SlideShare a Scribd company logo
1 of 62
Download to read offline
1
PILOT PLANT
PILOT PLANT
SCALE-UP TECHNIQUES
SCALE-UP TECHNIQUES
Mr.Sagar Kishor Savale
Mr.Sagar Kishor Savale
Department of Pharmaceutics
Department of Pharmaceutics
avengersagar16@gmail.com
avengersagar16@gmail.com
2015-016
2015-016
Department of Pharmacy (Pharmaceutics) | Sagar savale
Content
 Definitions
 Introduction
 Objectives
 Reason for building of pilot plant
 Why conduct pilot plant study ?
 Steps in scale-up
 Scientific scale -up
 General considerations
 GMP considerations
 SUPAC
 Significance
 Uses
 Advantages
 Disadvantages
 Pilot Plant design for Tablets
 References
2
Sagar Kishor Savale
04/21/16
Plant :- It is a place were the 5 M’s like money, material, man,
method and machine are brought together for the
manufacturing of the products.
Definitions
3
Sagar Kishor Savale
04/21/16
Pilot Plant :- It is the part of the pharmaceutical industry where a
lab scale formula is transformed into a viable product by
development of liable and practical procedure of manufacture.
4
Sagar Kishor Savale
04/21/16
Scale-up :- The art for designing of prototype using the data
obtained from the pilot plant model.
5
Sagar Kishor Savale
04/21/16
Introduction
 Last 25-30 year pharmaceutical research are going on very
fast speed.
 Have witnessed amazing invention and innovation in
pharmaceutical field.
 NDA and ANDA are all time high.
 Researcher are motivated to adopt new processes and
technology.
 Scale up batches are essential for ensuring success in the
clinical testing and bioequivalence study.
 Pilot plant scale up is one of the most imp stage in the product
development.
6
Sagar Kishor Savale
04/21/16
Objective
To try the process on a model of proposed plant before
committing large sum of money on a production unit.
Examination of the formula to determine it’s ability to withstand
Batch-scale and process modification.
Evaluation and Validation for process and equipments
To identify the critical features of the process
Guidelines for production and process controls.
To provide master manufacturing formula with instructions for
manufacturing procedure.
To avoid the scale-up problems.
7
Sagar Kishor Savale
04/21/16
Reasons for building a pilot plant
To evaluate on process of
large change in scale up
operation.
To find and examine all by-
products or waste .
To produce a trail lot of
quantities of material.
Clinical studies, analytical
development, process dev-
elopment, stability testing.
8
Sagar Kishor Savale
04/21/16
Why conduct Pilot Plant Studies?
A pilot plant allows investigation of a product and process on
an intermediate scale before large amounts of money are
committed to full-scale production.
It is usually not possible to predict the effects of a many-fold
increase in scale.
It is not possible to design a large scale processing plant from
laboratory data alone with any degree of success.
9
Sagar Kishor Savale
04/21/16
STEPS IN SCALE UP
10
Sagar Kishor Savale
04/21/16
Development process for formulation
Development batches / laboratory scale batch
Pre-exhibit batch / process qualification batch
Exhibit batch / pivotal batch
Production scale batch
11
Scale up
batches
Sagar Kishor Savale
04/21/16
Laboratory scale batch
• Early development at laboratory stage.
• It is generally 100-1000 times less than production batch.
• It is 1X (3-10 kg or 3-10 liters or 3000-10000 unit) batch.
Uses
• To support formulation.
• For packaging development.
• For preclinical trial.
12
Sagar Kishor Savale
04/21/16
Pre-exhibit batch
• It is 1st
step in scale up.
• It generally 70 % of the size of the exhibit batch.
• It prepaid with the complete process documentation and fully
validated analytical methodology.
Uses
• To detect any problem arise in manufacture of exhibit batch .
13
Sagar Kishor Savale
04/21/16
Exhibit batch
It is demonstration batch.
It contains the mfg. documentation, product specification,
accelerated stability data submitted to FDA.
It generally 10 % of the production scale batch.
It is 10X (30-100 kg or 30-100 liters or 30000-100000 unit)
batch .
It is manufactured under GMP.
Exhibit batch also called as :-
NDA or ANDA batch
Regulatory reference batch
Bioequivalence batch
Fully GMP batch
Stability tested batch
14
Sagar Kishor Savale
04/21/16
Production batch
It is produced during the routine marketing of product.
It is 100X batch means :- 300-1000 kg or
300-1000 liters or
300000-1000000 unit
15
Sagar Kishor Savale
04/21/16
Scientific scale up
Should done in incremental manner.
Process being validated for each new scale.
The equipment should possess following similarity
1) Geometric similarity
2) Kinematic similarity
3) Dynamic similarity
16
Sagar Kishor Savale
04/21/16
Geometric similarity
Dimensions of equipment in all scale up should have same
ratio such as like,
Vessel diameter
Impeller diameter
Baffle widths
17
Sagar Kishor Savale
04/21/16
Kinematic similarity
This requires all corresponding
point in each system to have the
same ratio.
18
Dynamic similarity
 This requires equal force ratio at corresponding point of
the system like,
Gravitation
Surface tension
Viscosity
Sagar Kishor Savale
04/21/16
General considerations
1. Reporting Responsibility
R & D group with
separate staffing
The formulator who developed the
product can take into the
production and can provide support
even after transition into
production has been completed.
19
Sagar Kishor Savale
04/21/16
Scientists with experience in
