SlideShare a Scribd company logo
1 of 10
Download to read offline
CIVIL & STRUCTURAL
ENGIN EER
" A ccomplish,
or do not begin."
ZA INOL ZA KA RIA
Get to k now
the life as a
civil &
structural
engineer
and what it
tak es to
become
one.
CONTENTS
1. LIFE ASA CIVIL &
STRUCTURAL ENGIN EER
2. COMPAN Y PROFILE
3. COMPAN Y
STRUCTURE
4. PROFILE OF
IN TERVIEWEE
5. PAST PROJECT
KUALA LUMPUR
TOWER
6. CURREN T PROJECT
WOMEN AN D
CHILDREN HOSPITAL,
KUALA LUMPUR
7. Q&A
About
An interview with acivil and structural engineer
about hisjourney in the construction industry.
Copyright 2015 by PAPER TOWN S
All rightsreserved. No part of thisbook may be
reproduced in any form without expresswritten
permission.
WRITERS
FARAH HAN ISAH BIN TI ZAINOL
DAN ICA GAN JIA-EN
DAN A KAN JIA TORNG
CHIN KE N I KELLY
CRYSTAL CHIA FYE JZING
DAYANG N ADRAH AIDHA BIN TI AWG
IDRUS
Life As A Civil
& Structural
Engineer
In general, acivil and
structural engineer hasto
ensureandexaminethe
structureof buildingsothat it
remainsstableandsafe. They
either work in officesor on
construction sites. Structural
engineersinvolvein designing
structureslikehouses, hospitals
andofficeblocks. They also
involvein reportingandmaking
decision on financial
Structural engineersareresponsible
in choosingtheright materialssuch as
concrete, steelsandbricksfor the
project. They consult andwork along
with thearchitect, engineersand
landscapearchitect. In order tobecome
agoodstructural engineer, oneshould
begoodin Physicsandmust havea
strongthree-dimensional conceptual
skills. It isimportant for them tothink
out of box tosolvedaily problems.
UEM Builders Berhad, the
engineering & construction arm of the
UEM Group, is an international
construction com pany with a strong
track record in delivering infrastructure
developm ent projects.
Over the years, they have played a
significant role in building M alaysia?s
landscape through the construction of
national infrastructures, which are
recognised globally. The Second Penang
Bridge, M alaysia-Singapore Second
Crossing, and Kuala Lum pur Light Rail
Transit System 2, are am ongst the m any
m ega projects credited to UEM Builders?
capabilities.
Their vision is to be a Leading Globally
Com petitive Com pany in Integrated
Engineering, Construction and
M aintenance Services. Their m ission is
enterprising and com petitive whilst
m eeting stakeholders?expectations.
Board Of Directors
M anaging Directors
International Local
Indonesia
BruneiIndia
H ospital
M RT
H ighway
Preamakanthan
DKanapathy
LeeEngHoe
WongKingSeng
Zainol
Zakaria
TeeMeng
AhmadFauzi
Haji Ali
Com pany Structure
"Givingup isnever an option."
Here i would like to share about a
civil engineer?s personal
information. His full name is Zainol
Bin Zakaria. He born in the year
1964 (age51), andhadmarriedwith 6
childrens. Theproficienciesof him is
English andBahasaMelayu.
Zainol Zakaria
IR Zainol Bin Zakaria graduated
from Universiti Teknologi Malaysia
in 1987 with a Bachelor in Civil
Engineering. He has been in this
industry for the past 28 years. He
has worked as a junior engineer for
4 years and another 6 years as a
senior engineer.
Theprojectsthat he hadbeen involvedin are
SgPiah HydroElectricProject ,Peninsular Gas
Utilization Project Phase2, KlangRoadBypass
, Airport RoadInterchange, KualaLumpur
Tower, SlopeRepairsalongTamparuli-Ranau
Highway, Sabah, KLIA (PackageRA16), Bus&
taxi complex andoverpassat Jln Sultan Azlan
Shah, Ipoh, Perak, Monorail Trial Track,
AmpangHilir High EndCondominium, New
Alor Setar Hospital Project, New Pekan
Hospital Project, PetronasRantau Mall,
Kerteh, Terengganu ,ProposedNew Gumusut
CuttingAndAssembly Workshop, TheDesign,
Construction, Equipping, Commissioningand
Maintenanceof Shah Alam Hospital, The
Construction of BusinessBay Hotel, Dubai,
UAE, Women andChildren Hospital, Kuala
Lumpur, LawasHospital, Sarawak, MRT S3
stations- TheCurve, TDDI andOneUtama,
