16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
CPCCOM3001 PERFORM CONSTRUCTION CALCULATIONS
TO DETERMINE CARPENTRY MATERIAL REQUIREMENTS
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
1
P.O.S
7.28
m
6.63 m
5.55
m
7.69 m
4.25 m
270° 00' 00' 28.17M
0°
00'
00'
22.35M
90° 00' 00' 25.20M
1
7
2
°
2
6
'
1
4
"
2
2
.
5
4
M
SERVICE EASMENT 2.44M WIDE
BELLA CRESCENT
PROPOSED CONCRETE DRIVEWAY
DP
DP DP
DP
PROPOSED EXCAVATION LINE
PROPOSED RESEDENCE
FFL 615.000
FFL 614.850
CARPORT
614.75
614.25
614.50
SITE AREA 596M2
A
SITE PLAN
scale: 1:200
01
N
WM
SEWER TIE
STORM WATER TIE
E
Concrete
Footpath
900
1200 3445
9100
200mm thick wall
Round concrete
planter box 500mm high
DETAILS IN ANNEX A
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
1
P.O.S
7.28
m
6.63 m
5.55
m
7.69 m
4.25 m
270° 00' 00' 28.17M
0°
00'
00'
22.35M
90° 00' 00' 25.20M
1
7
2
°
2
6
'
1
4
"
2
2
.
5
4
M
SERVICE EASMENT 2.44M WIDE
BELLA CRESCENT
DP
DP DP
DP
PROPOSED EXCAVATION LINE
PROPOSED RESEDENCE
FFL 615.000
FFL 614.850
CARPORT
614.75
614.25
614.50
SITE AREA 596M2
N
WM
SEWER TIE
STORM WATER TIE
E
Concrete
Footpath
900
1200 3445
9100
Site Silt Fence
SITE/LANDSCAPE MANAGEMENT AND PROTECTION PLAN
SITE TOILET
1.8M HIGH SITE FENCE
BUILDING WASTE
ZONE
GENERAL SITE ACCESS POINT
SITE SIGN TO GO HERE
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
11115
8270
11115
8270
250
3120
90
600
90
2030
90
715
90
3790
250
250
6090
250
250
4155
90
2470
90
600
90
3120
250
130
3900
90
3900
250
2000
90
720
90
1000
90
1000
1100
600
3810
2
A
PLAN VIEW
scale: 1:100
02
1
A3
2
A3
D
1
D
9
D
3
W
1
W
2
W
3
W
4
W
5
R
FFL 615.000
D
2
D
6
D
5
D
7
D
10
D
4
D
8
N
CARPORT
FFL 614.700
ROBE
L/N
ROBE
DP
DP
DP
D
P
AREA SCHEDULE
NAME AREA
Proposed Residence 80.49m2
Proposed Verandah 12.33m2
Proposed Carport 25.14m2
Grand Total 117.96m2
450mm Eaves
600mm Eaves over Gable
Raked eaves
across front verandah area
All work must be IAW the NCC Volume 2
3000
8380
1812
6805
BED 1
BED 2
ENTRY 01
MEALS
LIVING
KITCHEN
BATH
LAUNDRY
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
3
A
Elevation 01
scale: 1:100
03
A
Elevation 02
scale: 1:100
03
A
Elevation 03
scale: 1:100
03
A
Elevation 04
scale: 1:100
03
Metal Roof
Face Brickwork
100mm
Concrete Slab
for Carport
Under Floor door
D3 W3
W1
D2 D1
W2
W4
W5
Face Brickwork
75mm Polystyrene
Cladding with 8mm
render
Base Brickwork
Base Brickwork
Base Brickwork
FCL
617400
FFL
615000
FCL
617400
FFL
615000
FCL
617400
FFL
615000
FCL
617400
FFL
615000
Timber Barge
Timber Fascia
All work must be IAW the NCC Volume 2
Metal Barge Flashing
2400 min
2400 Min
Concrete Strip footinhg
Concrete Pad Footing
100mm Carport Slab
Compact Fill
IAW with the NCC Vol 2. Concrete Strip Footing
24°
24°
75mm Polystyrene
Cladding with 8mm
render
75mm Polystyrene
Cladding with 8mm
render
Hardies linear
weatherboards
Staircase from Front Porch
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
4
24°
TIMBER FRAME CUT ROOF
COLOURBOND STANDARD ORB METAL ROOF
BED 1 KITCHEN
125MM METAL GUTTER
FACE BRICK WORK
STRIP FOOTING
PAD FOOTING COLOURBOND STANDARD ORB METAL ROOF
VERANDAH TIMBER CUT ROOF
METAL ROOF TO SUIT PITCH
1°
VERANDAH ROOF PITCH
SECTION 1
scale: 1:100
A
04
SECTION 2
scale: 1:100
A
04
24°
BATH
LIVING
Purlin
Strut
Ceiling
Hanging Beam
Strutting Beam
63x100mm LVL Bearer Max 1800 C/C
100x45 LVL Joist Max 450 C/C
100x45 LVL Joist Max 450mm C/C
1
R4
2
R4
D9 D10
W5
FCL
617400
FFL
615000
FCL
617400
FFL
615000
2410
2410
R2 Insulation
R5 Ceiling Insulation
ROLL TOP RIDGE
INSULATION BLANKET
All work must be IAW the NCC Volume 2
All Timber Frame must be IAW the AS 1684.2
Compact Fill Under Carport
Slab IAW NCC Vol 2
100mm Concrete Slab
Concrete Pad Footing
Concrete Strip Footing
SEE ANNEX A FOR CONCERET FOOTING DETAILS
120X45 mgp10
90x45
9045 porch rafter 1.1
90x90 post#1
