Strategy implementation
How do we ensure arrival?
ABAHO ERNEST STR.MGT BSC ACC 2
Strategy implementation is the sum
total of activities and choices
required to implement a strategic
plan. This requires the development
of programs, budgets and procedures
ABAHO ERNEST STR.MGT BSC ACC 3
Basic issues to be addressed in
implementing strategy
 Who are the staff who will undertake the
tasks?
 What must be done to ensure congruence
between current operations and the new
strategic direction?
 How is every one going to do what is
required?
ABAHO ERNEST STR.MGT BSC ACC 4
Common problems encountered in
strategy implementation
 Time taken is more than that originally planned
 Un foreseen problems set in
 Ineffective coordination of activities
 Other company activities overshadowed implementation of
strategy
 Respective staff lacked required skills
 Lack of training to create required skills
 Unforeseen external factors
 Inadequate leadership from top management
 Poorly defined activities to be implemented
 Insufficient back up by ICT
ABAHO ERNEST STR.MGT BSC ACC 5
The strategy implementer’s task is to
convert the plan into action and
undertake what is called for by the
plan. Managing strategy
implementation is therefore more art
than science.
ABAHO ERNEST STR.MGT BSC ACC 6
The eight managerial components of
implementing strategy
1. Building a capable organization
2. Developing budgets and allocating ample resources to the
strategic effort
3. Establishing strategy friendly and enabling policies
4. Instituting best practices and continuous improvement
5. Providing support systems that enable staff to perform
6. Linking rewards/ incentives with achievement of strategic
targets
7. Creating corporate culture which ensures/ enhances strategy
achievement
8. Exercising strategic leadership to drive implementation
ABAHO ERNEST STR.MGT BSC ACC 7
Building a capable organization
 Selecting people for key positions – creating a strong
management team
 Building core competences and capabilities which are
un matched: competitive advantage.
 Employee training and retraining
 Match orgn structure to strategy: identify and build
structure around critical activities then consider
outsourcing non core activities.
 Resolving which decisions to centralize and which to
decentralize
ABAHO ERNEST STR.MGT BSC ACC 8
Strategic advantages and disadvantages of various
organization structures
 Functional specialization
 Geographic organization
 Decentralized biz divisions
 Strategic biz units
 Matrix structures
( students to fill in )
ABAHO ERNEST STR.MGT BSC ACC 9
Strategy and stage of corporate
development
Stage one
1. Major problem- survival and growth, dealing with
short term operational probs
2. Objectives- personal, subjective
3. Strategy- implicit, entrepreneur owner
4. Structure- one man show
5. Control – personal criteria, daily observation
6. Reward punishment- informal, incentives limited
and used for control/ creating allegiances.
ABAHO ERNEST STR.MGT BSC ACC 10
Strategy and stage of corporate
development ctnd
Stage two
1. Major problems- growth, expansion of resources
2. Objectives – SMART meeting functional
performance targets
3. Strategy – limited to exploitation of one product
4. Organization- one unit functionally specialized
5. Control – many persons and systems involved
6. Reward punishment – based on agreed policies
ABAHO ERNEST STR.MGT BSC ACC 11
Strategy and stage of corporate
development ctnd
Stage three
1. Major problems- agency/ trusteeship and control of
diversified resources.
2. Objectives – SMART but expanded scope to
include society and environment
3. Strategy – growth and product diversification
4. Organization- decentralized operations
5. Control – complex formal systems with divisional
managers.
6. Reward punishment – based on agreed policies
ABAHO ERNEST STR.MGT BSC ACC 12
Functional organization structure
Advantages:
• Centralizes control
• Good for single biz unit
• Develops functional skills
Disadvantages:
• Interfunctional rivalry
• Tall structure enters bureaucracy/ delay
• Functional myopia/ conflicts
• Limits development of staff with cross
functional skills.
