BEST), and Holcim the "Fan save" energy calculation tools. The following were just
some of the documents used as references for the audit:
– Railton MPR technical document (2005),
– Holcim report – process control & electrical circle (2001),
– Holcim report – holistic approach to ener
gy management at Holcim US (2007),
– Holcim checklist – how to minimise electrical energy consumption and cost,
– Holcim technical development program for process engineers - efficient use of
electrical energy, and
– Berkeley National Laboratory – energy efficiency improvement and cost saving
opportunities for cement making (2008)
The findings of the audit will be assessed in early 2011 and an appropriate action plan
developed.
-The annual ATR/PMP process allows for a
regular and frequent assessment of energy
consumption and associated opportunities to reduce consumption. Future opportunities include
the adoption of grinding aid for cement milling (2011), the introduction of expert optimisers on
main equipment over the next fe w years, identification and implementation of control measures to
eliminate the unnecessary operation of equipment during plant idle
time, continued evaluation of opportunities to convert fixed speed drives / damper systems to
variable speed.
6 Statement
The information provided is, to the best of my knowledge, an accurate reflection of the situation
and conforms to the requirements of the Energy Efficiency Opportunities Act 2006 and
Regulations.
Chris Leon
Chief Executive Officer
http://www.cementaustralia.com.au

More Related Content

What's hot

Pending Building Energy Standards
Pending Building Energy StandardsPending Building Energy Standards
Pending Building Energy Standardsjimfreiberg
 
TIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardTIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardIEA-ETSAP
 
Europe User Conference: Neste FCC-SIM model usage
Europe User Conference: Neste FCC-SIM model usageEurope User Conference: Neste FCC-SIM model usage
Europe User Conference: Neste FCC-SIM model usageKBC (A Yokogawa Company)
 
Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...
Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...
Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...KBC (A Yokogawa Company)
 
ETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibrationETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibrationIEA-ETSAP
 
Flexibility Tracker Presentation - Austria
Flexibility Tracker Presentation - AustriaFlexibility Tracker Presentation - Austria
Flexibility Tracker Presentation - AustriaLeonardo ENERGY
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Hayley Pallister
 
Meta-review of long-term energy & carbon prices
Meta-review of long-term energy & carbon pricesMeta-review of long-term energy & carbon prices
Meta-review of long-term energy & carbon pricesLeonardo ENERGY
 
Energy and climate policies in major European Countries: insights from the PO...
Energy and climate policies in major European Countries: insights from the PO...Energy and climate policies in major European Countries: insights from the PO...
Energy and climate policies in major European Countries: insights from the PO...IEA-ETSAP
 
Guy Cunliffe Energy Benchmarks for Sector Reporting
Guy Cunliffe Energy Benchmarks for Sector ReportingGuy Cunliffe Energy Benchmarks for Sector Reporting
Guy Cunliffe Energy Benchmarks for Sector Reporting7391456
 
Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...
Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...
Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...Global CCS Institute
 
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...IEA-ETSAP
 

What's hot (19)

Pending Building Energy Standards
Pending Building Energy StandardsPending Building Energy Standards
Pending Building Energy Standards
 
Steering committee draft policy introduction
Steering committee draft policy introductionSteering committee draft policy introduction
Steering committee draft policy introduction
 
TIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardTIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way Forward
 
Adnoc and masdar project may 2013
Adnoc and masdar project   may 2013Adnoc and masdar project   may 2013
Adnoc and masdar project may 2013
 
Europe User Conference: Neste FCC-SIM model usage
Europe User Conference: Neste FCC-SIM model usageEurope User Conference: Neste FCC-SIM model usage
Europe User Conference: Neste FCC-SIM model usage
 
Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...
Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...
Europe User Conference: MOL multi unit optimization of FCC and VGOHTR reactor...
 
IEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINALIEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINAL
 
The impact of carbon tax on the Irish freight sector
The impact of carbon tax on the Irish freight sectorThe impact of carbon tax on the Irish freight sector
The impact of carbon tax on the Irish freight sector
 
ETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibrationETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibration
 
Flexibility Tracker Presentation - Austria
Flexibility Tracker Presentation - AustriaFlexibility Tracker Presentation - Austria
Flexibility Tracker Presentation - Austria
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010
 
Meta-review of long-term energy & carbon prices
Meta-review of long-term energy & carbon pricesMeta-review of long-term energy & carbon prices
Meta-review of long-term energy & carbon prices
 
Marathon Petro-SIM use at Marathon
Marathon Petro-SIM use at MarathonMarathon Petro-SIM use at Marathon
Marathon Petro-SIM use at Marathon
 
Energy and climate policies in major European Countries: insights from the PO...
Energy and climate policies in major European Countries: insights from the PO...Energy and climate policies in major European Countries: insights from the PO...
Energy and climate policies in major European Countries: insights from the PO...
 
