What is Project Control?
Another useful section of Gary Heerkens’ brief case book “Project Management” covers Project Control
and what it really means to the project manager. The discussion centers around the objectives of project
control and what it is that the project manager is actually trying to control. I’m not wholeheartedly
endorsing this information – I never am when I provide a magazine or book excerpt. However, I do find it
interesting and worth further review and discussion.
What Project Control Really Means
The term control has several meanings. Those new to project management are initially dismayed by
the use of the term “control,” because they mistakenly equate it with the concept of authority. In the
world of project management, control has very little to do with telling people what to do, dictating
their actions or thoughts, or trying to force them to behave in a certain way— all of which are
common interpretations of control. In project management, the term “control” is much more
analogous to steering a ship. It’s about continually making course adjustments with one main
objective in mind—bringing the ship into safe harbor, as promised at the start of the voyage. And the
successful project voyage includes identifying a specific destination, carefully charting a course to
get there, evaluating your location throughout the voyage, and keeping a watchful eye on what lies
ahead.
The Objective of Project Control
Fledgling project managers (and some experienced ones!) often make the same mistake when trying
to keep control of their projects. They get wrapped up in the here and now—the measurement and
evaluation of their immediate situation—to the exclusion of everything else. They calculate their
current position and how far off course they are. That’s what they report to management and promise
to fix. Their entire focus consists of staying on the line they’ve drawn from the beginning to end of
the project. Unfortunately, controlling the destiny of your project is not that simple.
As we’ll see, evaluating where you are in terms of where you’re supposed to be is certainly part of
the overall control and “getting back on track” is almost always a sound strategy. But your primary
mission is to deliver what you’ve promised, so you should think of “maintaining control” in terms of
minimizing the distance between where you end up and where you said you’d end up.
This means that overall project control requires an eye on the future, as this formula shows:
Calculated Present Variance + Estimated Future Variance = Final Project Variance
Maintaining proper control really requires that you consider three parameters: (a) where you are,
compared with where you’re supposed to be; (b) what lies ahead that can affect you; and (c) where
you’re going to end up, compared with where you said you would end up. Bear in mind that (a) and
(b) are used primarily as internal control functions(although you may choose to report them outside
the team). They’re used for evaluating (c). At the risk of being repetitive, your primary focus should
always be on evaluating where you think you’re going to end up.
There are two reasons for this.
First, you must take intelligent and meaningful corrective action with the end point in mind. Guiding
the ship must include more than just steering it back on course; it must also include recognizing that
there’s an object up ahead that you’re going to have to steer around or winds around the upcoming
point of land that have kicked up since you started your voyage. The future will always be different
than expected at the outset of the project. Assumptions will be revised, operating conditions will
change, and new things will be thrown in your path. Sometimes, actions you take now must
compensate for future sources of variance as well as variances created though past performance.
The second reason you need to focus on the end point pertains to management reporting. In most
cases, what will probably interest them most is a prediction of where you think you’re going to end
up: this is the type of information they need to run the business. Being able to report to your
management that you’re two weeks behind schedule or $10,000 over budget right now may or may
not be of value to them. Reporting that you expect the project to be completed three weeks late or
$15,000 over budget is much more likely to be of value.
What Are You Actually Controlling?
At this point, you’re probably saying, “OK, so I should be focused on the end point of the project and
I should be trying to ‘get back on track’ and minimize variances. But the end point of what? Get back
on whattrack? And whatkind of variance are we talking about?” All good questions.
The answers to these questions will take us back to the discussion in Chapter 2 about the dimensions
of project success. The most fundamental measure of project success relates to meeting the agreed-
upon targets in each of these dimensions. These are the targets that you promised to meet at the
beginning of the project; these are the targets that you should focus on controlling.
Two of the targets pertain to the consumption of resources:
 Schedule: Was the project completed on time? (How long did we take?)
 Cost: Did the project come in at cost? (How much did we spend?)
The other two targets are tied to the deliverables of the project:
 Functionality: Do project deliverables have the expected capability? (What can they do?)
 Quality: Do the deliverables perform as well as promised? (How well can they do it?)
As far as many organizational managers are concerned, the ideal end point occurs when a project
meets these four targets exactly as promised. Although “beating targets” is often characterized as
desirable, hitting targets provides a level of predictability that most organizational managers value.
The first two targets (schedule and cost) often get the most attention; hence the very common phrase
“controlling cost and schedule.”
Sometimes, however, controlling cost and schedule gets too much attention and deliverable
performance is not as closely monitored as it should be. This is a major oversight, one that you
should concentrate on avoiding.
It is important to consolidate the information of the knowledge areas that require special attention:
Scope, Time, Costs, Quality, Staff, Risks, Communications and Stakeholders. You will obtain
then the following benefits:
 Instant view of the project status: anticipation to issues and decisions based on relevant
information.
 Avoid budget overrun and delays: as a result of an effective monitoring of all the important
aspects of the project.
 Improvement of productivity: Minimising the necessary time to generate reports, gathering
informaction from different sources.
 Collaboration of all stakeholders: a well informed team is a solid and motivated team.
 Objective evaluation of providers: efficiency parameters to define improved contractual
agreements.
 Continuous improvement: anything that can be measured and analysed can be improved.

More Related Content

What's hot

Project Management Control Systems
Project Management Control SystemsProject Management Control Systems
Project Management Control Systemsskillern
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckSHAZEBALIKHAN1
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityAcumen
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structureumair khan
 
Your Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project ScopeYour Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project ScopeMatthew Hunt
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Schedulingsslovepk
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and schedulingSulman Ahmed
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
Program Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown StructureProgram Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown StructureJohn Carter
 
Project Workforce Management PowerPoint Presentation Slides
Project Workforce Management PowerPoint Presentation SlidesProject Workforce Management PowerPoint Presentation Slides
Project Workforce Management PowerPoint Presentation SlidesSlideTeam
 
Pm0015 – quantitative methods in project management
Pm0015 – quantitative methods in project managementPm0015 – quantitative methods in project management
Pm0015 – quantitative methods in project managementsmumbahelp
 
Event based scheduling brown bag
Event based scheduling brown bagEvent based scheduling brown bag
Event based scheduling brown bagGlen Alleman
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
Critical chain and buffer management
Critical chain and buffer managementCritical chain and buffer management
Critical chain and buffer managementpinalti
 

What's hot (19)

Project Management Control Systems
Project Management Control SystemsProject Management Control Systems
Project Management Control Systems
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule Quality
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure
 
Your Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project ScopeYour Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project Scope
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and scheduling
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
Program Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown StructureProgram Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown Structure
 
Stopping the insanity
Stopping the insanityStopping the insanity
Stopping the insanity
 
Project Planning
Project Planning Project Planning
Project Planning
 
Project Workforce Management PowerPoint Presentation Slides
Project Workforce Management PowerPoint Presentation SlidesProject Workforce Management PowerPoint Presentation Slides
Project Workforce Management PowerPoint Presentation Slides
 
Pm0015 – quantitative methods in project management
Pm0015 – quantitative methods in project managementPm0015 – quantitative methods in project management
Pm0015 – quantitative methods in project management
 
Event based scheduling brown bag
Event based scheduling brown bagEvent based scheduling brown bag
Event based scheduling brown bag
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
Project Management 08
Project Management 08Project Management 08
Project Management 08
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Critical chain and buffer management
Critical chain and buffer managementCritical chain and buffer management
Critical chain and buffer management
 

Viewers also liked

Viewers also liked (10)

Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Project Control Basics
Project Control BasicsProject Control Basics
Project Control Basics
 
Budgets, forecasts, and cashflow presentation
Budgets, forecasts, and cashflow presentationBudgets, forecasts, and cashflow presentation
Budgets, forecasts, and cashflow presentation
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
 
Project control
Project controlProject control
Project control
 
Project Control Process
Project Control ProcessProject Control Process
Project Control Process
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Classification Of Cost
Classification Of CostClassification Of Cost
Classification Of Cost
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
Project management
Project managementProject management
Project management
 

Similar to What is project control

Project management for everyone
Project management for everyoneProject management for everyone
Project management for everyoneRichard Schreiber
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining TawnaDelatorrejs
 
4 ways to manage your it budget it-toolkits
4 ways to manage your it budget   it-toolkits4 ways to manage your it budget   it-toolkits
4 ways to manage your it budget it-toolkitsIT-Toolkits.org
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptxMIANMNADEEM
 
28.Causes of project failure A Lecture By Mr Allah Dad Khan Visiting Profes...
28.Causes of project failure   A Lecture By Mr Allah Dad Khan Visiting Profes...28.Causes of project failure   A Lecture By Mr Allah Dad Khan Visiting Profes...
28.Causes of project failure A Lecture By Mr Allah Dad Khan Visiting Profes...Mr.Allah Dad Khan
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxDr. ABEER KHALID MANSOUR
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
Welcome back executive summery of stakeholder
Welcome back executive summery of stakeholderWelcome back executive summery of stakeholder
Welcome back executive summery of stakeholderAbdullah Al Mamun
 
Managing projects
Managing projectsManaging projects
Managing projectsNovoraj Roy
 
4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdfeyevisioncare1
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planningmfarbstein
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
ACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & FinanceACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & Financescribdpebbly302
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planningYasirHamour
 
How to set realistic priorities for it budget planning it-toolkits
How to set realistic priorities for it budget planning   it-toolkitsHow to set realistic priorities for it budget planning   it-toolkits
How to set realistic priorities for it budget planning it-toolkitsIT-Toolkits.org
 
Cameron downing presentation
Cameron downing presentationCameron downing presentation
Cameron downing presentationInSync Conference
 
Project Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingProject Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingDarryl Vleeming
 
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-ProjectsDeveloping-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-ProjectsNIDHI SEN
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementChris Hattingh
 

Similar to What is project control (20)

Project management for everyone
Project management for everyoneProject management for everyone
Project management for everyone
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining
 
4 ways to manage your it budget it-toolkits
4 ways to manage your it budget   it-toolkits4 ways to manage your it budget   it-toolkits
4 ways to manage your it budget it-toolkits
 
Estimate budget and project crashing.pptx
Estimate budget and project crashing.pptxEstimate budget and project crashing.pptx
Estimate budget and project crashing.pptx
 
28.Causes of project failure A Lecture By Mr Allah Dad Khan Visiting Profes...
28.Causes of project failure   A Lecture By Mr Allah Dad Khan Visiting Profes...28.Causes of project failure   A Lecture By Mr Allah Dad Khan Visiting Profes...
28.Causes of project failure A Lecture By Mr Allah Dad Khan Visiting Profes...
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptx
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Welcome back executive summery of stakeholder
Welcome back executive summery of stakeholderWelcome back executive summery of stakeholder
Welcome back executive summery of stakeholder
 
Managing projects
Managing projectsManaging projects
Managing projects
 
4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf4. Proper planning of a software project unless the project is trivia.pdf
4. Proper planning of a software project unless the project is trivia.pdf
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planning
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
ACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & FinanceACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & Finance
 
5 project management project planning
5 project management  project planning5 project management  project planning
5 project management project planning
 
How to set realistic priorities for it budget planning it-toolkits
How to set realistic priorities for it budget planning   it-toolkitsHow to set realistic priorities for it budget planning   it-toolkits
How to set realistic priorities for it budget planning it-toolkits
 
Cameron downing presentation
Cameron downing presentationCameron downing presentation
Cameron downing presentation
 
Project Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingProject Management Overview by Darryl Vleeming
Project Management Overview by Darryl Vleeming
 
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-ProjectsDeveloping-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
module
modulemodule
module
 

More from Davinder Singh

More from Davinder Singh (12)

What is project control
What is project controlWhat is project control
What is project control
 
The project management information system
The project management information systemThe project management information system
The project management information system
 
Soliciting proposal
Soliciting proposalSoliciting proposal
Soliciting proposal
 
Project meetings ddddd
Project meetings dddddProject meetings ddddd
Project meetings ddddd
 
Measuring in
Measuring inMeasuring in
Measuring in
 
Cost
CostCost
Cost
 
Measuring in
Measuring inMeasuring in
Measuring in
 
Cost
CostCost
Cost
 
The project management information system
The project management information systemThe project management information system
The project management information system
 
Soliciting proposal
Soliciting proposalSoliciting proposal
Soliciting proposal
 
Project meetings ddddd
Project meetings dddddProject meetings ddddd
Project meetings ddddd
 
Davinder Resume
Davinder ResumeDavinder Resume
Davinder Resume
 

What is project control

  • 1. What is Project Control? Another useful section of Gary Heerkens’ brief case book “Project Management” covers Project Control and what it really means to the project manager. The discussion centers around the objectives of project control and what it is that the project manager is actually trying to control. I’m not wholeheartedly endorsing this information – I never am when I provide a magazine or book excerpt. However, I do find it interesting and worth further review and discussion. What Project Control Really Means The term control has several meanings. Those new to project management are initially dismayed by the use of the term “control,” because they mistakenly equate it with the concept of authority. In the world of project management, control has very little to do with telling people what to do, dictating their actions or thoughts, or trying to force them to behave in a certain way— all of which are common interpretations of control. In project management, the term “control” is much more analogous to steering a ship. It’s about continually making course adjustments with one main objective in mind—bringing the ship into safe harbor, as promised at the start of the voyage. And the successful project voyage includes identifying a specific destination, carefully charting a course to get there, evaluating your location throughout the voyage, and keeping a watchful eye on what lies ahead. The Objective of Project Control Fledgling project managers (and some experienced ones!) often make the same mistake when trying to keep control of their projects. They get wrapped up in the here and now—the measurement and evaluation of their immediate situation—to the exclusion of everything else. They calculate their current position and how far off course they are. That’s what they report to management and promise to fix. Their entire focus consists of staying on the line they’ve drawn from the beginning to end of the project. Unfortunately, controlling the destiny of your project is not that simple. As we’ll see, evaluating where you are in terms of where you’re supposed to be is certainly part of the overall control and “getting back on track” is almost always a sound strategy. But your primary mission is to deliver what you’ve promised, so you should think of “maintaining control” in terms of minimizing the distance between where you end up and where you said you’d end up. This means that overall project control requires an eye on the future, as this formula shows: Calculated Present Variance + Estimated Future Variance = Final Project Variance Maintaining proper control really requires that you consider three parameters: (a) where you are, compared with where you’re supposed to be; (b) what lies ahead that can affect you; and (c) where you’re going to end up, compared with where you said you would end up. Bear in mind that (a) and (b) are used primarily as internal control functions(although you may choose to report them outside the team). They’re used for evaluating (c). At the risk of being repetitive, your primary focus should always be on evaluating where you think you’re going to end up. There are two reasons for this. First, you must take intelligent and meaningful corrective action with the end point in mind. Guiding the ship must include more than just steering it back on course; it must also include recognizing that there’s an object up ahead that you’re going to have to steer around or winds around the upcoming point of land that have kicked up since you started your voyage. The future will always be different than expected at the outset of the project. Assumptions will be revised, operating conditions will change, and new things will be thrown in your path. Sometimes, actions you take now must compensate for future sources of variance as well as variances created though past performance.
  • 2. The second reason you need to focus on the end point pertains to management reporting. In most cases, what will probably interest them most is a prediction of where you think you’re going to end up: this is the type of information they need to run the business. Being able to report to your management that you’re two weeks behind schedule or $10,000 over budget right now may or may not be of value to them. Reporting that you expect the project to be completed three weeks late or $15,000 over budget is much more likely to be of value. What Are You Actually Controlling? At this point, you’re probably saying, “OK, so I should be focused on the end point of the project and I should be trying to ‘get back on track’ and minimize variances. But the end point of what? Get back on whattrack? And whatkind of variance are we talking about?” All good questions. The answers to these questions will take us back to the discussion in Chapter 2 about the dimensions of project success. The most fundamental measure of project success relates to meeting the agreed- upon targets in each of these dimensions. These are the targets that you promised to meet at the beginning of the project; these are the targets that you should focus on controlling. Two of the targets pertain to the consumption of resources:  Schedule: Was the project completed on time? (How long did we take?)  Cost: Did the project come in at cost? (How much did we spend?) The other two targets are tied to the deliverables of the project:  Functionality: Do project deliverables have the expected capability? (What can they do?)  Quality: Do the deliverables perform as well as promised? (How well can they do it?) As far as many organizational managers are concerned, the ideal end point occurs when a project meets these four targets exactly as promised. Although “beating targets” is often characterized as desirable, hitting targets provides a level of predictability that most organizational managers value. The first two targets (schedule and cost) often get the most attention; hence the very common phrase “controlling cost and schedule.” Sometimes, however, controlling cost and schedule gets too much attention and deliverable performance is not as closely monitored as it should be. This is a major oversight, one that you should concentrate on avoiding. It is important to consolidate the information of the knowledge areas that require special attention: Scope, Time, Costs, Quality, Staff, Risks, Communications and Stakeholders. You will obtain then the following benefits:  Instant view of the project status: anticipation to issues and decisions based on relevant information.  Avoid budget overrun and delays: as a result of an effective monitoring of all the important aspects of the project.  Improvement of productivity: Minimising the necessary time to generate reports, gathering informaction from different sources.  Collaboration of all stakeholders: a well informed team is a solid and motivated team.  Objective evaluation of providers: efficiency parameters to define improved contractual agreements.  Continuous improvement: anything that can be measured and analysed can be improved.