ABAHO ERNEST STR.MGT BSC ACC 13
GEOGRAPHIC ORGN STRUCTURE
Advantages:
1. Strategy made specific to region
2. Reaps advantages of local operations/ scales
3. Improves functional coordination
Disadvantages:
• Difficult to attain uniformity across regions
• Duplication of staff to run geographic units
• Adds another layer of staff to run the geo. areas
ABAHO ERNEST STR.MGT BSC ACC 14
Strategic business unit orgn structure
Advantages:
• Enables decentralization/ delegation of authority
• Responsibility for each biz unit lies with it
• Profit responsibility rests on SBUs
Disadvantages:
• HQ managers may lose touch with sbu operations
• Excessive rivalry among SBUs
• HQ managemnt becomes heavily dependent on
SBUs
ABAHO ERNEST STR.MGT BSC ACC 15
A MATRIX ORGN
STRUCTURE HAS TWO OR
MORE CHAINS OF
COMMAND, TWO LINES OF
BUDGET AUTHORITY AND
TWO SOURCES OF
PERFORMANCE AND
REWARD
ABAHO ERNEST STR.MGT BSC ACC 16
MATRIX STRUCTURE CTND
Advantages
 Gives formal attention to each dimension of strategic
priority
 Creates chks and balances among competing view
points
 Encourages cooperation
Disadvantages
 Very complex to manage
 Many people involved in decision
 Promotes organization bureaucracy
ABAHO ERNEST STR.MGT BSC ACC 17
Supplementing the basic orgn structure
1. Special project teams
2. Cross functional task forces
3. Venture teams- manage launch of new
product
4. Self contained work teams- work on semi
permanent basis on continuous
improvement of the company
5. Process teams- functional specialists
6. Contact persons – single point/ one stop
port for all services.
ABAHO ERNEST STR.MGT BSC ACC 18
IMPLEMENTING STRATEGY –
BEST PRACTICES
 TQM- ENTAILS CREATING A TOTAL
QUALITY CULTURE KEEN ON
CONTINUOUS IMPROVEMENT OF EVERY
ASPECT OF PERFORMANCE. STEP BY
STEP IMPROVEMENTS.
 REENGINEERING SEEKS ONE TIME
QUANTUM IMPROVEMENT – BIG /
RADICAL DEPATURES
ABAHO ERNEST STR.MGT BSC ACC 19
BUILDING TOTAL QUALITY
MANAGEMENT CULTURE
 PASSION FOR TOTAL QUALITY
INCLUDING QUALITY VISION, SPECIFIC
MEASURABLE GOALS
 ENCOURAGING TQM SUPPORTIVE
BEHAVIOURS: REWARDING, Q TRAINING
USING QUALITY TEAMS
 EMPOWERING EMPLOYEES
 ICT SUPPORT
 PREACH TQM, EAT TQM
ABAHO ERNEST STR.MGT BSC ACC 20
STRATEGY SUPPORTIVE
REWARD SYSTEMS
CREATING EMPLOYEE COMITMENT
AND WINNING ATTITUDES IS
IMPERATIVE.
ABAHO ERNEST STR.MGT BSC ACC 21
WHAT IS COMMITMENT?
 COMMITMENT DETERMINES THE
RELATIONSHIP BTN EMPLOYER AND
EMPLOYEE
 BINDS EMPLOYEE TO THE
ORGANIZATION
 RESULTS IN EXTRA ROLE
CONTRIBUTIONS BY EMPLOYEES.
ABAHO ERNEST STR.MGT BSC ACC 22
HOW EMPLOYEES VIEW
COMMITMENT
 PERFORMANCE ON THE JOB/ OUT PUT
 VOLUNTARISM “ GOING AN EXTRA MILE”
 INVOLVEMENT
 QUALITY OF WORK
 NUMBER OF HOURS PUT IN THE JOB.
ABAHO ERNEST STR.MGT BSC ACC 23
NATURE OF EMPLOYEE
COMMITMENT
 COMMITMENT TO THE BOSS
 COMMITMENT TO WORKMATES
 COMITMENT TO THE ORGANIZATION
 COMMITMENT TO THE JOB
 COMMITMENT TO THE ORGANIZATION’S
POLICIES
ABAHO ERNEST STR.MGT BSC ACC 24
FACTORS CAUSING LOW
COMMITMENT
 LOW PAY
 DELAYS IN PAYING STAFF CLAIMS
 NATURE OF EMPLOYMENT TERMS (PART-TIME)
 LACK OF JOB SECURITY
 PREVIOUS EXPERIENCES WITH FORMER EMPLOYERS
 FAILURE TO RECOGNIZE AND REWARD EFFORT
 LACK OF EMPATHY
 LACK OF INCENTIVES
 UNFULFILLED PROMISES
 LAZINESS / WORK ETHIC
ABAHO ERNEST STR.MGT BSC ACC 25
Indicators of commitment
 Attendance and punctuality
 Daily performance on the job
 Ability to meet deadlines
 Willingness to market the organization /
ambassadors
 Time spent/helping developing skills of other
employees
 Willingness to voluntarily assist colleagues
and administration (without pay)
ABAHO ERNEST STR.MGT BSC ACC 26
Incentives for commitment
 Pay for extra work
 Housing and Transport
 Advances and loans
 Financial bonuses
 Recognition for good performance
 Medical attention for self and family
 Education subsidy for children
 Financial assistance extended to staff in problems
ABAHO ERNEST STR.MGT BSC ACC 27
BEST PRACTICE IN REWARDS
 LINK WORK ASSIGNMENT TO
PERFORMANCE TARGETS
 REWARD ACHIEVEMENT OF
PERFORMANCE TARGETS
 INCENTIVES SHOUL BE MORE THAN 20%
OF SALARY
 FAIRNESS IN REWARDS
 INDIVIDUALS SHD BE ABLE TO AFFECT
OUTCOME ( AVOIDS
UNCONTROLLABLES)

