ENVIRONMENTAL IMPACT ASSESSMENT
6.1 INTRODUCTION
The purpose of an Environmental Impact Assessment (EIA) is to identify the significant positive
and negative impacts of a project on the local and regional environment, and to determine
appropriate measures to exploit the benefits and mitigate any adverse effects.
Environmental Impact Assessment (EIA) to consider the study of :-
6.2 BASELINE CONDITIONS
6.2.1 Physical Environment
The project is located in the Tekeze River Basin, about 80 km to the west-south-west of
Mekele, the regional capital of Tigray. The topography of the basin is flat and relatively low lying
to the north-west, close to the Sudanese border, but is mountainous in the east, where the elevation
rises to over 4,500m in the Simien highlands. The climate is dry, with an average rainfall ranging
from less then 500 mm in the north-western lowlands to over 1400 mm in the high mountains,
mostly confined to the months June to August.
The Tekeze River drains an area of around 68,000 kmยฒ in NW Ethiopia, before joining the
River Atbara in Sudan. The damsite is situated in the middle reaches of the river, where it flows in
a generally northerly direction with a catchment area of 30,390 kmยฒ. The mean annual flow at the
site is 3,750 Mm3 (119 m3/s) varying from over 1,600 Mm3/month in August to less than 17 Mm3
/month on average in the drier period December to April.
6.2.2 Biological Environment
The flora and fauna in the study area were assessed through field observations, discussions with
local inhabitants and surveys of the available literature. The investigations did not include specific
species or habitat surveys, which were outside the scope of the study.
๏ƒ˜ Vegetation
The catchment to the damsite is characterised by open shrubland, widely grazed and moderately
or intensively cultivated. The natural vegetation in the project area is a mixture of Acacia-
Commiphora and Combretum-Terminalia woodland, which consists of small trees and shrubs that
are mainly drought tolerant. It is reported that the acacia woodland was much denser prior to the
severe drought in the early to mid 1980s, but today the vegetation is much degraded. Only two
species, Aloe elegans and Aloe trichosantha, are endemic, but both these are common outside the
project area. About 15-25 km from the damsite, along the access road from Adi Abi, there is is an
enclosed area with a high concentration of frankinsence trees, Boswellia papyrifera. This area has a
significant commercial value and is protected by the Regional Government.
๏ƒ˜ Wildlife and Fish
The faunistic diversity of the Tekeze catchment is relatively poor, except in the Simien
National Park and the Shire Wildlife reserve, both downstream from the dam site. There is,
however, a wide variety of birdlife centred on the river corridor. Wild animal populations are low
in the project area, but species encountered around the reservoir location include mammals (leopard,
hyena, fox, baboon, etc.), reptiles (crocodile, snakes) and birds. None of the larger mammals and birds
is endemic.
The Tekeze river contains at least seven species of fish. Barbus and Clarias are migratory
species, which move seasonally between the upstream and downstream reaches of the river. Four
species also have a commercial importance.
6.2.3 Socio-Economic Environment
๏ƒ˜ Areas Around the Reservoir
The reservoir is adjacent to four Weredas, three in the Amhara Region (Beyeda, Sekota and
Zikuala) and one in the Tigray Region (Abergele). The total population of Peasant Associations
(PA) adjacent to the reservoir is about 52,200 people. However, there are no houses or settlements
within the area to be flooded up to the top water level of 1140m, and most of the villages are
located at least two kilometres from the river on the plateau,
In both the Tigray and Amhara regions Orthodox Christianity is the main religion (>99%), the
remainder largely being Muslims. In the Tekeze basin, the Orthodox Church generally plays a
dominant role in the village life, for example for resolving conflicts over land.
๏ƒ˜ Downstream areas
The Tekeze river flows through a narrow gorge down to the Shire Wildlife Reserve before
crossing the floodplain aroung Humera, close to the international border. The Kashm-El-Girba
irrigation scheme in sited on the river, now called the Setit, in the Sudan. The first road bridge over
the river below the damsite is located at Embamadre, some 100 km downstream.
The socio-economic survey revealed a 10 ha area which is used for flood recession
