The document is a letter from the Chief Engineer of the Gujarat Energy Transmission Corporation regarding the State Deviation Settlement Account for the week of March 4-10, 2019. It provides the day-wise deviation charges in paise/kWh and notes on the deviation settlement mechanism, including charges paid to the state pool account by wind and solar generators for deviations beyond certain thresholds. Generators must pay indicated amounts for deviations within 10 days to avoid interest.
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
1. Report Generation Date: 15-05-2019 4:55:19 PM Page 1 of 50
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
----------------------------------------------------------------------------------------------------------------------------
State Load Despatch Centre-Gotri
Email:sldcabtcomm@gmail.com, Tel:- 0265-2322206, Fax 0265-2352019
No: SLDC/Comm./UI/2018-19/MAR/Week-49/1,908 Date: 15-MAY-2019
By Fax/Post
To:
As per List
(Sr. No. 1 to 61)
Subject: State Deviation Settlement Account (Deviation charges) for the week from 04/03/2019 to 10/03/2019
(Week No. 49, Revision 0).
(Due date for Payment: on or before 25/05/2019)
Sir,
The Unscheduled Interchange (UI) energy account (Deviation charges) for the week from 04/03/2019 to 10/03/2019 is
enclosed herewith along with day wise statement of UI/deviation energy and corresponding charges computed in
accordance with order no.3 of 2006 & amendments issued by GERC with effective from 5th April'2010. As per GERC
order: GERC/Legal/2015/436 dated 05th March'2015, revised UI/Deviation charges and volume of limits as specified by
CERC in DSM regulations 2014 and same is made effective from 17th February'2014 and Deviation charges received from
WRLDC towards power exchange with Gujarat transmission network which includes additional charges is pooled an
shared through pool account.
Further, UI charges reduced due to Additional charges, capping of UI charges and token penalty at the frequency 50.05
Hz and above are also pooled and share through Intra State UI pool account.
As per GERC Notification No.1 of 2019, Wind and Solar Generators are under the ambit of Forecasting,
Scheduling and Deviation Settlement Mechanism. The charge for deviation will be pooled in accordance with the
above Regulation.
In accordance with clause 5 of complimentary commercial mechanism of Amendment order no.3 of 2010 issued by
GERC, Payment of UI(Deviation) charges shall have a high priority and the concerned constituents/pool members shall
pay the indicated amounts within 10 (ten) days of the statement issue into a state UI pool account operated by the SLDC.
In the event of delay in realizing payment, simple interest of 0.04% for each day of delay would be recovered as per
aforesaid order.
Any discrepancy shall be intimated within 15 days (Clause No. 15-C of GERC order No. 3 of 2006) from the date of issue
of this UI/DSM account failing which UI/DSM account published shall be considered as final. Registered discrepancy shall
be addressed based on the merits of the discrepancy.
Details of above UI account are available on website www.sldcguj.com.