More Related Content

What's hot

Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5AntBMaro
 
Advanced project management mod 2
 Advanced project management mod 2 Advanced project management mod 2
Advanced project management mod 2POOJA UDAYAN
 
Performance management government
Performance management governmentPerformance management government
Performance management governmentchatwijustin5010
 
Strategicmanagementfullnotes 110824114832-phpapp01
Strategicmanagementfullnotes 110824114832-phpapp01Strategicmanagementfullnotes 110824114832-phpapp01
Strategicmanagementfullnotes 110824114832-phpapp01StudsPlanet.com
 
Strategic managemnet process ppt
Strategic managemnet process pptStrategic managemnet process ppt
Strategic managemnet process pptMUHAMMAD HASRATH
 
Planning, mbo, strategy & decision making by arun verma
Planning, mbo, strategy  & decision making by arun vermaPlanning, mbo, strategy  & decision making by arun verma
Planning, mbo, strategy & decision making by arun vermaArun Verma
 
advanced project management mod 5
advanced project management mod 5advanced project management mod 5
advanced project management mod 5POOJA UDAYAN
 
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO IIIModule 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO IIIJo Balucanag - Bitonio
 
Determining project performance the role of training and compensation
Determining project performance the role of training and compensationDetermining project performance the role of training and compensation
Determining project performance the role of training and compensationAlexander Decker
 
Management control systems jsb 606 part1
Management control systems jsb 606 part1Management control systems jsb 606 part1
Management control systems jsb 606 part1Debasis Das
 
Strat mgt res. alctn
Strat mgt   res. alctnStrat mgt   res. alctn
Strat mgt res. alctnphilmayo
 
STRUCTURAL IMPLEMENTATION
STRUCTURAL IMPLEMENTATIONSTRUCTURAL IMPLEMENTATION
STRUCTURAL IMPLEMENTATIONAjeesh Mk
 

What's hot (20)

Unit 3 pom
Unit 3  pomUnit 3  pom
Unit 3 pom
 
Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5
 
Advanced project management mod 2
 Advanced project management mod 2 Advanced project management mod 2
Advanced project management mod 2
 
organization planning
organization planningorganization planning
organization planning
 
Performance management government
Performance management governmentPerformance management government
Performance management government
 
Unit 3 organising-150217
Unit 3 organising-150217Unit 3 organising-150217
Unit 3 organising-150217
 
Ch 11.1 org plan
Ch 11.1 org planCh 11.1 org plan
Ch 11.1 org plan
 
Strategicmanagementfullnotes 110824114832-phpapp01
Strategicmanagementfullnotes 110824114832-phpapp01Strategicmanagementfullnotes 110824114832-phpapp01
Strategicmanagementfullnotes 110824114832-phpapp01
 