cultivation on the right bank of the Tekeze river, some 20 km downstream from the dam site. The
main crops grown are cotton and red peppers. According to discussions with local people, flood
recession agriculture is probably practised further downstream, but no information is available on
the location or extent of these areas. In addition, three crossing points of the Tekeze were identified
below the dam within the 20 km reach.
6.3 POTENTIAL ENVIRONMENTAL IMPACTS
The construction and operation of the Tekeze Hydropower Project will lead to a variety of
changes in the local and wider environment. Many of the effects will be beneficial, particularly the
impact at a national level of increasing the availability of electrical energy, and the potential to
develop the local economy through improved infrastructure and employment opportunities. There
will nevertheless be adverse effects, some of which will be short-term and reversible, but others that
will lead to permanent change. Although the scale and magnitude of many impacts cannot be
predicted accurately, their recognition at an early phase of the project development enables
mitigating measures, where these are practicable, to be incorporated into the design, and monitoring
programmes to be set up to assess the need for remedial action. An awareness of the residual
environmental implications of the project is also fundamental for a balanced decision as to whether
or not the project should be initiated.
6.3.1 Positive Impacts
The project will potentially have a number of beneficial impacts on the natural and the
socio-economic environment, both during its construction and its operational life. The
positive effects in the physical and biological domain and the anticipated socio-economic
benefits are discussed below
๏ƒ˜ Natural Environment
The lake will naturally develop populations of stagnant water fish species, which will lead to a
significant increase in the total fish biomass in the Tekeze river. The reservoir also offers a
potential for the development of a commercial fishery.
๏ƒ˜ Socio-Economic Environment
Positive socio-economic impacts may be anticipated from the regional development stemming from
the project. During the construction phase there will be improved employment opportunities for
local people, for work constructing the civil works, access road, camp and transmission lines.
There will also be a temporary surge in economic activity during the construction phase, and new
markets and services will develop in the area to provide goods and services for the workers and
their families
Under operation, the main positive impact will be the generation of reliable energy for Ethiopia.
๏ƒ˜ Negative Impacts
The following section summarises the main negative impacts of the project on the physical,
biological and socio-economic environment, and includes a specific assessment of the potential
impacts downstream of the dam.
๏ƒ˜ Physical impacts
The construction activities will give rise to a temporary local deterioration in air quality, and will
produce high noise levels and vibration. The construction works and the removal the vegetation
cover in the reservoir area prior to first filling will increase the risk of erosion in area, leading to the
loss of fertile soils and higher rates of sedimentation in the river.
๏ƒ˜ Biological impacts
This area includes a significant number of important riverine forest and savannah woodland
vegetation communities, and their loss will reduce both the regionโ€™s biodiversity and the availability
of wildlife habitats. The natural forest cover is critical for the maintenance of soil stability, and
plays an important role in protecting against erosion and increased sedimentation in the drainage
system. Forests and woodland ecosystems also contain a wide range of plant species of commercial
and domestic importance.
6.3.2 Summary of Significant Environmental Impacts
6.3.1 Summary of Significant Environmental Impacts
The main positive and negative impacts predicted to arise from the scheme are summarised in Table
Significant Environmental Impacts
Positive Impacts related to: Physical and Biological Environment Socio-Economic Environment
Construction and
Impoundment
Creation of aquatic habitat for a variety
of birds and fish species
Increased local employment
opportunities
Development of local economy
Operation Downstream regulation may be
beneficial to some aquatic flora and
fauna
Increase in regional and national
energy supplies
Potential development of
commercial fishery in the