VERANDAH ROOF DETAIL
Label text
A
04
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
5
roll top ridge cap
DETAIL 2
scale: 1:20
A
05
DETAIL 1
scale: 1:20
A
05
R2 Insulation
R5 Ceiling Insulation
Insulation Blanket
2410
120X45 mgp10
All work must be IAW the NCC Volume 2
All Timber Frame must be IAW the AS 1684.2
2100 Min
SEE ANNEX A FOR CONCERET FOOTING DETAILS
Concrete Strip Footing
IAW A/S 2870 or Engineers Details
50x38 batten
4.5mm FC sheeting
19x19 trimm
10mm x 1200mm plasterboard#52
joint tape#7
50x38 Dropper
125mm gutter
90x90 Post
Post Shoe
130x45 LVL Bearer
130x45 LVL deck
joist @450 C/C
90x19 HWD
Decking
130x45 LVL Pitching plate
90x45 LVL Joist at 450 Max Centers
10 mm Plaster board
to a level 4 finish
90x35mm MGP 10 pine stud IAW A/S 1684.2
19mm Chipboard flooring
Installed IAW Manufactures instruction
Ant Cap Galvenised
Engaged Brick Pier
Brick Sill
Aluminium Framed Window
Weep Hole
Cavity
67x18mm Architrave
Brick Tie
Foundation
125mm gutter
185mm Timber Fascia
metal Roof
metal roof batten standard
creeper rafter 5
90x45 mgp Pine
10mm Plasterboard
ceiling
55mm cornice
24°
Concrete Strip Footing
IAW A/S 2870 or Engineers Details Base Brick work
Engaged Brick Pier
Concrete Strip Footing
IAW A/S 2870 or
Engineers Details
intrim sk11
100x63 LVL Bearer at 1800 Max Centers
Brick Vent
Base Brickwork
1°
185x19 Timber Fascia
90x45 Verandah Rafter
@ 600C/C
90x45 Barge Rafter
metal roof batten standard
Metal Verandah Roof
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
WINDOW SCHEDULE
ID
WINDOW
STYLE
HEIGHT
(mm)
WIDTH
(mm)
DESCRIPTION
W01 AS1218 1200 1810
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W02 AS1218 1200 1810
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W03 AS0960 900 610
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W04 AS1012 1030 1210
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W05 AS1215 1200 1510
Aluminium Sliding Double
Glazed/Argon Gas/Low E
TIMBER FRAMING SCHEDULE JOIST SPACING
FLOORING MATERIAL
19MM YELLOW TONGUE
3600X900
6mm FC tiling backer 2400x1200
TIMBER SUB FLOOR
63X90 LVL BEARERS
90X45 LVL JOISTS
TIMBER FRAME SIZES
90X35 TOP PLATE
90X45 RIBBON PLATE
90X35 STUDS
90X35 NOGGINS
200X45 LVL LINTLE
FRONT VERANDAH
130X45 lvl joist
120x45 MGP10 Front verandah
beam
90x45 MGP10 Rafters
DOOR SCHEDULE
ID
HEIGHT
(mm)
WIDTH
(mm)
DESCRIPTION
D01 2100 1810
Aluminium Sliding Door Double
Glazed/Argon Gas/Low E
D02 2040 870
Timber solid core door
D03 2040 870
Timber solid core door
D04 2040 Sliding Bi-Pass robe doors
D05 2040 820
Internal ready coat timber
hollow core door
D06 2040 820
Internal ready coat timber
hollow core door
D07 2040 620
Internal ready coat timber
hollow core door
D08 2040 Sliding Bi-Pass robe doors
D09 2040 720
Internal ready coat timber
hollow core door
D10 2040
HOLLOW CORE BI-FOLD
TIMBER DOORS
All work must be IAW the NCC Volume 2
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
11130
6690
8370
4410
1680
6720
500
500
500
ANNEX A CONCRETE ENGINEERING
ANNEX A
All work must be IAW the NCC Volume 2
500
1200
CONCRETE PLANTER BOX
CONCRET FOOTINGS
CONCRETE FOOTINGS
200
200
100
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
SEE ANNEX C FOR MATERIALS CHOICE FOR PROJECT.
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Verandah Roof
90x45 LVL Pitching Plate and rafters. What lengths
would you order and how many lengths required?
$9.97
90x90 posts. What size posts and how many
required?
$105.00
200x45 LVL Beam. What lengths would you order? $33.20
Sundries/ FC soffit nails/clouts $300
Labour for installing Verandah roof frame
Carpenter. How many hours required for install?
$65
Wall And Roof Framing Material And Quantities
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Wall Frame
90x35mm MGP 10 for Plates & Noggins and Studs.