Strategic managemnet process ppt
Strategic managemnet process pptStrategic managemnet process ppt
Strategic managemnet process ppt
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Planning, mbo, strategy & decision making by arun verma
Planning, mbo, strategy  & decision making by arun vermaPlanning, mbo, strategy  & decision making by arun verma
Planning, mbo, strategy & decision making by arun verma
 
advanced project management mod 5
advanced project management mod 5advanced project management mod 5
advanced project management mod 5
 
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO IIIModule 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
 
Determining project performance the role of training and compensation
Determining project performance the role of training and compensationDetermining project performance the role of training and compensation
Determining project performance the role of training and compensation
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Management control systems jsb 606 part1
Management control systems jsb 606 part1Management control systems jsb 606 part1
Management control systems jsb 606 part1
 
2 nature of mcs
2 nature of mcs2 nature of mcs
2 nature of mcs
 
Strat mgt res. alctn
Strat mgt   res. alctnStrat mgt   res. alctn
Strat mgt res. alctn
 
MBO and MBE
MBO and MBEMBO and MBE
MBO and MBE
 
STRUCTURAL IMPLEMENTATION
STRUCTURAL IMPLEMENTATIONSTRUCTURAL IMPLEMENTATION
STRUCTURAL IMPLEMENTATION
 

Similar to Strategy%20 implementation%20pgdmf%2007[1]

Incorporating Internal Financial Controls Over Financial Reporting Empiricall...
Incorporating Internal Financial Controls Over Financial Reporting Empiricall...Incorporating Internal Financial Controls Over Financial Reporting Empiricall...
Incorporating Internal Financial Controls Over Financial Reporting Empiricall...taxguruedu
 
Strategy - from Porter to Kaplan
Strategy - from Porter to KaplanStrategy - from Porter to Kaplan
Strategy - from Porter to KaplanSTRIMgroup
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...CHED
 
Ian Whadcock1808 Kaplan.indd 621808 Kapl
Ian Whadcock1808 Kaplan.indd   621808 KaplIan Whadcock1808 Kaplan.indd   621808 Kapl
Ian Whadcock1808 Kaplan.indd 621808 KaplNarcisaBrandenburg70
 
MANOJ_Project_Point Plan
MANOJ_Project_Point PlanMANOJ_Project_Point Plan
MANOJ_Project_Point PlanManoj Kuber
 
S&A Knowledge Series - Budget & budgetary controls
S&A Knowledge Series - Budget & budgetary controlsS&A Knowledge Series - Budget & budgetary controls
S&A Knowledge Series - Budget & budgetary controlsDhruv Seth
 
Chapter 7
Chapter 7Chapter 7
Chapter 7Sitco
 
WidgetsRUs - Portfolio Management Excercise.pdf
WidgetsRUs - Portfolio Management Excercise.pdfWidgetsRUs - Portfolio Management Excercise.pdf
WidgetsRUs - Portfolio Management Excercise.pdfAngelRiba1
 
Principles of Management
Principles of ManagementPrinciples of Management
Principles of ManagementMuhammad Akram
 
WK12 Implementation and Control
WK12  Implementation and  ControlWK12  Implementation and  Control
WK12 Implementation and ControlAjOb
 
HCCIndustriesCaseAnalysis
HCCIndustriesCaseAnalysisHCCIndustriesCaseAnalysis
HCCIndustriesCaseAnalysisWilliam Duncan
 
Chapter v institutionalizing strategy
Chapter v  institutionalizing strategyChapter v  institutionalizing strategy
Chapter v institutionalizing strategySuzana Vaidya
 
Pom 3 04012009
Pom 3 04012009Pom 3 04012009
Pom 3 04012009msq2004
 
Strategic Management Ch12
Strategic Management Ch12Strategic Management Ch12
Strategic Management Ch12Chuong Nguyen
 
Operation Management Essay
Operation Management EssayOperation Management Essay
Operation Management EssayKaren Oliver
 
Manpower planning project
Manpower planning projectManpower planning project
Manpower planning projecthema_nt
 
18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docx18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docxRAJU852744
 
18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docx18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docxaulasnilda
 

Similar to Strategy%20 implementation%20pgdmf%2007[1] (20)

Incorporating Internal Financial Controls Over Financial Reporting Empiricall...
Incorporating Internal Financial Controls Over Financial Reporting Empiricall...Incorporating Internal Financial Controls Over Financial Reporting Empiricall...
Incorporating Internal Financial Controls Over Financial Reporting Empiricall...
 