Encl: As Above
Yours faithfully
(--Sd--)
(B B Mehta)
Chief Engineer (SLDC)
MOCK ACCOUNT
2. Report Generation Date: 15-05-2019 4:55:19 PM Page 2 of 50
Mailing List:
1) Managing Director, UGVCL, Mehsana (Fax 02762-223574)
2) Managing Director, DGVCL, Surat (Fax 0261-2572636)
3) Managing Director, MGVCL, Vadodara(Fax 0265-2337279)
4) Managing Director, PGVCL, Rajkot (Fax 0281-2380428)
5) Managing Director, GSECL, Vadodara (Fax 0265-2339066)
6) Executive Director, TPL-Ahemedabad.(Fax 079-25506386)
7) General Manager (Comm.), GUVNL, Vadodara (Fax 0265-2354715)
8) Executive Director, TPL-Surat (Fax 0261-2419963)
9) Chief Manager, KPTL, Kandla (Fax 02836-270184)
10) Executive Director, TEL-SEZ, Dahej (Fax 0261-2413020)
11) Managing Director, GIPCL, Vadodara (Fax 0265-2231207)
12) Managing Director, GIPCL, Mangrol (Fax 02629-261073)
13) General Manager, GPEC, Bharuch (Fax 02642-671521)
14) Managing Director, GMDC, Vastrapura (Fax 079-27911822)
15) Executive Director, TPL-Sugen (Fax 02621-661654)
16) Managing Director, GACL, Vadodara (Fax 0265-2336244)
17) Managing Director, GACL, Dahej (Fax 02641-256220)
18) Managing Director, ONGC, Ankleshwar (Fax 02646-246939)
19) Managing Director, ONGC, Hazira (Fax 0261-2875577)
20) General Manager, PCBL, Palej (Fax No. 02642-277160)
21) Managing Director,SAL Steel,Bharpara (Fax 02836-282198)
22) General Manager, UPL, Jhagadiya (Fax 02645-226017)
23) General Manager, BPL, Hazira (Fax 0261-6682070)
24) General Manager, RIL, Naroda ( Fax No. 079-66068577)
25) General Manager(E&I),JSW,Samaghogha(Fax 02838-240700)
26) Deputy General Manager, UTCL, Kovaya(Fax 02794-283088)
27) Vice President, Gallant Metal, Gandhidham(Fax 02836-235787)
28) Director, Welspun, Anjar (Fax No. 02836-279070/662324)
29) Vice President ,Hindalco, Bharuch (Fax No. 02641-251002)
30) General Manager,VIL,Gandhidham (Fax No.02836-299975)
31) Vice President (Proj),GFL, Noida (Fax No.0120-3063610)
32) Vice President, PCBL, Mokha, Mundra (Fax No.02838-283636)
33) Sr.Vice President, MIPSL,Gandhidham (Fax 02836-286527)
34) Vice President, RIL, Dahej (Fax No. 02641-283108)
35) The Secretary ,GERC, Ahmedabad (Fax 079-26584542)
36) General Manager,(F&A), GSEG(H), Hazira (Fax 079-23238648)
37) Executive V. P(Works), J K Paper Ltd, Fort Songadh (Fax: 02624-220138)
38) Vice President, Solaries Chem. Ltd,Khavda (Fax: 02803-288388)
39) Adani Power Ltd, Mundra, Kutch (Fax No. 079-25557176)
40) MPSEZ Utilities Pvt. Ltd., Mundra, Kutch (Fax No. 079-25557176)
41) M/s Amreli Biomass Power project Ltd, Savarkundla.
42) M/s Junagadh Biomass Power Project Ltd.
43) M/s Saurastra Cement Ltd, Ranavav.
44) M/s Rama News & Print Ltd, Sachin (Talangpore).
45) M/s Essar Power Gujarat Ltd, Vadinar, Jamnagar.
46) M/s Bhavnagar Biomass Power Project Ltd., Sanosara, Bhavnagar.
47) M/s Shree Renuka Sugar Ltd., Bharapar, Kutch.
