Failure Analysis & Prevention
Failure analysis
- FA is a systematic approach of investigation to establish the important causes
of the failure.
Therefore, it is worth to familiarize with
– fundamental causes of failure of mechanical
components,
– general approach to be used for the failure
analysis and prevention.
2
When to consider a failure
• In general, an engineering component or assembly is considered to have
failed under the following three conditions when the component
is
–Inoperable,
– Operates but doesn’t perform the intended
function
– Operates but safety and reliability is very poor
3
Failure of mechanical components
» Failure of a mechanical component can occur in many ways
» – elastic deformation is beyond acceptable limit,
» – excessive and unacceptable level of plastic deformation,
» – complete fracture and
» – loss of dimension due to variety of reasons
» Elastic deformation
» Plastic deformation
» Creep
» Fracture
» wear
4
Fundamental causes of failure
» The failure of an engineering component in actual working conditions can
occur due to very large of factors related with
» – Design,
» – Materials,
» – Manufacturing,
» – Service conditions.
5
Need to know causes of failure
» To have systematic understanding on various factors that can
lead to failure of mechanical components :
» – Improper design
» – Improper selection of materials
» – Defects and discontinuities in metal itself
» – Improper processing of materials
» – Poor service conditions
» – Poor assembling
» – Poor maintenance
6
Engineering disasters
» A disaster is referred to as an engineering disaster when it’s
caused by an engineering failure:
» – design flaws or
» – materials failures
» – insufficient knowledge,
» – different underestimations,
» – even carelessness or negligence.
7
Titanic Ship, 1912
» RMS Titanic was a British passenger ship that
sank after hitting an iceberg on her maiden
voyage from Southampton (UK) to New York
City, in April 1912. The tragedy claimed the
lives of over 1,500 people.
» Several rivets of the 3 million rivets that held
the Titanic together were recently recovered
and tested, and found to be made of low
quality iron, which on impact caused them to
fall apart.
» Another engineering fault was that the 16
watertight compartments that kept the boat
afloat, were not individually sealed, but rather
connected near the ceiling. This enabled the
water to spill from one compartment to
another and sink the boat.
8
St. Francis Dam flooding (1928)
» The St. Francis Dam was a concrete dam built between
the years 1924 and 1926, to create a water reservoir for
Los Angeles.
» The dam was located in a canyon around 40 miles (64
km) from the city.
» On March 12, 1928, just hours after being inspected by
the Chief Engineer William Mulholland, the dam failed,
sending a massive water wave 120 ft tall, and killing as
many as 600 people in one of the worst American civil
engineering disaster
9
Tacoma Narrows Bridge collapse (1940)
» The first Tacoma Narrows Bridge was a suspension
bridge in Washington state that opened in 1940 and
collapsed at the same year. At the time of its
construction, the bridge was the world’s third longest
suspension bridge, by main span length.
» The bridge was known to move vertically in windy
conditions, and in November 7, 1940, under 40 mph
(64 km/h) winds it collapsed. The collapse was
caught on video and made an impact on science and
engineering, especially bridge designing till today
» . The cause of failure was aero elastic flutter – a
dynamic instability of an elastic structure.
10
Kadalundi Train Disaster
» There was a structural failure. The railway bridge was around
140 years old and it definitely needed repair.
» What happened was one of the pier had settled down causing
internal stresses to grow in rails.
» As soon as a train came near it, the track snapped and the train
derailed which eventually landed into river.
» So lesson one, never ever use a structure of high importance
without testing it. Always, keep an eye on it and test it
11
The Bhopal Disaster: Union Carbide
12
Rafiganj rail bridge
» Blamed to poor design and construction as well as low
maintenance.
» It is said that the plate girder deteriorated over time and was
losing its strength in fatigue due to vibrations from trains.
» Nobody paid attention to it. Also the bridge was rusty to a
great extent.
» When the train was passing by, the plate girder gave up
leading to this fatal crash.
» Lesson two, make sure your design is checked against
fatigue and steel is coated with anti-corrosion paints.
13
Industrial Engineering Tools for FA: Failure Mode &
Effect Analysis
» What Is A Failure Mode?
» A Failure Mode is:
» The way in which the component, subassembly, product, input,
or process can fail to perform its intended function
» Things that can go wrong
14
Benefits of FMEA
» Methodology that facilitates process improvement
» Identifies and eliminates concerns early in the development of a process
or design
» Focuses on prevention
15
Approach of FMEA
A structured approach for :
– Identifying the ways in which a product or process can fail
– Estimating risk associated with specific causes
– Prioritizing the actions that should be taken to reduce risk
– Evaluating design validation plan (design FMEA) or current control plan (process FMEA)
When to Conduct an FMEA
» Investigation for the process improvement investigation
» Design of new systems, products, and processes
» Modification of existing designs or processes
» Existing designs for new applications
16
FMEA: A Team Tool
» A team approach is necessary.
» Team should be led by the Process Owner who is the responsible manufacturing
engineer or technical person, or other similar individual familiar with FMEA.
» The following should be considered for team members:
» – Design Engineers
» – Operators
» – Process Engineers
» – Reliability
» – Materials Suppliers
» – Suppliers
» – Customers
17
FMEA Procedure
» For each process input (start with high value inputs), determine the ways in
which the input can go wrong (failure mode)
» For each failure mode, determine effects – Select a severity level for each effect
» Identify potential causes of each failure mode – Select an occurrence level for
each cause
» List current controls for each cause – Select a detection level for each cause
» Calculate the Risk Priority Number (RPN)
» Develop recommended actions, assign responsible persons, and take actions –
-Give priority to high RPNs – MUST look at severities rated a 10
» Assign the predicted severity, occurrence, and detection levels and compare
RPNs
18
Severity, Occurrence, and Detection
» Severity – Importance of the effect on requirements
» Occurrence – Frequency with which a given cause occurs and
creates failure modes (obtain from past data if possible)
» Detection – The ability of the current control scheme to detect
(then prevent) a given cause (may be difficult to estimate early
in process operations).
19
Rating Scales & RPN
» There are a wide variety of scoring “anchors”, both quantitative or
qualitative
» Two types of scales are 1-5 or 1-10 • The 1-5 scale makes it easier for the
teams to decide on scores
» The 1-10 scale may allow for better precision in estimates and a wide
variation in scores (most common)
» Severity – 1 = Not Severe, 10 = Very Severe
» Occurrence – 1 = Not Likely, 10 = Very Likely
» Detection – 1 = Easy to Detect, 10 = Not easy to Detect
» RPN is the product of the severity, occurrence, and detection scores.
20
21
The FMEA Form
THANKS!
STAY HOME & STAY SAFE
22