reservoir
Improved seasonal regime for
irrigation abstraction downstream
Negative Impacts related to:
Project Location Destruction of aquatic wildlife habitat
and elimination of riverine fishes in the
reservoir
Creation of breeding sites for vectors of
water-borne diseases
Risk of loss of protected Frankincense
trees for access road and transmission
lines
Loss of 231ha of flood recession
cropland, 68ha of irrigated
cropland, loss of grazing land
Disruption of cross-valley
communication links by
inundation of crossing paths (9
upstream and 3 downstream
within 20km)
Construction and
impoundment
Risk of erosion and pollution (water
pollution, dust, noise)
Creation of breeding sites for tropical
diseases vectors
Effects on aquatic fauna due to
reduction in downstream flows to
compensation levels throughout the
period of impoundment
Temporary loss of about 200ha of
land for construction camps
Permanent loss of land for access
road and transmission lines
Increased health risks for local
population and workers
Effects on downstream irrigation
and flood retreat agriculture
Project Operation Increased population pressure on
natural vegetation and wildlife
resources
Siltation in the reservoir
Decrease in flows downstream during
wet season and increase during dry
season
Changes in reservoir water quality and
risk of eutrophication and growth of
invasive water weeds
Downstream impacts on water quality
and aquatic fauna
Increase in transmission of water-
related diseases
Effects on downstream flood
retreat cultivation
Possible flooding of crossing
paths in the valley below the dam
Inundation of the Merdianos
sacred spring
6.4 MITIGATION MEASURES
The proposed mitigation measures to minimise adverse impacts and enhance the benefits of the
scheme are summarised in Table.
Mitigation Measures
Item No Unit Unit cost Total cost
(Birr) (Birr)
1 Compensation for income foregone
1.1 temporary loss of land for camp site cosntruction 200 ha 3,000 600,000
1.2 Loss of flood recession cropland 231 ha 6,000 1,386,000
1.3 Loss of grazing land in reservoir area 168 ha 650 109,200
1.4 Loss of irrigated land in reservoir areas 68 ha 16,000 1,088,000
2 Infrastructure
2.1 Water supply wells 16 borehole 200,000 3,200,000
2.2 Sanitation facilities 1,000 pit latrine 225 225,000
2.3 Health facilities 1 h. centre 2,500,000 2,500,000
2.4 River crossing replacements across reservoir 9 ferry annual maintenance
9 ferryman of the scheme
2.5 River crossing replacements below dam 3 irish
crossing
200,000 600,000
2.6 Small scale irrigation development 150 ha 15,000 2,250,000
3 Community health control programme lump sum 745,000
4 Agricultural extension services lump sum 1,000,000
5 Compensation for Merdianos spring ceremony
or civil
works
6 Survey of downstream flood recession
agriculture and crossing paths
23,400
7 Contingency for mitigation measures for
downstream agricultural land losses
240,000
8 Contingency for mitigation measures for river
crossing replacement
2,400,000
9 Preparation of catchment plans for conservation
areas
2,100,000
10 Implementation and management of
conservation areas
9,000,000
20% contingency 5,493,320
TOTAL 32,959,920
6.5 MONITORING PLAN
An appropriate monitoring programme is recommended to verify the magnitude and scale of the
predicted impacts, and to detect any unforeseen impacts at an early stage. One of the most
important aims of monitoring is to ensure that any necessary corrective action arising from
unforeseen adverse impacts, or from different magnitudes of recognised impacts, is undertaken
before significant environmental damage results.
The EIA studies have shown that there has been relatively little monitoring of existing
environmental conditions in the area. It is therefore important to establish a monitoring programme
prior to the start of construction, in order to establish background conditions against which future
change can be assessed.
Monitoring Activities and Costs
Subject Activity Frequency Responsible Organisation
Water Quality Survey of the physico-
chemical parameters of the
reservoir water
quarterly for 5 years MWR
Fishery Fisheries monitoring in the
river and reservoir
quarterly for 5 years Ministry of Agriculture
- Fisheries Sector
Health Survey of disease vectors
(mosquitoes and snails)
annual survey for 5
years
Ministry of Health
Human health survey annual survey for 3
years
Ministry of Health - Malaria
Control Office
Environmental
co-ordination
Compensation plan 6 man months MWR or EELPA
20%
contingency
214,000
TOTAL 1,284,000

