IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 117
A MATHEMATICAL MODEL FOR DETERMINING THE OPTIMAL SIZE
OF A RESERVE RESOURCE POOL FOR ESSENTIAL SERVICES:
HUMAN RESOURCES
S.C. Saha1
, Seena.P2
, Subodh Deb Barma3
1
Professor, 2
Assistant Professor, 3
Research Scholar
1, 3
Mechanical Engineering Department, 2
Production Engineering Department
National Institute of Technology, Agartala-799055
subashchandrasaha@yahoo.in, zeenapriyan@gmail.com, Subodh_debbarma@yahoo.co.in
Abstract
For uninterrupted service/operation, a main work force is employed when the workforce is inadequate during peak hours; a reserve of
resource pool has to be maintained, to fulfill the necessity. In many cases, the optimal work force in the reserve pool is laborious to
determine or may be an approximate figure. To find the optimal manpower/resource pool, a mathematical model using Steady state
probability is coined for uninterrupted service. The model may be used for different other requirements like sourcing goods/materials
from suppliers, and to determine the optimal capacity of the in-house facility.
Keywords: Optimal manpower in Reserve pool, Steady state probability
---------------------------------------------------------------------***-----------------------------------------------------------------------
1. INTRODUCTION
To provide an uninterrupted service the main workforce, is
employed. When the main workforce is not adequate for
absenteeism and such reasons, persons from the reserve pool
are utilized. Examples of additional nurses in the hospital,
ticket reservation desk – assistants in a reservation system or
machine operators in a factory, can be given to illustrate this.
In this article, we discuss a model, constructed on some
approximating assumptions, to determine an optimal number
of persons who are to be put in the reserve, in such situations.
It is perhaps worthwhile to note here that, the applicability of
statistical techniques for planning of man power, though in
somewhat a different context of deciding on the recruitment,
training and promotional policies in an organization where
employees may move from class to class, has been illustrated
by various authors [1].
2. MODEL AND ANALYSIS
2.1 Model
It is assumed that:
i) There are n machines and one operator operates each
machine. These n operators form the main work force. In
addition, there is a reserve pool in which there are m
operators.
ii) In the absence of an operator of the main workforce, an
operator from the reserve pool is deputed in his place,
provided the reserve pool has adequate persons at that
moment to permit this; if this is not possible at that
moment, this is done whenever, at earliest as possible. All
the machines have the same priority in this respect.
iii) Let F (.) be the distribution of the random variable
which denotes the time after which an operator (in the
main work force) takes a break, and G (.) be the
distribution of the length of a break. Let µF and µG be the
means of F (.) and G (.) respectively (0 < µF, µG < ∞)
iv) No operator in the reserve pool is absent when there is
a need. That is, if it is required, m operators can always be
taken from the reserve pool.
v) Cost per unit time for an unmanned machine is C1 and
the cost per unit time for a person in the reserve pool is
C2.
vi) All the random variables are independent.
2.2 Analysis
We take the objective function as the long-term average cost
per unit time.