More Related Content

Similar to Fmea

SUBROGATING THE SLIP AND FALL
SUBROGATING THE SLIP AND FALLSUBROGATING THE SLIP AND FALL
SUBROGATING THE SLIP AND FALLBob Horn
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Vecoin
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyKook Dean
 
2017 03-10 - vu amsterdam - testing safety critical systems
2017 03-10 - vu amsterdam - testing safety critical systems2017 03-10 - vu amsterdam - testing safety critical systems
2017 03-10 - vu amsterdam - testing safety critical systemsJaap van Ekris
 
Unit 9 implementing the reliability strategy
Unit 9  implementing the reliability strategyUnit 9  implementing the reliability strategy
Unit 9 implementing the reliability strategyCharlton Inao
 
comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...
comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...
comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...SHIBASOUMYA GHOSH
 
Product assurance
Product assurance Product assurance
Product assurance PriyankaKg4
 
Le Trench DISPONET INTRO
Le Trench  DISPONET INTRO Le Trench  DISPONET INTRO
Le Trench DISPONET INTRO Peter ORMAI
 
Protecting Occupied Buildings from Process Tank Rupture Spillage
Protecting Occupied Buildings from Process Tank Rupture SpillageProtecting Occupied Buildings from Process Tank Rupture Spillage
Protecting Occupied Buildings from Process Tank Rupture SpillageAdvisian
 
2016-04-28 - VU Amsterdam - testing safety critical systems
2016-04-28 - VU Amsterdam - testing safety critical systems2016-04-28 - VU Amsterdam - testing safety critical systems
2016-04-28 - VU Amsterdam - testing safety critical systemsJaap van Ekris
 
CPP PROJECT REPORT ON RETROFITTING
CPP PROJECT REPORT ON RETROFITTINGCPP PROJECT REPORT ON RETROFITTING
CPP PROJECT REPORT ON RETROFITTINGJustIn221994
 