Strategy - from Porter to Kaplan
Strategy - from Porter to KaplanStrategy - from Porter to Kaplan
Strategy - from Porter to Kaplan
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
 
Ian Whadcock1808 Kaplan.indd 621808 Kapl
Ian Whadcock1808 Kaplan.indd   621808 KaplIan Whadcock1808 Kaplan.indd   621808 Kapl
Ian Whadcock1808 Kaplan.indd 621808 Kapl
 
MANOJ_Project_Point Plan
MANOJ_Project_Point PlanMANOJ_Project_Point Plan
MANOJ_Project_Point Plan
 
S&A Knowledge Series - Budget & budgetary controls
S&A Knowledge Series - Budget & budgetary controlsS&A Knowledge Series - Budget & budgetary controls
S&A Knowledge Series - Budget & budgetary controls
 
Chapter 7
Chapter 7Chapter 7
Chapter 7
 
WidgetsRUs - Portfolio Management Excercise.pdf
WidgetsRUs - Portfolio Management Excercise.pdfWidgetsRUs - Portfolio Management Excercise.pdf
WidgetsRUs - Portfolio Management Excercise.pdf
 
Principles of Management
Principles of ManagementPrinciples of Management
Principles of Management
 
WK12 Implementation and Control
WK12  Implementation and  ControlWK12  Implementation and  Control
WK12 Implementation and Control
 
HCCIndustriesCaseAnalysis
HCCIndustriesCaseAnalysisHCCIndustriesCaseAnalysis
HCCIndustriesCaseAnalysis
 
ICP.000523.pdf
ICP.000523.pdfICP.000523.pdf
ICP.000523.pdf
 
Chapter v institutionalizing strategy
Chapter v  institutionalizing strategyChapter v  institutionalizing strategy
Chapter v institutionalizing strategy
 
Pom 3 04012009
Pom 3 04012009Pom 3 04012009
Pom 3 04012009
 
Strategic Management Ch12
Strategic Management Ch12Strategic Management Ch12
Strategic Management Ch12
 
Operation Management Essay
Operation Management EssayOperation Management Essay
Operation Management Essay
 
Manpower planning project
Manpower planning projectManpower planning project
Manpower planning project
 
Strategic mgt
Strategic mgtStrategic mgt
Strategic mgt
 
18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docx18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docx
 
18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docx18Analysis of Organizational Behavior Issues i.docx
18Analysis of Organizational Behavior Issues i.docx
 

More from bwire sedrick

Effect of poor customer care on the image of police a case study of uganda po...
Effect of poor customer care on the image of police a case study of uganda po...Effect of poor customer care on the image of police a case study of uganda po...
Effect of poor customer care on the image of police a case study of uganda po...bwire sedrick
 
Planning for a good presentation
Planning for a good presentationPlanning for a good presentation
Planning for a good presentationbwire sedrick
 
Principles of ict concepts and data processing
Principles of ict   concepts and data processingPrinciples of ict   concepts and data processing
Principles of ict concepts and data processingbwire sedrick
 
Ura taxation handbook
Ura  taxation handbookUra  taxation handbook
Ura taxation handbookbwire sedrick
 
INTRODUCTION TO HTML
INTRODUCTION TO HTMLINTRODUCTION TO HTML
INTRODUCTION TO HTMLbwire sedrick
 
Lan access control methods
Lan access control methodsLan access control methods
Lan access control methodsbwire sedrick
 
ENTERPRISE NETWORKING
ENTERPRISE NETWORKINGENTERPRISE NETWORKING
ENTERPRISE NETWORKINGbwire sedrick
 
Strategy implementation
Strategy implementationStrategy implementation
Strategy implementationbwire sedrick
 
Strategic management process
Strategic management processStrategic management process
Strategic management processbwire sedrick
 
