1. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
CPCCOM3001 PERFORM CONSTRUCTION CALCULATIONS
TO DETERMINE CARPENTRY MATERIAL REQUIREMENTS
2. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
1
P.O.S
7.28
m
6.63 m
5.55
m
7.69 m
4.25 m
270° 00' 00' 28.17M
0°
00'
00'
22.35M
90° 00' 00' 25.20M
1
7
2
°
2
6
'
1
4
"
2
2
.
5
4
M
SERVICE EASMENT 2.44M WIDE
BELLA CRESCENT
PROPOSED CONCRETE DRIVEWAY
DP
DP DP
DP
PROPOSED EXCAVATION LINE
PROPOSED RESEDENCE
FFL 615.000
FFL 614.850
CARPORT
614.75
614.25
614.50
SITE AREA 596M2
A
SITE PLAN
scale: 1:200
01
N
WM
SEWER TIE
STORM WATER TIE
E
Concrete
Footpath
900
1200 3445
9100
200mm thick wall
Round concrete
planter box 500mm high
DETAILS IN ANNEX A
3. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
1
P.O.S
7.28
m
6.63 m
5.55
m
7.69 m
4.25 m
270° 00' 00' 28.17M
0°
00'
00'
22.35M
90° 00' 00' 25.20M
1
7
2
°
2
6
'
1
4
"
2
2
.
5
4
M
SERVICE EASMENT 2.44M WIDE
BELLA CRESCENT
DP
DP DP
DP
PROPOSED EXCAVATION LINE
PROPOSED RESEDENCE
FFL 615.000
FFL 614.850
CARPORT
614.75
614.25
614.50
SITE AREA 596M2
N
WM
SEWER TIE
STORM WATER TIE
E
Concrete
Footpath
900
1200 3445
9100
Site Silt Fence
SITE/LANDSCAPE MANAGEMENT AND PROTECTION PLAN
SITE TOILET
1.8M HIGH SITE FENCE
BUILDING WASTE
ZONE
GENERAL SITE ACCESS POINT
SITE SIGN TO GO HERE
4. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
11115
8270
11115
8270
250
3120
90
600
90
2030
90
715
90
3790
250
250
6090
250
250
4155
90
2470
90
600
90
3120
250
130
3900
90
3900
250
2000
90
720
90
1000
90
1000
1100
600
3810
2
A
PLAN VIEW
scale: 1:100
02
1
A3
2
A3
D
1
D
9
D
3
W
1
W
2
W
3
W
4
W
5
R
FFL 615.000
D
2
D
6
D
5
D
7
D
10
D
4
D
8
N
CARPORT
FFL 614.700
ROBE
L/N
ROBE
DP
DP
DP
D
P
AREA SCHEDULE
NAME AREA
Proposed Residence 80.49m2
Proposed Verandah 12.33m2
Proposed Carport 25.14m2
Grand Total 117.96m2
450mm Eaves
600mm Eaves over Gable
Raked eaves
across front verandah area
All work must be IAW the NCC Volume 2
3000
8380
1812
6805
BED 1
BED 2
ENTRY 01
MEALS
LIVING
KITCHEN
BATH
LAUNDRY
5. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
3
A
Elevation 01
scale: 1:100
03
A
Elevation 02
scale: 1:100
03
A
Elevation 03
scale: 1:100
03
A
Elevation 04
scale: 1:100
03
Metal Roof
Face Brickwork
100mm
Concrete Slab
for Carport
Under Floor door
D3 W3
W1
D2 D1
W2
W4
W5
Face Brickwork
75mm Polystyrene
Cladding with 8mm
render
Base Brickwork
Base Brickwork
Base Brickwork
FCL
617400
FFL
615000
FCL
617400
FFL
615000
FCL
617400
FFL
615000
FCL
617400
FFL
615000
Timber Barge
Timber Fascia
All work must be IAW the NCC Volume 2
Metal Barge Flashing
2400 min
2400 Min
Concrete Strip footinhg
Concrete Pad Footing
100mm Carport Slab
Compact Fill
IAW with the NCC Vol 2. Concrete Strip Footing
24°
24°
75mm Polystyrene
Cladding with 8mm
render
75mm Polystyrene
Cladding with 8mm
render
Hardies linear
weatherboards
Staircase from Front Porch
6. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
4
24°
TIMBER FRAME CUT ROOF
COLOURBOND STANDARD ORB METAL ROOF
BED 1 KITCHEN
125MM METAL GUTTER
FACE BRICK WORK
STRIP FOOTING
PAD FOOTING COLOURBOND STANDARD ORB METAL ROOF
VERANDAH TIMBER CUT ROOF
METAL ROOF TO SUIT PITCH
1°
VERANDAH ROOF PITCH
SECTION 1
scale: 1:100
A
04
SECTION 2
scale: 1:100
A
04
24°
BATH
LIVING
Purlin
Strut
Ceiling
Hanging Beam
Strutting Beam
63x100mm LVL Bearer Max 1800 C/C
100x45 LVL Joist Max 450 C/C
100x45 LVL Joist Max 450mm C/C
1
R4
2
R4
D9 D10
W5
FCL
617400
FFL
615000
FCL
617400
FFL
615000
2410
2410
R2 Insulation
R5 Ceiling Insulation
ROLL TOP RIDGE
INSULATION BLANKET