pilot plant operations as well as in
actual production area are the
most preferable.
As they have to understand the
intent of the formulator as well as
understand the perspective of the
production personnel.
The group should have some
personnel with engineering
knowledge as well as scale up
also involves engineering
principles.
2. Personnel Requirement:-
20
Sagar Kishor Savale
04/21/16
3.Space Requirements
Administration
and information
processing
Physical
testing area
Standard
equipment
floor space
Storage
area
21
Sagar Kishor Savale
04/21/16
 Administration and information process:
Adequate office and desk space should be provided for both
scientist and technicians.
The space should be adjacent to the working area.
22
Sagar Kishor Savale
04/21/16
 Physical testing area:-
This area should provide permanent bench top space for
routinely used physical- testing equipment.
23
Sagar Kishor Savale
04/21/16
 Standard pilot-plant equipment floor space:-
Discreet pilot plant space, where the equipment needed for
manufacturing all types of dosage form is located.
Intermediate – sized and full scale production equipment is
essential in evaluating the effects of scale-up of research
formulations and processes
Equipments used should be made portable where ever possible. So
that after use it can be stored in the small store room.
Space for cleaning of the equipment should be also provided.
24
Sagar Kishor Savale
04/21/16
It should have two areas divided
as approved and unapproved area
for active ingredient as well as
excipient.
Different areas should provided
for the storage of the in-process
materials, finished bulk products
from the pilot-plant & materials
from the experimental scale-up
batches made in the production.
Storage area for the packing
material should also be provided.
 Storage Area:-
25
Sagar Kishor Savale
04/21/16
4. Review of the formula:-
A thorough review of the each
aspect of formulation is important.
The purpose of each ingredient
and it’s contribution to the final
product manufactured on the
small-scale laboratory equipment
should be understood.
Then the effect of scale-up using
equipment that may subject the
product to stresses of different
types and degrees can more readily
be predicted, or recognized.
26
Sagar Kishor Savale
04/21/16
5. Raw materials:-
One purpose/responsibility of the pilot-plant is the approval &
validation of the active ingredient & excipients raw materials.
Raw materials used in the small scale production cannot
necessarily be the representative for the large scale production
27
Why?
Sagar Kishor Savale
04/21/16
6. Equipment:-
The most economical and the simplest & efficient equipment
which are capable of producing product within the proposed
specifications are used.
The size of the equipment should be such that the experimental
trials run should be relevant to the production sized batches.
If the equipment is too small the process developed will not
scale up.
Whereas if equipment is too big then the wastage of the
expensive active ingredients.
28
Sagar Kishor Savale
04/21/16
7. Production Rates:-
The immediate as well as the future market trends/requirements are
considered while determining the production rates.
29
Sagar Kishor Savale
04/21/16
8. Process Evaluation:-
PARAMETERS
Order of mixing of
components Mixing
speed
Mixing
time
Rate of addition of
granulating agents,
solvents,
solutions of drug etc.
Heating and cooling
Rates
Filters size
(liquids)
Screen size
(solids)
Drying temp.
And drying time
30
Sagar Kishor Savale
04/21/16
 Why to carry out process evaluation????
The knowledge of the effects of various process parameters
as few mentioned above form the basis for process
optimization and validation.
31
Sagar Kishor Savale
04/21/16
9. Master Manufacturing Procedures:-
The three important aspects
Weight sheet Processing
directions
Manufacturing
procedure
32
Sagar Kishor Savale
04/21/16
The weight sheet should clearly identify the chemicals required
In a batch. To prevent confusion the names and identifying nos.
for the ingredients should be used on batch records.
The process directions should be precise and explicit.
A manufacturing procedure should be written by the actual
operator.
Various specifications like addition rates, mixing time, mixing
speed, heating, and cooling rates, temperature, storing of the
finished product samples should be mentioned in the batch
record directions. 33
Sagar Kishor Savale
04/21/16
10. Product stability and uniformity:-
The primary objective of the pilot
plant is the physical as well as
chemical stability of the products.
Hence each pilot batch representing
the final formulation and
manufacturing procedure should be
studied for stability.
Stability studies should be carried
out in finished packages as well.
34
Sagar Kishor Savale
04/21/16
Scale-up and post approval changes
(SUPAC)
FDA and American Association of Pharmaceutical Scientists
(AAPS) provided the scientific foundation for the scale up and
post approval changes required for immediate release product
Called as SUPAC.
It provide guideline for post approval changes in the following
Component
Composition
Site of mfg
Process and equipment
35
IR Tablet
Sagar Kishor Savale
04/21/16
GMP consideration
Equipment qualification
Process validation
Regularly schedule preventative maintenance
Regularly process review & revalidation
Relevant written standard operating procedures
The use of competent technically qualified personnel
Adequate provision for training of personnel
