Project: CountyCouncil Highway Repairs
The problem:
Thisroad, edgedbya streamto one side,wasbeingerodedasa result
of the streambankhavingbeenundercutbywinterhighwaterlevels.
The resultingdamage wasvarioussectionsof the bankbeingwashed
away,takingthe road surface withit.
The road was graduallybecomingnarrower,forcingvehiclestouse the
otherside of the road, makingitincreasinglydangeroustouse.
Local residents,farmersandheavyservice vehicles,such asmilk
tankersservicingthe farms,were findingitdifficulttouse thissection
of the road.
The area of damage measuredapproximately1mhighby33m long.
The solution:
One solutionwouldhave beengabionbaskets. Howeverthiswasdeemedunsuitableforvarious
reasons,includingthe significantexcavationrequirements,cost,time toconstructandthe fact that
large transportand equipmentwouldbe requiredonsite,wherespace wasalreadylimitedasa
resultof the erosion.
The council heardabout the Deltaloksystemanddecidedthisprojectrepresentedthe ideal
opportunityforthemtotrial this.
Installationand observations:
The firsttwo rowsof DeltalokBagswere laidbelow the normal water
level andthese were filledwithgranularsoil material toaidfiltration
and secure the base of the structure.
The additional rowsof bagswere filledwithasoil/sandmix andgrass
seed.
The structure wasthentoppedoff witha soil roadside verge and
seeded.
The results:
The time it tookfor the Deltalokbuildwas
considerablyquickerthanalternative,conventional
erosioncontrol methods.
The stream hasnow beenreroutedbackonto its
normal course and awayfrom the roadside by
rebuildingthe streambankwiththe Deltaloksystem.
The outcome is a green,vegetated,natural-lookingstreambank, restoredtoitsformerglorywithout
any evidence of work havingbeencarriedout. All achieved inaveryshort space of time.
The client, contractor, local residentsandroadusersare all veryhappywiththe endresult.

More Related Content

What's hot (20)

The Great Manmade River Project
The Great Manmade River ProjectThe Great Manmade River Project
The Great Manmade River Project
 
The great manmade river project
The great manmade river projectThe great manmade river project
The great manmade river project
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 
Great man-made-river
Great man-made-riverGreat man-made-river
Great man-made-river
 
The Three Gorges Dam
The Three Gorges DamThe Three Gorges Dam
The Three Gorges Dam
 
Suez canal
Suez canalSuez canal
Suez canal
 
Civil engineering Seminar on G cans project japan.
Civil engineering Seminar on G cans project japan.Civil engineering Seminar on G cans project japan.
Civil engineering Seminar on G cans project japan.
 
Dam engineering i 1
Dam engineering i 1Dam engineering i 1
Dam engineering i 1
 
DAMS
DAMSDAMS
DAMS
 
G cans project report
G cans project reportG cans project report
G cans project report
 
#. Japao Tokyo Flod Tunnel 26.10.08
#. Japao   Tokyo Flod Tunnel   26.10.08#. Japao   Tokyo Flod Tunnel   26.10.08
#. Japao Tokyo Flod Tunnel 26.10.08
 
La visió del paisatge i d'allò viu
La visió del paisatge i d'allò viuLa visió del paisatge i d'allò viu
La visió del paisatge i d'allò viu
 
OredolaOlayinka_2016
OredolaOlayinka_2016OredolaOlayinka_2016
OredolaOlayinka_2016
 
On the road
On the roadOn the road
On the road
 
9
99
9
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopia
 
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
 
Warsak Dam(16me07)
Warsak Dam(16me07)Warsak Dam(16me07)
Warsak Dam(16me07)
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
dam
damdam
dam
 

Similar to Case Study

060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_AkhtarJavad Akhtar
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestPhilip Tunnah
 
Restoring Westmeadows Meander
Restoring Westmeadows MeanderRestoring Westmeadows Meander
Restoring Westmeadows MeanderTony Smith
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxMd. Mahmudor Rahman
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...BPA-GmbH, Waterproofing is our Passion!
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...Michal Krzeminski
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel studyroidghozi
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridgeBismillah Arif
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Dario Gnoato
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 
Construction of gravity dam by M.R.S
Construction of gravity dam by M.R.SConstruction of gravity dam by M.R.S
Construction of gravity dam by M.R.SMD RAHEL SK
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinContech Engineered Solutions
 
10-CE 408 Lining &Design of channel.pptx
10-CE 408 Lining &Design of  channel.pptx10-CE 408 Lining &Design of  channel.pptx
10-CE 408 Lining &Design of channel.pptxHuzaifaZafar15
 
Landform-based Erosion Control for Stormwater Management
Landform-based Erosion Control for Stormwater ManagementLandform-based Erosion Control for Stormwater Management
Landform-based Erosion Control for Stormwater ManagementOHM Advisors
 

Similar to Case Study (20)

060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes Digest
 
Restoring Westmeadows Meander
Restoring Westmeadows MeanderRestoring Westmeadows Meander
Restoring Westmeadows Meander
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel study
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
Construction of gravity dam by M.R.S
Construction of gravity dam by M.R.SConstruction of gravity dam by M.R.S
Construction of gravity dam by M.R.S
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Virginia
VirginiaVirginia
Virginia
 
10-CE 408 Lining &Design of channel.pptx
10-CE 408 Lining &Design of  channel.pptx10-CE 408 Lining &Design of  channel.pptx
10-CE 408 Lining &Design of channel.pptx
 
Landform-based Erosion Control for Stormwater Management
Landform-based Erosion Control for Stormwater ManagementLandform-based Erosion Control for Stormwater Management
Landform-based Erosion Control for Stormwater Management
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Case Study

  • 1. CASE STUDIES Project: CountyCouncil Highway Repairs The problem: Thisroad, edgedbya streamto one side,wasbeingerodedasa result of the streambankhavingbeenundercutbywinterhighwaterlevels. The resultingdamage wasvarioussectionsof the bankbeingwashed away,takingthe road surface withit. The road was graduallybecomingnarrower,forcingvehiclestouse the otherside of the road, makingitincreasinglydangeroustouse. Local residents,farmersandheavyservice vehicles,such asmilk tankersservicingthe farms,were findingitdifficulttouse thissection of the road. The area of damage measuredapproximately1mhighby33m long. The solution: One solutionwouldhave beengabionbaskets. Howeverthiswasdeemedunsuitableforvarious reasons,includingthe significantexcavationrequirements,cost,time toconstructandthe fact that large transportand equipmentwouldbe requiredonsite,wherespace wasalreadylimitedasa resultof the erosion. The council heardabout the Deltaloksystemanddecidedthisprojectrepresentedthe ideal opportunityforthemtotrial this. Installationand observations: The firsttwo rowsof DeltalokBagswere laidbelow the normal water level andthese were filledwithgranularsoil material toaidfiltration and secure the base of the structure. The additional rowsof bagswere filledwithasoil/sandmix andgrass seed. The structure wasthentoppedoff witha soil roadside verge and seeded. The results: The time it tookfor the Deltalokbuildwas considerablyquickerthanalternative,conventional erosioncontrol methods. The stream hasnow beenreroutedbackonto its normal course and awayfrom the roadside by rebuildingthe streambankwiththe Deltaloksystem.
  • 2. The outcome is a green,vegetated,natural-lookingstreambank, restoredtoitsformerglorywithout any evidence of work havingbeencarriedout. All achieved inaveryshort space of time. The client, contractor, local residentsandroadusersare all veryhappywiththe endresult.