48) M/s Essar Oil Ltd, Jamnagar
49) M/s Nirma Ltd, Kalatalav
50) Executive Director, TPL-UNOSUGEN, Kamrej
51) M/s Siddhi Vinayak Ltd, Surat
52) M/s Welspun CGPL, Varsamedi, Anjar, Kutch
53) M/s Abellon Clean Energy Ltd, Ahmedabad. Fax No: 079-66309334
54) M/s Jaydeep Cotton Fibres Pvt. Ltd., Rajkot Fax No: 0281-2580090
55) M/s Sanghi Industries Ltd., Sanghipurm, Kutch- 370511
56) M/s OPGS Power Ltd, Mundra, Kutch
4. Report Generation Date: 15-05-2019 4:55:19 PM Page 4 of 50
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
----------------------------------------------------------------------------------------------------------------------------
State Load Despatch Centre-Gotri
Email:sldcabtcomm@gmail.com, Tel:- 0265-2322206, Fax 0265-2352019
No: SLDC/Comm./UI/2018-19/MAR/Week-49/1,908 Date: 15.05.2019
General Notes on UI (Deviation) Account for the Week
From 04/03/2019 to 10/03/2019
1. In accordance with Hon'ble CERC (Derivation Settlement Mechanism and Related matters) (Fourth
Amendment) Regulations with effect from 01.01.2019. DSM Price vector as per CERC DSM regulation
Fourth Amendment:
Average Frequency of the time block (Hz)
Charges for Deviation
(Paise/kWh)
Below Not Below
50.05 0.00
50.05 50.04 1xP/5
50.04 50.03 2xP/5
50.03 50.02 3xP/5
50.02 50.01 4xP/5
50.01 50.00 P
50.00 49.99 50.00+15xP/16
49.99 49.98 100.00+14xP/16
49.98 49.97 150.00+13xP/16
49.97 49.96 200.00+12xP/16
49.96 49.95 250.00+11xP/16
49.95 49.94 300.00+10xP/16
49.94 49.93 350.00+9xP/16
49.93 49.92 400.00+8xP/16
49.92 49.91 450.00+7xP/16
49.91 49.90 500.00+6xP/16
49.90 49.89 550.00+5xP/16
49.89 49.88 600.00+4xP/16
49.88 49.87 650.00+3xP/16
49.87 49.86 700.00+2xP/16
49.86 49.85 750.00+1xP/16
49.85 800.00
5. Report Generation Date: 15-05-2019 4:55:19 PM Page 5 of 50
Average Frequency Of the
Time Block(Hz)
Charges For Deviation (Paise/KWH) for the Week 04/03/2019 to 10/03/2019
Below Not Below DAY1 DAY2 DAY3 DAY4 DAY5 DAY6 DAY7
50.05 0 0 0 0 0 0 0
50.05 50.04 57.4 60.23 57.87 61.35 60.3 58.04 57.35
50.04 50.03 114.8 120.46 115.74 122.7 120.59 116.08 114.71
50.03 50.02 172.21 180.69 173.61 184.04 180.89 174.13 172.06
50.02 50.01 229.61 240.92 231.48 245.39 241.18 232.17 229.42
50.01 50 287.01 301.15 289.35 306.74 301.48 290.21 286.77
50 49.99 319.07 332.33 321.27 337.57 332.64 322.07 318.85
49.99 49.98 351.13 363.51 353.18 368.4 363.8 353.93 350.92
49.98 49.97 383.2 394.68 385.1 399.23 394.95 385.8 383
49.97 49.96 415.26 425.86 417.01 430.06 426.11 417.66 415.08
49.96 49.95 447.32 457.04 448.93 460.88 457.27 449.52 447.15
49.95 49.94 479.38 488.22 480.84 491.71 488.43 481.38 479.23
49.94 49.93 511.44 519.4 512.76 522.54 519.58 513.24 511.31
49.93 49.92 543.5 550.58 544.67 553.37 550.74 545.11 543.38
49.92 49.91 575.57 581.75 576.59 584.2 581.9 576.97 575.46
49.91 49.9 607.63 612.93 608.51 615.03 613.06 608.83 607.54
49.9 49.89 639.69 644.11 640.42 645.86 644.21 640.69 639.62
49.89 49.88 671.75 675.29 672.34 676.68 675.37 672.55 671.69
49.88 49.87 703.81 706.47 704.25 707.51 706.53 704.41 703.77
49.87 49.86 735.88 737.64 736.17 738.34 737.68 736.28 735.85
49.86 49.85 767.94 768.82 768.08 769.17 768.84 768.14 767.92
49.85 800 800 800 800 800 800 800
Provided that,
1. The charges for the Deviation for the under drawals by the buyer in a time block in excess of 12% of the
schedule or 150 MW, whichever is less, shall be zero.