More Related Content

What's hot

A Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of BangladeshA Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of Bangladesh
suvash roy
ย 
LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998
Mr Cornish
ย 
Geo l15 flood_drought_india
Geo l15 flood_drought_indiaGeo l15 flood_drought_india
Geo l15 flood_drought_india
Mukesh Bugaliya
ย 
Paase Koh Lecture Liongson
Paase Koh Lecture LiongsonPaase Koh Lecture Liongson
Paase Koh Lecture Liongson
leony1948
ย 
Integrated Flood Management Project
Integrated Flood Management ProjectIntegrated Flood Management Project
Integrated Flood Management Project
WaterCap
ย 

What's hot (20)

GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
ย 
A Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of BangladeshA Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of Bangladesh
ย 
LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998
ย 
Salinity problem in bangladesh
Salinity problem in bangladeshSalinity problem in bangladesh
Salinity problem in bangladesh
ย 
Lecture 1 flood
Lecture 1 floodLecture 1 flood
Lecture 1 flood
ย 
how human population growth affecting resource depletion
how human population growth affecting resource depletionhow human population growth affecting resource depletion
how human population growth affecting resource depletion
ย 
Salinity risk assessment in bangladesh
Salinity risk assessment in bangladeshSalinity risk assessment in bangladesh
Salinity risk assessment in bangladesh
ย 
Kerala flood and after. 300918
Kerala   flood and after. 300918Kerala   flood and after. 300918
Kerala flood and after. 300918
ย 
Mekong ARCC - Final workshop - Socio-Economic Study
Mekong ARCC - Final workshop - Socio-Economic StudyMekong ARCC - Final workshop - Socio-Economic Study
Mekong ARCC - Final workshop - Socio-Economic Study
ย 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management ppt
ย 
Geo l15 flood_drought_india
Geo l15 flood_drought_indiaGeo l15 flood_drought_india
Geo l15 flood_drought_india
ย 
Dams and their Effects on forests and tribal people
Dams and their Effects on forests and tribal peopleDams and their Effects on forests and tribal people
Dams and their Effects on forests and tribal people
ย 
Paase Koh Lecture Liongson
Paase Koh Lecture LiongsonPaase Koh Lecture Liongson
Paase Koh Lecture Liongson
ย 
Wtershed management
Wtershed managementWtershed management
Wtershed management
ย 
Dams & environment
Dams & environmentDams & environment
Dams & environment
ย 
Water ressource assessment
Water ressource assessmentWater ressource assessment
Water ressource assessment
ย 
Disaster: How we can reduce the risk of it.
Disaster: How we can reduce the risk of it.Disaster: How we can reduce the risk of it.
Disaster: How we can reduce the risk of it.
ย 
Causes of japan flood 2015
Causes of japan flood 2015Causes of japan flood 2015
Causes of japan flood 2015
ย 
Integrated Flood Management Project
Integrated Flood Management ProjectIntegrated Flood Management Project
Integrated Flood Management Project
ย 
Water resources
Water resourcesWater resources
Water resources
ย 

Viewers also liked

The impact of tourism on a host country
The impact of tourism on a host countryThe impact of tourism on a host country
The impact of tourism on a host country
Karen Houston
ย 
Impact Of Multinational Companies
Impact Of Multinational CompaniesImpact Of Multinational Companies
Impact Of Multinational Companies
sabiya
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prithvi Ghag
ย 
Economic impact of tourism
Economic impact of tourismEconomic impact of tourism
Economic impact of tourism
Eman Abbas
ย 
Socio-cultural Development - Vygotsky
Socio-cultural Development - VygotskySocio-cultural Development - Vygotsky
Socio-cultural Development - Vygotsky
Corey Durward
ย 

Viewers also liked (17)