Guy Cunliffe Energy Benchmarks for Sector Reporting
Guy Cunliffe Energy Benchmarks for Sector ReportingGuy Cunliffe Energy Benchmarks for Sector Reporting
Guy Cunliffe Energy Benchmarks for Sector Reporting
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
 
Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...
Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...
Monitoring CCS and CCUS projects for GHG regulatory compliance , Pamela Tomsk...
 
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
 
Mayors in Action - Monitoring of SEAP Implementation - Julije Domac
Mayors in Action - Monitoring of SEAP Implementation - Julije DomacMayors in Action - Monitoring of SEAP Implementation - Julije Domac
Mayors in Action - Monitoring of SEAP Implementation - Julije Domac
 

Viewers also liked

B100 Presentation Slides
B100 Presentation SlidesB100 Presentation Slides
B100 Presentation Slidescourtland8
 
COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30
COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30
COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30Pepe Alanís
 
دراسة تفصيلية
دراسة تفصيليةدراسة تفصيلية
دراسة تفصيليةFaseelaFiles
 
Jarraitutasuna eta deribatuak (zuzenketa)
Jarraitutasuna eta deribatuak (zuzenketa)Jarraitutasuna eta deribatuak (zuzenketa)
Jarraitutasuna eta deribatuak (zuzenketa)iralekontsultazerbitzua
 
My Onus and Not Just CSR !
My Onus and Not Just CSR !My Onus and Not Just CSR !
My Onus and Not Just CSR !Nivarana CPC
 
Networking 101 Guide
Networking 101 GuideNetworking 101 Guide
Networking 101 GuideDavid Yung
 
Psycholinguistics,class b, group 2, 2015
Psycholinguistics,class b, group 2, 2015Psycholinguistics,class b, group 2, 2015
Psycholinguistics,class b, group 2, 2015Tiara Puspitasari
 

Viewers also liked (12)

B100 Presentation Slides
B100 Presentation SlidesB100 Presentation Slides
B100 Presentation Slides
 
COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30
COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30
COORDINACIÓN REGIONAL IX DEL SNTE SECCIÓN 30
 
دراسة تفصيلية
دراسة تفصيليةدراسة تفصيلية
دراسة تفصيلية
 
Jarraitutasuna eta deribatuak (zuzenketa)
Jarraitutasuna eta deribatuak (zuzenketa)Jarraitutasuna eta deribatuak (zuzenketa)
Jarraitutasuna eta deribatuak (zuzenketa)
 
Ludvika Shoppingkarta
Ludvika ShoppingkartaLudvika Shoppingkarta
Ludvika Shoppingkarta
 
Transitional Home Design - Home Office
Transitional Home Design - Home OfficeTransitional Home Design - Home Office
Transitional Home Design - Home Office
 
Management
ManagementManagement
Management
 
My Onus and Not Just CSR !
My Onus and Not Just CSR !My Onus and Not Just CSR !
My Onus and Not Just CSR !
 
CPM training 35 hours
CPM training 35 hoursCPM training 35 hours
CPM training 35 hours
 
Networking 101 Guide
Networking 101 GuideNetworking 101 Guide
Networking 101 Guide
 
Psycholinguistics,class b, group 2, 2015
Psycholinguistics,class b, group 2, 2015Psycholinguistics,class b, group 2, 2015
Psycholinguistics,class b, group 2, 2015
 
20150707_Soutenance_Ruault
20150707_Soutenance_Ruault20150707_Soutenance_Ruault
20150707_Soutenance_Ruault
 

Similar to Cement Australia - Energy Efficiency Opportunities Public Report 2010

Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...
Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...
Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...Dr Dev Kambhampati
 
What are greenhouse gas conversion factors
What are greenhouse gas conversion factorsWhat are greenhouse gas conversion factors
What are greenhouse gas conversion factorswalled ashwah
 
001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods 001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods Anil Palamwar
 
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...Gianmarco Rossi
 
Impacts of carbon tax.docx
Impacts of carbon tax.docxImpacts of carbon tax.docx
Impacts of carbon tax.docxwrite4
 
Clean Power Plan Regulatory Alert
Clean Power Plan Regulatory AlertClean Power Plan Regulatory Alert
Clean Power Plan Regulatory AlertDoug Huxley
 
LBNL 11th Fyp Presentation
LBNL 11th Fyp PresentationLBNL 11th Fyp Presentation
LBNL 11th Fyp PresentationJulian Wong
 
LBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation ProgressLBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation ProgressJulian Wong
 
Research Paper - Final Year Project
Research Paper - Final Year ProjectResearch Paper - Final Year Project
Research Paper - Final Year ProjectIshan Rathnayake
 
Life cycle analysis for hybrid and electric vehicles
Life cycle analysis for hybrid and electric vehiclesLife cycle analysis for hybrid and electric vehicles
Life cycle analysis for hybrid and electric vehiclesRicardo Energy & Environment
 
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...Silicon Energy
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationMatthew Le Cordeur
 
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)Brian James
 
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINALSA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINALBrian James
 
Communicating Environmental Regulations: It's Good Business
Communicating Environmental Regulations: It's Good BusinessCommunicating Environmental Regulations: It's Good Business
Communicating Environmental Regulations: It's Good BusinessSociety of Women Engineers
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly TechnologyProbodh Mallick
 
Praveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.pptPraveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.pptpraveen gautam
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingGlobal CCS Institute
 

Similar to Cement Australia - Energy Efficiency Opportunities Public Report 2010 (20)

Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...
Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...
Dr Dev Kambhampati | DOE NETL Report- Cost & Performance Baseline for Fossil ...
 
What are greenhouse gas conversion factors
What are greenhouse gas conversion factorsWhat are greenhouse gas conversion factors
What are greenhouse gas conversion factors
 
001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods 001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods
 
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
 
Impacts of carbon tax.docx
Impacts of carbon tax.docxImpacts of carbon tax.docx
Impacts of carbon tax.docx
 
Clean Power Plan Regulatory Alert
Clean Power Plan Regulatory AlertClean Power Plan Regulatory Alert
Clean Power Plan Regulatory Alert
 
LBNL 11th Fyp Presentation
LBNL 11th Fyp PresentationLBNL 11th Fyp Presentation
LBNL 11th Fyp Presentation
 
LBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation ProgressLBNL China 11th 5YP Energy Connservation Progress
LBNL China 11th 5YP Energy Connservation Progress
 
Research Paper - Final Year Project
Research Paper - Final Year ProjectResearch Paper - Final Year Project
Research Paper - Final Year Project
 
Life cycle analysis for hybrid and electric vehicles
Life cycle analysis for hybrid and electric vehiclesLife cycle analysis for hybrid and electric vehicles
Life cycle analysis for hybrid and electric vehicles
 
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
 
Eskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentationEskom MYPD 3Selective Reopener presentation
Eskom MYPD 3Selective Reopener presentation
 
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
 
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINALSA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
 
Annual report
Annual reportAnnual report
Annual report
 
PDD for GTCC
PDD for GTCCPDD for GTCC
PDD for GTCC
 
Communicating Environmental Regulations: It's Good Business
Communicating Environmental Regulations: It's Good BusinessCommunicating Environmental Regulations: It's Good Business
Communicating Environmental Regulations: It's Good Business
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly Technology
 
Praveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.pptPraveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.ppt
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modelling
 

Cement Australia - Energy Efficiency Opportunities Public Report 2010

  • 1. cement australia energy efficiency 1. Introduction Cement Australia has certain reporting obligations under the Energy Efficiency Opportunities (EEO) legislation. Information provided herewith is in fulfilment of the EEO requirement to provide an annual update public report providing details of further assessments undertaken and updates to Cement Australia's business response to the outcomes of assessments. This public report relates to the period from 1 July 2006 to 30 June 2010. Cement production is an energy intensive activity, with energy a major component of production cost and contributing substantially to the overall competitiveness of our business. As a result, Cement Australia, including its se nior managers, executive and board give careful consideration to energy use and energy efficiency opportunities. This document had been presented to and approved by the board of directors. 2. Summary of Assessment Methodology and Energy Use As described in Cement Australia's Assessment and Reporting Schedule (submitted to the Australian Government, Department of Resources, Energy and Tourism in December 2007), EEO assessments are incorporated into Cement Australia's annual plant performance assessment process which consists of: the Plant Master Plan (PMP); Annual Technical Review (ATR); the CAPEX project planning pr ocess; and the five-year Business Plan. The ATR and PMP examine energy use in det ail by energy type and production area. The introduction of mandatory greenhouse and energy reporting under the National Greenhouse and Energy Reporting System (NGERS) in 2008 prompted a review of the structure of the Cement Australia controlling corporation and group as per definitions under the NGERS legislation. In accordance with amendments to the EEO regulations in 2008 to streamline reporting entities between the two reporting systems, this review prompted a number of minor modifications to Cement Australia's reporting structure. For the purposes of this public report "Cement Australia" is taken to refer jointly to Cement Australia Holdings Pty Limited and Cement Australia Pty Limited. Cement Australia's total current energy use for the period 1 July 2009 to 30 June 2010 totals 14.09 PJ with 13.2 PJ or 94% being consumed at the three sites which trigger the 0.5PJ site threshold (the Rockhampton integrated clinker/cement manufacturing facility was mothballed early in the current reporting period). For this same reporting period, Cement Australia assessed energy use at our three largest manufacturing sites and our largest grinding plant. Energy types used at the reportable sites include grid electricity, coal, diesel, natural gas
  • 2. and gasoline. Energy is also substituted by recycled sources including spent cell liners and blended alternative fuels from a subsidiary industrial waste reprocessing facility, Geocycle. 3 Operational variations occurring during the reporting period 3.1 Production variations Production variations across company operations over the reporting period were within 10% of previous reporting periods with the exception of the Rockhampton facility which was mothballed early in the reporting period. 3.2 Streamlining of EEO and NGERS In-line with the intent of the Australian Government's National Greenhouse and Energy Reporting Streamlining Protocol, Cement Australia has established a greenhouse and energy reporting system designed to meet the requirements of both NGERS and EEO. As indicated in Section 2 above, the participation rules under NGERS, which post-dated Cement Australia's initial ARS and EEO report, has resulted in as lightly modified EEO reporting structure which has been implemented for this current EEO reporting period. Energy consumption data compiled for NGERS reporting purposes is used for meeting EEO energy consumption reporting requirements. This process is defined in Group Procedure CAS-PR-10.02 (CO2 Data Inventory and Reporting Procedure). Cement Australia's Greenhouse and Energy Management System ("GEMS") database was designed initially to the requirements of the now defunct Greenhouse Challenge program but has been enhanced to facilitate the tracking of greenhouse gas abatement, energy efficiency and financial indicators associated with projects. 4 Energy Efficiency Opportunities that have been identified and evaluated 4.1 New assessments completed or not reported since last Public Report Cement Australia has a formal and systematic annual process to review and assess the energy performance of its cement manufacturing facilities and grinding plants, called the Annual Technical Review (ATR). Data collected and calculated from the ATR is analysed and compared to previous year's data, global benchmarks and defined performance targets. Cement Australia (Kandos) Pty Ltd–Kandos site. Assessment through annual ATR/PMP process Cement Australia (Goliath) Pty Ltd–Railton site.
  • 3. Assessment through annual ATR/PMP process Cement Australia (Queensland) Pty. Ltd.–Gladstonesite Assessment through annual ATR/PMP process Cement Australia (Queensland) Pty Ltd–Bulwer Island site Assessment through annual ATR/PMP process 4.2 Update of assessments reported in previous Public Reports The status of the following Energy Efficiency Opportunities (assessed to an accuracy of better than ±30%) as a result of previous assessments has been updated for each reporting entity. 5 Details of significant opportunities found through EEO assessments Cement Australia (Goliath) Pty. Ltd. -A number of small initiatives have resulted in a significant reduction (5%) in specific electrical energy (ie kWh/tonne produced). These initiatives are: – New media design for cement mills; – Mill repairs and liner plate replacement; and – Improved grindability and reactivity of clinker -An energy audit was completed in October 2010 using the Cement Benchmarking & Energy Savings Tool (BEST), and Holcim the "Fan save" energy calculation tools. The following were just some of the documents used as references for the audit: – Railton MPR technical document (2005), – Holcim report – process control & electrical circle (2001), – Holcim report – holistic approach to ener gy management at Holcim US (2007), – Holcim checklist – how to minimise electrical energy consumption and cost, – Holcim technical development program for process engineers - efficient use of electrical energy, and – Berkeley National Laboratory – energy efficiency improvement and cost saving opportunities for cement making (2008) The findings of the audit will be assessed in early 2011 and an appropriate action plan developed. -The annual ATR/PMP process allows for a regular and frequent assessment of energy consumption and associated opportunities to reduce consumption. Future opportunities include the adoption of grinding aid for cement milling (2011), the introduction of expert optimisers on
  • 4. main equipment over the next fe w years, identification and implementation of control measures to eliminate the unnecessary operation of equipment during plant idle time, continued evaluation of opportunities to convert fixed speed drives / damper systems to variable speed. 6 Statement The information provided is, to the best of my knowledge, an accurate reflection of the situation and conforms to the requirements of the Energy Efficiency Opportunities Act 2006 and Regulations. Chris Leon Chief Executive Officer http://www.cementaustralia.com.au