Projek MenaraKembar Bank Rakyat, Kuala
Lumpur.
One of the earlier project he was
fortunate enough to work on was
alongside the com pany W ayss &
Freytag (M ) Sdn. Bhd. which is the
Kuala Lum pur Tower as the site
engineer. A tower m uch
appreciated by us M alaysians and
tourists as it holds so m uch
purpose including a tourist
Kuala Lum pur
Tower
Past Project :
The duration of his involvem ent in
the project was roughly about a year
and a half,starting from January 1992
until June 1993. This puts him in the
center position as the tower was
constructed in 1991and com pleted in
1994. This gives him a contract value
of RM 270 m illion. In this project, M r
Zainol was responsible for taking off,
standing supervision and the
preparation of Bar Bending Schedule
BBS.
W om en an d
Chi l dr en H ospi tal ,
Kual a Lum pur
The ongoing project
M r. Zainol is involved in
as a project director is
the new W om en and
Children?s H ospital that
is located within the
proxim ity of the existing
H ospital Kuala Lum pur
in Jalan Pahang.
Cur r en t Pr oject :
The W om en & Children?s H ospital
is an RM 848m il project signed
between the M inistry of H ealth,and
UEM Construction Sdn Bhd with its
joint venture com pany,Najcom Sdn
Bhd and is expected for com pletion
by the end of 2016. It is a 12 storey
building which will hold 600 beds
where it has a total gross floor area of
1,890,143 sq. ft.
Am ong the facilities to be built in
the hospital include therapy services,
crèche or nursery,labour and
delivery,specialist clinics,child
developm ent centre,paediatric
specialist clinics,wom en health
centre,neonatal Intensive Care
Units,obstetric wards,Em ergency
Departm ent,cafeteria,shops for
public convenience and a 20-room
hotel. A m ulti-level car park which
will provide an addition of about
1000 m ore parking bays will also be
built to ease traffic congestion within
the hospital com pound. The hospital
project is a part of the Kuala Lum pur
Structure Plan 2020 by the
governm ent to upgrade general
hospitals to provide better m edical
services to the people.
In this project,M r Zainol reports to
m anaging director of UEM Builders
BH D. H e also leads the hospital design
and construction team to carry out the
pricing as well as reviewing the costings
prior presenting to the m anaging
director and subm itting them to the
clients. Other than that,he also
coordinates am ong the consultants,
covers both technical contractual and
financial aspects. Lastly,he is responsible
from the pre contract stage to the final
accounts.
Q & A
W hat m ade you deci de to tak e c&s en gi n eer i n g
as a pr ofessi on ?
?For me, it?s just a coincident. I do not know what civil engineering at that
time and during the interview, I just said to the interviewer that civil
engineer sounds good. So, i only realise what is c&s engineering upon my
enrolment to the university. "
W hat qual i ti es shoul d a str uctur al en gi n eer have?
?The right attitude,technical knowledge teamwork and most importantly it
comes with responsibility and liability."
W hat i s your gr eatest achi evem en t?
?W hen I was the project manager for the slope remedial works along
Tamparuli-Ranau project, we completed the project in average of 30 days
ahead schedule for all the 4 packages awarded to us. Also, we made quite a
big profit margins."
Is ther e an y chal l en ges you face at w or k ?
?Each project has it?s own unique challenges. I t?s different from one project to
another such as civil works, structural works, marine works, slope protection
works or even towers."
Do you have an y advi ce for the futur e ci vi l an d str uctur al
en gi n eer s?
?You must put a very high interest and effort to manage and execute any
assignments given. W orking in the silo is extremely prohibited as
communication is the main tool to cascade and escalate the information."