How to Stress Less
How to Stress LessHow to Stress Less
How to Stress Less
ย 
Cรณmo acreditar los derechos de autor
Cรณmo acreditar los derechos de autorCรณmo acreditar los derechos de autor
Cรณmo acreditar los derechos de autor
ย 
Evolutionรคr webbdesign - Webbdagarna Stockholm 2016
Evolutionรคr webbdesign  - Webbdagarna Stockholm 2016Evolutionรคr webbdesign  - Webbdagarna Stockholm 2016
Evolutionรคr webbdesign - Webbdagarna Stockholm 2016
ย 
201703 EC-CUBE 3.1้–‹็™บๆ–น้‡่ชฌๆ˜Žไผš๏ผšๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บ็ทจ 02_ๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใฎใŸใ‚ใฎใ‚ขใƒผใ‚ญใƒ†ใ‚ฏใƒใƒฃ
201703 EC-CUBE 3.1้–‹็™บๆ–น้‡่ชฌๆ˜Žไผš๏ผšๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บ็ทจ 02_ๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใฎใŸใ‚ใฎใ‚ขใƒผใ‚ญใƒ†ใ‚ฏใƒใƒฃ201703 EC-CUBE 3.1้–‹็™บๆ–น้‡่ชฌๆ˜Žไผš๏ผšๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บ็ทจ 02_ๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใฎใŸใ‚ใฎใ‚ขใƒผใ‚ญใƒ†ใ‚ฏใƒใƒฃ
201703 EC-CUBE 3.1้–‹็™บๆ–น้‡่ชฌๆ˜Žไผš๏ผšๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บ็ทจ 02_ๆฉŸ่ƒฝใ‚ซใ‚นใ‚ฟใƒžใ‚คใ‚บใฎใŸใ‚ใฎใ‚ขใƒผใ‚ญใƒ†ใ‚ฏใƒใƒฃ
ย 
Kickstarta den digitala transformationen 2017 - 3 sรคtt att komma igรฅng.
Kickstarta den digitala transformationen 2017 - 3 sรคtt att komma igรฅng.Kickstarta den digitala transformationen 2017 - 3 sรคtt att komma igรฅng.
Kickstarta den digitala transformationen 2017 - 3 sรคtt att komma igรฅng.
ย 
Nghiรชn cแปฉu ฤ‘แบทc ฤ‘iแปƒm lรขm sร ng, cแบญn lรขm sร ng vร  ฤ‘iแปu trแป‹ hแบก nartri mรกu แปŸ bแป‡nh n...
Nghiรชn cแปฉu ฤ‘แบทc ฤ‘iแปƒm lรขm sร ng, cแบญn lรขm sร ng vร  ฤ‘iแปu trแป‹ hแบก nartri mรกu แปŸ bแป‡nh n...Nghiรชn cแปฉu ฤ‘แบทc ฤ‘iแปƒm lรขm sร ng, cแบญn lรขm sร ng vร  ฤ‘iแปu trแป‹ hแบก nartri mรกu แปŸ bแป‡nh n...
Nghiรชn cแปฉu ฤ‘แบทc ฤ‘iแปƒm lรขm sร ng, cแบญn lรขm sร ng vร  ฤ‘iแปu trแป‹ hแบก nartri mรกu แปŸ bแป‡nh n...
ย 
Economic, Environmental & Socio-cultural Considerations
Economic, Environmental & Socio-cultural ConsiderationsEconomic, Environmental & Socio-cultural Considerations
Economic, Environmental & Socio-cultural Considerations
ย 
The Socio Cultural Impact of Tourism
The Socio Cultural Impact of TourismThe Socio Cultural Impact of Tourism
The Socio Cultural Impact of Tourism
ย 
The impact of tourism on a host country
The impact of tourism on a host countryThe impact of tourism on a host country
The impact of tourism on a host country
ย 
Impact Of Multinational Companies
Impact Of Multinational CompaniesImpact Of Multinational Companies
Impact Of Multinational Companies
ย 
Private sector skills - what value to the NHS?
Private sector skills - what value to the NHS?Private sector skills - what value to the NHS?
Private sector skills - what value to the NHS?
ย 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
ย 
Economic impact of tourism
Economic impact of tourismEconomic impact of tourism
Economic impact of tourism
ย 
Av1 unidade produtora de refeicoes
Av1 unidade produtora de refeicoesAv1 unidade produtora de refeicoes
Av1 unidade produtora de refeicoes
ย 
AWSใงๅง‹ใ‚ใ‚‹ใ‚ตใƒผใƒใƒฌใ‚นใช RESTful API ใ‚ทใ‚นใƒ†ใƒ 
AWSใงๅง‹ใ‚ใ‚‹ใ‚ตใƒผใƒใƒฌใ‚นใช RESTful API ใ‚ทใ‚นใƒ†ใƒ AWSใงๅง‹ใ‚ใ‚‹ใ‚ตใƒผใƒใƒฌใ‚นใช RESTful API ใ‚ทใ‚นใƒ†ใƒ 
AWSใงๅง‹ใ‚ใ‚‹ใ‚ตใƒผใƒใƒฌใ‚นใช RESTful API ใ‚ทใ‚นใƒ†ใƒ 
ย 
Socio-cultural Development - Vygotsky
Socio-cultural Development - VygotskySocio-cultural Development - Vygotsky
Socio-cultural Development - Vygotsky
ย 
SOCIO-CULTURAL IMPACTS OF TOURISM
SOCIO-CULTURAL IMPACTS OF TOURISMSOCIO-CULTURAL IMPACTS OF TOURISM
SOCIO-CULTURAL IMPACTS OF TOURISM
ย 

Similar to Environmental impact assessment

ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011
Torsten Kowal
ย 
Land Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water QualityLand Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water Quality
Hannah Kiesler
ย 

Similar to Environmental impact assessment (20)

ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011
ย 
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
ย 
Land Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water QualityLand Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water Quality
ย 
Wetland degradation in Bangladesh
Wetland degradation in BangladeshWetland degradation in Bangladesh
Wetland degradation in Bangladesh
ย 
Aquatic management
Aquatic managementAquatic management
Aquatic management
ย 
Environment as important water use for hydro-infrastructure's consideration
Environment as important water use for hydro-infrastructure's considerationEnvironment as important water use for hydro-infrastructure's consideration
Environment as important water use for hydro-infrastructure's consideration
ย 
Climate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processClimate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP process
ย 
18. Environmental Impacts of Dams (Supply).pdf
18. Environmental Impacts of Dams (Supply).pdf18. Environmental Impacts of Dams (Supply).pdf
18. Environmental Impacts of Dams (Supply).pdf
ย 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02
ย 
CHAPTER 5 NATURAL ENVIRONMENT
CHAPTER 5 NATURAL ENVIRONMENTCHAPTER 5 NATURAL ENVIRONMENT
CHAPTER 5 NATURAL ENVIRONMENT
ย 
Chapter 5 natural environment
Chapter 5   natural environmentChapter 5   natural environment
Chapter 5 natural environment
ย 
EbA Along Bedkot-Jhilmila Lake Corridor.pptx
EbA Along Bedkot-Jhilmila Lake Corridor.pptxEbA Along Bedkot-Jhilmila Lake Corridor.pptx
EbA Along Bedkot-Jhilmila Lake Corridor.pptx
ย 
15. Biodiversity and in land water A Presentation By Mr. Allah Dad Khan Vis...
15. Biodiversity and in land water A Presentation By Mr. Allah  Dad Khan  Vis...15. Biodiversity and in land water A Presentation By Mr. Allah  Dad Khan  Vis...
15. Biodiversity and in land water A Presentation By Mr. Allah Dad Khan Vis...
ย 
Degradation and Loss of Peri-Urban Ecosystems
Degradation and Loss of Peri-Urban EcosystemsDegradation and Loss of Peri-Urban Ecosystems
Degradation and Loss of Peri-Urban Ecosystems
ย 
Aggregateact
AggregateactAggregateact
Aggregateact
ย 
AN OVERVIEW.pptx
AN OVERVIEW.pptxAN OVERVIEW.pptx
AN OVERVIEW.pptx
ย 
Environmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectEnvironmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower project
ย 
Sudan SUDAN: NAPA PROJECT PROFILE
Sudan SUDAN: NAPA PROJECT PROFILESudan SUDAN: NAPA PROJECT PROFILE
Sudan SUDAN: NAPA PROJECT PROFILE
ย 
Bibhu santosh behera (2)
Bibhu santosh behera (2)Bibhu santosh behera (2)
Bibhu santosh behera (2)
ย 
Land Use And Regulation
Land Use And RegulationLand Use And Regulation
Land Use And Regulation
ย 

Recently uploaded

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
MOHANI PANDEY
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Anamikakaur10
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
hossanmdjobayer103
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
SUHANI PANDEY
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
tanu pandey
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
SUHANI PANDEY
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
garthraymundo123
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
SUHANI PANDEY
ย 

Recently uploaded (20)

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
ย 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 

