- 1. 2305
2155
605
1384
586 586
402
2305
2154
605
02-03-2015
1 : 25
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 021
21
40
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
LOCATION
QUANTITY
MATERIALS
FINISHES
NO OF GLAZING
ACCESSORIES
FEATURES
CONDITIONS
CORRIDOR 3, ROOM 5
2
0
HINGES, METAL TOWER BOLTS
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
ROOM 6
2
0
HINGES, METAL TOWER BOLTS, METAL LEVER HANDLE LOCK
DOUBLE PANEL DOOR
INTACT
TIMBER
PAINTED BEIGE
PENANG GROUP
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
FRONT AND BACK ELEVATION
SCALE 1 : 25
FRONT AND BACK ELEVATION
SCALE 1 : 25
SECTION
SCALE 1 : 25
SECTION
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
EXPLODED ISOMETRIC
SCALE 1 : 25
PLAN
SCALE 1 : 25
PLAN
SCALE 1 : 25
DOUBLE PANEL DOORD11 DOUBLE PANEL DOORD12
DOOR SCHEDULE D11
DOOR SCHEDULE D12