Let N(t) give the number of operators (of the main work force)
absent at time t and S(t) the number of unmanned machine at
time t. then, if N(t) = m+j, S(t)=j; j=0,1…, n-m. In an interval
[t, t+∆t] the cost incurred is C1.S (t) ∆t + C2.m. ∆t, where ∆t
is sufficiently small. Thus, the long term expected cost per
unit time can be written, as a function of m, as,
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 118
………
…………….. (a)
Define Xi(t) =1, if N(t) = m+I, (i=1,2,…,n-m), Xi(t) = 0,
otherwise. Then, S (t) =∑i. Xi (t). And,
……….. (b)
Where,
If the limits exist (Lemma 2.2, Barlow and Proschan 1975) [2,
4, 5]; next, let p (t) be the probability that an operator is absent
at time t, since the operators act independently and identically.
……………………………. (c)
By the theorem of steady state probabilities in a two stage,
alternating renewal process [3-5]
Thus,
……………….….. (d)
Hence,
………………… (e)
Where,
It is straightforward to see that,
If,
………………………... (f)
The LHS of 2.1 is the complement of the binomial distribution
with parameters (n, ). For m=0, the LHS =1- . Thus, if
1- > , (0 < <1) then there exist a non zero unique
such that ( (m), m= 0,1, …., n, since the LHS is
decreasing with m. the minimizing can be found, in this
case, as minimum m for which LHS , and can be
calculated without any great difficulty. The binomial
distribution table may be used, and can be approximated by
the Poisson’s distribution table when n is large, and for still
larger n the standard normal distribution table can be used.
Also, we may note that, the optimal is a minimize as long
as,
………………… (g)
2.3 Numerical Example
Take = 0.05, = 0.1; the following table gives the
optimal for different values of n, and the sensitivity range
of ( ) in which is optimal.
Table 1 Different Values of n, and optimal
n
( ) Sensitivity
5 1+1 0.0226-0.2262
10 1+1 0.0861-0.4013
15 2+1 0.0362-0.171
20 2+1 0.0755-0.2642
30 3+1 0.068- 0.191
40 4+1 0.053 -0.143
CONCLUSIONS
A model is presented by which the optimal manpower in
reserve for an essential service may be determined. Though
the assumptions of independence of the random variables,
assumption of uniform pay for the persons in the reserve pool,
etc. are somewhat restrictive, but overall, it is quite indicative.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 119
In a numerical example, it is seen that the extra manpower
required for a fixed number of machines decreases as the total
number of machines increases.
The same model may be valid for the situations, which are
similar to that discussed here. For example, when a certain
commodity is sourced from different suppliers, who may stop
the supply for a temporary period sometimes, and there is an
in house sourcing also to make up for this the same analysis
may be applicable to determine the optimal capacity of the in
house facility.
REFERENCES
[1] Bartholomew, D. J., and A. F. Forbes 1979, “Statistical
techniques for manpower planning”, Wiley.
Chichester [Eng.]; New York
[2] Barlow, R. E., and Proschan, F. (1975), “Statistical
theory of Reliability and life testing: Probability
Models”, Holt, Rinehart and, Winston, New York.
[3] W. Feller, “An Introduction to Probability Theory
and Its Applications,” vol. 11, New York: Wiley,
1966.
[4] Kall, P. and J. Mayer 2005. “Stochastic linear
programming: models, theory, and computation”,
Springer Science, New York
[5] J. R. Birge and F. Louveaux, “Introduction to
Stochastic Programming”, New York: Springer-
Verlag, 1997.