How many 5.4m Lengths required?
$5.70
90x45mm MGP Ribbon Plate/Extra Top Plate. How
many 6m Lengths required?
$7.10
Brace Ply wood Untreated F8. Sheets required? $57.60
Strap bracing. How many 30m rolls required? $55.00
Stud ties/Stud screw. How many required? $2.50
Sundries/ FC soffit nails/clouts $500
pack of 50x38 rough sawn battens for temporary
bracing. How many packs of 8 would you order?
$74.11
Labour for installing frame, Carpenter. How many
hours required for install?
$65
Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
SEE ANNEX C FOR MATERIALS CHOICE FOR PROJECT.
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Internal Linning
10mm Plasterboard 1200 wide sheets. What
sizes and how many required?
sqm $5.55
8mm Villa board for bathroom and laundry.
What size sheets and how many required?
sqm $12.15
16mm Ceiling Battens Metal. How many 6m
lengths required?
m $11.10
55mm Standard Cove cornice. How many 4.8m
lengths required?
m $14.75
Joint Tape 75m roll. How many rolls required? No $6.48
Base coat 45 minute Compound. How many
bags required?
No $32.86
Top Coat Compound. How many tubs required? No $58.30
Sundries/ FC soffit nails/clouts No 1 1 $500 $500
externals mouldings for external corners 3m.
Count how many required?
No $7.40
labour to install Plasterboard. How many hours? No $65
Labour to install compounds and topping. How
many hours?
No $65
Internal lining and Flooring Materials and Quantities
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Flooring
3600x900 Yellow tongue chipboard Floor
sheets. How many sheets required?
No $48.50
Glue . How many sausages of glue required? No $11.49
james Hardie ceramic tile underlay 1800 x
1200 x 6mm. How many sheets required for
bathroom and Laundry cupboard?
$23.40
Sundries/ FC soffit nails/clouts No $500
Labour for installing floor sheets Carpenter.
How many hours required for install?
No
Fill out each calculation sheet and the up load photo to Readyskills for marking by trainer
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
External Cladding and Roofing Materials and Quantities
ROOFING
Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS
Metal Roof
standard Orb Sheets cover 762 effective cover. How
many sheets and sizes required.
m $23.32
Metal roof battens 6.5m. How many lengths required. per length $22.50
Earthwool Space Blanket R1.3 55mm x 1200mm x
15000mm 18m² Insulation Metal Roof . How many
rolls required?
roll $195.00
Flashings Barge. How many lengths and sizes
required?
m $12.90
valley iron. What length required? m $12.90
Roll top ridge. How many lengths and sizes required? m $12.90
Sundries/ FC soffit nails/clouts item $500
deliveries each $150
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS
External Cladding hardies linear weatherboard. How many 4.2m Lengths $33.50
Starter bead for Hardies Linear Cladding. What length
required?
$12.80
Hardie Wall wrap 2750 x 30m. How many rolls
reuired?
$252.71
75mm Polystyrene 2.5 x 1.2. How many Sheets
required?
$41.25
25mm Polystyrene battens 1200 x 45 x 25mm. How
many Battens Required?
$1.60
Mungo Nylon Washers and screws. No 1 1 $500 $500
Sundries/ FC soffit nails/clouts No 1 1 $300 $300
deliveries
Labour for install
HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
BLANK AREA FOR WORKINGS.
Concrete Planter Box/drive way and Foot path Quantitites
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS
Concretor
Concrete planter box. How many CUM of concrete
required (Annex A for details)
$280
Foot Path. How many CUM of concrete required? (See
Site plan A01)
$280
Drive way. How many CUM of concrete required ( see
Site plan A01)
$280
Workout quantities for all items and then compile an
overall total to be delivered to site.
Labour for install
Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer

More Related Content

Similar to Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf

Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problemdhineshkumar002
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
strip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxstrip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxVICTOR A. KIPLAGAT
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationTan Jaden
 
Hansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdfHansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdfFolk James
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and detailsTeresa Seasons
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Ian de Mink
 
Detail behind the proposal
Detail behind the proposalDetail behind the proposal
Detail behind the proposallauracarcano2
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setarshacjhow
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawingsjiuaN59
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00Mansoor Sakharkar
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 

Similar to Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf (20)

Dick Smith
Dick SmithDick Smith
Dick Smith
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
strip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxstrip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docx
 
Building technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilationBuilding technology 1 Project 1 Drawing compilation
Building technology 1 Project 1 Drawing compilation
 
Hansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdfHansons Lodge Eaves.pdf
Hansons Lodge Eaves.pdf
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and details
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
 
20161130 - Booosting Circular Demolition @Erasmus MC Rotterdam - Redesign gro...
20161130 - Booosting Circular Demolition @Erasmus MC Rotterdam - Redesign gro...20161130 - Booosting Circular Demolition @Erasmus MC Rotterdam - Redesign gro...
20161130 - Booosting Circular Demolition @Erasmus MC Rotterdam - Redesign gro...
 
Detail behind the proposal
Detail behind the proposalDetail behind the proposal
Detail behind the proposal
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawings
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
Car park bq
Car park bqCar park bq
Car park bq
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 

More from Canberra Institute of technology

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxCanberra Institute of technology
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxCanberra Institute of technology
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerCanberra Institute of technology
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Canberra Institute of technology
 

More from Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
 
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
 
Form Release Agent SDS
Form Release Agent SDSForm Release Agent SDS
Form Release Agent SDS
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 

Recently uploaded

History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Recently uploaded (20)