Strategic management overview
Strategic management   overviewStrategic management   overview
Strategic management overviewbwire sedrick
 
Industry analysis, swot & portfolio analysis
Industry analysis, swot & portfolio analysisIndustry analysis, swot & portfolio analysis
Industry analysis, swot & portfolio analysisbwire sedrick
 
Industry analysis, swot & portfolio analysis spare
Industry analysis, swot & portfolio analysis   spareIndustry analysis, swot & portfolio analysis   spare
Industry analysis, swot & portfolio analysis sparebwire sedrick
 
Establishing sustainable markets for ugandan products
Establishing sustainable markets for ugandan productsEstablishing sustainable markets for ugandan products
Establishing sustainable markets for ugandan productsbwire sedrick
 

More from bwire sedrick (20)

Effect of poor customer care on the image of police a case study of uganda po...
Effect of poor customer care on the image of police a case study of uganda po...Effect of poor customer care on the image of police a case study of uganda po...
Effect of poor customer care on the image of police a case study of uganda po...
 
Planning for a good presentation
Planning for a good presentationPlanning for a good presentation
Planning for a good presentation
 
Marketing channels
Marketing channelsMarketing channels
Marketing channels
 
Principles of ict concepts and data processing
Principles of ict   concepts and data processingPrinciples of ict   concepts and data processing
Principles of ict concepts and data processing
 
Computer systems
Computer systemsComputer systems
Computer systems
 
Ura taxation handbook
Ura  taxation handbookUra  taxation handbook
Ura taxation handbook
 
E learning slide
E learning slideE learning slide
E learning slide
 
INTRODUCTION TO HTML
INTRODUCTION TO HTMLINTRODUCTION TO HTML
INTRODUCTION TO HTML
 
NETWORK COMPONENTS
NETWORK COMPONENTSNETWORK COMPONENTS
NETWORK COMPONENTS
 
Osi model
Osi modelOsi model
Osi model
 
Lan access control methods
Lan access control methodsLan access control methods
Lan access control methods
 
ENTERPRISE NETWORKING
ENTERPRISE NETWORKINGENTERPRISE NETWORKING
ENTERPRISE NETWORKING
 
Strategy implementation
Strategy implementationStrategy implementation
Strategy implementation
 
Strategic management process
Strategic management processStrategic management process
Strategic management process
 
Strategic management overview
Strategic management   overviewStrategic management   overview
Strategic management overview
 
Strategic choice
Strategic choiceStrategic choice
Strategic choice
 
Industry analysis, swot & portfolio analysis
Industry analysis, swot & portfolio analysisIndustry analysis, swot & portfolio analysis
Industry analysis, swot & portfolio analysis
 
Industry analysis, swot & portfolio analysis spare
Industry analysis, swot & portfolio analysis   spareIndustry analysis, swot & portfolio analysis   spare
Industry analysis, swot & portfolio analysis spare
 
Establishing sustainable markets for ugandan products
Establishing sustainable markets for ugandan productsEstablishing sustainable markets for ugandan products
Establishing sustainable markets for ugandan products
 
Course outline
Course outlineCourse outline
Course outline
 

Recently uploaded

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 

Recently uploaded (20)

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 

Strategy%20 implementation%20pgdmf%2007[1]