2. The charges for Deviation for the over-injection by the seller in a time block in excess of 12% of the schedule
or 150 MW, whichever is less, shall be zero, except in case of injection of infirm power.
6. Report Generation Date: 15-05-2019 4:55:19 PM Page 6 of 50
2. In accordance with GERC Notification of 1 of 2019, Deviation Charges for Shortfall of excess Generation
for Wind/Solar Generators or QCA appointed on its behalf, as the case may be, to the state DSM Pool.
TABLE -I (Wind Generators)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to State DSM Pool
1 <=12% None
2 > 12% but <=20% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 12% and up to 20%
3 >20% but <=28% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 12% and up to 20% + 0.50 per unit for balance energy beyond 20%
and up to 28%
4 >28% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 12% and up to 20% + 0.50 per unit for balance energy beyond 20%
and up to 28%+0.75 per unit for balance energy beyond 28%
TABLE -II (Solar Generators selling power with in Gujarat)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to State DSM Pool
1 <=7% None
2 > 7% but <=15% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 7% and up to 15%
3 >15% but <=23% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 15% and up to 20% + 0.50 per unit for balance energy beyond 15%
and up to 23%
4 >23% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 7% and up to 20% + 0.50 per unit for balance energy beyond 15%
and up to 23%+0.75 per unit for balance energy beyond 23%
TABLE -III (Deviation Charges in case of under injection by Wind & Solar Generators selling power
outside Gujarat)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to State DSM Pool
1 <=15% At the Fixed Rate for the shortfall energy for absolute error up to 15%
2 > 15% but <=25% At the Fixed Rate for the shortfall energy for absolute error up to 15% +
110% of the Fixed Rate for balance energy beyond 15% and up to 25%
3 >25% but <=35% At the Fixed Rate for the shortfall energy for absolute error up to 15% +
110% of the Fixed Rate for balance energy beyond 15% and up to
25%+120% of the Fixed Rate for balance energy beyond 25% and up to
35%
4 >35% At the Fixed Rate for the shortfall energy for absolute error up to 15% +
110% of the Fixed Rate for balance energy beyond 15% and up to
25%+120% of the Fixed Rate for balance energy beyond 25% and up to
35%+130% of the Fixed Rate for balance Energy beyond 35%
*Fixed Rate Considered as PPA rate
7. Report Generation Date: 15-05-2019 4:55:19 PM Page 7 of 50
TABLE -IV (Deviation Charges in case of over injection by Wind & Solar Generators selling power outside
Gujarat)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to RE Generators From DSM Pool
1 <=15% At the Fixed Rate for excess energy up to 15%
2 > 15% but <=25% At the Fixed Rate for excess energy up to 15% + 90% of the Fixed Rate
for excess energy beyond 15% and up to 25%
3 >25% but <=35% At the Fixed Rate for excess energy up to 15% + 90% of the Fixed Rate
for excess energy beyond 15% and up to 25% + 80% of the Fixed Rate for
excess energy beyond 25% and up to 35%
4 >35% At the Fixed Rate for excess energy up to 15% + 90% of the Fixed Rate
for excess energy beyond 15% and up to 25% + 80% of the Fixed Rate for
excess energy beyond 25% and up to 35% + 70% of the Fixed Rate for
excess energy beyond 35%
*Fixed Rate Considered as PPA rate
3. Limits of Deviation volume and consequences of crossing limits:
• In addition to the charges for Deviation as stipulated under Regulation 5 of Principal DSM
regulations, Additional Charge for Deviation shall be applicable for over-Drawal as well as under-
injection of electricity for each time block in excess of the volume limit specified. When average
grid frequency of the time block is "49.85 Hz and above" at the rates specified in the Table-I(A)
below in line with CERC DSM 4th Amendment Regulation 2018 dated 20th November 2018.
TABLE -I (A)
When 12% of Schedule is less than or equal to 150 MW
(i) For over drawal of electricity by any buyer
in excess of 12% and up to 15% of the
schedule in a time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(ii) For over drawal of electricity by any buyer
in excess of 15% and up to 20% of the
schedule in a time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iii) For over drawal of electricity by any buyer
in excess of 20% of the schedule in a time
block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iv) For under injection of electricity by any
seller in excess of 12% and up to 15% of
the schedule in a time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(v) For under injection of electricity by any
seller in excess of 15% and up to 20% of
the schedule in a time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(vi) For under injection of electricity by any
seller in excess of 20% of the schedule in a
time block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
8. Report Generation Date: 15-05-2019 4:55:19 PM Page 8 of 50
When 12% of Schedule is more than 150 MW
(i) For over drawal of electricity by any buyer
is above 150 MW and up to 200 MW in a
time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(ii) For over drawal of electricity by any buyer
is above 200 MW and up to 250 MW in a
time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iii) For over drawal of electricity by any buyer
is above 250 MW in a time block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iv) For under injection of electricity by any
seller is above 150 MW and up to 200 MW
in a time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(v) For under injection of electricity by any
seller is above 200 MW and up to 250 MW
in a time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(vi) For under injection of electricity by any
seller is above 250 MW in a time block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
• As per the CERC CORRIGENDUM dated 17th Februar'2014, in the notification No. L-1/132/2013-
CERC, dated the 6th January, 2014 after Table-I(A) added the following "Provided further that
when the schedule is less than 150 MW, the additional charges for deviation shall be based on
percentage of deviation worked out with reference to schedule of 150 MW as per TABLE-I (A)"
• In addition to the charges for Deviation as stipulated, Additional Charge for Deviation shall be
applicable for over-injection/under Drawal of electricity for each time block by a seller/buyer as
the case may be when grid frequency is "50.05 Hz and above" at the rates equivalent to the
charges of deviation corresponding to the grid frequency of "below 50.01 Hz but not below 50.0
Hz".
• In addition to the Charges for Deviation as stipulated, Additional Charge for Deviation shall be
applicable for over-Drawal or under-injection of electricity when grid frequency is "below 49.85
Hz" and the same shall be equivalent to 100% of the Charge for Deviation of 800.00 Paise/kWH
corresponding to the grid frequency of "below 49.85 Hz".
9. Report Generation Date: 15-05-2019 4:55:19 PM Page 9 of 50
4. Transmission Losses considered for State Transmission network during 04/03/2019 to 10/03/2019 as
under:
Loss Type Period Loss (%)
Estimated Pool Losses 04/MAR/2019 - 10/MAR/2019 .71
Estimated Transmission Losses 04/MAR/2019 - 10/MAR/2019 3.99
Estimated Pool Losses is applicable at Notional periphery of distribution licensee.