A well-defined technology transfer system
Validated cleaning procedures.
An orderly arrangement of equipment so as to ease material flow &
prevent cross- contamination
36
Sagar Kishor Savale
04/21/16
Significance of pilot plant
Examination of formulae.
Review of range of relevant processing equipments.
production rate adjustment.
Idea about physical space required.
Appropriate records and reports to support GMP.
Identification of critical features to maintain quality.
37
Sagar Kishor Savale
04/21/16
A pilot plant can be used for
Evaluating the results of laboratory studies and making product and
process corrections and improvements.
Producing small quantities of product for sensory, chemical,
microbiological evaluations, limited market testing or furnishing
samples to potential customers, shelf-life and storage stability studies.
Providing data that can be used in making a decision on whether or
not to proceed to a full-scale production process; and in the case of a
positive decision, designing and constructing a full-size plant or
modifying an existing plant.
38
Sagar Kishor Savale
04/21/16
Advantages
Members of the production and quality control divisions can
readily observe scale up runs.
Supplies of excipients & drugs, cleared by the quality control
division, can be drawn from the more spacious areas provided
to the production division.
Access to engineering department personnel is provided for
equipment installation, maintenance and repair.
39
Sagar Kishor Savale
04/21/16
Disadvantages
The frequency of direct interaction of the formulator with the
production personnel in the manufacturing area will be
reduced.
Any problem in manufacturing will be directed towards it’s
own pilot-plant personnel's.
40
Sagar Kishor Savale
04/21/16
Pilot Plant design for Tablets
41
Sagar Kishor Savale
04/21/16
The primary responsibility of the pilot plant staff is to ensure
that the newly formulated tablets developed by product
development personnel will prove to be efficiently,
economically, and consistently reproducible on a production
scale.
The design and construction of the pharmaceutical pilot plant
for tablet development should incorporate features necessary to
facilitate maintenance and cleanliness.
If possible, it should be located on the ground floor to expedite
the delivery and shipment of supplies.
42
Sagar Kishor Savale
04/21/16
Extraneous and microbiological contamination must be guarded
against by incorporating the following features in the pilot plant
design:
1.Fluorescent lighting fixtures should be the ceiling flush type.
2.The various operating areas should have floor drains to simplify
cleaning.
3.The area should be air-conditioned and humidity controlled.
4.High -density concrete floors should be installed.
5.The walls in the processing and packaging areas should be
enamel cement finish on concrete.
6.Equipment in the pharmaceutical pilot plant should be similar to
that used by production division- manufacture of tablets.
43
Sagar Kishor Savale
04/21/16
44
Sagar Kishor Savale
04/21/16
45
Sagar Kishor Savale
04/21/16
Material handling system
46
Vacuum loading machine
Sagar Kishor Savale
04/21/16
Dry Blending
47
The equipment used for blending are:
V- blender
Double cone blender
Ribbon blender
Slant cone blender
Bin blender
Orbiting screw blenders vertical and horizontal high intensity
mixers.
SCALE UP CONSIDERATIONS
 Time of blending .
Blender loading.
Size of blender.
Sagar Kishor Savale
04/21/16
V – cone blender Double cone blender
48
Sagar Kishor Savale
04/21/16
Ribbon blender
49
Sagar Kishor Savale
04/21/16
Sigma blade mixer Planetary mixer
50
Granulation
Sagar Kishor Savale
04/21/16
Wet granulation can
also be prepared using
tumble blenders
equipped with high-
speed chopper blades.
51
Sagar Kishor Savale
04/21/16
Drying
The most common
conventional method of
drying a granulation
continues to be the
circulating hot air oven,
which is heated by either
steam or electricity
Fluidized bed dryers are an
attractive alternative to the
circulating hot air ovens.
52
Sagar Kishor Savale
04/21/16
Oscillating type granulator Hammer mill
53
Reduction of Particle size
Sagar Kishor Savale
04/21/16
Equipments used for mixing
Sigma blade mixer.
Planetary mixer.
Twin shell blender.
High shear mixer
54
Blending
Sagar Kishor Savale
04/21/16
DIFFERENT PUNCHES &DIES
55
Compression
Sagar Kishor Savale
04/21/16
HIGH SPEED ROTARY
MACHINE
MULTI ROTARY MACHINE
56
Sagar Kishor Savale
04/21/16
DOUBLE ROTARY
MACHINE
UPPER PUNCH AND
LOWER PUNCH
57
Sagar Kishor Savale
04/21/16
SINGLE ROTARY MACHINE
58
Sagar Kishor Savale
04/21/16
59
Tablet Coating
Sagar Kishor Savale
04/21/16
References
1. “The theory and practice of industrial pharmacy” by Leon
Lachman, Herbert A. Lieberman, Joseph L. Kanig. Third
edition. Varghese publishing house. Page no. 681-703.
2. “Pharmaceutical dosage forms: Tablets” Volume 3. second
edition by Leon Lachman, Herbert A. Lieberman, Joseph B.
Schwartz. Page no. 303-365.
3. “Pharmaceutical process scale –up” by Michael Levin marcel
dekker inc volume-157, 2003.
4. “Pharmaceutical process validation” by Robert A. Nash and
Alfred H Wachter marcel dekker inc volume-129, 2003 .
Page no. 17-21.
5. “Text book of industrial pharmacy” by Shobha Rani R.
Hircmath, orient longman pvt ltd Chennai . 60
Sagar Kishor Savale
04/21/16
www.google.com
• htpp://en.wikipedia.org/pilotplantscaleup
• www.Pilotplanstzeton.com
• www.sciencedirect.com
61
Sagar Kishor Savale
04/21/16
62
Sagar Kishor Savale
04/21/16

More Related Content

Similar to pilotplant2-160421053434.pdf

Pilot plant scaleup techniques used in pharmaceutical manufacturing
Pilot plant scaleup techniques used in pharmaceutical manufacturingPilot plant scaleup techniques used in pharmaceutical manufacturing
Pilot plant scaleup techniques used in pharmaceutical manufacturing
Sunil Boreddy Rx
 

Similar to pilotplant2-160421053434.pdf (20)

Pilot plant scaleup techniques used in pharmaceutical manufacturing
Pilot plant scaleup techniques used in pharmaceutical manufacturingPilot plant scaleup techniques used in pharmaceutical manufacturing
Pilot plant scaleup techniques used in pharmaceutical manufacturing
 
Pilot plant scale up technique
Pilot plant scale up techniquePilot plant scale up technique
Pilot plant scale up technique
 
PILOT PLANT SCALE UP TECHNIQUES BY MOHAMMAD A. KHAN
PILOT PLANT SCALE UP TECHNIQUES BY MOHAMMAD A. KHAN PILOT PLANT SCALE UP TECHNIQUES BY MOHAMMAD A. KHAN
PILOT PLANT SCALE UP TECHNIQUES BY MOHAMMAD A. KHAN
 
Pilot plant scale up techniques
Pilot plant scale up techniquesPilot plant scale up techniques
Pilot plant scale up techniques
 
Pilot plant scale up techniques
Pilot plant scale up techniquesPilot plant scale up techniques
Pilot plant scale up techniques
 
Pilot plant scaleup.pptx
Pilot plant scaleup.pptxPilot plant scaleup.pptx
Pilot plant scaleup.pptx
 