History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 

Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf

  • 1. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements CPCCOM3001 PERFORM CONSTRUCTION CALCULATIONS TO DETERMINE CARPENTRY MATERIAL REQUIREMENTS
  • 2. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 1 P.O.S 7.28 m 6.63 m 5.55 m 7.69 m 4.25 m 270° 00' 00' 28.17M 0° 00' 00' 22.35M 90° 00' 00' 25.20M 1 7 2 ° 2 6 ' 1 4 " 2 2 . 5 4 M SERVICE EASMENT 2.44M WIDE BELLA CRESCENT PROPOSED CONCRETE DRIVEWAY DP DP DP DP PROPOSED EXCAVATION LINE PROPOSED RESEDENCE FFL 615.000 FFL 614.850 CARPORT 614.75 614.25 614.50 SITE AREA 596M2 A SITE PLAN scale: 1:200 01 N WM SEWER TIE STORM WATER TIE E Concrete Footpath 900 1200 3445 9100 200mm thick wall Round concrete planter box 500mm high DETAILS IN ANNEX A
  • 3. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 1 P.O.S 7.28 m 6.63 m 5.55 m 7.69 m 4.25 m 270° 00' 00' 28.17M 0° 00' 00' 22.35M 90° 00' 00' 25.20M 1 7 2 ° 2 6 ' 1 4 " 2 2 . 5 4 M SERVICE EASMENT 2.44M WIDE BELLA CRESCENT DP DP DP DP PROPOSED EXCAVATION LINE PROPOSED RESEDENCE FFL 615.000 FFL 614.850 CARPORT 614.75 614.25 614.50 SITE AREA 596M2 N WM SEWER TIE STORM WATER TIE E Concrete Footpath 900 1200 3445 9100 Site Silt Fence SITE/LANDSCAPE MANAGEMENT AND PROTECTION PLAN SITE TOILET 1.8M HIGH SITE FENCE BUILDING WASTE ZONE GENERAL SITE ACCESS POINT SITE SIGN TO GO HERE
  • 4. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 11115 8270 11115 8270 250 3120 90 600 90 2030 90 715 90 3790 250 250 6090 250 250 4155 90 2470 90 600 90 3120 250 130 3900 90 3900 250 2000 90 720 90 1000 90 1000 1100 600 3810 2 A PLAN VIEW scale: 1:100 02 1 A3 2 A3 D 1 D 9 D 3 W 1 W 2 W 3 W 4 W 5 R FFL 615.000 D 2 D 6 D 5 D 7 D 10 D 4 D 8 N CARPORT FFL 614.700 ROBE L/N ROBE DP DP DP D P AREA SCHEDULE NAME AREA Proposed Residence 80.49m2 Proposed Verandah 12.33m2 Proposed Carport 25.14m2 Grand Total 117.96m2 450mm Eaves 600mm Eaves over Gable Raked eaves across front verandah area All work must be IAW the NCC Volume 2 3000 8380 1812 6805 BED 1 BED 2 ENTRY 01 MEALS LIVING KITCHEN BATH LAUNDRY
  • 5. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 3 A Elevation 01 scale: 1:100 03 A Elevation 02 scale: 1:100 03 A Elevation 03 scale: 1:100 03 A Elevation 04 scale: 1:100 03 Metal Roof Face Brickwork 100mm Concrete Slab for Carport Under Floor door D3 W3 W1 D2 D1 W2 W4 W5 Face Brickwork 75mm Polystyrene Cladding with 8mm render Base Brickwork Base Brickwork Base Brickwork FCL 617400 FFL 615000 FCL 617400 FFL 615000 FCL 617400 FFL 615000 FCL 617400 FFL 615000 Timber Barge Timber Fascia All work must be IAW the NCC Volume 2 Metal Barge Flashing 2400 min 2400 Min Concrete Strip footinhg Concrete Pad Footing 100mm Carport Slab Compact Fill IAW with the NCC Vol 2. Concrete Strip Footing 24° 24° 75mm Polystyrene Cladding with 8mm render 75mm Polystyrene Cladding with 8mm render Hardies linear weatherboards Staircase from Front Porch
  • 6. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 4 24° TIMBER FRAME CUT ROOF COLOURBOND STANDARD ORB METAL ROOF BED 1 KITCHEN 125MM METAL GUTTER FACE BRICK WORK STRIP FOOTING PAD FOOTING COLOURBOND STANDARD ORB METAL ROOF VERANDAH TIMBER CUT ROOF METAL ROOF TO SUIT PITCH 1° VERANDAH ROOF PITCH SECTION 1 scale: 1:100 A 04 SECTION 2 scale: 1:100 A 04 24° BATH LIVING Purlin Strut Ceiling Hanging Beam Strutting Beam 63x100mm LVL Bearer Max 1800 C/C 100x45 LVL Joist Max 450 C/C 100x45 LVL Joist Max 450mm C/C 1 R4 2 R4 D9 D10 W5 FCL 617400 FFL 615000 FCL 617400 FFL 615000 2410 2410 R2 Insulation R5 Ceiling Insulation ROLL TOP RIDGE INSULATION BLANKET All work must be IAW the NCC Volume 2 All Timber Frame must be IAW the AS 1684.2 Compact Fill Under Carport Slab IAW NCC Vol 2 100mm Concrete Slab Concrete Pad Footing Concrete Strip Footing SEE ANNEX A FOR CONCERET FOOTING DETAILS 120X45 mgp10 90x45 9045 porch rafter 1.1 90x90 post#1 VERANDAH ROOF DETAIL Label text A 04