  • 1. A.N.S- nsserwanga@yahoo.com STR.MGT BSC ACC 1 Strategy implementation How do we ensure arrival?
  • 2. ABAHO ERNEST STR.MGT BSC ACC 2 Strategy implementation is the sum total of activities and choices required to implement a strategic plan. This requires the development of programs, budgets and procedures
  • 3. ABAHO ERNEST STR.MGT BSC ACC 3 Basic issues to be addressed in implementing strategy  Who are the staff who will undertake the tasks?  What must be done to ensure congruence between current operations and the new strategic direction?  How is every one going to do what is required?
  • 4. ABAHO ERNEST STR.MGT BSC ACC 4 Common problems encountered in strategy implementation  Time taken is more than that originally planned  Un foreseen problems set in  Ineffective coordination of activities  Other company activities overshadowed implementation of strategy  Respective staff lacked required skills  Lack of training to create required skills  Unforeseen external factors  Inadequate leadership from top management  Poorly defined activities to be implemented  Insufficient back up by ICT
  • 5. ABAHO ERNEST STR.MGT BSC ACC 5 The strategy implementer’s task is to convert the plan into action and undertake what is called for by the plan. Managing strategy implementation is therefore more art than science.
  • 6. ABAHO ERNEST STR.MGT BSC ACC 6 The eight managerial components of implementing strategy 1. Building a capable organization 2. Developing budgets and allocating ample resources to the strategic effort 3. Establishing strategy friendly and enabling policies 4. Instituting best practices and continuous improvement 5. Providing support systems that enable staff to perform 6. Linking rewards/ incentives with achievement of strategic targets 7. Creating corporate culture which ensures/ enhances strategy achievement 8. Exercising strategic leadership to drive implementation
  • 7. ABAHO ERNEST STR.MGT BSC ACC 7 Building a capable organization  Selecting people for key positions – creating a strong management team  Building core competences and capabilities which are un matched: competitive advantage.  Employee training and retraining  Match orgn structure to strategy: identify and build structure around critical activities then consider outsourcing non core activities.  Resolving which decisions to centralize and which to decentralize
  • 8. ABAHO ERNEST STR.MGT BSC ACC 8 Strategic advantages and disadvantages of various organization structures  Functional specialization  Geographic organization  Decentralized biz divisions  Strategic biz units  Matrix structures ( students to fill in )
  • 9. ABAHO ERNEST STR.MGT BSC ACC 9 Strategy and stage of corporate development Stage one 1. Major problem- survival and growth, dealing with short term operational probs 2. Objectives- personal, subjective 3. Strategy- implicit, entrepreneur owner 4. Structure- one man show 5. Control – personal criteria, daily observation 6. Reward punishment- informal, incentives limited and used for control/ creating allegiances.
  • 10. ABAHO ERNEST STR.MGT BSC ACC 10 Strategy and stage of corporate development ctnd Stage two 1. Major problems- growth, expansion of resources 2. Objectives – SMART meeting functional performance targets 3. Strategy – limited to exploitation of one product 4. Organization- one unit functionally specialized 5. Control – many persons and systems involved 6. Reward punishment – based on agreed policies
  • 11. ABAHO ERNEST STR.MGT BSC ACC 11 Strategy and stage of corporate development ctnd Stage three 1. Major problems- agency/ trusteeship and control of diversified resources. 2. Objectives – SMART but expanded scope to include society and environment 3. Strategy – growth and product diversification 4. Organization- decentralized operations 5. Control – complex formal systems with divisional managers. 6. Reward punishment – based on agreed policies
  • 12. ABAHO ERNEST STR.MGT BSC ACC 12 Functional organization structure Advantages: • Centralizes control • Good for single biz unit • Develops functional skills Disadvantages: • Interfunctional rivalry • Tall structure enters bureaucracy/ delay • Functional myopia/ conflicts • Limits development of staff with cross functional skills.