Pilot plant part1
Pilot plant part1Pilot plant part1
Pilot plant part1
 
Pilot plant Scale up techniques
Pilot plant Scale up techniquesPilot plant Scale up techniques
Pilot plant Scale up techniques
 
Pilot plant scale up techniques
Pilot plant scale up techniquesPilot plant scale up techniques
Pilot plant scale up techniques
 
Pilot Plant Scale Up Techniques.pdf
Pilot Plant Scale Up Techniques.pdfPilot Plant Scale Up Techniques.pdf
Pilot Plant Scale Up Techniques.pdf
 
Industrial pharmacy-UNIT-I.pdf.pdf
Industrial pharmacy-UNIT-I.pdf.pdfIndustrial pharmacy-UNIT-I.pdf.pdf
Industrial pharmacy-UNIT-I.pdf.pdf
 
Anthony crasto scaleup techniques & pilot plant
Anthony crasto scaleup techniques & pilot plantAnthony crasto scaleup techniques & pilot plant
Anthony crasto scaleup techniques & pilot plant
 
Scale up & Pilot plant concept.pptx
Scale up & Pilot plant concept.pptxScale up & Pilot plant concept.pptx
Scale up & Pilot plant concept.pptx
 
Preformulation
PreformulationPreformulation
Preformulation
 
Process valiadtion
Process valiadtionProcess valiadtion
Process valiadtion
 
Fermentation -- Scale up Technology
Fermentation -- Scale up TechnologyFermentation -- Scale up Technology
Fermentation -- Scale up Technology
 
Scale up of industrial microbial processes
Scale up of industrial microbial processes Scale up of industrial microbial processes
Scale up of industrial microbial processes
 
Pilotplantscale uptechniques by kailash vilegave
Pilotplantscale uptechniques by kailash vilegavePilotplantscale uptechniques by kailash vilegave
Pilotplantscale uptechniques by kailash vilegave
 
pilot plant scale slide share.ppt
pilot plant scale slide share.pptpilot plant scale slide share.ppt
pilot plant scale slide share.ppt
 
PILOT PLANT SCALE-UP TECHNIQUES ppt.pptx
PILOT PLANT SCALE-UP TECHNIQUES ppt.pptxPILOT PLANT SCALE-UP TECHNIQUES ppt.pptx
PILOT PLANT SCALE-UP TECHNIQUES ppt.pptx
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 