  • 7. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 5 roll top ridge cap DETAIL 2 scale: 1:20 A 05 DETAIL 1 scale: 1:20 A 05 R2 Insulation R5 Ceiling Insulation Insulation Blanket 2410 120X45 mgp10 All work must be IAW the NCC Volume 2 All Timber Frame must be IAW the AS 1684.2 2100 Min SEE ANNEX A FOR CONCERET FOOTING DETAILS Concrete Strip Footing IAW A/S 2870 or Engineers Details 50x38 batten 4.5mm FC sheeting 19x19 trimm 10mm x 1200mm plasterboard#52 joint tape#7 50x38 Dropper 125mm gutter 90x90 Post Post Shoe 130x45 LVL Bearer 130x45 LVL deck joist @450 C/C 90x19 HWD Decking 130x45 LVL Pitching plate 90x45 LVL Joist at 450 Max Centers 10 mm Plaster board to a level 4 finish 90x35mm MGP 10 pine stud IAW A/S 1684.2 19mm Chipboard flooring Installed IAW Manufactures instruction Ant Cap Galvenised Engaged Brick Pier Brick Sill Aluminium Framed Window Weep Hole Cavity 67x18mm Architrave Brick Tie Foundation 125mm gutter 185mm Timber Fascia metal Roof metal roof batten standard creeper rafter 5 90x45 mgp Pine 10mm Plasterboard ceiling 55mm cornice 24° Concrete Strip Footing IAW A/S 2870 or Engineers Details Base Brick work Engaged Brick Pier Concrete Strip Footing IAW A/S 2870 or Engineers Details intrim sk11 100x63 LVL Bearer at 1800 Max Centers Brick Vent Base Brickwork 1° 185x19 Timber Fascia 90x45 Verandah Rafter @ 600C/C 90x45 Barge Rafter metal roof batten standard Metal Verandah Roof
  • 8. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements WINDOW SCHEDULE ID WINDOW STYLE HEIGHT (mm) WIDTH (mm) DESCRIPTION W01 AS1218 1200 1810 Aluminium Sliding Double Glazed/Argon Gas/Low E W02 AS1218 1200 1810 Aluminium Sliding Double Glazed/Argon Gas/Low E W03 AS0960 900 610 Aluminium Sliding Double Glazed/Argon Gas/Low E W04 AS1012 1030 1210 Aluminium Sliding Double Glazed/Argon Gas/Low E W05 AS1215 1200 1510 Aluminium Sliding Double Glazed/Argon Gas/Low E TIMBER FRAMING SCHEDULE JOIST SPACING FLOORING MATERIAL 19MM YELLOW TONGUE 3600X900 6mm FC tiling backer 2400x1200 TIMBER SUB FLOOR 63X90 LVL BEARERS 90X45 LVL JOISTS TIMBER FRAME SIZES 90X35 TOP PLATE 90X45 RIBBON PLATE 90X35 STUDS 90X35 NOGGINS 200X45 LVL LINTLE FRONT VERANDAH 130X45 lvl joist 120x45 MGP10 Front verandah beam 90x45 MGP10 Rafters DOOR SCHEDULE ID HEIGHT (mm) WIDTH (mm) DESCRIPTION D01 2100 1810 Aluminium Sliding Door Double Glazed/Argon Gas/Low E D02 2040 870 Timber solid core door D03 2040 870 Timber solid core door D04 2040 Sliding Bi-Pass robe doors D05 2040 820 Internal ready coat timber hollow core door D06 2040 820 Internal ready coat timber hollow core door D07 2040 620 Internal ready coat timber hollow core door D08 2040 Sliding Bi-Pass robe doors D09 2040 720 Internal ready coat timber hollow core door D10 2040 HOLLOW CORE BI-FOLD TIMBER DOORS All work must be IAW the NCC Volume 2
  • 9. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements 11130 6690 8370 4410 1680 6720 500 500 500 ANNEX A CONCRETE ENGINEERING ANNEX A All work must be IAW the NCC Volume 2 500 1200 CONCRETE PLANTER BOX CONCRET FOOTINGS CONCRETE FOOTINGS 200 200 100
  • 10. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements SEE ANNEX C FOR MATERIALS CHOICE FOR PROJECT. ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS Verandah Roof 90x45 LVL Pitching Plate and rafters. What lengths would you order and how many lengths required? $9.97 90x90 posts. What size posts and how many required? $105.00 200x45 LVL Beam. What lengths would you order? $33.20 Sundries/ FC soffit nails/clouts $300 Labour for installing Verandah roof frame Carpenter. How many hours required for install? $65 Wall And Roof Framing Material And Quantities ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS Wall Frame 90x35mm MGP 10 for Plates & Noggins and Studs. How many 5.4m Lengths required? $5.70 90x45mm MGP Ribbon Plate/Extra Top Plate. How many 6m Lengths required? $7.10 Brace Ply wood Untreated F8. Sheets required? $57.60 Strap bracing. How many 30m rolls required? $55.00 Stud ties/Stud screw. How many required? $2.50 Sundries/ FC soffit nails/clouts $500 pack of 50x38 rough sawn battens for temporary bracing. How many packs of 8 would you order? $74.11 Labour for installing frame, Carpenter. How many hours required for install? $65 Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer
  • 11. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements SEE ANNEX C FOR MATERIALS CHOICE FOR PROJECT. ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS Internal Linning 10mm Plasterboard 1200 wide sheets. What sizes and how many required? sqm $5.55 8mm Villa board for bathroom and laundry. What size sheets and how many required? sqm $12.15 16mm Ceiling Battens Metal. How many 6m lengths required? m $11.10 55mm Standard Cove cornice. How many 4.8m lengths required? m $14.75 Joint Tape 75m roll. How many rolls required? No $6.48 Base coat 45 minute Compound. How many bags required? No $32.86 Top Coat Compound. How many tubs required? No $58.30 Sundries/ FC soffit nails/clouts No 1 1 $500 $500 externals mouldings for external corners 3m. Count how many required? No $7.40 labour to install Plasterboard. How many hours? No $65 Labour to install compounds and topping. How many hours? No $65 Internal lining and Flooring Materials and Quantities ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS Flooring 3600x900 Yellow tongue chipboard Floor sheets. How many sheets required? No $48.50 Glue . How many sausages of glue required? No $11.49 james Hardie ceramic tile underlay 1800 x 1200 x 6mm. How many sheets required for bathroom and Laundry cupboard? $23.40 Sundries/ FC soffit nails/clouts No $500 Labour for installing floor sheets Carpenter. How many hours required for install? No Fill out each calculation sheet and the up load photo to Readyskills for marking by trainer
  • 12. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements External Cladding and Roofing Materials and Quantities ROOFING Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS Metal Roof standard Orb Sheets cover 762 effective cover. How many sheets and sizes required. m $23.32 Metal roof battens 6.5m. How many lengths required. per length $22.50 Earthwool Space Blanket R1.3 55mm x 1200mm x 15000mm 18m² Insulation Metal Roof . How many rolls required? roll $195.00 Flashings Barge. How many lengths and sizes required? m $12.90 valley iron. What length required? m $12.90 Roll top ridge. How many lengths and sizes required? m $12.90 Sundries/ FC soffit nails/clouts item $500 deliveries each $150 ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS External Cladding hardies linear weatherboard. How many 4.2m Lengths $33.50 Starter bead for Hardies Linear Cladding. What length required? $12.80 Hardie Wall wrap 2750 x 30m. How many rolls reuired? $252.71 75mm Polystyrene 2.5 x 1.2. How many Sheets required? $41.25 25mm Polystyrene battens 1200 x 45 x 25mm. How many Battens Required? $1.60 Mungo Nylon Washers and screws. No 1 1 $500 $500 Sundries/ FC soffit nails/clouts No 1 1 $300 $300 deliveries Labour for install
  • 13. HANSONS LODGE REVISIONS REMARKS 1 MM/DD/YY 2 3 4 5 16/05/2022 VERSION 1 fixed window schedule 19/08/2022 Version 1.1 updated brick hatching _17/10/2022 _ Version 1.2 updated all prices and added more detail on the cost centers./added a new roof scene/ removed materials info _ _ /_ _ /_ _ ... _ _ /_ _ /_ _ ... CPCCOM3001 Perform Construction Calculations to Determine Carpentry Material Requirements BLANK AREA FOR WORKINGS. Concrete Planter Box/drive way and Foot path Quantitites ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS Concretor Concrete planter box. How many CUM of concrete required (Annex A for details) $280 Foot Path. How many CUM of concrete required? (See Site plan A01) $280 Drive way. How many CUM of concrete required ( see Site plan A01) $280 Workout quantities for all items and then compile an overall total to be delivered to site. Labour for install Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer