2. Fellows, R., & Liu, A. M. M. (2012 August). Managing
organizational interfaces in engineering
construction projects: Addressing fragmentation and boundary
issues across multiple interfaces.
Construction Management and Economics, 30, 653–671.
Fernandez-Solis, J. L., Porwal, V., Lavy, S., Shafaat, A.,
Rybkowski, Z. K., Son, K., & Lagoo, N. (2013
April). Survey of motivations, benefits, and implementation
challenges of last planner system
users. Journal of Construction Engineering and Management,
354–360.
Fulk, H. K., Kwun, O., & Alijani, G. S. (2013 November).
Scapegoating humans, scapegoating
technologies: Examining another side of information system
project control. Academy of
Information and Management Sciences Journal, 16(2),31–48.
Galvin, T., Gibbs, M., Sullivan, J., & Williams, C. (2014).
Leadership competencies of project
managers: An empirical study of emotional, intellectual, and
managerial dimensions. Journal of
Economic Development, Management, IT, Finance and
Marketing, 6(1), 35–60.
2
Golenko-Ginzburg, D., Ben-Yair, A., & Swid, N. (2013).
Methodological aspects of controlling
multilevel man-machine organization systems. Informatica
3. Economica, 17(3), 16–27.
Ingason, H. T., & Jonasson, H. I. (2009). Contemporary
knowledge and skill requirements in project
management. Project Management Journal, 40(2), 59–69.
Jerbrant, A. (2014). A maturation model for project-based
organisations—With uncertainty
management as an ever-present multi-project management
focus. SAJEMS Special Issue, 17, 33–
51.
Kutsch, E., Browning, T. R., & Hall, M. (2014, March-April).
Bridging the risk gap: The failure of risk
management in information systems projects. Research
Technology Management, 26–32.
Leybourne, S. A, & Sainter, P.(2012). Advancing project
management: Authenticating the shift from
process to “nuanced” project-based management in the
ambidextrous organization. Project
Management Journal, 43(6) 5–15.
Muller, R., Gluckler, J., Aubry, M., & Shao, J. (2013). Project
management knowledge flows in
networks of project managers and project management offices:
A case study in the
pharmaceutical industry. Project Management Journal, 44(2), 4–
19.
Nangoli, S., Namagembe, S., Ntayi, J. M., & Ngoma, M. (2012).
Towards building project-
stakeholder commitment: Case study—Citizenship projects in
Uganda. World Journal of
Entrepreneurship, Management and Sustainable Development,
8(4), 233–245.
5. 3
Starkweather, J., & Stevenson, D. H. (2011). PMP®
Certification as a core competency: Necessary
but not sufficient. Project Management Journal, 42(1), 31–41.
Thamhain, H. (2013). Managing risks in complex projects.
Project Management Journal, 44(2), 20–
35.
Thomas, J. L., Cicmil, S., & George, S. (2012). Learning from
project management implementation
by applying a management innovation lens. Project Management
Journal, 43(6), 70–87.
Trejo, A. (2014). Emotional intelligence and project outcomes
in technology. International
Management Review, 10(1), 31-42.
Unger, B. N., Gemunden, H. G., & Aubry, M.(2012). The three
roles of a project portfolio
management office: Their impact on portfolio management
execution and success. International
Journal of Project Management, 30, 608–620.