pilotplant2-160421053434.pdf

  • 1. 1 PILOT PLANT PILOT PLANT SCALE-UP TECHNIQUES SCALE-UP TECHNIQUES Mr.Sagar Kishor Savale Mr.Sagar Kishor Savale Department of Pharmaceutics Department of Pharmaceutics avengersagar16@gmail.com avengersagar16@gmail.com 2015-016 2015-016 Department of Pharmacy (Pharmaceutics) | Sagar savale
  • 2. Content  Definitions  Introduction  Objectives  Reason for building of pilot plant  Why conduct pilot plant study ?  Steps in scale-up  Scientific scale -up  General considerations  GMP considerations  SUPAC  Significance  Uses  Advantages  Disadvantages  Pilot Plant design for Tablets  References 2 Sagar Kishor Savale 04/21/16
  • 3. Plant :- It is a place were the 5 M’s like money, material, man, method and machine are brought together for the manufacturing of the products. Definitions 3 Sagar Kishor Savale 04/21/16
  • 4. Pilot Plant :- It is the part of the pharmaceutical industry where a lab scale formula is transformed into a viable product by development of liable and practical procedure of manufacture. 4 Sagar Kishor Savale 04/21/16
  • 5. Scale-up :- The art for designing of prototype using the data obtained from the pilot plant model. 5 Sagar Kishor Savale 04/21/16
  • 6. Introduction  Last 25-30 year pharmaceutical research are going on very fast speed.  Have witnessed amazing invention and innovation in pharmaceutical field.  NDA and ANDA are all time high.  Researcher are motivated to adopt new processes and technology.  Scale up batches are essential for ensuring success in the clinical testing and bioequivalence study.  Pilot plant scale up is one of the most imp stage in the product development. 6 Sagar Kishor Savale 04/21/16
  • 7. Objective To try the process on a model of proposed plant before committing large sum of money on a production unit. Examination of the formula to determine it’s ability to withstand Batch-scale and process modification. Evaluation and Validation for process and equipments To identify the critical features of the process Guidelines for production and process controls. To provide master manufacturing formula with instructions for manufacturing procedure. To avoid the scale-up problems. 7 Sagar Kishor Savale 04/21/16
  • 8. Reasons for building a pilot plant To evaluate on process of large change in scale up operation. To find and examine all by- products or waste . To produce a trail lot of quantities of material. Clinical studies, analytical development, process dev- elopment, stability testing. 8 Sagar Kishor Savale 04/21/16
  • 9. Why conduct Pilot Plant Studies? A pilot plant allows investigation of a product and process on an intermediate scale before large amounts of money are committed to full-scale production. It is usually not possible to predict the effects of a many-fold increase in scale. It is not possible to design a large scale processing plant from laboratory data alone with any degree of success. 9 Sagar Kishor Savale 04/21/16
  • 10. STEPS IN SCALE UP 10 Sagar Kishor Savale 04/21/16
  • 11. Development process for formulation Development batches / laboratory scale batch Pre-exhibit batch / process qualification batch Exhibit batch / pivotal batch Production scale batch 11 Scale up batches Sagar Kishor Savale 04/21/16
  • 12. Laboratory scale batch • Early development at laboratory stage. • It is generally 100-1000 times less than production batch. • It is 1X (3-10 kg or 3-10 liters or 3000-10000 unit) batch. Uses • To support formulation. • For packaging development. • For preclinical trial. 12 Sagar Kishor Savale 04/21/16
  • 13. Pre-exhibit batch • It is 1st step in scale up. • It generally 70 % of the size of the exhibit batch. • It prepaid with the complete process documentation and fully validated analytical methodology. Uses • To detect any problem arise in manufacture of exhibit batch . 13 Sagar Kishor Savale 04/21/16
  • 14. Exhibit batch It is demonstration batch. It contains the mfg. documentation, product specification, accelerated stability data submitted to FDA. It generally 10 % of the production scale batch. It is 10X (30-100 kg or 30-100 liters or 30000-100000 unit) batch . It is manufactured under GMP. Exhibit batch also called as :- NDA or ANDA batch Regulatory reference batch Bioequivalence batch Fully GMP batch Stability tested batch 14 Sagar Kishor Savale 04/21/16
  • 15. Production batch It is produced during the routine marketing of product. It is 100X batch means :- 300-1000 kg or 300-1000 liters or 300000-1000000 unit 15 Sagar Kishor Savale 04/21/16
  • 16. Scientific scale up Should done in incremental manner. Process being validated for each new scale. The equipment should possess following similarity 1) Geometric similarity 2) Kinematic similarity 3) Dynamic similarity 16 Sagar Kishor Savale 04/21/16
  • 17. Geometric similarity Dimensions of equipment in all scale up should have same ratio such as like, Vessel diameter Impeller diameter Baffle widths 17 Sagar Kishor Savale 04/21/16
  • 18. Kinematic similarity This requires all corresponding point in each system to have the same ratio. 18 Dynamic similarity  This requires equal force ratio at corresponding point of the system like, Gravitation Surface tension Viscosity Sagar Kishor Savale 04/21/16
  • 19. General considerations 1. Reporting Responsibility R & D group with separate staffing The formulator who developed the product can take into the production and can provide support even after transition into production has been completed. 19 Sagar Kishor Savale 04/21/16