More Related Content

Viewers also liked (11)

Assignment 2 : Oral Presentation
Assignment 2 : Oral PresentationAssignment 2 : Oral Presentation
Assignment 2 : Oral Presentation
 
warlen is loveless
warlen is lovelesswarlen is loveless
warlen is loveless
 
PSOL 50 - Eleições municipais 2016 - Garça/SP - Programa de Governo
PSOL 50 - Eleições municipais 2016 - Garça/SP - Programa de GovernoPSOL 50 - Eleições municipais 2016 - Garça/SP - Programa de Governo
PSOL 50 - Eleições municipais 2016 - Garça/SP - Programa de Governo
 
NAE4HA 2016 Report
NAE4HA 2016 ReportNAE4HA 2016 Report
NAE4HA 2016 Report
 
Gauss jordan
Gauss jordanGauss jordan
Gauss jordan
 
International Technology Perspectives
International Technology PerspectivesInternational Technology Perspectives
International Technology Perspectives
 
English essay
English essayEnglish essay
English essay
 
Business Plan Presentation Slides
Business Plan Presentation SlidesBusiness Plan Presentation Slides
Business Plan Presentation Slides
 
co-worker cheyenne 020915 r3
co-worker cheyenne 020915 r3co-worker cheyenne 020915 r3
co-worker cheyenne 020915 r3
 
ICI//ITD
ICI//ITDICI//ITD
ICI//ITD
 
BestPractices in Battery Storage
BestPractices in Battery StorageBestPractices in Battery Storage
BestPractices in Battery Storage
 

Similar to ICI Magazine (20)

Ici magazine
Ici magazineIci magazine
Ici magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Train 9 Project newsletter 1st release
Train 9 Project newsletter 1st releaseTrain 9 Project newsletter 1st release
Train 9 Project newsletter 1st release
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME
MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME
MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINE
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2
 
Ici magazine-fnbe0315
Ici magazine-fnbe0315Ici magazine-fnbe0315
Ici magazine-fnbe0315
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
ICI magazine
ICI magazineICI magazine
ICI magazine
 
Magazine
MagazineMagazine
Magazine
 
Project 1B Profession in Construction Industry – Building Teams Identifying T...
Project 1B Profession in Construction Industry – Building Teams Identifying T...Project 1B Profession in Construction Industry – Building Teams Identifying T...
Project 1B Profession in Construction Industry – Building Teams Identifying T...
 
Magazine of ICI Project 1B
Magazine of ICI Project 1BMagazine of ICI Project 1B
Magazine of ICI Project 1B
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