More Related Content

Viewers also liked

Patkaran sa Pananalapi
Patkaran sa PananalapiPatkaran sa Pananalapi
Patkaran sa Pananalapi
Mygie Janamike
 
Patakarang pananalapi konsepto ng patakarang pananalapi
Patakarang pananalapi  konsepto ng patakarang pananalapiPatakarang pananalapi  konsepto ng patakarang pananalapi
Patakarang pananalapi konsepto ng patakarang pananalapi
Nathaniel Vallo
 
Money market instruments
Money market instrumentsMoney market instruments
Money market instruments
vidhyamalu
 
Monetary policy presentation.ppt
Monetary policy presentation.pptMonetary policy presentation.ppt
Monetary policy presentation.ppt
Agnes Stephanie
 

Viewers also liked (7)

Treasury bills
Treasury billsTreasury bills
Treasury bills
 
Commercial papers
Commercial papersCommercial papers
Commercial papers
 
Commercial paper
Commercial paperCommercial paper
Commercial paper
 
Patkaran sa Pananalapi
Patkaran sa PananalapiPatkaran sa Pananalapi
Patkaran sa Pananalapi
 
Patakarang pananalapi konsepto ng patakarang pananalapi
Patakarang pananalapi  konsepto ng patakarang pananalapiPatakarang pananalapi  konsepto ng patakarang pananalapi
Patakarang pananalapi konsepto ng patakarang pananalapi
 
Money market instruments
Money market instrumentsMoney market instruments
Money market instruments
 
Monetary policy presentation.ppt
Monetary policy presentation.pptMonetary policy presentation.ppt
Monetary policy presentation.ppt
 

Similar to A mathematical model for determining the optimal size of a reserve resource pool for essential services copy (2)

Similar to A mathematical model for determining the optimal size of a reserve resource pool for essential services copy (2) (20)

Optimum capacity allocation of distributed generation
Optimum capacity allocation of distributed generationOptimum capacity allocation of distributed generation
Optimum capacity allocation of distributed generation
 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case study
 
Seismic comparative study on tmd structure an overview
Seismic comparative study on tmd structure  an overviewSeismic comparative study on tmd structure  an overview
Seismic comparative study on tmd structure an overview
 
Optimum capacity allocation of distributed generation units using parallel ps...
Optimum capacity allocation of distributed generation units using parallel ps...Optimum capacity allocation of distributed generation units using parallel ps...
Optimum capacity allocation of distributed generation units using parallel ps...
 
Batch arrival retrial queuing system with state
Batch arrival retrial queuing system with stateBatch arrival retrial queuing system with state
Batch arrival retrial queuing system with state
 
An adaptive algorithm for task scheduling for computational grid
An adaptive algorithm for task scheduling for computational gridAn adaptive algorithm for task scheduling for computational grid
An adaptive algorithm for task scheduling for computational grid
 
Gravitational search algorithm with chaotic map (gsa cm) for solving optimiza...
Gravitational search algorithm with chaotic map (gsa cm) for solving optimiza...Gravitational search algorithm with chaotic map (gsa cm) for solving optimiza...
Gravitational search algorithm with chaotic map (gsa cm) for solving optimiza...
 
Batch arrival retrial queuing system with state dependent admission and berno...
Batch arrival retrial queuing system with state dependent admission and berno...Batch arrival retrial queuing system with state dependent admission and berno...
Batch arrival retrial queuing system with state dependent admission and berno...
 
Predicting construction project duration with support
Predicting construction project duration with supportPredicting construction project duration with support
Predicting construction project duration with support
 
Fuzzy Fatigue Failure Model to Estimate the Reliability of Extend the Service...
Fuzzy Fatigue Failure Model to Estimate the Reliability of Extend the Service...Fuzzy Fatigue Failure Model to Estimate the Reliability of Extend the Service...
Fuzzy Fatigue Failure Model to Estimate the Reliability of Extend the Service...
 
Predicting construction project duration with support vector machine
Predicting construction project duration with support vector machinePredicting construction project duration with support vector machine
Predicting construction project duration with support vector machine
 
Application of ann for ultimate shear strength of fly ash concrete beams
Application of ann for ultimate shear strength of fly ash concrete beamsApplication of ann for ultimate shear strength of fly ash concrete beams
Application of ann for ultimate shear strength of fly ash concrete beams
 
Application of ann for ultimate shear strength of fly
Application of ann for ultimate shear strength of flyApplication of ann for ultimate shear strength of fly
Application of ann for ultimate shear strength of fly
 
Application of ann for ultimate shear strength of fly ash concrete beams
Application of ann for ultimate shear strength of fly ash concrete beamsApplication of ann for ultimate shear strength of fly ash concrete beams
Application of ann for ultimate shear strength of fly ash concrete beams
 
Desinging dsp (0, 1) acceptance sampling plans based on truncated life tests ...
Desinging dsp (0, 1) acceptance sampling plans based on truncated life tests ...Desinging dsp (0, 1) acceptance sampling plans based on truncated life tests ...
Desinging dsp (0, 1) acceptance sampling plans based on truncated life tests ...
 