  • 20. Scientists with experience in pilot plant operations as well as in actual production area are the most preferable. As they have to understand the intent of the formulator as well as understand the perspective of the production personnel. The group should have some personnel with engineering knowledge as well as scale up also involves engineering principles. 2. Personnel Requirement:- 20 Sagar Kishor Savale 04/21/16
  • 21. 3.Space Requirements Administration and information processing Physical testing area Standard equipment floor space Storage area 21 Sagar Kishor Savale 04/21/16
  • 22.  Administration and information process: Adequate office and desk space should be provided for both scientist and technicians. The space should be adjacent to the working area. 22 Sagar Kishor Savale 04/21/16
  • 23.  Physical testing area:- This area should provide permanent bench top space for routinely used physical- testing equipment. 23 Sagar Kishor Savale 04/21/16
  • 24.  Standard pilot-plant equipment floor space:- Discreet pilot plant space, where the equipment needed for manufacturing all types of dosage form is located. Intermediate – sized and full scale production equipment is essential in evaluating the effects of scale-up of research formulations and processes Equipments used should be made portable where ever possible. So that after use it can be stored in the small store room. Space for cleaning of the equipment should be also provided. 24 Sagar Kishor Savale 04/21/16
  • 25. It should have two areas divided as approved and unapproved area for active ingredient as well as excipient. Different areas should provided for the storage of the in-process materials, finished bulk products from the pilot-plant & materials from the experimental scale-up batches made in the production. Storage area for the packing material should also be provided.  Storage Area:- 25 Sagar Kishor Savale 04/21/16
  • 26. 4. Review of the formula:- A thorough review of the each aspect of formulation is important. The purpose of each ingredient and it’s contribution to the final product manufactured on the small-scale laboratory equipment should be understood. Then the effect of scale-up using equipment that may subject the product to stresses of different types and degrees can more readily be predicted, or recognized. 26 Sagar Kishor Savale 04/21/16
  • 27. 5. Raw materials:- One purpose/responsibility of the pilot-plant is the approval & validation of the active ingredient & excipients raw materials. Raw materials used in the small scale production cannot necessarily be the representative for the large scale production 27 Why? Sagar Kishor Savale 04/21/16
  • 28. 6. Equipment:- The most economical and the simplest & efficient equipment which are capable of producing product within the proposed specifications are used. The size of the equipment should be such that the experimental trials run should be relevant to the production sized batches. If the equipment is too small the process developed will not scale up. Whereas if equipment is too big then the wastage of the expensive active ingredients. 28 Sagar Kishor Savale 04/21/16
  • 29. 7. Production Rates:- The immediate as well as the future market trends/requirements are considered while determining the production rates. 29 Sagar Kishor Savale 04/21/16
  • 30. 8. Process Evaluation:- PARAMETERS Order of mixing of components Mixing speed Mixing time Rate of addition of granulating agents, solvents, solutions of drug etc. Heating and cooling Rates Filters size (liquids) Screen size (solids) Drying temp. And drying time 30 Sagar Kishor Savale 04/21/16
  • 31.  Why to carry out process evaluation???? The knowledge of the effects of various process parameters as few mentioned above form the basis for process optimization and validation. 31 Sagar Kishor Savale 04/21/16
  • 32. 9. Master Manufacturing Procedures:- The three important aspects Weight sheet Processing directions Manufacturing procedure 32 Sagar Kishor Savale 04/21/16
  • 33. The weight sheet should clearly identify the chemicals required In a batch. To prevent confusion the names and identifying nos. for the ingredients should be used on batch records. The process directions should be precise and explicit. A manufacturing procedure should be written by the actual operator. Various specifications like addition rates, mixing time, mixing speed, heating, and cooling rates, temperature, storing of the finished product samples should be mentioned in the batch record directions. 33 Sagar Kishor Savale 04/21/16
  • 34. 10. Product stability and uniformity:- The primary objective of the pilot plant is the physical as well as chemical stability of the products. Hence each pilot batch representing the final formulation and manufacturing procedure should be studied for stability. Stability studies should be carried out in finished packages as well. 34 Sagar Kishor Savale 04/21/16
  • 35. Scale-up and post approval changes (SUPAC) FDA and American Association of Pharmaceutical Scientists (AAPS) provided the scientific foundation for the scale up and post approval changes required for immediate release product Called as SUPAC. It provide guideline for post approval changes in the following Component Composition Site of mfg Process and equipment 35 IR Tablet Sagar Kishor Savale 04/21/16