5. UI Suspension for the week due to Transmission Constraints:
Date Block No Station/Constituent Reason
(No reports received from STU (GETCO) and TPGL)
6. UI Suspension for the week due to Grid Disturbance:
From Period To Period Station/Constituent Reason
(No reports received from STU (GETCO) and TPGL)
7. UI Reduction in respect of State Generating Stations due to violation of ceiling construed as a Gaming:
Name of SGS For Date Block No Reduction in UI
SLDC has yet not declared gaming for any state generating plant. If gaming is observed for any state
generating plant by SLDC, account will be revised accordingly
8. Allocation of Wind Farm Energy Received for the Week from 04/03/2019 to 10/03/2019
8.1 Wind Farm Allocation for WEG owned by GUVNL :
Sr No Distribution Licensee Allocation (%)
1 DGVCL 25
2 MGVCL 15
3 PGVCL 30
4 UGVCL 30
TOTAL 100.00
7.2 Total Wind Farm Allocation for WEG for the week including other beneficiary incorporated in UI Accounting:
Sr No Start Date Stop Date Distribution
Licensee
Allocation (%)
1 04-MAR-19 10-MAR-19 DGVCL 25.941825
2 04-MAR-19 10-MAR-19 KPT .118038
3 04-MAR-19 10-MAR-19 MGVCL 14.983019
4 04-MAR-19 10-MAR-19 PGVCL 25.135806
5 04-MAR-19 10-MAR-19 TAECO 6.867857
6 04-MAR-19 10-MAR-19 TEL .305906
7 04-MAR-19 10-MAR-19 TSECO 2.505954
8 04-MAR-19 10-MAR-19 UGVCL 24.141596
TOTAL 100.00
7.3 NO PPA energy 662.733345 MWH is allocated to GUVNL subsidiary entities as per percentage allocation
mentioned herein at section 7.1
10. Report Generation Date: 15-05-2019 4:55:19 PM Page 10 of 50
8 Loss Adjustment :
In case of not receipt of data or data discrepancy, the other end meter is considered for energy accounting by
adjustment of losses. The losses are considered as 4% for the 220 KV & below voltage level and 2% for the 400
KV voltage level.
9 Master Frequency :
Master Frequency data is considered in line with WRLDC for considering UI (Deviation) charges. Master
Frequency meter is considered as Korba-Mahan location.
10 Network Changes:
(i) Network Addition Details:
1. 220 KV GTPS line-1 at Vadavi added to the network on 07-03-2019 00:00:00.
2. 400 KV APL_Mundra Line 1 At CHARANKA added to the network on 06-03-2019 00:00:00.
3. 220 KV Vadavi Line -1 at Gandhinagar TPS added to the network on 07-03-2019 00:00:00.
4. 66KV Azure power thirty three solar Line No.1 at NETRAMALI added to the network on 07-03-2019 00:00:00.
5. 400 KV CHARANKA Line 1 At APL_Mundra added to the network on 06-03-2019 00:00:00.
6. 400 KV CHARANKA Line 1 At VARSANA added to the network on 06-03-2019 00:00:00.
7. 400 KV Varsana Line 1 At CHARANKA added to the network on 06-03-2019 00:00:00.
(ii) Network Removal Details: NIL
11 (i) Meter Change:
Entity Service Point
Name
Location ID Meter ID Start Time Stop Time
APPL 400 KV CHARANKA
Line 1 At
APL_Mundra
4-L-APL-CHK-M1 GJ-0906-A 06-03-2019 00:00:00
APPL 400 KV CHARANKA
Line 1 At
APL_Mundra
4-L-APL-CHK-M1 GJ-0906-A 21-02-2016 00:00:00 05-03-2019 23:59:59
APPL 400 KV CHARANKA
Line 1 At
APL_Mundra
4-L-APL-CHK-C1 GJ-0907-A 06-03-2019 00:00:00
APPL 400 KV CHARANKA