Human_Factors_in_Aviation__PowerPoint_.pptx.pptx
Human_Factors_in_Aviation__PowerPoint_.pptx.pptxHuman_Factors_in_Aviation__PowerPoint_.pptx.pptx
Human_Factors_in_Aviation__PowerPoint_.pptx.pptxEndris Mohammed
 
RISSB Rail Turnouts: Maintenance Q&A Summary
RISSB Rail Turnouts: Maintenance Q&A SummaryRISSB Rail Turnouts: Maintenance Q&A Summary
RISSB Rail Turnouts: Maintenance Q&A SummaryTina_Karas
 
VIVA VOCE NORZILA NOH 0008908 - 10122021.pptx
VIVA VOCE NORZILA NOH 0008908 - 10122021.pptxVIVA VOCE NORZILA NOH 0008908 - 10122021.pptx
VIVA VOCE NORZILA NOH 0008908 - 10122021.pptxnorzilanoh1
 

Similar to Fmea (20)

SUBROGATING THE SLIP AND FALL
SUBROGATING THE SLIP AND FALLSUBROGATING THE SLIP AND FALL
SUBROGATING THE SLIP AND FALL
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
 
FMEA-Intro.ppt
FMEA-Intro.pptFMEA-Intro.ppt
FMEA-Intro.ppt
 
Forensic Engineering
Forensic EngineeringForensic Engineering
Forensic Engineering
 
Compact Spring Supports Webinar
Compact Spring Supports WebinarCompact Spring Supports Webinar
Compact Spring Supports Webinar
 
860686
860686860686
860686
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap Study
 
2017 03-10 - vu amsterdam - testing safety critical systems
2017 03-10 - vu amsterdam - testing safety critical systems2017 03-10 - vu amsterdam - testing safety critical systems
2017 03-10 - vu amsterdam - testing safety critical systems
 
Unit 9 implementing the reliability strategy
Unit 9  implementing the reliability strategyUnit 9  implementing the reliability strategy
Unit 9 implementing the reliability strategy
 
comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...
comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...
comparison of FACTOR OF SAFETY using LIMIT EQUILIBRIUM(OASYS) and NUMERICAL M...
 
Product assurance
Product assurance Product assurance
Product assurance
 
Targeted assessment program update Greg Connolly
Targeted assessment program update Greg ConnollyTargeted assessment program update Greg Connolly
Targeted assessment program update Greg Connolly
 
Le Trench DISPONET INTRO
Le Trench  DISPONET INTRO Le Trench  DISPONET INTRO
Le Trench DISPONET INTRO
 
Introduction to NDT
Introduction to NDT Introduction to NDT
Introduction to NDT
 
Protecting Occupied Buildings from Process Tank Rupture Spillage
Protecting Occupied Buildings from Process Tank Rupture SpillageProtecting Occupied Buildings from Process Tank Rupture Spillage
Protecting Occupied Buildings from Process Tank Rupture Spillage
 
2016-04-28 - VU Amsterdam - testing safety critical systems
2016-04-28 - VU Amsterdam - testing safety critical systems2016-04-28 - VU Amsterdam - testing safety critical systems
2016-04-28 - VU Amsterdam - testing safety critical systems
 
CPP PROJECT REPORT ON RETROFITTING
CPP PROJECT REPORT ON RETROFITTINGCPP PROJECT REPORT ON RETROFITTING
CPP PROJECT REPORT ON RETROFITTING
 
Human_Factors_in_Aviation__PowerPoint_.pptx.pptx
Human_Factors_in_Aviation__PowerPoint_.pptx.pptxHuman_Factors_in_Aviation__PowerPoint_.pptx.pptx
Human_Factors_in_Aviation__PowerPoint_.pptx.pptx
 
RISSB Rail Turnouts: Maintenance Q&A Summary
RISSB Rail Turnouts: Maintenance Q&A SummaryRISSB Rail Turnouts: Maintenance Q&A Summary
RISSB Rail Turnouts: Maintenance Q&A Summary
 
VIVA VOCE NORZILA NOH 0008908 - 10122021.pptx
VIVA VOCE NORZILA NOH 0008908 - 10122021.pptxVIVA VOCE NORZILA NOH 0008908 - 10122021.pptx
VIVA VOCE NORZILA NOH 0008908 - 10122021.pptx
 