All work must be IAW the NCC Volume 2
All Timber Frame must be IAW the AS 1684.2
Compact Fill Under Carport
Slab IAW NCC Vol 2
100mm Concrete Slab
Concrete Pad Footing
Concrete Strip Footing
SEE ANNEX A FOR CONCERET FOOTING DETAILS
120X45 mgp10
90x45
9045 porch rafter 1.1
90x90 post#1
VERANDAH ROOF DETAIL
Label text
A
04
7. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
5
roll top ridge cap
DETAIL 2
scale: 1:20
A
05
DETAIL 1
scale: 1:20
A
05
R2 Insulation
R5 Ceiling Insulation
Insulation Blanket
2410
120X45 mgp10
All work must be IAW the NCC Volume 2
All Timber Frame must be IAW the AS 1684.2
2100 Min
SEE ANNEX A FOR CONCERET FOOTING DETAILS
Concrete Strip Footing
IAW A/S 2870 or Engineers Details
50x38 batten
4.5mm FC sheeting
19x19 trimm
10mm x 1200mm plasterboard#52
joint tape#7
50x38 Dropper
125mm gutter
90x90 Post
Post Shoe
130x45 LVL Bearer
130x45 LVL deck
joist @450 C/C
90x19 HWD
Decking
130x45 LVL Pitching plate
90x45 LVL Joist at 450 Max Centers
10 mm Plaster board
to a level 4 finish
90x35mm MGP 10 pine stud IAW A/S 1684.2
19mm Chipboard flooring
Installed IAW Manufactures instruction
Ant Cap Galvenised
Engaged Brick Pier
Brick Sill
Aluminium Framed Window
Weep Hole
Cavity
67x18mm Architrave
Brick Tie
Foundation
125mm gutter
185mm Timber Fascia
metal Roof
metal roof batten standard
creeper rafter 5
90x45 mgp Pine
10mm Plasterboard
ceiling
55mm cornice
24°
Concrete Strip Footing
IAW A/S 2870 or Engineers Details Base Brick work
Engaged Brick Pier
Concrete Strip Footing
IAW A/S 2870 or
Engineers Details
intrim sk11
100x63 LVL Bearer at 1800 Max Centers
Brick Vent
Base Brickwork
1°
185x19 Timber Fascia
90x45 Verandah Rafter
@ 600C/C
90x45 Barge Rafter
metal roof batten standard
Metal Verandah Roof
8. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
WINDOW SCHEDULE
ID
WINDOW
STYLE
HEIGHT
(mm)
WIDTH
(mm)
DESCRIPTION
W01 AS1218 1200 1810
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W02 AS1218 1200 1810
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W03 AS0960 900 610
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W04 AS1012 1030 1210
Aluminium Sliding Double
Glazed/Argon Gas/Low E
W05 AS1215 1200 1510
Aluminium Sliding Double
Glazed/Argon Gas/Low E
TIMBER FRAMING SCHEDULE JOIST SPACING
FLOORING MATERIAL
19MM YELLOW TONGUE
3600X900
6mm FC tiling backer 2400x1200
TIMBER SUB FLOOR
63X90 LVL BEARERS
90X45 LVL JOISTS
TIMBER FRAME SIZES
90X35 TOP PLATE
90X45 RIBBON PLATE
90X35 STUDS
90X35 NOGGINS
200X45 LVL LINTLE
FRONT VERANDAH
130X45 lvl joist
120x45 MGP10 Front verandah
beam
90x45 MGP10 Rafters
DOOR SCHEDULE
ID
HEIGHT
(mm)
WIDTH
(mm)
DESCRIPTION
D01 2100 1810
Aluminium Sliding Door Double
Glazed/Argon Gas/Low E
D02 2040 870
Timber solid core door
D03 2040 870
Timber solid core door
D04 2040 Sliding Bi-Pass robe doors
D05 2040 820
Internal ready coat timber
hollow core door
D06 2040 820
Internal ready coat timber
hollow core door
D07 2040 620
Internal ready coat timber
hollow core door
D08 2040 Sliding Bi-Pass robe doors
D09 2040 720
Internal ready coat timber
hollow core door
D10 2040
HOLLOW CORE BI-FOLD
TIMBER DOORS
All work must be IAW the NCC Volume 2
9. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
11130
6690
8370
4410
1680
6720
500
500
500
ANNEX A CONCRETE ENGINEERING
ANNEX A
All work must be IAW the NCC Volume 2
500
1200
CONCRETE PLANTER BOX
CONCRET FOOTINGS
CONCRETE FOOTINGS
200
200
100
10. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
SEE ANNEX C FOR MATERIALS CHOICE FOR PROJECT.
