This document discusses liquefied natural gas (LNG) and floating LNG (FLNG). It provides an overview of the global LNG market and value chain. It notes that traditional land-based LNG projects face challenges like lengthy timelines and high costs. FLNG provides solutions to these challenges by reducing project durations and costs through smaller, modular designs that can access stranded gas reserves. The first FLNG facility is scheduled to begin operations in early 2015.