More from dinesh babu

Metrology Measurements and All units PPT
Metrology Measurements and  All units PPTMetrology Measurements and  All units PPT
Metrology Measurements and All units PPTdinesh babu
 
Unit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptx
Unit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptxUnit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptx
Unit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptxdinesh babu
 
Unit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptx
Unit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptxUnit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptx
Unit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptxdinesh babu
 
Unit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptx
Unit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptxUnit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptx
Unit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptxdinesh babu
 
UNIT 2-Geometric Modeling.pptx
UNIT 2-Geometric Modeling.pptxUNIT 2-Geometric Modeling.pptx
UNIT 2-Geometric Modeling.pptxdinesh babu
 
UNIT 1-INTRODUCTION.pptx
UNIT 1-INTRODUCTION.pptxUNIT 1-INTRODUCTION.pptx
UNIT 1-INTRODUCTION.pptxdinesh babu
 
UNIT-5FIRE SAFETY AND INSTALLATION.pptx
UNIT-5FIRE SAFETY AND INSTALLATION.pptxUNIT-5FIRE SAFETY AND INSTALLATION.pptx
UNIT-5FIRE SAFETY AND INSTALLATION.pptxdinesh babu
 
UNIT-4-REFIGERATION PRINCIPLES.pptx
UNIT-4-REFIGERATION PRINCIPLES.pptxUNIT-4-REFIGERATION PRINCIPLES.pptx
UNIT-4-REFIGERATION PRINCIPLES.pptxdinesh babu
 
UNIT-3-Principles of illumination.pptx
UNIT-3-Principles of illumination.pptxUNIT-3-Principles of illumination.pptx
UNIT-3-Principles of illumination.pptxdinesh babu
 
UNIT-2-Electrical Systems.pptx
UNIT-2-Electrical Systems.pptxUNIT-2-Electrical Systems.pptx
UNIT-2-Electrical Systems.pptxdinesh babu
 
UNIT-1-MACHINERIES.pptx
UNIT-1-MACHINERIES.pptxUNIT-1-MACHINERIES.pptx
UNIT-1-MACHINERIES.pptxdinesh babu
 
UNIT- 2&3 based on gear life.pdf
UNIT- 2&3 based on gear life.pdfUNIT- 2&3 based on gear life.pdf
UNIT- 2&3 based on gear life.pdfdinesh babu
 
ELEMENTS OF TECHNOLOGY.pdf
ELEMENTS OF TECHNOLOGY.pdfELEMENTS OF TECHNOLOGY.pdf
ELEMENTS OF TECHNOLOGY.pdfdinesh babu
 
Unit ii engine auxiliary systems
Unit ii engine auxiliary systemsUnit ii engine auxiliary systems
Unit ii engine auxiliary systemsdinesh babu
 

More from dinesh babu (20)

Metrology Measurements and All units PPT
Metrology Measurements and  All units PPTMetrology Measurements and  All units PPT
Metrology Measurements and All units PPT
 
Unit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptx
Unit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptxUnit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptx
Unit 5-CELLULAR MANUFACTURING AND FLEXIBLE MANUFACTURING SYSTEM (FMS) .pptx
 
Unit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptx
Unit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptxUnit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptx
Unit 4-FUNDAMENTAL OF CNC AND PART PROGRAMING.pptx
 
Unit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptx
Unit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptxUnit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptx
Unit 3-ASSEMBLY OF PARTS AND CAD STANDARDS.pptx
 
UNIT 2-Geometric Modeling.pptx
UNIT 2-Geometric Modeling.pptxUNIT 2-Geometric Modeling.pptx
UNIT 2-Geometric Modeling.pptx
 
UNIT 1-INTRODUCTION.pptx
UNIT 1-INTRODUCTION.pptxUNIT 1-INTRODUCTION.pptx
UNIT 1-INTRODUCTION.pptx
 
UNIT-5FIRE SAFETY AND INSTALLATION.pptx
UNIT-5FIRE SAFETY AND INSTALLATION.pptxUNIT-5FIRE SAFETY AND INSTALLATION.pptx
UNIT-5FIRE SAFETY AND INSTALLATION.pptx
 