Massmomentsof inertia of joined wing unmanned aerial vehicle
Massmomentsof inertia of joined wing unmanned aerial vehicleMassmomentsof inertia of joined wing unmanned aerial vehicle
Massmomentsof inertia of joined wing unmanned aerial vehicle
 
Hybridizing guided genetic algorithm and single-based metaheuristics to solve...
Hybridizing guided genetic algorithm and single-based metaheuristics to solve...Hybridizing guided genetic algorithm and single-based metaheuristics to solve...
Hybridizing guided genetic algorithm and single-based metaheuristics to solve...
 
Massmomentsof inertia of joined wing unmanned aerial
Massmomentsof inertia of joined wing unmanned aerialMassmomentsof inertia of joined wing unmanned aerial
Massmomentsof inertia of joined wing unmanned aerial
 
Desinging dsp (0, 1) acceptance sampling plans based on
Desinging dsp (0, 1) acceptance sampling plans based onDesinging dsp (0, 1) acceptance sampling plans based on
Desinging dsp (0, 1) acceptance sampling plans based on
 
A tricky task scheduling technique to optimize time cost and reliability in m...
A tricky task scheduling technique to optimize time cost and reliability in m...A tricky task scheduling technique to optimize time cost and reliability in m...
A tricky task scheduling technique to optimize time cost and reliability in m...
 

More from eSAT Journals

Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
eSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
eSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
eSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
eSAT Journals
 

More from eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

A mathematical model for determining the optimal size of a reserve resource pool for essential services copy (2)