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Verandah Roof
90x45 LVL Pitching Plate and rafters. What lengths
would you order and how many lengths required?
$9.97
90x90 posts. What size posts and how many
required?
$105.00
200x45 LVL Beam. What lengths would you order? $33.20
Sundries/ FC soffit nails/clouts $300
Labour for installing Verandah roof frame
Carpenter. How many hours required for install?
$65
Wall And Roof Framing Material And Quantities
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Wall Frame
90x35mm MGP 10 for Plates & Noggins and Studs.
How many 5.4m Lengths required?
$5.70
90x45mm MGP Ribbon Plate/Extra Top Plate. How
many 6m Lengths required?
$7.10
Brace Ply wood Untreated F8. Sheets required? $57.60
Strap bracing. How many 30m rolls required? $55.00
Stud ties/Stud screw. How many required? $2.50
Sundries/ FC soffit nails/clouts $500
pack of 50x38 rough sawn battens for temporary
bracing. How many packs of 8 would you order?
$74.11
Labour for installing frame, Carpenter. How many
hours required for install?
$65
Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer
11. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
SEE ANNEX C FOR MATERIALS CHOICE FOR PROJECT.
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Internal Linning
10mm Plasterboard 1200 wide sheets. What
sizes and how many required?
sqm $5.55
8mm Villa board for bathroom and laundry.
What size sheets and how many required?
sqm $12.15
16mm Ceiling Battens Metal. How many 6m
lengths required?
m $11.10
55mm Standard Cove cornice. How many 4.8m
lengths required?
m $14.75
Joint Tape 75m roll. How many rolls required? No $6.48
Base coat 45 minute Compound. How many
bags required?
No $32.86
Top Coat Compound. How many tubs required? No $58.30
Sundries/ FC soffit nails/clouts No 1 1 $500 $500
externals mouldings for external corners 3m.
Count how many required?
No $7.40
labour to install Plasterboard. How many hours? No $65
Labour to install compounds and topping. How
many hours?
No $65
Internal lining and Flooring Materials and Quantities
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY WASTE ORDER COSTS PER UNIT TOTAL COSTS
Flooring
3600x900 Yellow tongue chipboard Floor
sheets. How many sheets required?
No $48.50
Glue . How many sausages of glue required? No $11.49
james Hardie ceramic tile underlay 1800 x
1200 x 6mm. How many sheets required for
bathroom and Laundry cupboard?
$23.40
Sundries/ FC soffit nails/clouts No $500
Labour for installing floor sheets Carpenter.
How many hours required for install?
No
Fill out each calculation sheet and the up load photo to Readyskills for marking by trainer
12. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
External Cladding and Roofing Materials and Quantities
ROOFING
Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS
Metal Roof
standard Orb Sheets cover 762 effective cover. How
many sheets and sizes required.
m $23.32
Metal roof battens 6.5m. How many lengths required. per length $22.50
Earthwool Space Blanket R1.3 55mm x 1200mm x
15000mm 18m² Insulation Metal Roof . How many
rolls required?
roll $195.00
Flashings Barge. How many lengths and sizes
required?
m $12.90
valley iron. What length required? m $12.90
Roll top ridge. How many lengths and sizes required? m $12.90
Sundries/ FC soffit nails/clouts item $500
deliveries each $150
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS
External Cladding hardies linear weatherboard. How many 4.2m Lengths $33.50
Starter bead for Hardies Linear Cladding. What length
required?
$12.80
Hardie Wall wrap 2750 x 30m. How many rolls
reuired?
$252.71
75mm Polystyrene 2.5 x 1.2. How many Sheets
required?
$41.25
25mm Polystyrene battens 1200 x 45 x 25mm. How
many Battens Required?
$1.60
Mungo Nylon Washers and screws. No 1 1 $500 $500
Sundries/ FC soffit nails/clouts No 1 1 $300 $300
deliveries
Labour for install
13. HANSONS LODGE
REVISIONS
REMARKS
1
MM/DD/YY
2
3
4
5
16/05/2022 VERSION 1 fixed window schedule
19/08/2022 Version 1.1 updated brick hatching
_17/10/2022 _
Version 1.2 updated all prices and added more detail on the cost centers./added a
new roof scene/ removed materials info
_ _ /_ _ /_ _
...
_ _ /_ _ /_ _ ...
CPCCOM3001 Perform Construction Calculations to Determine Carpentry
Material Requirements
BLANK AREA FOR WORKINGS.
Concrete Planter Box/drive way and Foot path Quantitites
ITEM DESCRIPTION UNIT (sqm,cum,m,No) QUANTITY ORDER WASTE COSTS PER UNIT TOTAL COSTS
Concretor
Concrete planter box. How many CUM of concrete
required (Annex A for details)
$280
Foot Path. How many CUM of concrete required? (See
Site plan A01)
$280
Drive way. How many CUM of concrete required ( see
Site plan A01)
$280
Workout quantities for all items and then compile an
overall total to be delivered to site.
Labour for install
Fill out each calculation sheet and then up load photo to Readyskills for marking by trainer