CtrlS, the leading data center solution provider, today announced the launch of an innovative, first-of-its-kind solution in India: Disaster Recovery on Demand. CtrlS's DR on Demand framework is built to align to enterprises - large and medium - DR strategy by offering a robust Disaster recovery solution at a cost that suits their budget. CtrlS is using "scalable, ready to deploy private cloud architecture" for this framework. With this solution, CtrlS now supports the full LAMP and Windows Stack for on demand disaster recovery services.
4. Promoted by 18 year old Pioneer Group and $20 Billion NYSE listed Och-Ziff Capital Investment of Rs. 400 Crore being done in the next 12 months Datacenter space to host more than 20,000 racks across the major cities in India.
9. CtrlS Mumbai Facility The State-of-the-art infrastructure
10. Some of the largest companies trust us for their IT Infrastructure …..
11. Our Customer Approach We Strongly believe that adding value to customers is just not fundamental to us but also defines our very purpose
12. CtrlS Services Customer Business Disaster Recovery Private Cloud Customers Focus ERP Applications SAP, Ebiz, Dynamix Hardware Intel AMD SUN HP IBM Microsoft LINUX Solaris HP-UX AIX Databases High Availble Bandwidth Oracle Load Balancing Firewall MS-SQL CtrlS Commitment High Availability On Hardware MySQL Backup Messaging Services Storage DC Ready DC Consulting DC Audit
14. Network Infrastructure Two ‘meet me’ rooms for telcos and ring architecture inside the premises All MPLS providers are present at site Tier4 philosophy – fully redundant Service providers, routers, firewalls, IDS,switches Internet bandwidth scalable beyond 5GBPS Network Infrastructure Network Infrastructure
15. Choice of Telecom Providers Airtel Reliance Tata Tele Tata Communications BSNL NIXI RailTel Tulip Power Grid Class ‘A’ ISP IP Pools : 202.65.128.0 /19 ASP No : 18229 Bandwidth : 5Gbps to 25Gbps Dual Active path for network eliminating any possibility of downtime Sate of Art IDS/ IPS with DDoS protection
16. Our certifications TIA Tier 4 certification CtrlS Certifications ISO 20000 ISO 27001 BS 25999
17. DR Credentials Ctrls Disaster Recovery solutions DR Solutions for 75 + Customers HOT / WARM & COLD Solutions on SAP / Microsoft Dynamics / Oracle EBS / Exchange Experience on NATIVE tools for Data Replication of Oracle, MS-SQL, DB2 Successfully Conducted 200 + DR Drills Certified by BCCPI(Runners up Award ,2010) In House Customized CtrlS Data Assurance Software for Data Replication
20. DR On Demand ? CtrlS DR on Demand framework is a pioneering concept that will change the way enterprises look at DR. DR on Demand now ensures that you have almost the same benefits as that of a complete DR site, at a fraction of the cost.
21.
22.
23. DR Setup MPLS/Int Connectivity Firewall Security Load Balancer Application Servers Passive Instance DB Servers Data Replication MPLS/Int Storage & Backup Data Store Storage DR Setup Primary Setup
24. DR on Demand Setup FW DB BKP FW LB App DB BKP OS OS OS OS OS OS OS OS Private Cloud Private Cloud 100% in DR MPLS/Int Storage MPLS/Int
29. Primary site restorationUsing this Frame work, Private Cloud of CtrlS , N/W Infra and in house DR specialists will make the DR Site up and running in a matter of hours.
34. DR on Demand Framework Adds Value for all Three Scenarios Cold Site : A cold site is the most inexpensive type of backup site for an organization to operate. It does not include backed up copies of data and information from the original location of the organization, nor does it include hardware already set up. The lack of hardware contributes to the minimal startup costs of the cold site, but requires additional time following the disaster to have the operation running at a capacity close to that prior to the disaster. Warm Site : A warm site is, quite logically, These sites will have hardware and connectivity already established, though on a smaller scale than the original production site or even a hot site. Real time synchronization may happen. Hot Site : hot site is a duplicate of the original site of the organization, with full computer systems as well as near-complete backups of user data. Real time synchronization between the two sites may be used to completely mirror the data environment of the original site using wide area network links and specialized software.
35. DR on Demand Supports.. Database Database CHANGE LOG REPLICATION OS OS FILE SYSTEM REPLICATION Storage Storage File System File System STORAGE REPLICATION
36. Milestones defined DR On Demand Framework … * 4 Hrs 8 Hrs 16 Hrs 24 Hrs 12 Hrs 2 Hrs 4 Hrs 6 Hrs 8 Hrs 12 hrs DR Ready Data Restoration Application Environment Resource Allocation Network and Service Provider * Time Zero – After customer announces DR
38. Hot Site Firewall Load Balancer Application Servers DB Servers Internet Internet Backup Server Storage DR Setup Primary Setup
39. On Demand Hot Site Firewall Load Balancer DB App App LB FW OS OS OS OS OS Application Servers Private Cloud DB Servers Internet Internet Storage Storage Storage Backup Server Primary Setup
40. On Demand Hot Site Firewall Load Balancer App DB App LB FW OS OS OS OS OS Application Servers Cloud DB Servers RPO 30 min Internet Internet Storage RTO 1 hrs Backup Server Storage Primary Setup
41. Traditional Warm Site Firewall Load Balancer Application Servers DB Servers Internet Internet Backup Server Storage Backup Server Storage DR Setup Primary Setup
42. On Demand Warm Site Firewall Load Balancer DB FW OS OS Application Servers Private Cloud DB Servers Internet Internet Storage Backup Server Storage Primary Setup
43. On Demand Warm Site Firewall Load Balancer App DB App LB FW OS OS OS OS OS Application Servers Private Cloud DB Servers Internet Internet Storage RPO 2 hrs RTO 4 hrs Backup Server Storage Primary Setup
45. Traditional Cold Site Firewall Load Balancer Application Servers DB Servers Offline Shipments Internet Internet Storage Storage Backup Server DR Setup Primary Setup
46. On Demand Cold Site Firewall Load Balancer BKP OS Application Servers DB Servers Online Backup App Private Cloud Internet Internet Storage Backup Server Storage Primary Setup
47. On Demand Cold Site Firewall Load Balancer App DB App LB FW OS OS OS OS OS Application Servers Private Cloud DB Servers Internet Internet RTO 24 hrs Storage RPO 6 hrs Backup Server Storage Primary Setup
55. On Demand DR Services… 3 yr TCO 50,00,000/- FW Oracle Exch ADS Share Pt Citrix SMTP FW ERP App Oracle Exch ADS OS OS OS OS OS OS OS OS OS OS OS OS Sh Pt OS Private Cloud SCR File Sync Log Shipping RTO 4 hrs Internet Storage RPO 2 hrs
56. For any further details/queries : Please drop in an email to drondemand@ctrls.in
61. Choice of MPLS ProviderPrivate Cloud Storage Storage Storage * Can be further scaled with due notice
Editor's Notes
It is promoted by pioneer groups $20 Billion NYSE listed Och Ziff capital. We are investing Rs. 400 crore in 2009 to scale up our capacity to 20,000 racks across all the major cities in India
Picture Format of Customer FocusCustomer Outsource
Most of the assets in DR are only used in the event of DR happening.Companies invest in all these resources only in the event of disaster – primary reason of not investing in the DR resourcesDR on demand approach facilitates customer to use these resources in the event of disaster without actually paying for it
In the event of normal operations, only a part of DB server and storage is in use