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 117 A MATHEMATICAL MODEL FOR DETERMINING THE OPTIMAL SIZE OF A RESERVE RESOURCE POOL FOR ESSENTIAL SERVICES: HUMAN RESOURCES S.C. Saha1 , Seena.P2 , Subodh Deb Barma3 1 Professor, 2 Assistant Professor, 3 Research Scholar 1, 3 Mechanical Engineering Department, 2 Production Engineering Department National Institute of Technology, Agartala-799055 subashchandrasaha@yahoo.in, zeenapriyan@gmail.com, Subodh_debbarma@yahoo.co.in Abstract For uninterrupted service/operation, a main work force is employed when the workforce is inadequate during peak hours; a reserve of resource pool has to be maintained, to fulfill the necessity. In many cases, the optimal work force in the reserve pool is laborious to determine or may be an approximate figure. To find the optimal manpower/resource pool, a mathematical model using Steady state probability is coined for uninterrupted service. The model may be used for different other requirements like sourcing goods/materials from suppliers, and to determine the optimal capacity of the in-house facility. Keywords: Optimal manpower in Reserve pool, Steady state probability ---------------------------------------------------------------------***----------------------------------------------------------------------- 1. INTRODUCTION To provide an uninterrupted service the main workforce, is employed. When the main workforce is not adequate for absenteeism and such reasons, persons from the reserve pool are utilized. Examples of additional nurses in the hospital, ticket reservation desk – assistants in a reservation system or machine operators in a factory, can be given to illustrate this. In this article, we discuss a model, constructed on some approximating assumptions, to determine an optimal number of persons who are to be put in the reserve, in such situations. It is perhaps worthwhile to note here that, the applicability of statistical techniques for planning of man power, though in somewhat a different context of deciding on the recruitment, training and promotional policies in an organization where employees may move from class to class, has been illustrated by various authors [1]. 2. MODEL AND ANALYSIS 2.1 Model It is assumed that: i) There are n machines and one operator operates each machine. These n operators form the main work force. In addition, there is a reserve pool in which there are m operators. ii) In the absence of an operator of the main workforce, an operator from the reserve pool is deputed in his place, provided the reserve pool has adequate persons at that moment to permit this; if this is not possible at that moment, this is done whenever, at earliest as possible. All the machines have the same priority in this respect. iii) Let F (.) be the distribution of the random variable which denotes the time after which an operator (in the main work force) takes a break, and G (.) be the distribution of the length of a break. Let µF and µG be the means of F (.) and G (.) respectively (0 < µF, µG < ∞) iv) No operator in the reserve pool is absent when there is a need. That is, if it is required, m operators can always be taken from the reserve pool. v) Cost per unit time for an unmanned machine is C1 and the cost per unit time for a person in the reserve pool is C2. vi) All the random variables are independent. 2.2 Analysis We take the objective function as the long-term average cost per unit time. Let N(t) give the number of operators (of the main work force) absent at time t and S(t) the number of unmanned machine at time t. then, if N(t) = m+j, S(t)=j; j=0,1…, n-m. In an interval [t, t+∆t] the cost incurred is C1.S (t) ∆t + C2.m. ∆t, where ∆t is sufficiently small. Thus, the long term expected cost per unit time can be written, as a function of m, as,
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 118 ……… …………….. (a) Define Xi(t) =1, if N(t) = m+I, (i=1,2,…,n-m), Xi(t) = 0, otherwise. Then, S (t) =∑i. Xi (t). And, ……….. (b) Where, If the limits exist (Lemma 2.2, Barlow and Proschan 1975) [2, 4, 5]; next, let p (t) be the probability that an operator is absent at time t, since the operators act independently and identically. ……………………………. (c) By the theorem of steady state probabilities in a two stage, alternating renewal process [3-5] Thus, ……………….….. (d) Hence, ………………… (e) Where, It is straightforward to see that, If, ………………………... (f) The LHS of 2.1 is the complement of the binomial distribution with parameters (n, ). For m=0, the LHS =1- . Thus, if 1- > , (0 < <1) then there exist a non zero unique such that ( (m), m= 0,1, …., n, since the LHS is decreasing with m. the minimizing can be found, in this case, as minimum m for which LHS , and can be calculated without any great difficulty. The binomial distribution table may be used, and can be approximated by the Poisson’s distribution table when n is large, and for still larger n the standard normal distribution table can be used. Also, we may note that, the optimal is a minimize as long as, ………………… (g) 2.3 Numerical Example Take = 0.05, = 0.1; the following table gives the optimal for different values of n, and the sensitivity range of ( ) in which is optimal. Table 1 Different Values of n, and optimal n ( ) Sensitivity 5 1+1 0.0226-0.2262 10 1+1 0.0861-0.4013 15 2+1 0.0362-0.171 20 2+1 0.0755-0.2642 30 3+1 0.068- 0.191 40 4+1 0.053 -0.143 CONCLUSIONS A model is presented by which the optimal manpower in reserve for an essential service may be determined. Though the assumptions of independence of the random variables, assumption of uniform pay for the persons in the reserve pool, etc. are somewhat restrictive, but overall, it is quite indicative.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 02 Issue: 08 | Aug-2013, Available @ http://www.ijret.org 119 In a numerical example, it is seen that the extra manpower required for a fixed number of machines decreases as the total number of machines increases. The same model may be valid for the situations, which are similar to that discussed here. For example, when a certain commodity is sourced from different suppliers, who may stop the supply for a temporary period sometimes, and there is an in house sourcing also to make up for this the same analysis may be applicable to determine the optimal capacity of the in house facility. REFERENCES [1] Bartholomew, D. J., and A. F. Forbes 1979, “Statistical techniques for manpower planning”, Wiley. Chichester [Eng.]; New York [2] Barlow, R. E., and Proschan, F. (1975), “Statistical theory of Reliability and life testing: Probability Models”, Holt, Rinehart and, Winston, New York. [3] W. Feller, “An Introduction to Probability Theory and Its Applications,” vol. 11, New York: Wiley, 1966. [4] Kall, P. and J. Mayer 2005. “Stochastic linear programming: models, theory, and computation”, Springer Science, New York [5] J. R. Birge and F. Louveaux, “Introduction to Stochastic Programming”, New York: Springer- Verlag, 1997.