Environmental impact assessment

  • 1. ENVIRONMENTAL IMPACT ASSESSMENT 6.1 INTRODUCTION The purpose of an Environmental Impact Assessment (EIA) is to identify the significant positive and negative impacts of a project on the local and regional environment, and to determine appropriate measures to exploit the benefits and mitigate any adverse effects. Environmental Impact Assessment (EIA) to consider the study of :- 6.2 BASELINE CONDITIONS 6.2.1 Physical Environment The project is located in the Tekeze River Basin, about 80 km to the west-south-west of Mekele, the regional capital of Tigray. The topography of the basin is flat and relatively low lying to the north-west, close to the Sudanese border, but is mountainous in the east, where the elevation rises to over 4,500m in the Simien highlands. The climate is dry, with an average rainfall ranging from less then 500 mm in the north-western lowlands to over 1400 mm in the high mountains, mostly confined to the months June to August. The Tekeze River drains an area of around 68,000 kmยฒ in NW Ethiopia, before joining the River Atbara in Sudan. The damsite is situated in the middle reaches of the river, where it flows in a generally northerly direction with a catchment area of 30,390 kmยฒ. The mean annual flow at the site is 3,750 Mm3 (119 m3/s) varying from over 1,600 Mm3/month in August to less than 17 Mm3 /month on average in the drier period December to April. 6.2.2 Biological Environment The flora and fauna in the study area were assessed through field observations, discussions with local inhabitants and surveys of the available literature. The investigations did not include specific species or habitat surveys, which were outside the scope of the study. ๏ƒ˜ Vegetation The catchment to the damsite is characterised by open shrubland, widely grazed and moderately or intensively cultivated. The natural vegetation in the project area is a mixture of Acacia- Commiphora and Combretum-Terminalia woodland, which consists of small trees and shrubs that are mainly drought tolerant. It is reported that the acacia woodland was much denser prior to the severe drought in the early to mid 1980s, but today the vegetation is much degraded. Only two species, Aloe elegans and Aloe trichosantha, are endemic, but both these are common outside the project area. About 15-25 km from the damsite, along the access road from Adi Abi, there is is an enclosed area with a high concentration of frankinsence trees, Boswellia papyrifera. This area has a significant commercial value and is protected by the Regional Government. ๏ƒ˜ Wildlife and Fish The faunistic diversity of the Tekeze catchment is relatively poor, except in the Simien National Park and the Shire Wildlife reserve, both downstream from the dam site. There is, however, a wide variety of birdlife centred on the river corridor. Wild animal populations are low in the project area, but species encountered around the reservoir location include mammals (leopard, hyena, fox, baboon, etc.), reptiles (crocodile, snakes) and birds. None of the larger mammals and birds is endemic. The Tekeze river contains at least seven species of fish. Barbus and Clarias are migratory species, which move seasonally between the upstream and downstream reaches of the river. Four species also have a commercial importance.
  • 2. 6.2.3 Socio-Economic Environment ๏ƒ˜ Areas Around the Reservoir The reservoir is adjacent to four Weredas, three in the Amhara Region (Beyeda, Sekota and Zikuala) and one in the Tigray Region (Abergele). The total population of Peasant Associations (PA) adjacent to the reservoir is about 52,200 people. However, there are no houses or settlements within the area to be flooded up to the top water level of 1140m, and most of the villages are located at least two kilometres from the river on the plateau, In both the Tigray and Amhara regions Orthodox Christianity is the main religion (>99%), the remainder largely being Muslims. In the Tekeze basin, the Orthodox Church generally plays a dominant role in the village life, for example for resolving conflicts over land. ๏ƒ˜ Downstream areas The Tekeze river flows through a narrow gorge down to the Shire Wildlife Reserve before crossing the floodplain aroung Humera, close to the international border. The Kashm-El-Girba irrigation scheme in sited on the river, now called the Setit, in the Sudan. The first road bridge over the river below the damsite is located at Embamadre, some 100 km downstream. The socio-economic survey revealed a 10 ha area which is used for flood recession cultivation on the right bank of the Tekeze river, some 20 km downstream from the dam site. The main crops grown are cotton and red peppers. According to discussions with local people, flood recession agriculture is probably practised further downstream, but no information is available on the location or extent of these areas. In addition, three crossing points of the Tekeze were identified below the dam within the 20 km reach. 6.3 POTENTIAL ENVIRONMENTAL IMPACTS The construction and operation of the Tekeze Hydropower Project will lead to a variety of changes in the local and wider environment. Many of the effects will be beneficial, particularly the impact at a national level of increasing the availability of electrical energy, and the potential to develop the local economy through improved infrastructure and employment opportunities. There will nevertheless be adverse effects, some of which will be short-term and reversible, but others that will lead to permanent change. Although the scale and magnitude of many impacts cannot be predicted accurately, their recognition at an early phase of the project development enables mitigating measures, where these are practicable, to be incorporated into the design, and monitoring programmes to be set up to assess the need for remedial action. An awareness of the residual environmental implications of the project is also fundamental for a balanced decision as to whether or not the project should be initiated. 6.3.1 Positive Impacts The project will potentially have a number of beneficial impacts on the natural and the socio-economic environment, both during its construction and its operational life. The positive effects in the physical and biological domain and the anticipated socio-economic benefits are discussed below ๏ƒ˜ Natural Environment The lake will naturally develop populations of stagnant water fish species, which will lead to a significant increase in the total fish biomass in the Tekeze river. The reservoir also offers a potential for the development of a commercial fishery. ๏ƒ˜ Socio-Economic Environment Positive socio-economic impacts may be anticipated from the regional development stemming from the project. During the construction phase there will be improved employment opportunities for local people, for work constructing the civil works, access road, camp and transmission lines. There will also be a temporary surge in economic activity during the construction phase, and new markets and services will develop in the area to provide goods and services for the workers and their families