  • 13. ABAHO ERNEST STR.MGT BSC ACC 13 GEOGRAPHIC ORGN STRUCTURE Advantages: 1. Strategy made specific to region 2. Reaps advantages of local operations/ scales 3. Improves functional coordination Disadvantages: • Difficult to attain uniformity across regions • Duplication of staff to run geographic units • Adds another layer of staff to run the geo. areas
  • 14. ABAHO ERNEST STR.MGT BSC ACC 14 Strategic business unit orgn structure Advantages: • Enables decentralization/ delegation of authority • Responsibility for each biz unit lies with it • Profit responsibility rests on SBUs Disadvantages: • HQ managers may lose touch with sbu operations • Excessive rivalry among SBUs • HQ managemnt becomes heavily dependent on SBUs
  • 15. ABAHO ERNEST STR.MGT BSC ACC 15 A MATRIX ORGN STRUCTURE HAS TWO OR MORE CHAINS OF COMMAND, TWO LINES OF BUDGET AUTHORITY AND TWO SOURCES OF PERFORMANCE AND REWARD
  • 16. ABAHO ERNEST STR.MGT BSC ACC 16 MATRIX STRUCTURE CTND Advantages  Gives formal attention to each dimension of strategic priority  Creates chks and balances among competing view points  Encourages cooperation Disadvantages  Very complex to manage  Many people involved in decision  Promotes organization bureaucracy
  • 17. ABAHO ERNEST STR.MGT BSC ACC 17 Supplementing the basic orgn structure 1. Special project teams 2. Cross functional task forces 3. Venture teams- manage launch of new product 4. Self contained work teams- work on semi permanent basis on continuous improvement of the company 5. Process teams- functional specialists 6. Contact persons – single point/ one stop port for all services.
  • 18. ABAHO ERNEST STR.MGT BSC ACC 18 IMPLEMENTING STRATEGY – BEST PRACTICES  TQM- ENTAILS CREATING A TOTAL QUALITY CULTURE KEEN ON CONTINUOUS IMPROVEMENT OF EVERY ASPECT OF PERFORMANCE. STEP BY STEP IMPROVEMENTS.  REENGINEERING SEEKS ONE TIME QUANTUM IMPROVEMENT – BIG / RADICAL DEPATURES
  • 19. ABAHO ERNEST STR.MGT BSC ACC 19 BUILDING TOTAL QUALITY MANAGEMENT CULTURE  PASSION FOR TOTAL QUALITY INCLUDING QUALITY VISION, SPECIFIC MEASURABLE GOALS  ENCOURAGING TQM SUPPORTIVE BEHAVIOURS: REWARDING, Q TRAINING USING QUALITY TEAMS  EMPOWERING EMPLOYEES  ICT SUPPORT  PREACH TQM, EAT TQM
  • 20. ABAHO ERNEST STR.MGT BSC ACC 20 STRATEGY SUPPORTIVE REWARD SYSTEMS CREATING EMPLOYEE COMITMENT AND WINNING ATTITUDES IS IMPERATIVE.
  • 21. ABAHO ERNEST STR.MGT BSC ACC 21 WHAT IS COMMITMENT?  COMMITMENT DETERMINES THE RELATIONSHIP BTN EMPLOYER AND EMPLOYEE  BINDS EMPLOYEE TO THE ORGANIZATION  RESULTS IN EXTRA ROLE CONTRIBUTIONS BY EMPLOYEES.
  • 22. ABAHO ERNEST STR.MGT BSC ACC 22 HOW EMPLOYEES VIEW COMMITMENT  PERFORMANCE ON THE JOB/ OUT PUT  VOLUNTARISM “ GOING AN EXTRA MILE”  INVOLVEMENT  QUALITY OF WORK  NUMBER OF HOURS PUT IN THE JOB.
  • 23. ABAHO ERNEST STR.MGT BSC ACC 23 NATURE OF EMPLOYEE COMMITMENT  COMMITMENT TO THE BOSS  COMMITMENT TO WORKMATES  COMITMENT TO THE ORGANIZATION  COMMITMENT TO THE JOB  COMMITMENT TO THE ORGANIZATION’S POLICIES
  • 24. ABAHO ERNEST STR.MGT BSC ACC 24 FACTORS CAUSING LOW COMMITMENT  LOW PAY  DELAYS IN PAYING STAFF CLAIMS  NATURE OF EMPLOYMENT TERMS (PART-TIME)  LACK OF JOB SECURITY  PREVIOUS EXPERIENCES WITH FORMER EMPLOYERS  FAILURE TO RECOGNIZE AND REWARD EFFORT  LACK OF EMPATHY  LACK OF INCENTIVES  UNFULFILLED PROMISES  LAZINESS / WORK ETHIC
  • 25. ABAHO ERNEST STR.MGT BSC ACC 25 Indicators of commitment  Attendance and punctuality  Daily performance on the job  Ability to meet deadlines  Willingness to market the organization / ambassadors  Time spent/helping developing skills of other employees  Willingness to voluntarily assist colleagues and administration (without pay)
  • 26. ABAHO ERNEST STR.MGT BSC ACC 26 Incentives for commitment  Pay for extra work  Housing and Transport  Advances and loans  Financial bonuses  Recognition for good performance  Medical attention for self and family  Education subsidy for children  Financial assistance extended to staff in problems