UNIT-4-REFIGERATION PRINCIPLES.pptx
UNIT-4-REFIGERATION PRINCIPLES.pptxUNIT-4-REFIGERATION PRINCIPLES.pptx
UNIT-4-REFIGERATION PRINCIPLES.pptx
 
UNIT-3-Principles of illumination.pptx
UNIT-3-Principles of illumination.pptxUNIT-3-Principles of illumination.pptx
UNIT-3-Principles of illumination.pptx
 
UNIT-2-Electrical Systems.pptx
UNIT-2-Electrical Systems.pptxUNIT-2-Electrical Systems.pptx
UNIT-2-Electrical Systems.pptx
 
UNIT-1-MACHINERIES.pptx
UNIT-1-MACHINERIES.pptxUNIT-1-MACHINERIES.pptx
UNIT-1-MACHINERIES.pptx
 
UNIT- 2&3 based on gear life.pdf
UNIT- 2&3 based on gear life.pdfUNIT- 2&3 based on gear life.pdf
UNIT- 2&3 based on gear life.pdf
 
ELEMENTS OF TECHNOLOGY.pdf
ELEMENTS OF TECHNOLOGY.pdfELEMENTS OF TECHNOLOGY.pdf
ELEMENTS OF TECHNOLOGY.pdf
 
belt_drive.ppt
belt_drive.pptbelt_drive.ppt
belt_drive.ppt
 
Unit iii
Unit iiiUnit iii
Unit iii
 
Unit ii engine auxiliary systems
Unit ii engine auxiliary systemsUnit ii engine auxiliary systems
Unit ii engine auxiliary systems
 
Unit i
Unit iUnit i
Unit i
 
Unitv
Unitv   Unitv
Unitv
 
Unit iv
Unit ivUnit iv
Unit iv
 
Mm -unit iii
Mm -unit iii Mm -unit iii
Mm -unit iii
 

Recently uploaded

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Fmea

  • 1. Failure Analysis & Prevention
  • 2. Failure analysis - FA is a systematic approach of investigation to establish the important causes of the failure. Therefore, it is worth to familiarize with – fundamental causes of failure of mechanical components, – general approach to be used for the failure analysis and prevention. 2
  • 3. When to consider a failure • In general, an engineering component or assembly is considered to have failed under the following three conditions when the component is –Inoperable, – Operates but doesn’t perform the intended function – Operates but safety and reliability is very poor 3
  • 4. Failure of mechanical components » Failure of a mechanical component can occur in many ways » – elastic deformation is beyond acceptable limit, » – excessive and unacceptable level of plastic deformation, » – complete fracture and » – loss of dimension due to variety of reasons » Elastic deformation » Plastic deformation » Creep » Fracture » wear 4
  • 5. Fundamental causes of failure » The failure of an engineering component in actual working conditions can occur due to very large of factors related with » – Design, » – Materials, » – Manufacturing, » – Service conditions. 5
  • 6. Need to know causes of failure » To have systematic understanding on various factors that can lead to failure of mechanical components : » – Improper design » – Improper selection of materials » – Defects and discontinuities in metal itself » – Improper processing of materials » – Poor service conditions » – Poor assembling » – Poor maintenance 6
  • 7. Engineering disasters » A disaster is referred to as an engineering disaster when it’s caused by an engineering failure: » – design flaws or » – materials failures » – insufficient knowledge, » – different underestimations, » – even carelessness or negligence. 7
  • 8. Titanic Ship, 1912 » RMS Titanic was a British passenger ship that sank after hitting an iceberg on her maiden voyage from Southampton (UK) to New York City, in April 1912. The tragedy claimed the lives of over 1,500 people. » Several rivets of the 3 million rivets that held the Titanic together were recently recovered and tested, and found to be made of low quality iron, which on impact caused them to fall apart. » Another engineering fault was that the 16 watertight compartments that kept the boat afloat, were not individually sealed, but rather connected near the ceiling. This enabled the water to spill from one compartment to another and sink the boat. 8
  • 9. St. Francis Dam flooding (1928) » The St. Francis Dam was a concrete dam built between the years 1924 and 1926, to create a water reservoir for Los Angeles. » The dam was located in a canyon around 40 miles (64 km) from the city. » On March 12, 1928, just hours after being inspected by the Chief Engineer William Mulholland, the dam failed, sending a massive water wave 120 ft tall, and killing as many as 600 people in one of the worst American civil engineering disaster 9
  • 10. Tacoma Narrows Bridge collapse (1940) » The first Tacoma Narrows Bridge was a suspension bridge in Washington state that opened in 1940 and collapsed at the same year. At the time of its construction, the bridge was the world’s third longest suspension bridge, by main span length. » The bridge was known to move vertically in windy conditions, and in November 7, 1940, under 40 mph (64 km/h) winds it collapsed. The collapse was caught on video and made an impact on science and engineering, especially bridge designing till today » . The cause of failure was aero elastic flutter – a dynamic instability of an elastic structure. 10
  • 11. Kadalundi Train Disaster » There was a structural failure. The railway bridge was around 140 years old and it definitely needed repair. » What happened was one of the pier had settled down causing internal stresses to grow in rails. » As soon as a train came near it, the track snapped and the train derailed which eventually landed into river. » So lesson one, never ever use a structure of high importance without testing it. Always, keep an eye on it and test it 11
  • 12. The Bhopal Disaster: Union Carbide 12
  • 13. Rafiganj rail bridge » Blamed to poor design and construction as well as low maintenance. » It is said that the plate girder deteriorated over time and was losing its strength in fatigue due to vibrations from trains. » Nobody paid attention to it. Also the bridge was rusty to a great extent. » When the train was passing by, the plate girder gave up leading to this fatal crash. » Lesson two, make sure your design is checked against fatigue and steel is coated with anti-corrosion paints. 13
  • 14. Industrial Engineering Tools for FA: Failure Mode & Effect Analysis » What Is A Failure Mode? » A Failure Mode is: » The way in which the component, subassembly, product, input, or process can fail to perform its intended function » Things that can go wrong 14
  • 15. Benefits of FMEA » Methodology that facilitates process improvement » Identifies and eliminates concerns early in the development of a process or design » Focuses on prevention 15 Approach of FMEA A structured approach for : – Identifying the ways in which a product or process can fail – Estimating risk associated with specific causes – Prioritizing the actions that should be taken to reduce risk – Evaluating design validation plan (design FMEA) or current control plan (process FMEA)
  • 16. When to Conduct an FMEA » Investigation for the process improvement investigation » Design of new systems, products, and processes » Modification of existing designs or processes » Existing designs for new applications 16
  • 17. FMEA: A Team Tool » A team approach is necessary. » Team should be led by the Process Owner who is the responsible manufacturing engineer or technical person, or other similar individual familiar with FMEA. » The following should be considered for team members: » – Design Engineers » – Operators » – Process Engineers » – Reliability » – Materials Suppliers » – Suppliers » – Customers 17
  • 18. FMEA Procedure » For each process input (start with high value inputs), determine the ways in which the input can go wrong (failure mode) » For each failure mode, determine effects – Select a severity level for each effect » Identify potential causes of each failure mode – Select an occurrence level for each cause » List current controls for each cause – Select a detection level for each cause » Calculate the Risk Priority Number (RPN) » Develop recommended actions, assign responsible persons, and take actions – -Give priority to high RPNs – MUST look at severities rated a 10 » Assign the predicted severity, occurrence, and detection levels and compare RPNs 18
  • 19. Severity, Occurrence, and Detection » Severity – Importance of the effect on requirements » Occurrence – Frequency with which a given cause occurs and creates failure modes (obtain from past data if possible) » Detection – The ability of the current control scheme to detect (then prevent) a given cause (may be difficult to estimate early in process operations). 19
  • 20. Rating Scales & RPN » There are a wide variety of scoring “anchors”, both quantitative or qualitative » Two types of scales are 1-5 or 1-10 • The 1-5 scale makes it easier for the teams to decide on scores » The 1-10 scale may allow for better precision in estimates and a wide variation in scores (most common) » Severity – 1 = Not Severe, 10 = Very Severe » Occurrence – 1 = Not Likely, 10 = Very Likely » Detection – 1 = Easy to Detect, 10 = Not easy to Detect » RPN is the product of the severity, occurrence, and detection scores. 20
  • 22. THANKS! STAY HOME & STAY SAFE 22