  • 3. Under operation, the main positive impact will be the generation of reliable energy for Ethiopia. ๏ƒ˜ Negative Impacts The following section summarises the main negative impacts of the project on the physical, biological and socio-economic environment, and includes a specific assessment of the potential impacts downstream of the dam. ๏ƒ˜ Physical impacts The construction activities will give rise to a temporary local deterioration in air quality, and will produce high noise levels and vibration. The construction works and the removal the vegetation cover in the reservoir area prior to first filling will increase the risk of erosion in area, leading to the loss of fertile soils and higher rates of sedimentation in the river. ๏ƒ˜ Biological impacts This area includes a significant number of important riverine forest and savannah woodland vegetation communities, and their loss will reduce both the regionโ€™s biodiversity and the availability of wildlife habitats. The natural forest cover is critical for the maintenance of soil stability, and plays an important role in protecting against erosion and increased sedimentation in the drainage system. Forests and woodland ecosystems also contain a wide range of plant species of commercial and domestic importance.
  • 4. 6.3.2 Summary of Significant Environmental Impacts 6.3.1 Summary of Significant Environmental Impacts The main positive and negative impacts predicted to arise from the scheme are summarised in Table
  • 5. Significant Environmental Impacts Positive Impacts related to: Physical and Biological Environment Socio-Economic Environment Construction and Impoundment Creation of aquatic habitat for a variety of birds and fish species Increased local employment opportunities Development of local economy Operation Downstream regulation may be beneficial to some aquatic flora and fauna Increase in regional and national energy supplies Potential development of commercial fishery in the reservoir Improved seasonal regime for irrigation abstraction downstream Negative Impacts related to: Project Location Destruction of aquatic wildlife habitat and elimination of riverine fishes in the reservoir Creation of breeding sites for vectors of water-borne diseases Risk of loss of protected Frankincense trees for access road and transmission lines Loss of 231ha of flood recession cropland, 68ha of irrigated cropland, loss of grazing land Disruption of cross-valley communication links by inundation of crossing paths (9 upstream and 3 downstream within 20km) Construction and impoundment Risk of erosion and pollution (water pollution, dust, noise) Creation of breeding sites for tropical diseases vectors Effects on aquatic fauna due to reduction in downstream flows to compensation levels throughout the period of impoundment Temporary loss of about 200ha of land for construction camps Permanent loss of land for access road and transmission lines Increased health risks for local population and workers Effects on downstream irrigation and flood retreat agriculture Project Operation Increased population pressure on natural vegetation and wildlife resources Siltation in the reservoir Decrease in flows downstream during wet season and increase during dry season Changes in reservoir water quality and risk of eutrophication and growth of invasive water weeds Downstream impacts on water quality and aquatic fauna Increase in transmission of water- related diseases Effects on downstream flood retreat cultivation Possible flooding of crossing paths in the valley below the dam Inundation of the Merdianos sacred spring 6.4 MITIGATION MEASURES
  • 6. The proposed mitigation measures to minimise adverse impacts and enhance the benefits of the scheme are summarised in Table. Mitigation Measures Item No Unit Unit cost Total cost (Birr) (Birr) 1 Compensation for income foregone 1.1 temporary loss of land for camp site cosntruction 200 ha 3,000 600,000 1.2 Loss of flood recession cropland 231 ha 6,000 1,386,000 1.3 Loss of grazing land in reservoir area 168 ha 650 109,200 1.4 Loss of irrigated land in reservoir areas 68 ha 16,000 1,088,000 2 Infrastructure 2.1 Water supply wells 16 borehole 200,000 3,200,000 2.2 Sanitation facilities 1,000 pit latrine 225 225,000 2.3 Health facilities 1 h. centre 2,500,000 2,500,000 2.4 River crossing replacements across reservoir 9 ferry annual maintenance 9 ferryman of the scheme 2.5 River crossing replacements below dam 3 irish crossing 200,000 600,000 2.6 Small scale irrigation development 150 ha 15,000 2,250,000 3 Community health control programme lump sum 745,000 4 Agricultural extension services lump sum 1,000,000 5 Compensation for Merdianos spring ceremony or civil works 6 Survey of downstream flood recession agriculture and crossing paths 23,400 7 Contingency for mitigation measures for downstream agricultural land losses 240,000 8 Contingency for mitigation measures for river crossing replacement 2,400,000 9 Preparation of catchment plans for conservation areas 2,100,000 10 Implementation and management of conservation areas 9,000,000 20% contingency 5,493,320 TOTAL 32,959,920
  • 7. 6.5 MONITORING PLAN An appropriate monitoring programme is recommended to verify the magnitude and scale of the predicted impacts, and to detect any unforeseen impacts at an early stage. One of the most important aims of monitoring is to ensure that any necessary corrective action arising from unforeseen adverse impacts, or from different magnitudes of recognised impacts, is undertaken before significant environmental damage results. The EIA studies have shown that there has been relatively little monitoring of existing environmental conditions in the area. It is therefore important to establish a monitoring programme prior to the start of construction, in order to establish background conditions against which future change can be assessed. Monitoring Activities and Costs Subject Activity Frequency Responsible Organisation Water Quality Survey of the physico- chemical parameters of the reservoir water quarterly for 5 years MWR Fishery Fisheries monitoring in the river and reservoir quarterly for 5 years Ministry of Agriculture - Fisheries Sector Health Survey of disease vectors (mosquitoes and snails) annual survey for 5 years Ministry of Health Human health survey annual survey for 3 years Ministry of Health - Malaria Control Office Environmental co-ordination Compensation plan 6 man months MWR or EELPA 20% contingency 214,000 TOTAL 1,284,000