Line 1 At
APL_Mundra
4-L-APL-CHK-C1 GJ-0907-A 21-02-2016 00:00:00 05-03-2019 23:59:59
AZURE_POWER_THI
RTY_THREE_SOLAR
66KV Azure power
thirty three solar Line
No.1 at NETRAMALI
6-L-NTR-AZ3-M1 GJ-4095-A 07-03-2019 00:00:00
AZURE_POWER_THI
RTY_THREE_SOLAR
66KV Azure power
thirty three solar Line
No.1 at NETRAMALI
6-L-NTR-AZ3-C1 GJ-4096-A 07-03-2019 00:00:00
GTPS 3&4 220 KV Vadavi Line - 2-L-GTP-VDV-C1 GJ-0399-A 07-03-2019 00:00:00
11. Report Generation Date: 15-05-2019 4:55:19 PM Page 11 of 50
Entity Service Point
Name
Location ID Meter ID Start Time Stop Time
1 at Gandhinagar
TPS
GTPS 3&4 220 KV Vadavi Line -
1 at Gandhinagar
TPS
2-L-GTP-VDV-C1 GJ-0399-A 10-07-2006 00:00:00 06-03-2019 23:59:59
GTPS 3&4 220 KV Vadavi Line -
1 at Gandhinagar
TPS
2-L-GTP-VDV-M1 GJ-0401-A 07-03-2019 00:00:00
GTPS 3&4 220 KV Vadavi Line -
1 at Gandhinagar
TPS
2-L-GTP-VDV-M1 GJ-0401-A 10-07-2006 00:00:00 06-03-2019 23:59:59
PGVCL 400 KV CHARANKA
Line 1 At VARSANA
4-L-VAR-CHK-M1 GJ-1971-A 06-03-2019 00:00:00
PGVCL 400 KV CHARANKA
Line 1 At VARSANA
4-L-VAR-CHK-M1 GJ-1971-A 21-02-2016 00:00:00 05-03-2019 23:59:59
UGVCL 220 KV GTPS line-1
at Vadavi
2-L-VDV-GTP-S1 GJ-0353-A 07-03-2019 00:00:00
UGVCL 220 KV GTPS line-1
at Vadavi
2-L-VDV-GTP-S1 GJ-0353-A 18-06-2006 00:00:00 06-03-2019 23:59:59
UGVCL 400 KV APL_Mundra
Line 1 At CHARANKA
4-L-CHK-APL-S1 GJ-1450-A 06-03-2019 00:00:00
UGVCL 400 KV APL_Mundra
Line 1 At CHARANKA
4-L-CHK-APL-S1 GJ-1450-A 20-02-2016 00:00:00 05-03-2019 23:59:59
UGVCL 400 KV Varsana Line
1 At CHARANKA
4-L-CHK-VAR-M1 GJ-1281-A 06-03-2019 00:00:00
UGVCL 400 KV Varsana Line
1 At CHARANKA
4-L-CHK-VAR-M1 GJ-1281-A 20-02-2016 00:00:00 05-03-2019 23:59:59
(ii) CT ratio changed for following meters during this period:
Entity Service Point
Name
Location ID Meter ID Old CTR New CTR CTR Change
Time
12. Report Generation Date: 15-05-2019 4:55:19 PM Page 12 of 50
STATE LOAD DISPATCH CENTRE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
WEEKLY STATE DEVIATION SETTLEMENT ACCOUNT FOR
INTRA STATE ABT
Period From 04/03/2019 To 10/03/2019
Week 49
Revision 0
CONTENTS
SUMMARY
DETAIL STATEMENT
14. Report Generation Date: 15-05-2019 4:55:19 PM Page 14 of 50
SR NO MEMBER BASIC UI CAP UI ADDITIONAL UI
SIGN VIOLATION
ADDITIONAL
CHARGE
NET UI
PAYABLE RECEIVABLE
LEGENDS :
(+VE) PAYABLE
BRACKET (-VE ) RECEIVABLE
15. State Load Despatch Centre-Gotri
Vadodara-390 021, Website : www.sldcguj.com, Email: sldcabtcomm@gmail.com, Fax No:0265-2352019
No: SLDC/Comm./UI/2018-19/MAR/Week-49/1,908 15-MAY-19
STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 04-Mar-2019 to 10-Mar-2019
Report Generation Date: 15-05-2019 4:55:19 PM Page 15 of 50
SUMMARY OF STATE POOL ACCOUNT FOR THE WEEK 04-Mar-2019 to 10-Mar-2019
Total Deviation Charges Payable to State DSM pool Amount (in Rs.)
Total deviation charges for wind generating stations payable to State DSM pool 24397979
Total deviation charges for Solar generating stations payable to State DSM pool 6267877
Total RE Deviation Charges of Wind and Solar Generating stations payable to state DSM pool 30665856