ICI Magazine

  • 1. CIVIL & STRUCTURAL ENGIN EER " A ccomplish, or do not begin." ZA INOL ZA KA RIA Get to k now the life as a civil & structural engineer and what it tak es to become one.
  • 2. CONTENTS 1. LIFE ASA CIVIL & STRUCTURAL ENGIN EER 2. COMPAN Y PROFILE 3. COMPAN Y STRUCTURE 4. PROFILE OF IN TERVIEWEE 5. PAST PROJECT KUALA LUMPUR TOWER 6. CURREN T PROJECT WOMEN AN D CHILDREN HOSPITAL, KUALA LUMPUR 7. Q&A About An interview with acivil and structural engineer about hisjourney in the construction industry. Copyright 2015 by PAPER TOWN S All rightsreserved. No part of thisbook may be reproduced in any form without expresswritten permission. WRITERS FARAH HAN ISAH BIN TI ZAINOL DAN ICA GAN JIA-EN DAN A KAN JIA TORNG CHIN KE N I KELLY CRYSTAL CHIA FYE JZING DAYANG N ADRAH AIDHA BIN TI AWG IDRUS
  • 3. Life As A Civil & Structural Engineer In general, acivil and structural engineer hasto ensureandexaminethe structureof buildingsothat it remainsstableandsafe. They either work in officesor on construction sites. Structural engineersinvolvein designing structureslikehouses, hospitals andofficeblocks. They also involvein reportingandmaking decision on financial Structural engineersareresponsible in choosingtheright materialssuch as concrete, steelsandbricksfor the project. They consult andwork along with thearchitect, engineersand landscapearchitect. In order tobecome agoodstructural engineer, oneshould begoodin Physicsandmust havea strongthree-dimensional conceptual skills. It isimportant for them tothink out of box tosolvedaily problems.
  • 4. UEM Builders Berhad, the engineering & construction arm of the UEM Group, is an international construction com pany with a strong track record in delivering infrastructure developm ent projects. Over the years, they have played a significant role in building M alaysia?s landscape through the construction of national infrastructures, which are recognised globally. The Second Penang Bridge, M alaysia-Singapore Second Crossing, and Kuala Lum pur Light Rail Transit System 2, are am ongst the m any m ega projects credited to UEM Builders? capabilities. Their vision is to be a Leading Globally Com petitive Com pany in Integrated Engineering, Construction and M aintenance Services. Their m ission is enterprising and com petitive whilst m eeting stakeholders?expectations.
  • 5. Board Of Directors M anaging Directors International Local Indonesia BruneiIndia H ospital M RT H ighway Preamakanthan DKanapathy LeeEngHoe WongKingSeng Zainol Zakaria TeeMeng AhmadFauzi Haji Ali Com pany Structure
  • 6. "Givingup isnever an option." Here i would like to share about a civil engineer?s personal information. His full name is Zainol Bin Zakaria. He born in the year 1964 (age51), andhadmarriedwith 6 childrens. Theproficienciesof him is English andBahasaMelayu. Zainol Zakaria IR Zainol Bin Zakaria graduated from Universiti Teknologi Malaysia in 1987 with a Bachelor in Civil Engineering. He has been in this industry for the past 28 years. He has worked as a junior engineer for 4 years and another 6 years as a senior engineer. Theprojectsthat he hadbeen involvedin are SgPiah HydroElectricProject ,Peninsular Gas Utilization Project Phase2, KlangRoadBypass , Airport RoadInterchange, KualaLumpur Tower, SlopeRepairsalongTamparuli-Ranau Highway, Sabah, KLIA (PackageRA16), Bus& taxi complex andoverpassat Jln Sultan Azlan Shah, Ipoh, Perak, Monorail Trial Track, AmpangHilir High EndCondominium, New Alor Setar Hospital Project, New Pekan Hospital Project, PetronasRantau Mall, Kerteh, Terengganu ,ProposedNew Gumusut CuttingAndAssembly Workshop, TheDesign, Construction, Equipping, Commissioningand Maintenanceof Shah Alam Hospital, The Construction of BusinessBay Hotel, Dubai, UAE, Women andChildren Hospital, Kuala Lumpur, LawasHospital, Sarawak, MRT S3 stations- TheCurve, TDDI andOneUtama, Projek MenaraKembar Bank Rakyat, Kuala Lumpur.
  • 7. One of the earlier project he was fortunate enough to work on was alongside the com pany W ayss & Freytag (M ) Sdn. Bhd. which is the Kuala Lum pur Tower as the site engineer. A tower m uch appreciated by us M alaysians and tourists as it holds so m uch purpose including a tourist Kuala Lum pur Tower Past Project : The duration of his involvem ent in the project was roughly about a year and a half,starting from January 1992 until June 1993. This puts him in the center position as the tower was constructed in 1991and com pleted in 1994. This gives him a contract value of RM 270 m illion. In this project, M r Zainol was responsible for taking off, standing supervision and the preparation of Bar Bending Schedule BBS.
  • 8. W om en an d Chi l dr en H ospi tal , Kual a Lum pur The ongoing project M r. Zainol is involved in as a project director is the new W om en and Children?s H ospital that is located within the proxim ity of the existing H ospital Kuala Lum pur in Jalan Pahang. Cur r en t Pr oject : The W om en & Children?s H ospital is an RM 848m il project signed between the M inistry of H ealth,and UEM Construction Sdn Bhd with its joint venture com pany,Najcom Sdn Bhd and is expected for com pletion by the end of 2016. It is a 12 storey building which will hold 600 beds where it has a total gross floor area of 1,890,143 sq. ft.
  • 9. Am ong the facilities to be built in the hospital include therapy services, crèche or nursery,labour and delivery,specialist clinics,child developm ent centre,paediatric specialist clinics,wom en health centre,neonatal Intensive Care Units,obstetric wards,Em ergency Departm ent,cafeteria,shops for public convenience and a 20-room hotel. A m ulti-level car park which will provide an addition of about 1000 m ore parking bays will also be built to ease traffic congestion within the hospital com pound. The hospital project is a part of the Kuala Lum pur Structure Plan 2020 by the governm ent to upgrade general hospitals to provide better m edical services to the people. In this project,M r Zainol reports to m anaging director of UEM Builders BH D. H e also leads the hospital design and construction team to carry out the pricing as well as reviewing the costings prior presenting to the m anaging director and subm itting them to the clients. Other than that,he also coordinates am ong the consultants, covers both technical contractual and financial aspects. Lastly,he is responsible from the pre contract stage to the final accounts.
  • 10. Q & A W hat m ade you deci de to tak e c&s en gi n eer i n g as a pr ofessi on ? ?For me, it?s just a coincident. I do not know what civil engineering at that time and during the interview, I just said to the interviewer that civil engineer sounds good. So, i only realise what is c&s engineering upon my enrolment to the university. " W hat qual i ti es shoul d a str uctur al en gi n eer have? ?The right attitude,technical knowledge teamwork and most importantly it comes with responsibility and liability." W hat i s your gr eatest achi evem en t? ?W hen I was the project manager for the slope remedial works along Tamparuli-Ranau project, we completed the project in average of 30 days ahead schedule for all the 4 packages awarded to us. Also, we made quite a big profit margins." Is ther e an y chal l en ges you face at w or k ? ?Each project has it?s own unique challenges. I t?s different from one project to another such as civil works, structural works, marine works, slope protection works or even towers." Do you have an y advi ce for the futur e ci vi l an d str uctur al en gi n eer s? ?You must put a very high interest and effort to manage and execute any assignments given. W orking in the silo is extremely prohibited as communication is the main tool to cascade and escalate the information."