  • 36. GMP consideration Equipment qualification Process validation Regularly schedule preventative maintenance Regularly process review & revalidation Relevant written standard operating procedures The use of competent technically qualified personnel Adequate provision for training of personnel A well-defined technology transfer system Validated cleaning procedures. An orderly arrangement of equipment so as to ease material flow & prevent cross- contamination 36 Sagar Kishor Savale 04/21/16
  • 37. Significance of pilot plant Examination of formulae. Review of range of relevant processing equipments. production rate adjustment. Idea about physical space required. Appropriate records and reports to support GMP. Identification of critical features to maintain quality. 37 Sagar Kishor Savale 04/21/16
  • 38. A pilot plant can be used for Evaluating the results of laboratory studies and making product and process corrections and improvements. Producing small quantities of product for sensory, chemical, microbiological evaluations, limited market testing or furnishing samples to potential customers, shelf-life and storage stability studies. Providing data that can be used in making a decision on whether or not to proceed to a full-scale production process; and in the case of a positive decision, designing and constructing a full-size plant or modifying an existing plant. 38 Sagar Kishor Savale 04/21/16
  • 39. Advantages Members of the production and quality control divisions can readily observe scale up runs. Supplies of excipients & drugs, cleared by the quality control division, can be drawn from the more spacious areas provided to the production division. Access to engineering department personnel is provided for equipment installation, maintenance and repair. 39 Sagar Kishor Savale 04/21/16
  • 40. Disadvantages The frequency of direct interaction of the formulator with the production personnel in the manufacturing area will be reduced. Any problem in manufacturing will be directed towards it’s own pilot-plant personnel's. 40 Sagar Kishor Savale 04/21/16
  • 41. Pilot Plant design for Tablets 41 Sagar Kishor Savale 04/21/16
  • 42. The primary responsibility of the pilot plant staff is to ensure that the newly formulated tablets developed by product development personnel will prove to be efficiently, economically, and consistently reproducible on a production scale. The design and construction of the pharmaceutical pilot plant for tablet development should incorporate features necessary to facilitate maintenance and cleanliness. If possible, it should be located on the ground floor to expedite the delivery and shipment of supplies. 42 Sagar Kishor Savale 04/21/16
  • 43. Extraneous and microbiological contamination must be guarded against by incorporating the following features in the pilot plant design: 1.Fluorescent lighting fixtures should be the ceiling flush type. 2.The various operating areas should have floor drains to simplify cleaning. 3.The area should be air-conditioned and humidity controlled. 4.High -density concrete floors should be installed. 5.The walls in the processing and packaging areas should be enamel cement finish on concrete. 6.Equipment in the pharmaceutical pilot plant should be similar to that used by production division- manufacture of tablets. 43 Sagar Kishor Savale 04/21/16
  • 46. Material handling system 46 Vacuum loading machine Sagar Kishor Savale 04/21/16
  • 47. Dry Blending 47 The equipment used for blending are: V- blender Double cone blender Ribbon blender Slant cone blender Bin blender Orbiting screw blenders vertical and horizontal high intensity mixers. SCALE UP CONSIDERATIONS  Time of blending . Blender loading. Size of blender. Sagar Kishor Savale 04/21/16
  • 48. V – cone blender Double cone blender 48 Sagar Kishor Savale 04/21/16
  • 50. Sigma blade mixer Planetary mixer 50 Granulation Sagar Kishor Savale 04/21/16
  • 51. Wet granulation can also be prepared using tumble blenders equipped with high- speed chopper blades. 51 Sagar Kishor Savale 04/21/16
  • 52. Drying The most common conventional method of drying a granulation continues to be the circulating hot air oven, which is heated by either steam or electricity Fluidized bed dryers are an attractive alternative to the circulating hot air ovens. 52 Sagar Kishor Savale 04/21/16
  • 53. Oscillating type granulator Hammer mill 53 Reduction of Particle size Sagar Kishor Savale 04/21/16
  • 54. Equipments used for mixing Sigma blade mixer. Planetary mixer. Twin shell blender. High shear mixer 54 Blending Sagar Kishor Savale 04/21/16
  • 56. HIGH SPEED ROTARY MACHINE MULTI ROTARY MACHINE 56 Sagar Kishor Savale 04/21/16
  • 57. DOUBLE ROTARY MACHINE UPPER PUNCH AND LOWER PUNCH 57 Sagar Kishor Savale 04/21/16
  • 58. SINGLE ROTARY MACHINE 58 Sagar Kishor Savale 04/21/16
  • 60. References 1. “The theory and practice of industrial pharmacy” by Leon Lachman, Herbert A. Lieberman, Joseph L. Kanig. Third edition. Varghese publishing house. Page no. 681-703. 2. “Pharmaceutical dosage forms: Tablets” Volume 3. second edition by Leon Lachman, Herbert A. Lieberman, Joseph B. Schwartz. Page no. 303-365. 3. “Pharmaceutical process scale –up” by Michael Levin marcel dekker inc volume-157, 2003. 4. “Pharmaceutical process validation” by Robert A. Nash and Alfred H Wachter marcel dekker inc volume-129, 2003 . Page no. 17-21. 5. “Text book of industrial pharmacy” by Shobha Rani R. Hircmath, orient longman pvt ltd Chennai . 60 Sagar Kishor Savale 04/21/16